Library / Laws / 113th / s / S. 545 / Introduced in Senate
II
113th CONGRESS
1st Session
S. 545
IN THE SENATE OF THE UNITED STATES
March 13, 2013
Ms. Murkowski (for
herself, Mr. Wyden,
Mr. Risch, Ms.
Cantwell, Mr. Crapo,
Mrs. Murray, and
Mr. Begich) introduced the following
bill; which was read twice and referred to the
Committee on Energy and Natural
Resources
A BILL
To improve hydropower, and for other
purposes.
1.
Short
title; table of contents
(a)
Short
title
This Act may be cited
as the Hydropower Improvement Act of
2013.
(b)
Table of
contents
The table of contents of this Act is as follows:
Sec. 1. Short title; table of
contents.
Sec. 2. Findings.
Sec. 3. Definitions.
Sec. 4. Sense of the Senate on the use of hydropower renewable
resources.
Sec. 5. Promoting hydropower development at nonpowered dams and
closed loop pumped storage projects.
Sec. 6. Promoting conduit hydropower projects.
Sec. 7. Promoting small hydroelectric power
projects.
Sec. 8. FERC authority to extend preliminary permit
terms.
Sec. 9. Study of pumped storage and potential hydropower from
conduits.
Sec. 10. Report on memorandum of understanding on
hydropower.
2.
Findings
Congress finds that—
(1) hydropower is the largest source of clean,
renewable electricity in the United States;
(2) as of the date of enactment of this Act,
hydropower resources, including pumped storage facilities, provide—
(A) nearly 7 percent of the electricity
generated in the United States, avoiding approximately 200,000,000 metric tons
of carbon emissions each year; and
(B) approximately 100,000 megawatts of electric
capacity in the United States;
(3) only 3 percent of
the 80,000 dams in the United States generate electricity so there is
substantial potential for adding hydropower generation to nonpower dams;
(4) in every State, a tremendous untapped
growth potential exists in hydropower resources, including—
(A) efficiency improvements and capacity
additions;
(B) adding generation to nonpower dams;
(C) conduit hydropower;
(D) conventional hydropower;
(E) pumped storage facilities; and
(F) new marine and hydrokinetic resources;
and
(5) improvements in
increased hydropower production in the United States have the potential—
(A) to increase the clean energy generation of
the United States;
(B) to improve
project performance and result in better environmental outcomes; and
(C) to provide ancillary benefits that include
grid reliability, energy storage, and integration services for variable
renewable resources.
3.
Definitions
In this Act:
(1)
Conduit
The
term conduit means any tunnel, canal, pipeline, aqueduct, flume,
ditch, or similar manmade water conveyance that is operated for the
distribution of water for agricultural, municipal, or industrial consumption
and not primarily for the generation of electricity.
(2)
Secretary
The term Secretary means the
Secretary of Energy.
(3)
Small
hydroelectric power project
The term small hydroelectric
power project has the meaning given the term in section 4.30 of title
18, Code of Federal Regulations.
4.
Sense of the
Senate on the use of hydropower renewable resources
It is the sense of the Senate that the
United States should increase substantially the capacity and generation of
clean, renewable hydropower which will improve the environmental quality of
resources in the United States and support local job creation and economic
investment across the United States.
5.
Promoting
hydropower development at nonpowered dams and closed loop pumped storage
projects
(a)
In
general
To improve the regulatory process and reduce delays and
costs for hydropower development at nonpowered dams and closed loop pumped
storage projects, the Federal Energy Regulatory Commission (referred to in this
section as the Commission) shall investigate the feasibility of
the issuance of a license for certain hydropower development during the 2-year
period beginning on the date of commencement of the prefiling licensing process
of the Commission (referred to in this section as a 2-year
process).
(b)
Workshops and
pilots
The Commission shall—
(1) not later than 60
days after the date of enactment of this Act, hold an initial workshop to
solicit public comment and recommendations on how to implement a 2-year
process;
(2) develop criteria
for identifying projects featuring hydropower development at nonpowered dams
and closed loop pumped storage projects that may be appropriate for licensing
within a 2-year process;
(3) not later than
180 days after the date of enactment of this Act, develop and implement pilot
projects to test a 2-year process, if practicable; and
(4) not later than 3
years after the date of implementation of any pilot project to test a 2-year
process, hold a final workshop to solicit public comment on the effectiveness
of the pilot project.
