A BILL
To establish the American Infrastructure Investment Fund
and other activities to facilitate investments in infrastructure projects that
significantly enhance the economic competitiveness of the United States by
improving economic output, productivity, or competitive commercial advantage,
and for other purposes.
1.
Short
title; table of contents
(a)
Short
title
This Act may be cited
as the American Infrastructure
Investment Fund Act.
(b)
Table of
contents
The table of contents of this Act is as follows:
Sec. 1. Short title; table of
contents.
Sec. 2. American infrastructure investment fund.
Sec. 3. National infrastructure investment grants.
2.
American
infrastructure investment fund
(a)
Establishment
of Fund
Chapter 3 of title 49, United States Code, is
amended—
(1) in the table of
sections, by adding at the end the following:
SUBCHAPTER IV—American Infrastructure
Investment Fund
361. Definitions.
362. Establishment of Fund.
363. Organizational structure and
duties.
364. Fund authorities and
assistance.
365. Studies and
reports.
;
and
(2) by adding at the
end the following:
IV
American
Infrastructure Investment Fund
361.
Definitions
In this subchapter:
(1)
Board
The
term Board means the Board of Directors of the Fund appointed
pursuant to section 363(b).
(2)
Direct
Loan
The term direct loan has the meaning given the
term under section 502(1) of the Congressional Budget Act of 1974 (2 U.S.C.
661a(1)).
(3)
Economic
competitiveness
The term economic competitiveness
means the ability of the economy to more efficiently produce goods and deliver
services, including—
(A) reductions in
travel time of goods and people, including reductions in average delay or the
uncertainty of travel time; and
(B) net benefits to
society through economic benefits attributable to improving the spatial
clustering of economic activity.
(4)
Eligible
project
The term eligible project means a capital
project that—
(A) advances the
objectives of this subchapter;
(B) is comprised of
activities included in a regional, State, or national plan, either at the time
of submission of the application or before the obligation of funds from the
Fund;
(C) has eligible
project costs related to a single project, or has aggregate eligible project
costs related to a program of projects that are coordinated to achieve a
unified improvement; and
(D) is a
transportation-related project.
(5)
Eligible
funding recipient
The term eligible funding
recipient—
(A) means an entity
that has received a financing award from the Fund;
(B) shall be—
(i) a
non-Federal governmental entity, agency, or instrumentality; or
(ii) a
nongovernmental entity, such as a corporation, partnership, joint venture, or
other instrumentality, that seeks funding for an eligible project; and
(C) shall have a
non-Federal governmental cosponsor of the project if it is a non-governmental
entity.
(6)
Eligible
project cost
The term eligible project cost—
(A) includes costs
associated with development phase planning and design activities, construction,
acquisition, rehabilitation, environmental remediation, interest expense during
construction or reconstruction, and reasonable required reserves; and
(B) excludes
operating costs, research and development costs, and any other costs not
otherwise specifically provided for in subparagraph (A).
(7)
Executive
director
The term Executive Director means the
Executive Director of the Fund appointed pursuant to section 363(a)(1).
(8)
Fund
The
term Fund means the American Infrastructure Investment Fund of the
Department of Transportation established under section 362.
(9)
Investment
plan
The term investment plan means a written mutual
agreement between the Fund and an applicant that outlines the prospective terms
of financial assistance to be invested by the Fund.
(10)
Line of
credit
The term line of credit means an agreement
entered into between the Fund and an eligible funding recipient to provide a
direct loan at a future date upon the occurrence of certain events.
(11)
Loan
guarantee
The term loan guarantee has the meaning
given the term under section 502(3) of the Congressional Budget Act of 1974 (2
U.S.C. 661a(3)).
(12)
Operating
guidance
The term Operating Guidance means the
detailed description of the Fund’s operating policies and procedures that has
been published in accordance with this subchapter.
(13)
Qualified
application
The term Qualified Application means an
application that the Executive Director has certified to have met eligibility
and qualification standards under this subchapter.
(14)
Rural
The
term rural means all population and territory that are not within
an Urbanized Area (as such term is defined in the most recent decennial United
States census).
(15)
Secretary
Except
as otherwise specified, the term Secretary means the Secretary of
Transportation.
