Library / Laws / 113th / s / S. 434 / Introduced in Senate
II
113th CONGRESS
1st Session
S. 434
IN THE SENATE OF THE UNITED STATES
March 4, 2013
Mr. Baucus (for himself
and Mr. Tester) introduced the following
bill; which was read twice and referred to the
Committee on Indian
Affairs
A BILL
To authorize and implement the water rights compact among
the Blackfeet Tribe of the Blackfeet Indian Reservation and the State of
Montana, and for other purposes.
1.
Short
title
This Act may be cited as
the Blackfeet Water Rights Settlement
Act of 2013.
2.
Purposes
The purposes of this Act are—
(1) to achieve a
fair, equitable, and final settlement of claims to water rights in the State of
Montana for—
(A) the Blackfeet
Tribe of the Blackfeet Indian Reservation; and
(B) the United
States, for the benefit of the Tribe and allottees;
(2) to approve,
ratify, and confirm the water rights compact entered into by the Tribe and the
State, to the extent that the Compact is consistent with this Act;
(3) to require the
Secretary of the Interior—
(A) to execute the
Compact; and
(B) to carry out any
other activity necessary to carry out the Compact in accordance with this Act;
and
(4) to authorize
funds necessary for the implementation of the Compact and this Act.
3.
Definitions
In this Act:
(1)
Allottee
The
term allottee means any individual who holds a beneficial real
property interest in an allotment of Indian land that is—
(A) located within
the Reservation; and
(B) held in trust by
the United States.
(2)
Available St.
Mary water
The term available St. Mary water
means—
(A) water from the
St. Mary River allocated to the United States under the International Boundary
Waters Treaty of 1909 between the United States and Great Britain relating to
boundary waters between the United States and Canada entered into force on May
13, 1910 (36 Stat. 2448), minus the quantity of water required for the Milk
River Project water right; and
(B) water that
is—
(i) otherwise part of
the Milk River Project water right; and
(ii) made available
by the United States to the Tribe without any net reduction of the legal
entitlement to water of any water user under the jurisdiction of an entity that
is a party to a contract for water from the Milk River Project water right, as
determined—
(I) initially, by the
Secretary; and
(II) subsequently, by
a court of competent jurisdiction.
(3)
Birch Creek
Agreement
The term Birch Creek Agreement
means—
(A) the agreement
between the Tribe and the State regarding Birch Creek water use dated January
31, 2008, as amended on February 13, 2009; and
(B) any amendment or
exhibit (including exhibit amendments) to that agreement that is executed in
accordance with this Act.
(4)
Birch Creek
Mitigation Project
The term Birch Creek Mitigation
Project means the project necessary to provide water from Four Horns
Reservoir to State water rights users on Birch Creek in fulfillment of the
obligations of the Tribe under the Birch Creek Agreement.
(5)
Blackfeet
Irrigation Project
The term Blackfeet Irrigation
Project means the irrigation project authorized by the matter under the
heading Montana of title II of the Act of March 1,
1907 (34 Stat. 1035, chapter 2285), and administered by the Bureau of Indian
Affairs.
(6)
Compact
The
term Compact means—
(A) the
Blackfeet-Montana water rights compact dated December 14, 2007, as contained in
section 85–20–1501 of the Montana Code Annotated (2011); and
(B) any amendment or
exhibit (including exhibit amendments) to the Compact that is executed in
accordance with this Act.
(7)
Enforceability
date
The term enforceability date means the date
described in section 19(e).
(8)
Lake
Elwell
The term Lake Elwell means the water
impounded on the Marias River in the State by Tiber Dam, a feature of the Lower
Marias Unit of the Pick-Sloan Missouri River Basin Program authorized by
section 9 of the Act of December 22, 1944 (commonly known as the Flood
Control Act of 1944) (58 Stat. 891, chapter 665).
(9)
Milk River
basin
The term Milk River basin means the main stem
of the Milk River (including tributaries), from the headwaters of that river to
the confluence with the Missouri River.
(10)
Milk River
Project
(A)
In
general
The term Milk River Project means the Bureau
of Reclamation project conditionally approved by the Secretary on March 14,
1903, pursuant to the Act of June 17, 1902 (32 Stat. 388, chapter 1093),
commencing at Lake Sherburne Reservoir and providing water to a point
approximately 6 miles east of Nashua, Montana.
(B)
Inclusions
The
term Milk River Project includes—
(i) the
St. Mary storage unit;
(ii) the Fresno Dam;
and
(iii) the Dodson
pumping unit.
(11)
Milk River
Project water right
The term Milk River Project water
right means the water right held by the Bureau of Reclamation on behalf
of the Milk River Project, as finally adjudicated by the Montana Water
Court.
(12)
Milk River
water right
The term Milk River water right means
the Milk River water right of the Tribe as established in article III.F of the
Compact.
(13)
Missouri River
basin
The term Missouri River basin means the
hydrologic basin of the Missouri River (including tributaries).
(14)
MR&I
System
The term MR&I System means—
(A) the intake,
treatment, pumping, storage, pipelines, appurtenant items, and real property,
as generally described in the document entitled Blackfeet Regional Water
System Report, prepared by DOWL HKM, and dated June 2010, and updated in
the memorandum entitled Blackfeet Regional Water System Potential Cost
Modifications, prepared by DOWL HKM, and dated November 3, 2011;
and
(B) the existing
public water systems improved under subparagraph (A).
(15)
OM&R
The
term OM&R means—
(A) any recurring or
ongoing activity associated with the day-to-day operation of a project;
(B) any activity
relating to scheduled or unscheduled maintenance of a project; and
(C) any activity
relating to replacing a feature of a project.
(16)
Pondera County
Canal and Reservoir Company Project
The term Pondera County
Canal and Reservoir Company Project means the project authorized in part
by section 4 of the Act of August 18, 1894 (28 Stat. 422), and lying south of
Birch Creek in Montana Water Court Basin 41M.
(17)
Reservation
The
term Reservation means the Blackfeet Indian Reservation of
Montana, as in existence on the date of enactment of this Act.
(18)
St. Mary River
water right
The term St. Mary River water right
means the water right of the Tribe in the St. Mary River as established by
article III.G.1.a.i. of the Compact and implemented in accordance with article
IV.D.4 of the Compact and this Act.
(19)
St. Mary
Unit
(A)
In
general
The term St. Mary Unit means the St. Mary
Storage Unit of the Milk River Project authorized by Congress on March 25,
1905.
(B)
Inclusions
The
term St. Mary Unit includes—
(i) Sherburne Dam and
Reservoir;
(ii) Swift Current
Creek Dike;
(iii) Lower St. Mary
Lake;
(iv) St. Mary Canal
Diversion Dam; and
(v) St.
Mary Canal and appurtenances.
(20)
Secretary
The
term Secretary means the Secretary of the Interior.
(21)
State
The
term State means the State of Montana.
(22)
Tribal water
code
The term tribal water code means the code
adopted by the Tribe in the tribal ordinance numbered 62 (as amended in
accordance with the Compact and this Act).
(23)
Tribal water
right
The term tribal water right means the right of
the Tribe to divert, use, or store water, as established in—
(A) article III of
the Compact;
(B) the allocation of
water to the Tribe from Lake Elwell pursuant to section 8; and
(C) any allocation of
water to the Tribe pursuant to this Act in fulfillment of the water rights of
the Tribe.
(24)
Tribe
The
term Tribe means the Blackfeet Tribe of the Blackfeet Indian
Reservation.
4.
Milk River water
right
(a)
Resolution
alternatives
(1)
In
general
Not later than 10 years after the enforceability date,
the Tribe shall identify, and discuss with the Fort Belknap Indian Community,
alternatives to resolve any conflict between the Milk River water right and the
Milk River water right of the Fort Belknap Indian Community.