(c)
Memorandum of
understanding
The Commission shall, to the maximum extent
practicable, enter into a memorandum of understanding with any applicable
Federal or State agency to implement a pilot project described in subsection
(b).
(d)
Reports
(1)
Pilot projects
not implemented
If the Commission determines that the pilot
projects described in subsection (b) are not practicable, not later than 240
days after the date of enactment of this Act, the Commission shall submit to
the Committee on Energy and Natural Resources of the Senate and the Committee
on Energy and Commerce of the House of Representatives a report that—
(A) describes the
public comments received as part of the initial workshop held under subsection
(b)(1); and
(B) identifies the
process, legal, environmental, economic, and other issues that justify the
determination of the Commission that a 2-year process is not practicable, with
recommendations on how Congress may address or remedy the identified
issues.
(2)
Pilot projects
implemented
If the Commission develops and implements pilot
projects involving a 2-year process described in subsection (b), not later than
60 days after the date of completion of any final workshop held under
subsection (b)(4), the Commission shall submit to the Committee on Energy and
Natural Resources of the Senate and the Committee on Energy and Commerce of the
House of Representatives a report that—
(A) describes the
outcomes of the pilot projects;
(B) describes the
public comments from the final workshop on the effectiveness of the pilot
projects; and
(C)
(i) outlines how the
Commission will adopt policies under existing law (including regulations) that
result in a 2-year process;
(ii) outlines how the Commission will
proceed with a rulemaking to adopt a 2-year process in the regulations of the
Commission; or
(iii) identifies the process, legal,
environmental, economic, and other issues that justify the determination of the
Commission that a 2-year process is not practicable, with recommendations on
how Congress may address or remedy the identified issues.
6.
Promoting conduit
hydropower projects
(a)
Applicability
of, and exemption from, licensing requirements
Section 30 of the Federal Power Act
(16 U.S.C.
823a) is amended—
(1) by redesignating
subsections (c) through (e) as subsections (d) through (f),
respectively;
(2) by striking
Sec.
30. and all that follows through the end of subsection (b) and
inserting the following:
30.
Conduit
hydropower facilities
(a)
Definitions
In
this section:
(1)
Conduit
The
term conduit means any tunnel, canal, pipeline, aqueduct, flume,
ditch, or similar manmade water conveyance that is operated—
(A) for the
distribution of water for agricultural, municipal, or industrial consumption;
and
(B) not primarily for
the generation of electricity.
(2)
Qualifying
conduit hydropower facility
The term qualifying conduit
hydropower facility means a facility (not including any dam or other
impoundment) that is determined or deemed under subsection (b)(2)(D) to meet
the qualifying criteria.
(3)
Qualifying
criteria
The term qualifying criteria means, with
respect to a facility, that—
(A) the facility is
constructed, operated, or maintained for the generation of electric power and
uses for the generation only the hydroelectric potential of a non-federally
owned conduit;
(B) the facility has
an installed capacity that does not exceed 5 megawatts; and
(C) on or before the
date of enactment of the Hydropower
Improvement Act of 2013, the facility is not licensed under, or
exempted from the license requirements contained in, this part.
(b)
Administration
(1)
In
general
A qualifying conduit hydropower facility shall not be
required to be licensed under this part.
(2)
Notice of
intent to construct facility
(A)
In
general
Any person, State, or municipality proposing to construct
a qualifying conduit hydropower facility shall file with the Commission a
notice of intent to construct the qualifying conduit hydropower
facility.
(B)
Information
The
notice shall include sufficient information to demonstrate that the facility
meets the qualifying criteria.
(C)
Initial
determination
Not later than
15 days after receipt of a notice of intent is filed under subparagraph (A),
the Commission shall—
(i) make an initial
determination as to whether the facility meets the qualifying criteria;
and
(ii) if the Commission makes an initial
determination, pursuant to clause (i) that the facility meets the qualifying
criteria, publish public notice of the notice of intent filed under
subparagraph (A).