(16)
Transportation-related
project
The term transportation-related project
means a project that is part of, or related to, a transportation improvement,
including projects related to the construction or improvement of—
(A) a passenger or
freight rail line;
(B) a highway;
(C) a bridge;
(D) an
airport;
(E) an air traffic
control system;
(F) a port or marine
facility;
(G) an inland
waterway;
(H) a transmission or
distribution pipeline;
(I) public
transportation facilities or systems;
(J) intercity
passenger bus or passenger rail facilities or equipment; or
(K) freight rail
facilities or equipment.
362.
Establishment
of Fund
(a)
Establishment
There
is established in the Department of Transportation an entity to be known as the
American Infrastructure Investment Fund.
(b)
Objectives
The
primary objective of the Fund shall be—
(1) to invest in
infrastructure projects that provide measurable improvements to the economic
competitiveness of all or part of the United States by increasing or otherwise
improving economic output, productivity, or competitive commercial
advantage;
(2) to provide
funding for projects that face significant funding barriers due to problems
associated with the need to combine resources across multiple jurisdictions or
modes of transportation;
(3) to improve the
efficiency or throughput of a national or regional transportation network
by—
(A) improving the
integration between networks; or
(B) improving the
condition, performance, or long-term cost structure of existing
infrastructure;
(4) to improve the
safety of transportation facilities and systems, as measured by the reduction
in risk of transportation-related crashes, injuries, or deaths; and
(5) to improve the
environmental sustainability of a national or regional transportation network,
as measured by—
(A) improvement in
energy efficiency;
(B) reduction in
greenhouse gas and other harmful emissions;
(C) conservation of
natural resources;
(D) improvement in
water quality;
(E) improvement in
infrastructure resilience to environmental hazards and natural disasters;
and
(F) other beneficial
environmental impacts.
(c)
Strategy
(1)
In
general
The Fund shall advance the objectives set forth in
subsection (b) by providing financial assistance for individual projects or
programs of related projects identified in State, regional, or national plans
and designed to significantly improve national or regional economic
competitiveness.
(2)
Project
portfolio
The Fund shall—
(A) target projects
or programs of related projects with a demonstrated difficulty in obtaining
complete financing through other available public or private sources of funds,
for reasons including project complexity, modes, or other comparable
transactional barriers;
(B) seek to identify
appropriate Investment Plans for selected projects and programs of projects;
and
(C) use Fund
resources to build a portfolio of transformational investments that—
(i) promotes greater
efficiency in the movement of freight or the provision of services;
(ii) promotes greater
efficiency in the movement of people;
(iii) integrates
multiple transportation modes in the movement of passengers or freight;
(iv) promotes the use
of innovation and best practices in the planning, design, development, and
delivery of projects, including practices that promote performance-based
decision making to achieve national, State, or regional objectives;
(v) promotes
cross-jurisdictional infrastructure planning and coinvestment among a broad
range of participants, including States, tribal governments, municipalities,
and public and private investors; and
(vi) integrates
transportation infrastructure investment planning, such as regional
transportation plans, with land-use economic development and other
infrastructure Investment Plans.
(3)
Investment
prospectus
(A)
Publication
Not
later than 1 year after the date of enactment of the
American Infrastructure Investment Fund
Act, the Fund shall publish a detailed description of its
strategy in an Investment Prospectus that—
(i) specifies what
will be considered significant to the economic competitiveness of all or part
of the United States in a manner consistent with the primary objective set
forth in subsection (b)(1);
(ii) specifies the
priorities and strategic focus of the Fund in—
(I) reaching the
objectives set forth in subsection (b); and
(II) carrying out the
Fund strategy described in this subsection;
(iii) describes in
detail—
(I) the framework and
methodology for calculating the qualification score assigned under section
364(f)(3);
(II) the data to be
requested from applicants; and
(III) the formula to
be applied to such data to calculate the qualification score;
(iv) describes how
selection criteria will be applied by the Fund to determine the competitiveness
of an application and its qualification score relative to other current
applications and previously funded applications; and
(v) describes how the
qualification score methodology and project selection framework are consistent
with maximizing the Fund’s goals in urban and rural areas.
(B)
Updates
Not
later than 2 years after the original publication of the Investment Prospectus,
and biennially thereafter, the Fund shall publish an updated Investment
Prospectus.
(C)
Approval
The
Fund may not publish the Investment Prospectus or any subsequent updates under
subparagraph (B) until the Board has approved the Investment Prospectus by a
majority vote.
