Skip to contentSkip to Braille Studio

Library / Laws / 117th / hr / H.R. 7119 / Introduced in House

H.R. 7119 — Introduced in House

482 words · about 2 min to read

Download .txt All versions Braille ⠃⠗⠋ Print Cite

I 117th CONGRESS 2d Session H. R. 7119 IN THE HOUSE OF REPRESENTATIVES March 17, 2022Ms. Davids of Kansas (for herself and Ms. Mace) introduced the following bill; which was referred to the Committee on Transportation and Infrastructure, and in addition to the Committee on Energy and Commerce, for a period to be subsequently determined by the Speaker, in each case for consideration of such provisions as fall within the jurisdiction of the committee concerned A BILL To amend the Water Infrastructure Finance and Innovation Act of 2014 to authorize the selection of eligible projects to be carried out using collaborative project delivery methods, and for other purposes. 1. Short title This Act may be cited as the Water Design-Build Improvement Act of 2022. 2. Collaborative project delivery methods Section 5028 of the Water Infrastructure Finance and Innovation Act of 2014 (33 U.S.C. 3907) is amended— (1) by redesignating subsection (c) as subsection (d); and (2) by inserting after subsection (b) the following: (c) Collaborative project delivery methods (1) Authorization The Secretary or the Administrator, as applicable, may select, in accordance with this section, a project to be carried out using a collaborative project delivery method (consistent with any applicable State or local law), including a construction management at-risk method and a design-build method. (2) Definitions In this subsection: (A) Collaborative project delivery method The term collaborative project delivery method means a method for carrying out a capital project that involves close collaboration among the eligible entity, the owner of the project (if different from the eligible entity), the designer of the project, and the contractor for the project, from design through completion of construction. (B) Construction management at-risk method The term construction management at-risk method means a collaborative project delivery method in which an engineering firm and a construction management at-risk firm are retained under 2 separate contracts for design and construction, respectively. (C) Design-build method The term design-build method means a collaborative project delivery method under which a single lead contract is entered into with a design-builder for design and construction. . 3. Study on the use of collaborative project delivery methods Not later than 180 days after the date of enactment of this Act, the Administrator of the Environmental Protection Agency, in coordination with the Regional Administrators, and the Secretary of the Army, acting through the Chief of Engineers, shall carry out, and make public the results of, a study that— (1) evaluates the use of collaborative project delivery methods in projects carried out using assistance received under the Water Infrastructure Finance and Innovation Act of 2014 (33 U.S.C. 3901 et seq.); (2) determines barriers to increased use of collaborative project delivery methods in such projects; (3) assesses the potential benefits of using collaborative project delivery methods in such projects; and (4) identifies areas of need to educate agency staff in collaborative project delivery method implementation and best practices.