Library / Laws / 114th / s / S. 14 / Introduced in Senate
II
114th CONGRESS
1st Session
S. 14
IN THE SENATE OF THE UNITED STATES
January 6, 2015Mr. Hatch introduced the following bill; which was read twice and referred to the Committee on Energy and Natural Resources
A BILL
To authorize the Secretary of the Interior to convey certain interests in Federal land acquired for
the Scofield Project in Carbon County, Utah.
1.
Short
title
This Act may be cited as
the Scofield Land Transfer
Act.
2.
Definitions
In this Act:
(1)
Carbon County
The term Carbon County means Carbon County, Utah, within which the Scofield Reservoir property is located.
(2)
Claimant
The
term claimant means any person or entity (or a successor in interest to a person or entity) that, according to
the
records in the office of the Recorder for Carbon County, as of the
date
of enactment of this Act, claims title to, or an interest in, the Federal
land.
(3)
Federal
land
(A)
In general
The term Federal land means the land acquired
by Price River Water Conservation District and transferred to the United
States
for use in the construction and operation of Scofield Dam and Reservoir
located
between the normal water surface elevation and the property boundary
elevation
in the Scofield Reservoir basin.
(B)
Exclusions
The term Federal land does not include—
(i) any mineral or subsurface rights to the land described in subparagraph (A); or
(ii) the 205 acres of land adjoining the Scofield Reservoir, as adjudicated in the case styled United
States v. Dunn (557 F.3d 1165 (10th Cir. 2009)).
(4)
Flood surcharge
elevation
The term flood surcharge elevation means
the elevation of 7640.3 in the North American Vertical Datum of 1988,
which
corresponds to the elevation of the crest of Scofield Dam.
(5)
Fund
The
term Fund means the Scofield Reservoir Fund established by
section 3(d)(9)(A).
(6)
Life
estate
The term life estate means—
(A) if the claimant
is a person, an interest of the claimant in the Federal land that will
revert
to the United States on the date of the death of the claimant; and
(B) if the claimant
is an entity, an interest in the Federal land of a person designated by
the
claimant that will revert to the United States on the date of the death of
the
designated person.
(7)
Normal water
surface elevation
The term normal water surface
elevation means the contour elevation of 7621.8 in the North American
Vertical Datum of 1988, which corresponds to the elevation of the crest of
the
spillway of Scofield Dam.
(8)
Property
boundary elevation
The term property boundary
elevation means the contour elevation 7630, as surveyed by McGonagle and
Ulrich, Land Surveyors, in 1926, which was transmuted to the current
elevation
of 7638.9 in the North American Vertical Datum of 1988 and which
corresponds to
1.4 vertical feet below the crest of Scofield Dam.
(9)
Roads
The term Roads means the streets, improved and unimproved, as in existence on the date of enactment of this Act,
that—
(A) are located on the Federal land;
(B) are intended for public access via motorized vehicle to the Federal land claims of the claimants;
and
(C) extend to the shoreline of Scofield Reservoir.
(10)
Secretary
The
term Secretary means the Secretary of the Interior.
(11)
Structure
(A)
In
general
The term structure means any improvement located on the property of a claimant, as in existence on the date of
enactment of this Act, including—
(i) a residence;
(ii) a shed;
(iii) a workshop;
(iv) a garage;
(v) a carport;
(vi) a deck;
(vii) a boathouse; or
(viii) an incidental building.
(B)
Inclusion
The
term structure includes any infrastructure associated with a
residence that is not owned by a public or private utility, including
water, power, sewer, and improvements to Roads.
3.
Conveyance of
Scofield project land
(a)
Survey
(1)
In general
To facilitate the conveyance of the Federal land under this Act, it shall be the responsibility of
Carbon County—
(A) to enter into an agreement with the Secretary to pay the costs associated with a full physical and
title survey of the Federal land in order to delineate the boundaries
associated with the Federal land, Federal easements, or other Federal
interests in land; and
(B) subject to paragraph (2), to initiate and complete a full physical survey of the Roads and the
parcels located within the Federal land that are eligible to be conveyed
to the claimants, and, in any case in which a land description or record
of ownership in any record of Carbon County conflicts with a claim of a
claimant with regard to an existing physical feature or facility, propose
boundaries and land descriptions to resolve the
dispute.
(2)
Unresolved disputes
(A)
In general
If a claim to a parcel or portion of a parcel of Federal land cannot be resolved in accordance with
the applicable land description in the records of Carbon County by the
applicable deadline for an election under subsection (d)(6), the claimant
shall stipulate to, accept, and submit to the Secretary the land
description developed by Carbon County to resolve the dispute in order to
meet the election requirement of subsection (d)(6) by not later than 180
days after that deadline.
