Library / Laws / 115th / hr / H.R. 4377 / Reported in House
IB
Union Calendar No. 417
115th CONGRESS
2d Session
H. R. 4377
[Report No. 115–555]
IN THE HOUSE OF REPRESENTATIVES
November 13, 2017
Mr. Hultgren (for himself, Mr. Foster, Mr. Smith of Texas, Mr. Lipinski, Mr. Weber of Texas, and Mr. Knight) introduced the following bill; which was referred to the Committee on Science, Space, and Technology
February 13, 2018Additional sponsors: Mr. Fleischmann and Mrs. Noem
February 13, 2018
Committed to the Committee of the Whole House on the State of the Union and ordered to be printed
A BILL
To direct the Secretary of Energy to carry out an upgrade to research equipment and construct
research user facilities, and for other purposes.
1.
Short title
This Act may be cited as the Accelerating American Leadership in Science Act of 2017.
2.
Advanced photon source upgrade
(a)
In general
The Secretary of Energy shall provide for the upgrade to the Advanced Photon Source described in the publication approved by the Basic Energy Sciences Advisory Committee on June 9, 2016, titled Report on Facility Upgrades, including the development of a multi-bend achromat lattice to produce a high flux of coherent x-rays within the hard x-ray energy region and a suite of beamlines optimized for this source.
(b)
Definitions
In this section:
(1)
Flux
The term flux means the rate of flow of photons.
(2)
Hard x-ray
The term hard x-ray means a photon with energy greater than 20 kiloelectron volts.
(c)
Start of operations
The Secretary shall, to the maximum extent practicable, ensure that the start of full operations of the upgrade under this section occurs before December 31, 2025.
(d)
Funding
Out of funds appropriated to the Office of Science, there shall be made available to the Secretary to carry out the upgrade under this section—
(1) $93,000,000 for fiscal year 2018;
(2) $130,000,000 for fiscal year 2019;
(3) $152,400,000 for fiscal year 2020;
(4) $150,000,000 for fiscal year 2021;
(5) $73,600,000 for fiscal year 2022; and
(6) $20,000,000 for fiscal year 2023.
3.
Long-Baseline Neutrino Facility for Deep Underground Neutrino Experiment
(a)
In general
The Secretary of Energy shall provide for a Long-Baseline Neutrino Facility to facilitate the international Deep Underground Neutrino Experiment to enable a program in neutrino physics to measure the fundamental properties of neutrinos, explore physics beyond the Standard Model, and better clarify the nature of matter and antimatter.
(b)
Facility capabilities
The Secretary shall ensure that the facility described in subsection (a) will provide, at a minimum, the following capabilities:
(1) A broad-band neutrino beam capable of 1.2 megawatts (MW) of beam power and upgradable to 2.4 MW of beam power.
(2) Four caverns excavated for a forty kiloton fiducial detector mass and supporting surface buildings and utilities.
(3) Neutrino detector facilities at both the Far Site in South Dakota and the Near Site in Illinois to categorize and study neutrinos on their 800-mile journey between the two sites.
(4) Cryogenic systems to support neutrino detectors.
(c)
Start of operations
The Secretary shall, to the maximum extent practicable, ensure that the start of full operations of the facility under this section occurs before December 31, 2026.
(d)
Funding
Out of funds appropriated to the Office of Science, there shall be made available to the Secretary to carry out activities, including construction of the facility, under this section—
(1) $95,000,000 for fiscal year 2018;
(2) $160,000,000 for fiscal year 2019;
(3) $195,000,000 for fiscal year 2020;
(4) $195,000,000 for fiscal year 2021;
(5) $200,000,000 for fiscal year 2022;
(6) $200,000,000 for fiscal year 2023;
(7) $195,000,000 for fiscal year 2024;
(8) $150,000,000 for fiscal year 2025; and
(9) $50,000,000 for fiscal year 2026.
4.
Spallation Neutron Source proton power upgrade
(a)
In general
The Secretary of Energy shall provide for a proton power upgrade to the Spallation Neutron Source.
(b)
Definition of proton power upgrade
For the purposes of this section, the term proton power upgrade means the Spallation Neutron Source power upgrade described in—
(1) the publication of the Office of Science of the Department of Energy titled Facilities for the Future of Science: A Twenty-Year Outlook, published December 2003;
(2) the publication of the Office of Science of the Department of Energy titled Four Years Later: An Interim Report on Facilities for the Future of Science: A Twenty-Year Outlook, published August 2007; and
(3) the publication approved by the Basic Energy Sciences Advisory Committee on June 9, 2016, titled Report on Facility Upgrades.
(c)
Start of operations
The Secretary shall, to the maximum extent practicable, ensure that the start of full operations of the upgrade under this section occurs before December 31, 2025.
(d)
Funding
Out of funds appropriated to the Office of Science, there shall be made available to the Secretary to carry out the upgrade under this section—
(1) $26,000,000 for fiscal year 2018;
(2) $70,800,000 for fiscal year 2019;
(3) $33,500,000 for fiscal year 2020;
(4) $40,500,000 for fiscal year 2021;
(5) $21,100,000 for fiscal year 2022;
(6) $13,200,000 for fiscal year 2023; and
(7) $2,900,000 for fiscal year 2024.
5.
Spallation Neutron Source second target station
(a)
In general
The Secretary of Energy shall provide for a second target station for the Spallation Neutron Source.
(b)
Definition of second target station
For the purposes of this section, the term second target station means the Spallation Neutron Source second target station described in—
(1) the publication of the Office of Science of the Department of Energy titled Facilities for the Future of Science: A Twenty-Year Outlook, published December 2003;
(2) the publication of the Office of Science of the Department of Energy titled Four Years Later: An Interim Report on Facilities for the Future of Science: A Twenty-Year Outlook, published August 2007; and
(3) the publication approved by the Basic Energy Sciences Advisory Committee on June 9, 2016, titled Report on Facility Upgrades.
(c)
Start of operations
The Secretary shall, to the maximum extent practicable, ensure that the start of full operations of the second target station under this section occurs before December 31, 2030, with the option for early operation in 2028.
(d)
Funding
Out of funds appropriated to the Office of Science, there shall be made available to the Secretary to carry out activities, including construction, under this section—
(1) $5,000,000 for fiscal year 2018;
(2) $10,000,000 for fiscal year 2019;
(3) $15,000,000 for fiscal year 2020;
(4) $25,000,000 for fiscal year 2021;
(5) $50,000,000 for fiscal year 2022;
(6) $200,000,000 for fiscal year 2023;
(7) $275,000,000 for fiscal year 2024;
(8) $275,000,000 for fiscal year 2025;
(9) $275,000,000 for fiscal year 2026;
(10) $250,000,000 for fiscal year 2027; and
(11) $120,000,000 for fiscal year 2028.
February 13, 2018 Committed to the Committee of the Whole House on the State of the Union and ordered to be printed