(4)
Operating
guidance
(A)
Publication
Not
later than 1 year after the date of enactment of the
American Infrastructure Investment Fund
Act, the Fund shall establish and publish its Operating Guidance
for the management of the Fund, which shall—
(i) establish general
operating procedures to be followed by the Fund in carrying out its authorities
under this subchapter;
(ii) establish
criteria, requirements, and standards regarding the provisions of various forms
of assistance authorized under this subchapter, including the various forms and
terms of credit assistance that are consistent with the requirements under this
subchapter;
(iii) establish an
application and award process for Planning and Feasibility Loans in accordance
with the provisions under this subchapter;
(iv) establish
disclosure and application procedures for nominating or otherwise proposing
applications for project assistance, either solicited or unsolicited, that are
consistent with the requirements under this subchapter;
(v) describe in
detail the form and timing of data and other information required of applicants
in conjunction with consideration of an application for financial assistance
under this subchapter; and
(vi) establish a
schedule of regular time intervals for the submission for consideration of sets
of 1 or more Investment Plans to the Board.
(B)
Review and
update
The Fund shall periodically review, and may update, the
Operating Guidance published under subparagraph (A).
(5)
Rulemaking
Paragraphs
(3) and (4) shall be carried out in accordance with the rulemaking procedures
set forth in section 553 of title 5, United States Code.
363.
Organizational
structure and duties
(a)
Executive
Director
(1)
Appointment;
authority
The President shall appoint, by and with the advice and
consent of the Senate, an Executive Director, who shall be the chief executive
officer of the Fund, and shall have such executive functions, powers, and
duties as set forth in this subchapter or prescribed by the Board.
(2)
Supervision
The
Executive Director shall be subject to the supervision and direction of the
Secretary of Transportation, consistent with the Executive Director’s duties
under this subchapter and other requirements set forth in the Operating
Guidance referred to in section 362(c)(4).
(3)
Qualifications
The
Executive Director shall have demonstrated expertise in at least 2 of the
following 3 areas:
(A) Economic
analysis.
(B) Project, public,
or corporate finance.
(C) Organizational
management.
(4)
Term of
service; vacancy
The Executive Director shall serve a 5-year
term, which may be renewed in accordance with paragraph (1). A vacancy in the
position of Executive Director shall be filled as expeditiously as possible in
the manner in which the original appointment was made.
(5)
Duties
In
addition to the other activities required to carry out the authorities and
purposes of the Fund under this subchapter, the Executive Director
shall—
(A) be responsible
for the day-to-day operations of the Fund;
(B) establish and
approve the Operating Guidance in accordance with section 362(c)(4);
(C) establish and
maintain a project application origination capability at the Fund that consists
of a staff of qualified transportation infrastructure planning
professionals;
(D) establish and
maintain an analysis capability at the Fund that consists of a staff of
qualified economics professionals directed to collect application data, analyze
that data, and report to the Executive Director on qualification scores and
ranges, measures of uncertainty, and other analyses of applications;
(E) establish and
maintain an investment planning process capability at the Fund that consists of
a staff of qualified project finance professionals directed to review qualified
applications and to structure Investment Plans; and
(F) establish and
maintain a technical assistance capability at the Fund that consists of a staff
of qualified project management professionals directed to assist those entities
receiving funding from the Fund in the successful execution of their Investment
Plans and to otherwise implement the funding decisions of the Secretary.
(6)
Other
authority
The Executive Director shall have the authority to hire
contractors to establish and maintain the expertise as described in paragraph
(5).
(7)
Compensation
The
Executive Director shall be a position compensated on the General Executive
Schedule.
(b)
Board of
Directors
(1)
Establishment
There
is established within the Fund a deliberative body to be known as the
Board of Directors.
(2)
Membership
The
Board shall be composed of 8 members, including—
(A) the Secretary of
the Treasury, the Secretary of Commerce, the Secretary of Energy, the Secretary
of Housing and Urban Development, and the Administrator of the Environmental
Protection Agency, who shall serve as permanent members; and
(B) 3 executives of
the Department of Transportation appointed by the Secretary, of whom—
(i) not more than 1
shall serve concurrently as—
(I) the Deputy
Secretary;
(II) the Under
Secretary of Transportation for Policy;
(III) the General
Counsel;
(IV) the Chief
Financial Officer;
(V) the Assistant
Secretary of Transportation for Policy; or
(VI) the Assistant
Secretary of Transportation for Aviation and International Affairs; and
(ii) not more than 2
shall serve for not longer than 2 years, while concurrently serving as—
(I) the Administrator
of the Federal Aviation Administration;
(II) the
Administrator of the Federal Highway Administration;
(III) the
Administrator of the Federal Railroad Administration;
(IV) the
Administrator of the Federal Transit Administration;
(V) the Administrator
of the Maritime Administration;
(VI) the
Administrator of the Pipeline and Hazardous Materials Safety Administration;
or
(VII) the
Administrator of the Federal Motor Carrier Safety Administration.