(B)
Failure to stipulate and accept
If a claimant fails to stipulate to and accept the land description of Carbon County by the date
described in subparagraph (A), the authority to convey the affected parcel
or portion of a parcel of Federal land pursuant to this section shall be
terminated with respect to the disputed claim.
(b)
Appraisal
(1)
In general
As a condition of the conveyance under this section, Carbon County shall enter into an agreement
with the Secretary to pay the costs associated with an
appraisal of the fair market value of each property interest requested by
a claimant relating to the conveyance by the Secretary under this Act.
(2)
Determination of fair market value
The fair market value of a property interest under paragraph (1) shall be determined by the
Secretary in accordance with the Uniform Appraisal Standards for Federal
Land Acquisitions and the Uniform Standards of Professional Appraisal
Practices.
(c)
Notification
It shall be the responsibility of Carbon County to notify each claimant of any trespass or
encroachment by the applicable claimant on the Federal land, including the
existence of any trespassing or encroaching structure of the claimant.
(d)
Authorization
To convey Federal land
(1)
In
general
To resolve the issues of trespass and encroachment on the
Federal land by the claimants, the Secretary may, in accordance with
paragraphs (5) and (6)—
(A) on an election by a claimant—
(i) subject to paragraph (2), convey to the claimant fee interest in the claimed portion of the Federal
land that is located above the normal water surface elevation, as
determined by the results of the survey required under subsection (a),
subject to all valid rights-of-way, licenses, and easements in existence
on the date of enactment of this Act; or
(ii) subject to paragraph (3), grant to the claimant a life estate permitting the continued occupation
of the claimed portion of the Federal land above the normal water surface
elevation, as determined by the results of the survey required under
subsection (a), subject to all valid rights-of-way, licenses, and
easements in existence on the date of enactment of this Act; or
(B) subject to paragraph (4), on an election by Carbon County, convey to Carbon County fee interest in
the Roads, as determined by the survey required under subsection (a),
subject to all valid rights-of-way, licenses, and easements in existence
on the date of enactment of this Act.
(2)
Conveyance
requirements
A conveyance under paragraph (1)(A)(i) shall be subject
to—
(A) the claimant
paying to the Secretary the fair market value of the fee interest in the
claimed portion of the Federal land, as determined by the Secretary under
subsection (b), exclusive of the value of any
structures;
(B) provisions under which the claimant shall agree to indemnify and hold harmless the United States
for all claims by the claimant or others arising from—
(i) the design, construction, operation, maintenance, or replacement of Scofield Dam and Reservoir;
(ii) the survey of claims, description of claims, delineation of boundaries, conveyance documents,
conveyance process, and recording of deeds associated with the conveyance;
and
(iii) any damages associated with any structure or chattel of the claimant that may be displaced in a
flood event;
(C) the United States retaining a flood easement as well as an access easement for purposes of
monitoring and enforcing the requirements of subparagraph (D) with respect
to the entire portion of Federal land conveyed; and
(D) deed restrictions
requiring that—
(i) to prevent any
structure on the portion of the Federal land conveyed from being displaced
during a flood event, the claimant shall—
(I) secure or tie
down all existing structures; and
(II) if replacing or rebuilding such a structure, limit the replacement or rebuilding to the number and
type of structures in existence on the date of enactment of this Act; and
(ii) all activities
carried out by the claimant under clause (i) with respect to a structure
be
carried out in accordance with applicable standards for structures that
may be submerged, flooded, or inundated, as contained in—
(I) the International
Building Code (as adopted by Utah Administrative Code R156–56); or
(II) any other
building code or engineering standard that is—
(aa) similar to the
International Building Code;
(bb) widely used;
and
(cc) nationally
recognized.
(3)
Life estate
requirements
A life estate granted under paragraph (1)(A)(ii) shall
be subject to—
(A) the claimant
paying to the Secretary the fair market value of the life estate on the
claimed
portion of the Federal land, as determined by the Secretary under
subsection (b), but excluding the value of any structures;
(B) provisions under
which the claimant agrees to indemnify and hold harmless the United States
for all
claims by the claimant or others arising from—
(i) the design, construction, operation, maintenance, or replacement of Scofield Dam and Reservoir;
(ii) the survey of claims, description of claims, delineation of boundaries, conveyance documents,
conveyance process, and recording of deeds associated with the conveyance;
and
(iii) any damages associated with any structure or chattel of the claimant that may be displaced in a
flood event; and
(C) restrictions equivalent to the deed restrictions described in clauses (i) and (ii) of paragraph
(2)(D), as applicable.
