Library / Laws / 118th / s / S. 3373 / Introduced in Senate
II
118th CONGRESS
1st Session
S. 3373
IN THE SENATE OF THE UNITED STATES
November 30, 2023Mr. Daines (for himself, Mr. Casey, Mrs. Hyde-Smith, and Mr. Fetterman) introduced the following bill; which was read twice and referred to the Committee on Energy and Natural Resources
A BILL
To require the Federal Energy Regulatory Commission to extend the time period during which licensees are required to commence construction of certain hydropower projects.
1.
Extension of time to commence construction of certain hydropower projects
(a)
Definition of covered project
In this section, the term covered project means a hydropower project with respect to which the Federal Energy Regulatory Commission issued a license before March 13, 2020.
(b)
Authorization of extension
Notwithstanding section 13 of the Federal Power Act (16 U.S.C. 806), on the request of a licensee of a covered project, the Federal Energy Regulatory Commission may, after reasonable notice and for good cause shown, extend in accordance with subsection (c) the period during which the licensee is required to commence construction of the covered project for an additional 4 years beyond the 8 years authorized by that section.
(c)
Period of extension
An extension of time to commence construction of a covered project under subsection (b) shall—
(1) begin on the date on which the final extension of the period for commencement of construction granted to the licensee under section 13 of the Federal Power Act (16 U.S.C. 806) expires; and
(2) end on the date that is 4 years after the latest date to which the Federal Energy Regulatory Commission is authorized to extend the period for commencement of construction under that section.