(2)
Action by
Secretary
The Secretary shall—
(A) facilitate
discussions between the Tribe and the Fort Belknap Indian Community under
paragraph (1); and
(B) provide technical
assistance to the Tribe and the Fort Belknap Indian Community to carry out
paragraph (1).
(3)
Uses by
Tribe
During the 10-year period described in paragraph (1), the
Tribe may—
(A) continue the
present and historical uses of water by the Tribe; and
(B) exercise any
State water rights in the Milk River basin possessed or acquired by the
Tribe.
(b)
Secretarial
determination
If the Tribe and the Fort Belknap Indian Community
are unable to reach an agreement on appropriate alternatives to resolve any
conflicts during the period described in subsection (a)(1), the Secretary shall
identify and implement alternatives to resolve any conflict between the Milk
River water right and the Milk River right of the Fort Belknap Indian
Community, subject to the conditions that—
(1) the Secretary
shall consult with the Tribe and the Fort Belknap Indian Community in
identifying the alternatives; and
(2) the Tribe and the
Fort Belknap Indian Community shall agree to the alternatives identified by the
Secretary.
5.
St. Mary River
water right
(a)
In
general
Pursuant to article IV.D.4 of the Compact, the Secretary,
acting through the Commissioner of Reclamation, shall carry out the activities
authorized by this section relating to the St. Mary River water right.
(b)
Water delivery
contract
(1)
In
general
Not later than 180 days after the enforceability date,
the Secretary shall enter into a water delivery contract with the Tribe for the
delivery of 5,000 acre-feet per year of the St. Mary River water right through
Milk River Project facilities to the Tribe or another entity specified by the
Tribe.
(2)
Terms and
conditions
The contract under paragraph (1) shall establish the
terms and conditions for the water deliveries described in paragraph (1) in
accordance with the Compact and this Act.
(3)
Requirements
The
water delivery contract under paragraph (1) shall include provisions requiring
that—
(A) the contract
shall be without limit as to term;
(B) the Tribe, and
not the United States, shall collect, and shall be entitled to, all
consideration due to the Tribe under any lease, contract, or agreement entered
into by the Tribe pursuant to subsection (e);
(C) the United States
shall have no obligation to monitor, administer, or account for—
(i) any
funds received by the Tribe as consideration under any lease, contract, or
agreement entered into by the Tribe pursuant to subsection (e); or
(ii) the expenditure
of such funds;
(D) if water
deliveries under the contract are interrupted for an extended period of time
because of damage to, or a reduction in the capacity of, St. Mary Unit
facilities, the rights of the Tribe shall be treated the same as the rights of
other contractors receiving water deliveries through the Milk River Project
with respect to the water delivered under this section;
(E) the Tribe shall
not be required to pay operation, maintenance, or replacement costs for the
water delivered under this section;
(F) deliveries of
water under this section shall be made at such times at which, and to such
places to which, the Bureau of Reclamation can deliver water without additional
cost to the Bureau; and
(G)
(i) the 5,000 acre-feet per
year of water delivered under this section shall not be subject to shortage
sharing or reduction; and
(ii) notwithstanding article IV.D.4 of
the Compact, any reduction in the Milk River Project water supply caused by the
delivery of water under this section shall not constitute injury to Milk River
Project water users.
(c)
Additional
water
(1)
In
general
If the Secretary determines that there is available St.
Mary water, the Secretary shall enter into a contract with the Tribe for the
delivery of the available St. Mary water subject to the requirements described
in subsection (b)(3) and this subsection.
(2)
Rehabilitation
Additional
water made available through any rehabilitation of the St. Mary Unit shall be
considered to be available St. Mary water for purposes of this Act and the
Compact.
(3)
Enlargement
Additional
water made available through any enlargement of the St. Mary Canal—
(A) shall not be
considered to be a part of the Milk River Project water right; and
(B) shall be made
available to the Tribe as part of the St. Mary River water right.
(d)
Trust fund
payments
In consideration for the deferral of the delivery of the
quantity in excess of the 5,000 acre-feet per year of water specified in
subsection (b)(1), the United States shall pay to the Tribe $27,800,000, which
shall be invested and managed in accordance with section 17(d).
(e)
Subcontracts
(1)
In
general
The Tribe may enter into any subcontract for the delivery
of water under this section to a third party, in accordance with section
16.
(2)
Compliance with
other law
A subcontract described in paragraph (1) shall comply
with the Compact, this Act, and any other applicable law.
(3)
No
liability
The Secretary shall not be liable to any party,
including the Tribe, for any term of, or any loss or other detriment resulting
from, a lease, contract, or other agreement entered into pursuant to this
subsection.
6.
Bureau of
Reclamation activities to improve water management
(a)
Milk River
Project purposes
(1)
In
general
Subject to paragraphs (2) and (3), the purposes of the
Milk River Project shall include—
(A) irrigation;
(B) flood
control;
(C) the protection of
fish and wildlife;
(D) recreation;
(E) the provision of
municipal, rural, and industrial water supply; and
(F) hydroelectric
power generation.
(2)
Limitation
(A)
In
general
Except as provided in subparagraph (B), the Secretary
shall not increase any water use by the Milk River Project as a result of the
purposes described in paragraph (1) beyond the quantity of water use authorized
by valid contracts in effect on the date of enactment of this Act, until the
St. Mary River water right is fulfilled.
(B)
Exception
Subparagraph
(A) shall not apply to any contract entered into by the Secretary and the Tribe
under subsection (b) or (c) of section 5.
(3)
Beneficial use
by Tribe
In addition to the purposes described in paragraph (1),
use of Milk River Project facilities to transport water for the Tribe pursuant
to subsections (b), (c), and (e) of section 5, together with any use by the
Tribe of such water in accordance with the tribal water code—
(A) shall be
considered to be an authorized purpose of the Milk River Project; and
(B) shall not change
the priority date of any tribal water right.
(b)
St. Mary River
feasibility study
(1)
In
general
Subject to paragraph (2), the Secretary, acting through
the Commissioner of Reclamation, in cooperation with the Tribe and the State,
shall conduct a study—
(A) to evaluate the
feasibility of alternatives for the rehabilitation of the St. Mary Unit;
(B) to identify
alternatives to provide additional St. Mary River water and Milk River water to
the Tribe;
(C) to evaluate the
feasibility of the development of increased storage in Fresno Reservoir;
(D) to establish a
cost allocation based on the purposes described in this section; and
(E) to develop a plan
for the management and development of water supplies in the St. Mary River
basin and the Milk River basin.
(2)
Consultation
Before
conducting the study under this subsection, and regularly during the course of
the study, the Secretary shall consult with the Tribe, the State, and the Milk
River Project users concerning the identification of alternatives to make
additional water available to the Tribe in fulfillment of the St. Mary River
water right and the Milk River water right for delivery through the St. Mary
Unit or from direct flow.
(3)
Submission to
Congress
Not later than 3 years after the date on which funds are
made available to carry out this Act, the Secretary shall submit to the
Committee on Energy and Natural Resources of the Senate and the Committee on
Natural Resources of the House of Representatives a report describing the
results of the study under this subsection.
(4)
Costs
nonreimbursable
The cost of the study under this subsection shall
not be—
(A) considered to be
a project cost; or
(B) reimbursable in
accordance with the Federal reclamation laws.
(c)
Consultation
with Tribe
Not later than 1 year after the date of enactment of
this Act, and not less frequently than annually thereafter, the Commissioner of
Reclamation shall consult with the Tribe regarding the management of the St.
Mary Unit by the Bureau of Reclamation.
(d)
Swift Current
Creek Bank stabilization
(1)
In
general
As soon as practicable after the date of enactment of
this Act, but not later than 5 years after the enforceability date, the
Secretary, acting through the Commissioner of Reclamation, shall carry out
appropriate activities to implement the Swift Current Creek Bank stabilization
project.