(3)
Duties
The
Board shall—
(A) not later than
180 days after the date of enactment of the American Infrastructure Investment Fund Act,
establish and approve the Investment Prospectus, in consultation with the Fund
Advisory Committee;
(B) on each biennial
anniversary of its original publication, update the Investment Prospectus, in
consultation with the Fund Advisory Committee;
(C) review Investment
Plans, related application materials, and other analyses provided to the Board
by the Executive Director;
(D) determine by
majority vote whether or not to recommend Investment Plans submitted by the
Executive Director to the Secretary; and
(E) certify reports
to Congress and other publications of the Fund.
(4)
Majority vote
required
Each action or decision by the Board shall be by
majority vote of all members, whether in person or in absentia. Each member
shall be provided a reasonable opportunity to vote on all matters before the
Board.
(c)
Fund Advisory
Committee
(1)
Establishment
Not
later than 180 days after the date of enactment of the
American Infrastructure Investment Fund
Act, the President shall establish an advisory committee, to be
known as the Fund Advisory Committee.
(2)
Membership
(A)
Appointment
The
President shall appoint not fewer than 5 people and not more than 7 people to
serve 3-year terms as members of the Fund Advisory Committee, including 1
member to serve as Chair of the Committee.
(B)
Qualifications
Each
member shall have expertise in—
(i) economics and
economic analysis;
(ii) project or fund
management;
(iii) portfolio or
fund management;
(iv) organized labor
interests;
(v) environmental
interests;
(vi) American
business and trade interests;
(vii) rural community
and economic development;
(viii) metropolitan
economic development and clustering of economic development;
(ix) State Department
of Transportation or Metropolitan Planning Organization policies and
priorities; or
(x) other
infrastructure planning, redevelopment, and development-related codes and
policies.
(C)
Representation
The
President shall ensure that the membership of the Fund Advisory
Committee—
(i) is
bipartisan;
(ii) is
geographically and economically balanced; and
(iii) is balanced in
terms of the functions to be performed by the Fund Advisory Committee.
(3)
Advice
The
Fund Advisory Committee shall advise the Board and the Secretary with respect
to—
(A) the alignment of
the Investment Prospectus with the primary and secondary objectives, and other
elements of the Fund strategy described in section 362(c);
(B) the alignment of
the framework and methodology used to determine qualification scores and
uncertainty estimates with the primary objective, secondary objectives, and the
Fund strategy;
(C) the consistency
of the calculation of qualification scores and uncertainty estimates with
academic standards for analytical rigor and data quality typically applied to
peer-reviewed research;
(D) the alignment of
investment decision mechanics and outcomes with the Investment Prospectus and
the requirements under this subchapter;
(E) the integrity and
effectiveness of Fund operations and performance, including application
evaluation processes, Investment Plan processes and determinations, and the
optimization of the Fund’s performance as a portfolio; and
(F) prospects for the
extension of the Fund’s activities to nontransportation infrastructure sectors
likely to benefit the United States, including renewable energy generation,
energy transmission and storage, energy efficiency, drinking water and
wastewater systems, and telecommunications.
(4)
Applicability
of FACA
The Fund Advisory Committee shall be subject to the
Federal Advisory Committee Act (5 U.S.C. App.).
364.
Fund
authorities and assistance
(a)
Agreements with
other organizations
The Fund may—
(1) enter into an
agreement with any organization within the Department of Transportation to
obtain necessary technical expertise and assistance; and
(2) request any
Federal agency to detail employees to the Fund for purposes of carrying out its
duties under this subchapter.
(b)
Fees for
services
(1)
Administrative
fees
The Fund may establish and collect fees from eligible
funding recipients, including application and processing fees and other fees
associated with the costs of loan servicing, at a level sufficient to cover all
or a portion of the administrative costs to the Federal Government of providing
funding assistance and servicing the credit instruments entered into under this
subchapter.