(D)
Final
determination
If, not later
than 45 days after the date of publication of the public notice described in
subparagraph (C)(ii)—
(i) an
entity contests whether the facility meets the qualifying criteria, the
Commission shall promptly issue a written determination as to whether the
facility meets the qualifying criteria; or
(ii) no entity
contests whether the facility meets the qualifying criteria, the facility shall
be considered to meet the qualifying criteria.
(c)
Exemptions
Subject
to subsection (d), the Commission may grant an exemption in whole or in part
from the requirements of this part, including any license requirements
contained in this part, to any facility (not including any dam or other
impoundment) constructed, operated, or maintained for the generation of
electric power that the Commission determines, by rule or order—
(1) uses for the
generation only the hydroelectric potential of a conduit; and
(2) has an installed
capacity that does not exceed 40
megawatts.
;
(3) in subsection (d)
(as redesigned by paragraph (1)), by striking subsection (a) and
inserting subsection (c); and
(4) in subsection (e)
(as so redesignated), by striking subsection (a) and inserting
subsection (c).
(b)
Conforming
amendments
(1) Section 210(j)(3)
of the Public Utility Regulatory Policies Act of 1978 (16 U.S.C. 824a–3(j)(3))
is amended by striking section 30(c) and inserting
section 30(d).
(2) Section 405(d) of
the Public Utility Regulatory Policies Act of 1978 (16 U.S.C. 2705(d))
is amended in the first sentence—
(A) by striking
subsections (c) and (d) each place it appears and inserting
subsections (d) and (e); and
(B) by striking
subsection (a) of such section 30 and inserting section
30(c) of that Act.
(3) Section
3401(a)(2) of the Omnibus Budget Reconciliation Act of 1986 (42 U.S.C.
7178(a)(2)) is amended by striking 30(e) and inserting
30(f).
(4) Section 242(b)(3)
of the Energy Policy Act of 2005 (42 U.S.C. 15881(b)(3)) is amended by striking
section 30(a)(2) of the Federal Power Act (16 U.S.C. 823a(a)(2))
and inserting section 30(a) of the Federal Power Act (16 U.S.C.
823a(a)).
7.
Promoting small
hydroelectric power projects
Section 405(d) of the Public Utility
Regulatory Policies Act of 1978 (16 U.S.C. 2705(d)) is amended in
the first sentence by striking 5,000 and inserting
10,000.
8.
FERC authority
to extend preliminary permit terms
Section 5 of the Federal Power Act (16
U.S.C. 798) is amended—
(1) by designating the first, second, and third
sentences as subsections (a), (c), and (d), respectively; and
(2) by inserting after subsection (a) (as so
designated) the following:
(b)
Extension
The
Commission may extend the term of a preliminary permit once for not more than 2
additional years if the Commission finds that the permittee has carried out
activities under the permit in good faith and with reasonable
diligence.
.
9.
Study of pumped
storage and potential hydropower from conduits
(a)
In
general
The Secretary shall conduct a study—
(1)
(A) of the technical
flexibility that existing pumped storage facilities can provide to support
intermittent renewable electric energy generation, including the potential for
those existing facilities to be upgraded or retrofitted with advanced
commercially available technology; and
(B) of the technical potential of existing
pumped storage facilities and new advanced pumped storage facilities, to
provide grid reliability benefits; and
(2)
(A) to identify the range
of opportunities for hydropower that may be obtained from conduits (as defined
by the Secretary) in the United States; and
(B) through case studies, to assess
amounts of potential energy generation from such conduit hydropower
projects.
(b)
Report
Not
later than 1 year after the date of enactment of this Act, the Secretary shall
submit to the Committee on Energy and Natural Resources of the Senate and the
Committee on Energy and Commerce of the House of Representatives a report that
describes the results of the study conducted under subsection (a), including
any recommendations.
10.
Report on
memorandum of understanding on hydropower
Not later than 180 days after the date of
enactment of this Act, the President shall submit to the Committee on Energy
and Natural Resources of the Senate and the Committee on Energy and Commerce of
the House of Representatives a report on actions taken by the Department of
Energy, the Department of the Interior, and the Corps of Engineers to carry out
the memorandum of understanding on hydropower entered into on March 24, 2010,
with particular emphasis on actions taken by the agencies to work together and
investigate ways to efficiently and responsibly facilitate the Federal
permitting process for Federal and non-Federal hydropower projects at Federal
facilities, within existing authority.