(2)
Scope
The
scope of the activities conducted under this subsection shall be as generally
described in the document entitled Boulder/Swiftcurrent Creek
Stabilization Project, Phase II Investigations Report, prepared by DOWL
HKM, and dated January 2012 (as updated or amended by the phase III
report).
(e)
Milk River
Project rights-of-Way and easements
As soon as practicable after
the date of enactment of this Act, but not later than the enforceability date,
the Secretary shall offer to enter into an agreement with the Tribe to
establish a process to resolve any issues associated with the location and
extent of the Federal rights-of-way, easements, and other property interests in
and to the Milk River Project that are located on land of the Tribe.
(f)
Funding
The
total amount of obligations incurred by the Secretary in carrying out this
section shall not exceed $25,200,000, including—
(1) $1,700,000 for a
right-of-way survey;
(2) $3,800,000 for
the St. Mary River feasibility study under subsection (b); and
(3) $19,700,000 for
the Swift Current Creek Bank stabilization project under subsection (d).
7.
St. Mary Canal
hydroelectric power generation
(a)
In
general
The Tribe shall have the exclusive right to develop and
market hydroelectric power from St. Mary Unit facilities.
(b)
Bureau of
Reclamation cooperation
The Commissioner of Reclamation shall
cooperate with the Tribe in the development of any hydroelectric power
generation project under this section.
(c)
Agreement
Before
construction of a hydroelectric power generation project under this section,
the Tribe shall enter into an agreement with the Commissioner of Reclamation
that includes provisions requiring that—
(1) the design,
construction, and operation of the project shall be consistent with the Bureau
of Reclamation guidelines and methods for hydroelectric power development at
Bureau facilities, as appropriate;
(2) the hydroelectric
power generation project shall be compatible with the operations of the Milk
River Project, including agreements—
(A) regarding
operating criteria and emergency procedures; and
(B) under which any
modification proposed by the Tribe to a facility owned by the Bureau of
Reclamation shall be subject to review and approval by the Secretary, acting
through the Commissioner of Reclamation;
(3) the Tribe shall
receive credit for any cost savings resulting from an activity for
rehabilitation of the St. Mary Canal if the Tribe constructs a hydroelectric
facility in conjunction with the rehabilitation activity; and
(4) beginning on the
date that is 10 years after the date on which the Tribe begins marketing
hydroelectric power generated from the St. Mary Unit, the Tribe shall make
annual payments for operation, maintenance, and replacement costs attributable
to the direct use of any facilities by the Tribe for hydroelectric power
generation in amounts determined in accordance with the guidelines and methods
of the Bureau of Reclamation for assessing operation, maintenance, and
replacement charges.
(d)
Use of
hydroelectric power by Tribe
Any hydroelectric power generated in
accordance with this section shall be used or marketed by the Tribe.
(e)
Revenues
The
Tribe shall collect and retain any revenues from the sale of hydroelectric
power generated by a project under this section.
(f)
Liability of
United States
The United States shall have no obligation to
monitor, administer, or account for—
(1) any revenues
received by the Tribe under this section; or
(2) the expenditure
of such revenues.
8.
Storage
allocation from Lake Elwell
(a)
Storage
allocation to Tribe
The Secretary shall allocate to the Tribe
56,000 acre-feet per year of water stored in Lake Elwell for use by the Tribe
for any beneficial purpose on or off the Reservation, under a water right held
by the United States and managed by the Bureau of Reclamation, as measured at
the outlet works of Tiber Dam or through direct pumping from Lake
Elwell.
(b)
Treatment
(1)
In
general
The allocation to the Tribe under subsection (a) shall be
considered to be part of the tribal water right.
(2)
Priority
date
The priority date of the allocation to the Tribe under
subsection (a) shall be the priority date of the Lake Elwell water right held
by the Bureau of Reclamation.
(3)
Administration
(A)
In
general
The Tribe shall administer the water allocated under
subsection (a) in accordance with the Compact and this Act.
(B)
Temporary
transfer
In accordance with subsection (d), the Tribe may
temporarily transfer by service contract, lease, exchange, or other agreement
the water allocated under subsection (a) off the Reservation, subject to the
approval of the Secretary and the requirements of the Compact.
(c)
Allocation
agreement
(1)
In
general
As a condition of receiving an allocation under this
section, the Tribe shall enter into an agreement with the Secretary to
establish the terms and conditions of the allocation, in accordance with the
Compact and this Act.
(2)
Inclusions
The
agreement under paragraph (1) shall include provisions that—
(A) the agreement
shall be without limit as to term;
(B) the Tribe, and
not the United States, shall be entitled to all consideration due to the Tribe
under any lease, contract, or agreement entered into by the Tribe pursuant to
subsection (d);
(C) the United States
shall have no obligation to monitor, administer, or account for—
(i) any
funds received by the Tribe as consideration under any lease, contract, or
agreement entered into by the Tribe pursuant to subsection (d); or
(ii) the expenditure
of such funds;
(D) if the capacity
or function of Lake Elwell facilities are significantly reduced, or are
anticipated to be significantly reduced, for an extended period of time, the
Tribe shall have the same storage rights as other storage contractors with
respect to the allocation under this section;
(E) the costs
associated with the construction of the storage facilities at Tiber Dam
allocable to the Tribe shall be—
(i) nonreimbursable;
and
(ii) excluded from
any repayment obligation of the Tribe;
(F) no water service
capital charge shall be due or payable for any water allocated to the Tribe
pursuant to this section or the allocation agreement, regardless of whether
that water is delivered for use by the Tribe or under a lease, contract, or by
agreement entered into by the Tribe pursuant to subsection (b)(3)(B);
(G) the Tribe shall
not be required to make payments to the United States for any water allocated
to the Tribe under this Act or the allocation agreement, except for each
acre-foot of stored water leased or sold for industrial purposes as described
in subparagraph (H); and
(H) for each
acre-foot of stored water leased or sold by the Tribe for industrial
purposes—
(i) the
Tribe shall pay annually to the United States an amount necessary to cover the
proportional share of the annual operation, maintenance, and replacement costs
allocable to the quantity of water leased or sold by the Tribe for industrial
purposes; and
(ii) the annual
payments of the Tribe shall be reviewed and adjusted, as appropriate, to
reflect the actual operation, maintenance, and replacement costs for Tiber
Dam.
(d)
Agreements by
Tribe
The Tribe may use, lease, contract, exchange, or enter into
other agreements for use of the water allocated to the Tribe under subsection
(a) if—
(1) the use of water
that is the subject of such an agreement occurs within the Missouri River
basin; and
(2) the agreement
does not permanently alienate any portion of the water allocated to the Tribe
under subsection (a).
(e)
Effective
date
The allocation under subsection (a) takes effect on the
enforceability date.
(f)
Prohibition on
increase
The allocation under subsection (a) shall not be
increased by any year-to-year carryover storage.
(g)
Development and
delivery costs
The United States shall not be required to pay the
cost of developing or delivering to the Reservation any water allocated under
this section.
9.
Blackfeet
Irrigation Project
(a)
In
general
Notwithstanding any other provision of law, and without
altering applicable law (including regulations) under which the Bureau of
Indian Affairs collects assessments and carries out Blackfeet Irrigation
Project OM&R (other than the maintenance and improvements carried out under
this section), the Secretary, acting through the Commissioner of Reclamation,
shall carry out the following responsibilities of the United States relating to
the Blackfeet Irrigation Project:
(1) Deferred
maintenance.
(2) Dam safety
improvements for Four Horns Dam.
(b)
Lead
agency
The Bureau of Reclamation shall serve as the lead agency
with respect to any activities under this section.
(c)
Scope
The
scope of the deferred maintenance activities and Four Horns Dam safety
improvements shall be as generally described in the document entitled
Engineering Evaluation and Condition Assessment, Blackfeet Irrigation
Project, prepared by DOWL HKM, and dated August 2007, subject to the
condition that, before commencing construction activities, the Secretary
shall—
(1) review the design
of the proposed rehabilitation or improvement; and
(2) perform value
engineering analyses.