(2)
Other
fees
The Fund may establish and collect fees from eligible
funding recipients at a level sufficient to cover all or a portion of the costs
of expert firms, including counsel in the field of municipal and project
finance, and financial advisors to assist with underwriting, credit analysis,
or other independent reviews, as appropriate.
(3)
Limitation
The
Fund may not collect fees under paragraph (1) or (2) that originate as a loan
or a debt obligation guaranteed by the Federal Government.
(4)
Availability of
amounts
Amounts collected under paragraphs (1) and (2) shall be
available to be expended to carry out the duties under this subchapter.
(c)
Planning and
feasibility loans
(1)
In
general
The Fund may provide loans, which may be forgivable, to
eligible funding recipients to fund activities related to the planning,
preparation, or design of an eligible project proposal, including costs
associated with—
(A) planning and
formulating optimal project design;
(B) assessing project
technical feasibility; and
(C) assessing
potential project performance.
(2)
Loan program
criteria
In providing loans under this subsection, the Fund shall
give priority to activities that are likely to lead to projects that—
(A) advance the
objectives set forth in section 362(b); and
(B) are consistent
with the strategy described in section 362(c).
(3)
Federal
share
The Fund may enter into a loan agreement with an eligible
recipient in which the Fund agrees to pay up to 100 percent of eligible
planning and feasibility costs of an eligible project under this
subsection.
(4)
Eligible
costs
Loan amounts received under this subsection may be used
for—
(A) any activity
reasonably necessary to obtain Federal, State, and local permits, licenses, and
approvals for an eligible project, including—
(i) concept
development and preliminary design;
(ii) economic and
environmental analyses; and
(iii) application,
licensing, and permit fees; or
(B) the preparation
of financial analyses and other economic analyses that are reasonably necessary
to secure funding to implement an eligible project.
(5)
Alignment with
investment prospectus
The Fund may not provide a loan for a
project under this subsection unless the application materials demonstrate that
the eligible project is aligned with the strategy outlined in the Investment
Prospectus.
(6)
Designation for
receipt of certain funds
If a non-Federal governmental entity,
agency, or instrumentality is carrying out the planning and feasibility
activities, the eligible funding recipient may designate such entity, agency,
or instrumentality to receive loan amounts for such activities directly from
the Fund.
(d)
Direct loans
and loan guarantees
(1)
Direct
loans
(A)
Agreements
The
Fund is authorized to make direct loans to eligible funding recipients for
eligible projects on such terms and conditions, and containing such covenants,
representations, warranties, and requirements, including required audits, as
the Fund determines appropriate, in accordance with the provisions under this
subchapter, the Operating Guidance, and all other statutory and regulatory
requirements.
(B)
Approved
investment plan
Direct loans made under this paragraph—
(i) may only be used
to fund eligible project costs covered in an Investment Plan approved by the
Secretary; and
(ii) are subject to
the terms and conditions of the approved Investment Plan.
(C)
Terms,
conditions, and limitations
Direct loans made under this
paragraph will be on such terms, conditions, and limitations as the Executive
Director may prescribe, except that—
(i) the Fund may not
provide credit assistance to any prospective borrower unless such
assistance—
(I) is
necessary—
(aa) to
alleviate a credit market imperfection; or
(bb) to
achieve specified Federal objectives by providing credit assistance; and
(II) is the most
efficient way to meet such objectives on a borrower-by-borrower basis;
(ii) loans made under
this paragraph may not be subordinated to other debt contracted by the borrower
or any other claims against the borrower in case of default unless such
subordination is necessary to achieve Federal objectives, consistent with the
criteria and policies set forth in the Operating Guidance;
(iii) direct loans or
interest supplements on loan guarantees shall be at an interest rate that is
set by reference to a benchmark interest rate (yield) on marketable Treasury
securities with a similar maturity to the direct loans being made or the
non-Federal loans being guaranteed, and includes any necessary credit risk
premium at a level consistent with the interest rate policy set forth in the
Operating Guidance;
(iv) the Executive
Director—
(I) shall prescribe
explicit standards for use in periodically assessing the credit risk of new and
existing direct loans and guaranteed loans; and
(II) may not extend
credit assistance without determining that there is a reasonable assurance of
repayment;
(v) new direct loans
may not be obligated and new loan guarantees may not be committed except to the
extent that appropriations of budget authority to cover their costs are made in
advance, as required under section 504 of the Federal Credit Reform Act of 1990
(2 U.S.C. 661c);
(vi) the total
principal amount of the direct loan or loan guarantee may not exceed—
(I) the lower of 70
percent of total eligible project cost less the percentage of eligible project
costs that are otherwise funded by the Fund; or
(II) another level
prescribed in the Operating Guidance; and
(vii) notwithstanding
any other provision of law relating to the acquisition, handling, or disposal
of property by the Federal Government, the Fund may complete, recondition,
reconstruct, renovate, repair, maintain, operate, or sell any property acquired
by the Fund under this subchapter.