(4)
Conveyance of Roads requirements
A conveyance under paragraph (1)(B) shall be subject to—
(A) Carbon County paying to the Secretary a sum determined to be acceptable by the Secretary;
(B) provisions under which Carbon County shall agree to indemnify and hold harmless the United States
for all claims by Carbon County or others arising from—
(i) the design, construction, operation, maintenance, or replacement of Scofield Dam and Reservoir;
(ii) the survey of claims, description of claims, delineation of boundaries, conveyance documents,
conveyance process, and recording of deeds associated with the conveyance;
and
(iii) any damages associated with structures or chattel of Carbon County that may be displaced in a flood
event;
(C) the United States retaining a flood easement as well as an access easement for purposes of
monitoring and enforcing the requirements of subparagraph (D) with respect
to the entire portion of the Roads conveyed; and
(D) restrictions equivalent to the deed restrictions described in clauses (i) and (ii) of paragraph
(2)(D), as applicable.
(5)
Compliance with
environmental laws
(A)
In
general
Before conveying the Federal land under paragraph (1)(A)(i)
or the Roads under paragraph (1)(B) or granting a life estate under
paragraph (1)(A)(ii), the Secretary shall
comply
with all applicable requirements under—
(i) the
National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.);
(ii) the Endangered
Species Act of 1973 (16 U.S.C. 1531 et seq.); and
(iii) any other
applicable law.
(B)
Effect
Nothing
in this Act modifies or alters any obligations under—
(i) the
National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.); or
(ii) the Endangered
Species Act of 1973 (16 U.S.C. 1531 et seq.).
(C)
Costs
Before the initiation of any conveyance under this Act, Carbon County shall pay to the Secretary an
amount equal to the costs associated with achieving environmental
compliance under this paragraph.
(6)
Deadline for
election
(A)
Claimants
Not later than 5 years after the date of enactment of
this Act, each claimant shall notify the Secretary in writing whether the
claimant elects to receive—
(i) a fee interest in
the claimed portion of the Federal land, in accordance with paragraph
(1)(A)(i);
or
(ii) a life estate in
the claimed portion of the Federal land, in accordance with paragraph
(1)(A)(ii).
(B)
Carbon County
Not later than 3 years after the date of enactment of
this Act, Carbon County shall notify the Secretary in writing whether
Carbon County elects to receive a fee interest in the Roads, in accordance
with paragraph (1)(B).
(7)
Failure to
notify Secretary or complete transfer
(A)
Notice of election
If a claimant fails to submit to the Secretary a notice of an election in accordance with paragraph
(6)(A), any future claim by the claimant with respect to the Federal land
shall be terminated.
(B)
Transfer
(i)
Claimants
If, due to a failure by the claimant to act in furtherance of the transfer of fee interest or life
estate under this section, no transfer of the claimed Federal Land has
been recorded with the recorder of Carbon County by the date that is 7
years after the date of enactment of this Act, any claim by the claimant
with respect to the Federal land shall be terminated.
(ii)
Carbon County
If, due to a failure by Carbon County to act in furtherance of the transfer of fee interest, no
transfer of the Roads has been recorded with the recorder of Carbon County
by the date that is 5 years after the date of enactment of this Act, the
authority of the Secretary to convey the interest in the Roads shall be
terminated.
(C)
Quiet
title
On extinguishment of a claim under subparagraph (A) or (B), the
Secretary shall take such action as is necessary to quiet title to the
applicable portion of the Federal land, including removal of persons,
entities,
structures, and materials encumbering the applicable portion of the
Federal
land.
(8)
Payments in lieu of taxes
Any Federal land transferred to a claimant in fee under paragraph (1)(A)(i) or to Carbon County
under paragraph (1)(B) shall not be included or taken into consideration
in the allocation of any payment in lieu of
taxes under chapter 69
of title 31, United States Code.
(9)
Trust
fund
(A)
Establishment
There
is established in the Treasury of the United States a fund, to be known as
the
Scofield Reservoir Fund, to be administered by the Secretary and
made available, without fiscal year limitation, for—
(i) monitoring and enforcing the requirements of paragraphs (2)(C), (3)(C), and (4)(C) regarding
maintaining access to, and eliminating encroachment and private exclusive
use of, the
Federal land surrounding the Scofield Reservoir; and
(ii) providing enhanced
public recreational opportunities at Scofield Reservoir.
(B)
Transfers to
fund
There shall be deposited in the Fund any amounts received as
consideration for—
(i) a conveyance under subparagraph (A)(i) or (B) of paragraph (1); or
(ii) the granting of a
life
estate under paragraph (1)(A)(ii).