(d)
Funding
The
total amount of obligations incurred by the Secretary in carrying out this
section shall not exceed $37,900,000.
10.
Birch Creek
mitigation project
(a)
In
general
The Secretary, acting through the Commissioner of
Reclamation, shall carry out activities to provide mitigation water for Birch
Creek water users from Four Horns Reservoir, in accordance with the Birch Creek
Agreement.
(b)
Lead
agency
The Bureau of Reclamation shall serve as the lead agency
with respect to any activities under this section.
(c)
Scope
(1)
In
general
The scope of the rehabilitation and improvements shall be
as generally described in the document entitled Four Horns Feeder Canal
Rehabilitation with Export, prepared by DOWL HKM, and dated May 31,
2012, subject to the condition that, before commencing construction activities,
the Secretary shall—
(A) review the design
of the proposed rehabilitation or improvement; and
(B) perform value
engineering analyses.
(2)
Inclusions
The
activities carried out by the Secretary under this section shall
include—
(A) the
rehabilitation or improvement of the Four Horns feeder canal system to a
capacity of not less than 360 cubic feet per second;
(B) the
rehabilitation or improvement of the outlet works of Four Horns Dam and
Reservoir to deliver 15,000 acre-feet of water per year, in accordance with
subparagraph (C); and
(C) construction of
facilities to deliver 15,000 acre-feet of water per year from Four Horns Dam
and Reservoir to a point on Birch Creek to be designated by the Tribe and the
State for delivery of water to the water delivery system of the Pondera County
Canal and Reservoir Company Project on Birch Creek, in accordance with the
Birch Creek Agreement.
(3)
Costs
The
costs to construct facilities under this subsection—
(A) shall not be paid
by the United States; and
(B) shall be
nonreimbursable.
(4)
Negotiation
with Tribe
On the basis of the review described in paragraph
(1)(A), the Secretary shall negotiate with the Tribe appropriate changes to the
final design of any activity under this subsection to ensure that the final
design meets applicable industry standards.
(d)
Funding
No
part of the project under this section shall be commenced until the State has
appropriated and made available $34,000,000 to carry out this section.
11.
Birch Creek
Mitigation Fund
(a)
Establishment
There
is established in the Treasury of the United States a fund, to be known as the
Birch Creek Mitigation Fund (referred to in this section as the
Fund), to be used to mitigate the impacts of development of the
tribal water right described in article III.C.1. of the Compact on the Birch
Creek water supplies of the Pondera County Canal and Reservoir Company
Project.
(b)
Management
The
Secretary, acting through the Commissioner of Reclamation, shall manage the
Fund in accordance with this section.
(c)
Disbursement of
Fund
Amounts from the Fund may not be disbursed until the
expiration of the Birch Creek Agreement.
(d)
Authorization
of appropriations
There are authorized to be appropriated such
sums as are necessary to carry out this section.
12.
Design and
construction of MR&I System
(a)
In
general
The Secretary, acting through the Commissioner of
Reclamation, shall plan, design, and construct the MR&I System in
accordance with 1 or more agreements between the Secretary and the
Tribe.
(b)
Lead
agency
The Bureau of Reclamation shall serve as the lead agency
with respect to any activity to design and construct the MR&I
System.
(c)
Scope
(1)
In
general
The scope of the design and construction under this
section shall be as generally described in the document entitled
Blackfeet Regional Water System Report, prepared by DOWL HKM, and
dated June 2010, and updated in a memorandum entitled Blackfeet Regional
Water System Potential Cost Modifications, prepared by DOWL HKM, and
dated November 3, 2011, subject to the condition that, before commencing final
design and construction activities, the Secretary shall—
(A) review the design
of the proposed MR&I System; and
(B) perform value
engineering analyses and appropriate Federal compliance activities.
(2)
Negotiation
with Tribe
On the basis of the review described in paragraph
(1)(A), the Secretary shall negotiate with the Tribe appropriate changes to the
final design—
(A) to ensure that
the final design meets applicable industry standards; and
(B) to improve the
cost-effectiveness of the delivery of MR&I System water.
(d)
Nonreimbursability
of costs
All costs incurred by the Secretary in carrying out this
section shall be nonreimbursable.
(e)
Funding
The
total amount of funding to carry out this section shall not exceed
$76,200,000.
(f)
Non-Federal
contribution
(1)
In
general
Prior to completion of the final design of the MR&I
System required by subsection (c), the Secretary shall consult with the Tribe,
the State, and other affected non-Federal parties to discuss the practicability
of receiving non-Federal contributions for the cost of the MR&I
System.
(2)
Negotiations
If,
based on the extent to which non-Federal parties are expected to use the
MR&I System, a non-Federal contribution to the MR&I System is
determined to be appropriate under paragraph (1), the Secretary shall initiate
negotiations for an agreement regarding the means by which such contributions
shall be provided.
13.
Blackfeet
water, storage, and development projects
(a)
In
general
The Secretary, acting through the Commissioner of
Reclamation, shall carry out such activities as are necessary to construct the
Blackfeet water, storage, and development projects, in accordance with an
agreement to be negotiated between the Secretary and the Tribe.
(b)
Lead
agency
The Bureau of Reclamation shall serve as the lead agency
with respect to any activity to rehabilitate or improve the water diversion or
delivery features of the Blackfeet water, storage, and development
projects.
(c)
Scope
(1)
In
general
The scope of the construction under this section shall be
as generally described in the document entitled Blackfeet Water Storage,
Development, and Projects Report, prepared by DOWL HKM, and dated July
16, 2012, and any modifications or revisions to the report, subject to the
condition that, before commencing construction activities, the Secretary
shall—
(A) review the design
of the proposed rehabilitation or improvement; and
(B) perform value
engineering analyses.
(2)
Negotiation
with Tribe
On the basis of the review described in paragraph
(1)(A), the Secretary shall negotiate with the Tribe appropriate changes to the
projects, including final design—
(A) to ensure that
the final design meets applicable industry standards;
(B) to improve the
use, management, and administration of tribal water for irrigation and other
purposes; and
(C) to take into
consideration the equitable distribution of water to allottees.
(d)
Nonreimbursability
of costs
All costs incurred by the Secretary in carrying out this
section shall be nonreimbursable.
(e)
Funding
The
total amount of obligations incurred by the Secretary in carrying out this
section shall not exceed $178,300,000.
14.
Tribal
implementation agreements
—
(a)
Applicability
of ISDEAA
At the request of the Tribe and in accordance with the
Indian Self-Determination and Education Assistance Act (25 U.S.C. 450 et seq.),
the Secretary shall enter into 1 or more agreements with the Tribe to carry out
sections 9, 10, 12, and 13.
(b)
Administration
The
Commissioner of Reclamation and the Tribe shall negotiate the cost of any
oversight activity carried out by the Bureau of Reclamation under any agreement
entered into under subsection (a), subject to the condition that the total cost
for the oversight shall not exceed 4 percent of the total project costs for
each project.
(c)
Acquisition of
land
(1)
Tribal
easements and rights-of-way
On request of the Secretary, and in
partial consideration for the funding provided under section 17(k), the Tribe
shall consent to the grant of such easements and rights-of-way over tribal land
as are necessary for the construction of the projects authorized by sections 9,
10, 12, and 13, at no cost to the United States.
(2)
Land acquired
by United States
Land acquired by the United States or the Tribe
in connection with the construction of the projects authorized by sections 9,
10, 12, and 13 shall be held in trust by the United States on behalf of the
Tribe as part of the Reservation.
(d)
Transfer of
title
(1)
In
general
Notwithstanding any other provision of law, the Secretary
may transfer to the Tribe, at no cost, any title held by the United States in
and to each facility, asset, or other property of each of the projects
authorized under sections 9, 10, 12, and 13 in accordance with paragraph
(2).