(D)
Repayment
(i)
Policies
The
Fund shall—
(I) adhere to the
policies set forth in the Operating Guidance concerning repayment terms;
and
(II) establish
repayment terms for each direct loan based on the projected cash flow from
project revenues or other repayment sources.
(ii)
Maturity
date
The final maturity date of a direct loan under this
paragraph—
(I) shall not exceed
90 percent of the estimated useful economic life of the asset being financed,
except under conditions set forth in the Operating Guidance; and
(II) may not be later
than the estimated useful economic life of the asset being financed.
(E)
Risk
assessment
Before entering in any agreement under this section,
the Executive Director shall complete a risk assessment of the project to be
funded. Requirements for risk assessment shall be outlined in the Operating
Guidance.
(2)
Loan
guarantees
(A)
In
general
The Fund is authorized to provide loan guarantees to
eligible funding recipients on such terms and conditions and containing such
covenants, representations, warranties, and requirements (including required
audits) as the Fund determines appropriate, in accordance with the provisions
under this subchapter, the Operating Guidance, and all other statutory and
regulatory requirements.
(B)
Approved
investment plan
Loan guarantees provided under this
paragraph—
(i) may only cover
eligible project costs in an approved Investment Plan; and
(ii) are subject to
the terms and conditions of the approved Investment Plan.
(C)
Terms,
conditions, and limitations
(i)
In
general
The terms, conditions, and limitations of a guaranteed
loan shall comply with the terms, conditions, and limitations set forth in
paragraph (1) for a direct loan, including maximum Fund share requirements,
except that the interest rate on the guaranteed loan and any repayment features
shall be negotiated between the eligible funding recipient and the lender in
accordance with the policies set forth in the Operating Guidance, and with the
consent of the Secretary.
(ii)
Income
excluded
A loan may not be guaranteed under this paragraph
if—
(I) the income from
such loan is excluded from gross income for the purposes of chapter 1 of the
Internal Revenue Code of 1986; or
(II) the guarantee
provides significant collateral or security, as determined by the Executive
Director, for other obligations generating income that is similarly
excluded.
(iii)
Fees
Fees
or premiums for a loan guarantee or insurance coverage shall be set at levels
that minimize the cost to the Government (as defined in section 502(5) of the
Federal Credit Reform Act of 1990 (2 U.S.C. 661a(5))) of such coverage, while
supporting achievement of the program’s objectives, in accordance with policies
set forth in the Operating Guidance.
(iv)
Percent
guaranteed
A loan guarantee under this paragraph may not exceed
80 percent of the loss of the loan. Borrowers who pose less of a risk shall
receive a lower guarantee as a percentage of the loan amount.
(v)
Criteria
A
loan may not be guaranteed under this paragraph unless the Executive Director
determines that—
(I) the lender is
responsible; and
(II) adequate
provision is made for servicing the loan on reasonable terms.
(vi)
Conclusive
evidence
Any guarantee shall be conclusive evidence that—
(I) such guarantee
has been properly obtained;
(II) the underlying
loan qualified for such guarantee; and
(III) such guarantee
is presumed to be valid, legal, and enforceable, unless such guarantee was
obtained through fraud or material misrepresentation by the holder.
(vii)
Effect of
default
If, as a result of a default by a borrower under a
guaranteed loan, after the holder of the loan has made such further collection
efforts and instituted such enforcement proceedings as the Executive Director
may require, the Executive Director determines that the holder has suffered a
loss, the Executive Director—
(I) shall pay to the
holder not more than 80 percent of such loss, as specified in the guarantee
contract;
(II) upon making such
payment, shall be subrogated to all the rights of the recipient of the payment;
and
(III) shall be
entitled to recover from the borrower the amount of any payments made pursuant
to any guarantee entered into under this paragraph.
(viii)
Enforcement
The
Attorney General shall take such action as may be appropriate to enforce any
right accruing to the United States as a result of the issuance of any loan
guarantee under this paragraph.