(2)
Conveyance to
Tribe
The Secretary shall convey to the Tribe title in and to the
projects authorized by sections 9, 10, 12, and 13 not later than 30 days after
the date on which the Secretary publishes in the Federal Register a statement
of findings that—
(A) the Tribe has
passed a resolution requesting that the Secretary transfer to the Tribe any
title held by the United States in and to the property or facilities of the
projects under section 9, 10, 11, or 12; and
(B) the Secretary has
provided to the Tribe—
(i) a
report regarding the condition of the project; and
(ii) technical
assistance regarding the operation and maintenance of the projects, including
operation and maintenance training.
(3)
Ownership
On
transfer of title under paragraph (1), the projects or any portion of the
projects transferred under paragraph (2) shall be considered to be owned,
operated, and managed by the Tribe.
(e)
Authority of
Tribe
On transfer of title to the project or any portion of a
project or facility to the Tribe in accordance with subsection (d), or on
assumption of the operation of the project by the Tribe, the Tribe may
collect—
(1) OM&R costs;
and
(2) any other costs
relating to the operation of the project, as appropriate.
(f)
Operation and
maintenance of Blackfeet Irrigation Project
On transfer of title
to the Blackfeet Irrigation Project pursuant to subsection (d), the Tribe shall
promulgate criteria and procedures, subject to the approval of the Secretary,
under which the Tribe shall operate and maintain the Blackfeet Irrigation
Project, including—
(1) a due process
system for the consideration and determination of any request by a water user
for an allocation of water that provides protection not less stringent than the
protection available under Federal law, including a process for—
(A) appeal and
adjudication of denied or disputed distributions of water; and
(B) resolution of
contested administrative decisions; and
(2) a system for
establishing operation and maintenance assessment rates, including a process
for—
(A) appeal and
adjudication of operation and maintenance assessment rates; and
(B) resolution of
contested administrative decisions.
(g)
Liability
(1)
In
general
Effective on the date of the transfer authorized by
subsection (d), the United States shall not be liable for damages of any kind
arising out of any act, omission, or occurrence relating to the land,
buildings, or facilities transferred under this subsection, other than damages
caused by acts of negligence committed by the United States (or an employee or
agent of the United States) before the date of transfer.
(2)
Tort
claims
Nothing in this section increases the liability of the
United States beyond the liability provided in chapter 171 of title 28, United
States Code (commonly known as the Federal Tort Claims
Act).
(3)
OM&R
obligation of Federal Government after transfer
The Federal
Government shall have no obligation to pay for the operation, maintenance, or
replacement costs of the projects authorized by sections 9, 10, 12, and 13
beginning on the later of—
(A) the date on which
title to any project authorized by sections 9, 10, 12, and 13 is transferred to
the Tribe; and
(B) the date on which
the amounts required to be deposited in the OM&R Account pursuant to
section 17(k)(2) have been deposited in that account.
(h)
Alienation and
taxation
Transfer of title to the Tribe pursuant to subsection
(d) does not waive or alter any applicable Federal law prohibiting alienation
or taxation of—
(1) the project;
or
(2) the underlying
Reservation land.
15.
Ratification of
Compact
(a)
Ratification
(1)
In
general
Except as modified by this Act, and to the extent that
the Compact does not conflict with this Act, the Compact is authorized,
ratified, and confirmed.
(2)
Amendments
If
an amendment is executed in accordance with this Act to make the Compact
consistent with this Act, the amendment is authorized, ratified, and
confirmed.
(b)
Execution
(1)
In
general
To the extent that the Compact does not conflict with
this Act, the Secretary shall execute the Compact, including all exhibits to,
or parts of, the Compact requiring the signature of the Secretary.
(2)
Modifications
Nothing
in this Act precludes the Secretary from approving any modification to an
appendix or exhibit to the Compact that is consistent with this Act, to the
extent that the modification does not otherwise require congressional approval
under section 2116 of the Revised Statutes (25 U.S.C. 177) or any other
applicable provision of Federal law.
(c)
Environmental
compliance
(1)
In
general
In implementing the Compact and this Act, the Secretary
shall comply with all applicable provisions of—
(A) the National
Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.);
(B) the Endangered
Species Act of 1973 (16 U.S.C. 1531 et seq.); and
(C) all other
applicable environmental law and regulations.
(2)
Effect of
execution
(A)
In
general
An activity carried out by the Secretary to execute the
Compact pursuant to this section shall not constitute a major Federal action
for purposes of the National Environmental Policy Act of 1969 (42 U.S.C. 4321
et seq.).
(B)
Compliance
The
Secretary shall carry out all Federal compliance activities necessary to
implement the Compact.
16.
Tribal water
rights
(a)
Confirmation of
tribal water rights
(1)
In
general
The tribal water rights are ratified, confirmed, and
declared to be valid.
(2)
Use
Use
of the tribal water rights shall be subject to the terms and conditions
established by the Compact and this Act.
(b)
Holding in
trust
The tribal water rights—
(1) shall be held in
trust by the United States for the use and benefit of the Tribe in accordance
with this section; and
(2) shall not be
subject to forfeiture or abandonment.
(c)
Intent of
Congress
It is the intent of Congress to provide to each allottee
benefits that are equivalent to, or exceed, the benefits possessed by allottees
on the day before the date of enactment of this Act, taking into
consideration—
(1) the potential
risks, cost, and time delay associated with litigation that would be resolved
by the Compact and this Act;
(2) the availability
of funding under this Act and from other sources;
(3) the availability
of water from the tribal water rights; and
(4) the applicability
of section 7 of the Act of February 8, 1887 (25 U.S.C. 381), and this Act to
protect the interests of allottees.
(d)
Allottees
(1)
Applicability
of Act of February 8, 1887
The provisions of section 7 of the Act
of February 8, 1887 (25 U.S.C. 381), relating to the use of water for
irrigation purposes shall apply to the tribal water rights.
(2)
Entitlement to
water
Any entitlement to water of an allottee under Federal law
shall be satisfied from the tribal water rights.
(3)
Allocations
Pursuant
to the Act of February 8, 1887 (24 Stat. 390, chapter 119), allottees shall be
entitled to a just and equitable allocation of water for irrigation
purposes.
(4)
Claims
(A)
Exhaustion of
remedies
Before asserting any claim against the United States
under section 7 of the Act of February 8, 1887 (25 U.S.C. 381), or any other
applicable law, an allottee shall exhaust remedies available under the tribal
water code or other applicable tribal law.
(B)
Action for
relief
After the exhaustion of all remedies available under the
tribal water code or other applicable tribal law, an allottee may assert a
claim against the United States under section 7 of the Act of February 8, 1887
(25 U.S.C. 381), or other applicable law.
(5)
Authority
The
Secretary shall have the authority to protect the rights of allottees in
accordance with this section.
(e)
Authority of
Tribe
(1)
In
general
The Tribe shall have the authority to allocate,
distribute, and transfer the tribal water right in accordance with—
(A) the Compact;
and
(B) the tribal water
code.
(2)
Land leases by
allottees
An allottee may lease any interest in land held by the
allottee, together with any allocation of water under subsection (d)(3),
subject to the condition that nothing in this section affects the authority of
the Tribe to require a water permit or to otherwise manage use of the water
under the tribal water code.
(f)
Tribal water
code
(1)
In
general
In accordance with article IV.C.1. of the Compact, the
Tribe shall—
(A) amend the tribal
water code in accordance with the Compact and this Act; and
(B) ensure that the
amendments provide for—
(i) the
management, regulation, and governance of all uses of the tribal water rights
in accordance with the Compact and this Act, including all uses by allottees
(or any successor in interest to an allottee); and
(ii) establishment by
the Tribe of conditions, permit requirements, and other limitations relating to
the storage, recovery, and use of the tribal water rights in accordance with
the Compact and this Act.
(2)
Inclusions
Subject
to the approval of the Secretary, the tribal water code shall provide
that—
(A) tribal
allocations of water to allottees shall be satisfied with water from the tribal
water rights;
(B) charges for
delivery of water for irrigation purposes for allottees shall be assessed on a
just and equitable basis;
(C) there is a
process by which an allottee may request that the Tribe provide water for
irrigation use in accordance with this Act, including the provision of water
under any allottee lease;
(D) there is a due
process system for the consideration and determination by the Tribe of any
request by an allottee (or a successor in interest to an allottee) for an
allocation of water for irrigation purposes on allotted land, including a
process for—
(i) appeal and
adjudication of any denied or disputed distribution of water; and
(ii) resolution of
any contested administrative decision; and
(E) any allottee with
a claim relating to the enforcement of rights of the allottee under the tribal
water code, or to the quantity of water allocated to land of the allottee,
shall exhaust all remedies available to the allottee under tribal law and the
tribal water code before initiating an action against the United States or
petitioning the Secretary pursuant to subsection (d)(4)(B).
(3)
Interim
provisions
(A)
In
general
Subject to the requirements of section 4 and until the
date on which the amendments to the tribal water code are approved by the
Secretary, the tribal water rights shall be administered by the Tribe pursuant
to ordinance numbered 62 of the tribal water code, to the extent that the
ordinance is not inconsistent and does not conflict with the Compact or this
Act.
(B)
Conflicts
In
the event of an inconsistency or conflict described in subparagraph (A), the
provisions of the Compact and this Act shall control.
(4)
Approval by
Secretary
(A)
In
general
The tribal water code, and any amendment to the tribal
water code, shall not be valid unless the tribal water code or amendment is
approved by the Secretary.
(B)
Approval
period
The Secretary shall approve or disapprove the tribal water
code or an amendment to the tribal water code by not later than 180 days after
the date on which the tribal water code or amendment is submitted to the
Secretary.
(g)
Effect
Except
as otherwise expressly provided in this section, nothing in this Act—
(1) authorizes any
action by an allottee against any individual or entity, or against the Tribe,
under Federal, State, tribal, or local law; or
(2) alters or affects
the status of any action pursuant to section 1491(a) of title 28, United States
Code.
17.
Blackfeet
Settlement Trust Fund
(a)
Establishment
There
is established in the Treasury of the United States a trust fund, to be known
as the Blackfeet Settlement Trust Fund (referred to in this
section as the Trust Fund), consisting of the amounts deposited in
the Fund under subsection (c), together with any interest earned on those
amounts, to be managed, invested, and distributed by the Secretary for the
benefit of the Tribe, to remain available until expended.
(b)
Accounts
The
Secretary shall establish in the Trust Fund the following accounts:
(1) The
Administration and Energy Account.
(2) The OM&R
Account.
(3) The Water
Deferral Account.
(4) The MR&I
System Account.
(5) The Blackfeet
Water, Storage, and Development Projects Account.
(6) The Blackfeet
Irrigation Project Deferred Maintenance and Four Horns Dam Safety Improvements
Account.
(7) The St. Mary/Milk
Water Management and Activities Account.
(c)
Transfers
The
Secretary shall transfer to the Trust Fund—
(1) to the
Administration and Energy Account, the amount made available pursuant to
subsection (k)(1);
(2) to the OM&R
Account, the amount made available pursuant to subsection (k)(2);
(3) to the Water
Deferral Account, the amount made available pursuant to subsection
(k)(3);
(4) to the MR&I
System Account, the amount made available pursuant to subsection (k)(4);
(5) to the Blackfeet
Water, Storage, and Development Projects Account, the amount made available
pursuant to subsection (k)(5);
(6) to the Blackfeet
Irrigation Project Deferred Maintenance and Four Horns Dam Safety Improvements
Account, the amount made available pursuant to subsection (k)(6); and
(7) to the St.
Mary/Milk Water Management and Activities Account, the amount made available
pursuant to subsection (k)(7).
(d)
Management
The
Secretary shall manage, invest, and distribute all amounts in the Trust Fund in
a manner that is consistent with the investment authority of the Secretary
under—
(1) the first section
of the Act of June 24, 1938 (25 U.S.C. 162a);
(2) the American
Indian Trust Fund Management Reform Act of 1994 (25 U.S.C. 4001 et seq.);
and
(3) this
section.
(e)
Availability of
amounts
Amounts appropriated to, and deposited in, the Trust
Fund, including any investment earnings, shall be made available to the Tribe
beginning on the enforceability date.
(f)
Withdrawals by
Tribe
(1)
In
general
The Tribe may withdraw any portion of the funds in the
accounts established under subsection (b) on approval by the Secretary of a
tribal management plan submitted by the Tribe in accordance with the American
Indian Trust Fund Management Reform Act of 1994 (25 U.S.C. 4001 et
seq.).
(2)
Requirements
(A)
In
general
In addition to the requirements under the American Indian
Trust Fund Management Reform Act of 1994 (25 U.S.C. 4001 et seq.), the tribal
management plan under paragraph (1) shall require that the Tribe shall spend
all amounts withdrawn from the Trust Fund in accordance with this Act.
(B)
Enforcement
The
Secretary may carry out such judicial or administrative actions as the
Secretary determines to be necessary to enforce the tribal management plan to
ensure that amounts withdrawn by the Tribe from the Trust Fund are used in
accordance with this Act.
(g)
Expenditure
plan
(1)
In
general
The Tribe shall submit to the Secretary for approval an
expenditure plan for any portion of the Trust Fund that the Tribe elects to
withdraw under this subsection.
(2)
Inclusions
An
expenditure plan under paragraph (1)—
(A) shall include a
description of the manner and purpose for which the amounts proposed to be
withdrawn from the Trust Fund will be used by the Tribe, in accordance with
subsection (h); and
(B) may include a
description of how any remaining amounts may be used.
(3)
Approval
On
receipt of an expenditure plan under paragraph (1), the Secretary shall approve
the plan, if the Secretary determines that the plan is consistent with this
Act.
(h)
Uses
Amounts
from the Trust Fund shall be used by the Tribe for the following
purposes:
(1) The
Administration and Energy Account shall be used for administration of the
tribal water right and energy development projects under the Compact.
(2) The OM&R
Account shall be used to assist the Tribe in paying OM&R costs.
(3) The Water
Deferral Account shall be distributed pursuant to an approved expenditure plan
as follows:
(A) The first
$1,000,000 deposited in the account shall be distributed to the Tribe annually
as compensation for the deferral of the St. Mary water right.
(B) Any additional
amounts deposited in the account may be used by the Tribe to pay OM&R costs
or such other costs as are authorized by the Secretary.
(4) The MR&I
System Account shall be used to carry out section 12.
(5) The Blackfeet
Water, Storage, and Development Projects Account shall be used to carry out
section 13.
(6) The Blackfeet
Irrigation Project Deferred Maintenance and Four Horns Dam Safety Improvements
Account shall be used to carry out section 9.
(7) The St. Mary/Milk
Water Management and Activities Account shall be used to carry out section
6.
(i)
Liability
The
Secretary and the Secretary of the Treasury shall not be liable for the
expenditure or investment of any amounts withdrawn from the Trust Fund by the
Tribe under subsection (f).
(j)
No per capita
distributions
No portion of the Trust Fund shall be distributed
on a per capita basis to any member of the Tribe.
(k)
Authorization
of appropriations
Subject to subsection (l), there is authorized
to be appropriated to the Secretary—
(1) for deposit in
the Administration and Energy Account, $28,900,000;
(2) for deposit in
the OM&R Account, $25,500,000;
(3) for deposit in
the Water Deferral Account, $27,800,000;
(4) for deposit in
the MR&I System Account, $76,200,000;
(5) for deposit in the Blackfeet Water,
Storage, and Development Projects Account, $178,300,000;
(6) for deposit in
the Blackfeet Irrigation Project Deferred Maintenance and Four Horns Dam Safety
Improvements Account, $37,900,000; and
(7) for deposit in
the St. Mary/Milk Water Management and Activities Account, $25,200,000.
(l)
Cost
indexing
All amounts made available pursuant to subsection (k)
shall be adjusted as necessary to reflect the changes since April, 2010, in the
construction costs indices applicable to the construction, maintenance,
rehabilitation, or improvement of the projects and activities described in this
Act.
18.
Water rights in
Lewis and Clark National Forest
As part of the tribal water right, the Tribe
shall hold the rights to water in the Lewis and Clark National Forest, as
described in the document entitled More Definite Statement of
Claims, dated November 14, 1997, filed by the United States on behalf of
the Tribe, in the Montana Water Court in the case styled Matter of the
Adjudication of the Existing and Reserved Rights to the Use of Water, Both
Surface and Underground, of the Blackfeet Tribe of the Blackfeet Reservation
Within the State of Montana, Civil No. WC91–1.
19.
Waivers and
releases of claims
(a)
Waivers and
releases
(1)
Claims by Tribe
and United States as trustee for Tribe
Subject to the retention
of rights described in subsection (c), in consideration for recognition of the
tribal water rights and other benefits under the Compact and this Act, the
Tribe, on behalf of itself and the members of the Tribe (but not tribal members
in their capacities as allottees), and the United States, acting as trustee for
the Tribe and the members of the Tribe (but not tribal members in their
capacities as allottees), shall execute a waiver and release of all claims for
water rights within the State that the Tribe, or the United States acting as
trustee for the Tribe, asserted or could have asserted in any proceeding,
including a State stream adjudication, on or before the enforceability date,
except to the extent that such rights are recognized by this Act.
(2)
Claims by
United States as trustee for allottees
Subject to the retention
of claims described in subsection (c), in consideration for recognition of the
tribal water rights and other benefits under the Compact and this Act, the
United States, acting as trustee for the allottees, shall execute a waiver and
release of all claims for water rights within the Reservation that the United
States, acting as trustee for the allottees, asserted or could have asserted in
any proceeding, including a State stream adjudication, on or before the
enforceability date, except to the extent that such rights are recognized by
the Compact or this Act.
(3)
Claims by Tribe
against United States
Subject to the retention of rights
described in subsection (c), in consideration for recognition of the tribal
water rights and other benefits under the Compact and this Act, the Tribe, on
behalf of itself and the members of the Tribe (but not tribal members in their
capacities as allottees), shall execute a waiver and release of—
(A) all claims
against the United States (including the agencies and employees of the United
States) relating to claims for water rights within the State that the United
States, acting as trustee for the Tribe, asserted or could have asserted in any
proceeding, including a State stream adjudication, except to the extent that
such rights are recognized as a tribal water right;
(B) all claims
against the United States (including the agencies and employees of the United
States) relating to—
(i) damages, losses,
or injuries to water, water rights, land, or natural resources due to loss of
water or water rights (including damages, losses, or injuries to hunting,
fishing, gathering, or cultural rights due to loss of water or water rights,
claims relating to interference with, diversion of, or taking of water, and
claims relating to failure to protect, acquire, replace, or develop water,
water rights, or water infrastructure) within the State that first accrued at
any time on or before the enforceability date; or
(ii) the failure to
establish or provide a municipal rural or industrial water delivery system on
the Reservation;
(C) all claims
against the United States (including the agencies and employees of the United
States) relating to the pending litigation of claims relating to the water
rights of the Tribe in the State;
(D) all claims
against the United States (including the agencies and employees of the United
States) relating to the negotiation, execution, or the adoption of the Compact
(including exhibits) and this Act;
(E) all claims
against the United States (including the agencies and employees of the United
States) that first accrued at any time on or before the enforceability date
arising from the taking or acquisition of the land of the Tribe or resources
for the construction of the features of the St. Mary Unit;
(F) all claims
against the United States (including the agencies and employees of the United
States) that first accrued at any time on or before the enforceability date
relating to—
(i) the
construction, operation, or maintenance of the St. Mary Unit; or
(ii) on
completion of the Swift Current Creek Bank stabilization project, the
management of flows in Swift Current Creek, including the diversion of Swift
Current Creek into Lower St. Mary’s Lake;
(G) all claims
against the United States (including the agencies and employees of the United
States) that first accrued at any time on or before the enforceability date
relating to the construction, operation, or management of Lower Two Medicine
Dam and Reservoir and Four Horns Dam and Reservoir; and
(H) all claims
against the United States (including the agencies and employees of the United
States) that first accrued at any time on or before the enforceability date
relating to the allocation of water of the Milk River (including tributaries)
or the St. Mary River (including tributaries) between the United States and
Canada pursuant to the International Boundary Waters Treaty of 1909 (36 Stat.
2448).
(b)
Effectiveness
of waivers and releases
The waivers under subsection (a) shall
take effect on the enforceability date.
(c)
Reservation of
rights and retention of claims
Notwithstanding the waivers and
releases under this section, the Tribe, on behalf of itself and the members of
the Tribe, and the United States, acting as trustee for the Tribe and
allottees, retain—
(1) all claims for
enforcement of the Compact, any final decree, or this Act;
(2) all rights to use
and protect water rights acquired after the date of enactment of this
Act;
(3) all claims
relating to activities affecting the quality of water, including any claims of
the Tribe under—
(A) the Comprehensive
Environmental Response, Compensation, and Liability Act of 1980 (42 U.S.C. 9601
et seq.), including claims for damages to natural resources;
(B) the Safe Drinking
Water Act (42 U.S.C. 300f et seq.);
(C) the Federal Water
Pollution Control Act (33 U.S.C. 1251 et seq.); and
(D) any regulations
promulgated pursuant to an Act described in subparagraph (A), (B), or
(C);
(4) all claims
relating to damages, losses, or injuries to land or natural resources not due
to loss of water or water rights (including hunting, fishing, gathering, or
cultural rights);
(5) all rights,
remedies, privileges, immunities, and powers not specifically waived and
released pursuant to this Act or the Compact;
(6) all claims for
rights retained under the agreement dated September 19, 1895, and ratified on
June 10, 1896 (29 Stat. 321, chapter 398), filed by the United States on behalf
of the Tribe in—
(A) Glacier National
Park, as described in the document entitled More Definite Statement of
Claims, dated November 14, 1997; or
(B) the case styled
Matter of the Adjudication of the Existing and Reserved Rights to the Use of
Water, Both Surface and Underground, of the Blackfeet Tribe of the Blackfeet
Reservation Within the State of Montana, Civil No. WC91–1;
(7) the water rights
of the Tribe, whether adjudicated or unadjudicated;
(8) the authority of
the Tribe to use and protect such water rights; and
(9) any claim for
damages for loss of water resources allegedly caused by a failure to establish,
acquire, enforce, or protect such water rights.
(d)
Effect of
Compact and Act
Nothing in the Compact or this Act—
(1) affects the
ability of the United States to take actions authorized by law, including any
laws relating to health, safety, or the environment, including—
(A) the Comprehensive
Environmental Response, Compensation, and Liability Act of 1980 (42 U.S.C. 9601
et seq.);
(B) the Safe Drinking
Water Act (42 U.S.C. 300f et seq.);
(C) the Federal Water
Pollution Control Act (33 U.S.C. 1251 et seq.); and
(D) any regulations
promulgated pursuant to an Act described in subparagraph (A), (B), or
(C);
(2) affects the
ability of the United States to act as trustee for any other Indian tribe or
allottee of any other Indian tribe;
(3) confers
jurisdiction on any State court—
(A) to interpret
Federal law relating to health, safety, or the environment;
(B) to determine the
duties of the United States or other parties pursuant to such a Federal law;
or
(C) to conduct
judicial review of any Federal agency action;
(4) waives any claim
of a member of the Tribe in an individual capacity that does not derive from a
right of the Tribe;
(5) revives any claim
waived by the Tribe in the case styled Blackfeet Tribe v. United States, No.
02–127L (Fed. Cl. 2012); or
(6) revives any claim
released by an allottee or a member of the Tribe in the settlement for the case
styled Cobell v. Salazar, No. 1:96CV01285–JR (D.D.C. 2012).
(e)
Enforceability
date
The enforceability date shall be the date on which the
Secretary publishes in the Federal Register a statement of findings
that—
(1)
(A) the Montana Water Court
has issued a final judgment and decree approving the Compact; or
(B) if the Montana Water Court is found to
lack jurisdiction, the United States district court of competent jurisdiction
has approved the Compact as a consent decree, and the approval is final;
(2) all amounts
authorized to be appropriated under section 17(k) have been
appropriated;
(3) the Tribe has
executed the agreements with the Secretary required by sections 5(b), 6(e),
8(c), and 14(a);
(4) the State has
appropriated and paid into an interest-bearing escrow account any payments due
as of the date of enactment of this Act to the Tribe under the Compact and this
Act;
(5)
(A) the Tribe has ratified
the Compact by submitting this Act and the Compact to a vote by the tribal
membership for approval or disapproval; and
(B) the Tribal membership has voted to
approve this Act and the Compact by a majority of votes cast on the day of the
vote, as certified by the Secretary and the Tribe;
(6) the Secretary has
fulfilled the requirements of section 8(a);
(7) the Tribe has
enacted a tribal water code pursuant to section 16(f);
(8) the waivers and
releases described subsection (a) have been executed by the Tribe and the
Secretary; and
(9) the Secretary has
fulfilled the requirements of section 15(b).
(f)
Tolling of
claims
(1)
In
general
Each applicable period of limitation and time-based
equitable defense relating to a claim described in this section shall be tolled
for the period beginning on the date of enactment of this Act and ending on the
date on which the amounts made available to carry out this Act are transferred
to the Secretary.
(2)
Effect of
subsection
Nothing in this subsection revives any claim or tolls
any period of limitation or time-based equitable defense that expired before
the date of enactment of this Act.
(g)
Expiration and
tolling
If all appropriations authorized by this Act have not
been made available to the Secretary by January 15, 2018—
(1) the waivers and
releases described in this section shall expire and be of no further force or
effect; and
(2) all statutes of
limitations applicable to any claim otherwise waived shall be tolled until
January 15, 2018.
(h)
Voiding of
waivers
If the waivers pursuant to this section are void under
subsection (g)—
(1) the approval of
the Compact under section 15 shall no longer be effective;
(2) any unexpended
Federal funds appropriated or made available to carry out the activities
authorized by this Act, together with any interest earned on those funds, any
water rights or contracts to use water, and any title in and to other property
acquired or constructed with Federal funds appropriated or made available to
carry out the activities authorized by this Act, shall be returned to the
Federal Government, unless otherwise agreed to by the Tribe and the United
States and approved by Congress; and
(3) except for
Federal funds used to acquire or develop property that is returned to the
Federal Government under paragraph (2), the United States shall be entitled to
offset any Federal funds appropriated or made available to carry out the
activities authorized by this Act that were expended or withdrawn, together
with any interest accrued, against any claims against the United States
relating to water rights in the State asserted by the Tribe or in any future
settlement of the water rights of the Tribe.
20.
Satisfaction of
claims
(a)
Tribal
claims
The benefits realized by the Tribe under this Act shall be
in complete replacement of, complete substitution for, and complete
satisfaction of all claims of the Tribe against the United States under
paragraphs (1) and (3) of section 19(a).
(b)
Allottee
claims
The benefits realized by the allottees under this Act
shall be in complete replacement of, in complete substitution for, and in
complete satisfaction of—
(1) all claims waived
and released under section 19; and
(2) any claims of the
allottees against the United States that the allottees have or could have
asserted that are similar in nature to any claim described in section
19.
21.
Miscellaneous
provisions
(a)
Waiver of
sovereign immunity
Except as provided in subsections (a) through
(c) of section 208 of the Department of Justice Appropriation Act, 1953 (43
U.S.C. 666), nothing in this Act waives the sovereign immunity of the United
States.
(b)
Other tribes
not adversely affected
Nothing in this Act quantifies or
diminishes any land or water right, or any claim or entitlement to land or
water, of an Indian tribe, band, or community other than the Tribe.
(c)
Limitation on
claims for reimbursement
With respect to Indian-owned land
located within the Reservation—
(1) the United States
shall not submit against such land any claim for reimbursement of the cost to
the United States of carrying out this Act or the Compact; and
(2) no assessment of
such land shall be made regarding that cost.
(d)
Limitation on
liability of United States
The United States has no
obligation—
(1) to monitor,
administer, or account for, in any manner, any funds provided to the Tribe by
any party to the Compact; or
(2) to review or
approve any expenditure of those funds.
(e)
Effect on
current law
Nothing in this section affects any provision of law
(including regulations) in effect on the day before the date of enactment of
this Act with respect to preenforcement review of any Federal environmental
enforcement action.
(f)
Effect on
reclamation law
The activities carried out by the Commissioner of
Reclamation under this Act shall not establish a precedent or impact the
authority provided under any other provision of Federal reclamation law,
including—
(1) the Reclamation
Rural Water Supply Act of 2006 (43 U.S.C. 2401 et seq.); and
(2) the Omnibus
Public Land Management Act of 2009 (Public Law 111–11; 123 Stat. 991).
(g)
Irrigation
efficiency in Upper Birch Creek drainage
Any activity carried out
by the Tribe in the Upper Birch Creek Drainage (as defined in article II.50 of
the Compact) using funds made available to carry out this Act shall achieve an
irrigation efficiency of not less than 50 percent.
(h)
Birch Creek
Agreement approval
The Birch Creek Agreement entered into between
the Tribe and the State on January 31, 2008 (including any amendments executed
in accordance with this Act to make the Agreement consistent with this Act), is
approved to the extent that the Birch Creek Agreement requires approval under
section 2116 of the Revised Statutes (25 U.S.C. 177).
22.
Repeal on
failure to meet enforceability date
If the Secretary fails to publish a
statement of findings under section 19(e) by not later than January 15, 2018,
or such alternative later date as is agreed to by the Tribe and the Secretary,
after reasonable notice to the State, as applicable—
(1) this Act is
repealed effective on the later of—
(A) January 15, 2018;
and
(B) the day after
such alternative later date as is agreed to by the Tribe and the
Secretary;
(2) any action taken
by the Secretary and any contract or agreement entered into pursuant to this
Act shall be void;
(3) any amounts made
available under section 17(k), together with any interest on those amounts,
shall immediately revert to the general fund of the Treasury;
(4) any amounts made
available under section 17(k) that remain unexpended shall immediately revert
to the general fund of the Treasury; and
(5) the United States
shall be entitled to offset against any claims asserted by the Tribe against
the United States relating to water rights—
(A) any funds
expended or withdrawn from the amounts made available pursuant to this Act;
and
(B) any funds made
available to carry out the activities authorized by this Act from other
authorized sources.
23.
Antideficiency
The United States shall not be liable for
any failure to carry out any obligation or activity authorized by this Act
(including any obligation or activity under the Compact) if adequate
appropriations are not provided expressly by Congress to carry out the purposes
of this Act in—
(1) the Reclamation
Water Settlements Fund established under section 10501(a) of the Omnibus Public
Land Management Act of 2009 (43 U.S.C. 407(a)); or
(2) the Emergency
Fund for Indian Safety and Health established by section 601(a) of the Tom
Lantos and Henry J. Hyde United States Global Leadership Against HIV/AIDS,
Tuberculosis, and Malaria Reauthorization Act of 2008 (25 U.S.C.
443c(a)).