(ix)
Savings
provision
Nothing in this paragraph may be construed to preclude
any forbearance for the benefit of the borrower, which may be agreed upon by
the Executive Director, if budget authority for any resulting modification cost
(as defined under section 502 of the Congressional Budget Act of 1974 (2 U.S.C.
661a)) is available.
(D)
Repayment
The
Fund shall adhere to policies set forth in the Operating Guidance concerning
repayment terms and shall establish repayment terms for each direct loan based
on the projected cash flow from project revenues or other repayment
sources.
(E)
Risk
assessment
Requirements for risk assessment shall be outlined in
the Operating Guidance.
(e)
Application
evaluation and qualification
(1)
Application
eligibility standard
An application for financial assistance from
the Fund may not be considered unless—
(A) funding recipient
or recipients, project or program of related projects, and associated project
costs identified in the application are eligible for such funding under this
subchapter;
(B) eligible project
costs identified in the application—
(i) are greater than
$50,000,000; or
(ii) if the
application is for a project or program of related projects located entirely in
a rural area, are greater than $10,000,000;
(C) the application
identifies financial assistance from sources outside of the Fund equal to at
least 30 percent of the total eligible project costs;
(D) the application
identifies project benefits that are distributed broadly, either at a national
or a regional level; and
(E) the applicant is
not ineligible to receive Federal loans, loan guarantees, or insurance due to a
delinquency on Federal tax or non-tax debts, including judgment liens against
property for a debt to the Federal Government.
(2)
Resolution of
debts
The Fund shall use credit bureaus as a screening tool and
ask applicants about delinquencies described in paragraph (1)(E) on the
application form. An application from an applicant that is delinquent on a debt
to the Federal Government may not be processed until after the applicant
satisfactorily resolves the debts in compliance with section 3720B of title 31,
United States Code, and section 285.13 of title 31, Code of Federal
Regulations.
(3)
Qualification
score
(A)
Assignment
The
Fund shall assign to each eligible application a single numerical factor, which
shall be—
(i) based upon an
evaluation of the information and data collected from the applicant or
otherwise obtained in the course of due diligence on the application;
(ii) referred to as
the ‘qualification score’; and
(iii) equal to the
ratio between the present value of benefits to the present value of costs
reasonably expected to result from the funding of the project or projects
proposed in the application.
(B)
Calculation
The
calculation of the qualification score shall be determined through a
consistently and transparently applied analytic and systematic framework. In
order to indicate the potential uncertainty of the qualification score, the
Fund shall use a measure of the uncertainty of expected project benefits and
costs to derive a range of ratio values with the qualification score as the
midpoint of that range.
(C)
Methodology
The
methodology used to calculate the qualification score and uncertainty measures
shall—
(i) apply equal
weighting to all measures of the net present value of benefits and
costs;
(ii) include
standardized measures of the expected uncertainty in both total and specific
benefits and costs associated with the project; and
(iii) include a
descriptive statement delineating the significant factors and analysis that
went into determination of the score and the range.
(D)
Publication
(i)
Investment
prospectus
The methodology of the framework for calculating the
qualification score, including the specific mechanics of its calculation, shall
be published in the Investment Prospectus.
(ii)
Methodology
The
quantification score, the methodology used to calculate the qualification
score, the calculation of the qualification score, and the measure of
uncertainty shall be—
(I) provided to the
applicant not later than 15 days after their final determination; and
(II) published on the
Fund’s website not later than 30 days after their final determination.
(4)
Application
certification
The Executive Director may not certify an
application as qualified for financial assistance on the basis of an evaluation
of the information and data collected from the applicant unless the Executive
Director determines that the application’s qualification score—
(A) has been
calculated on the basis of data, estimates, and assumptions that are defensible
according to accepted standards of economic analysis;
(B) appears valid
based on efforts by the Fund to conduct due diligence and verification;
(C) is greater than
the threshold for qualification published in the Investment Prospectus;
and
(D) is competitive
with scores issued to applications currently under consideration and scores
issued to applications previously funded under this section, after taking into
account the extent to which the application under consideration, in order of
priority—
(i) advances the
objectives of the Fund set forth in section 362(b);
(ii) addresses a
special infrastructure investment challenge due to cost, complexity,
cross-jurisdictional scope, multi-modal features, or the use of innovative
technologies;
(iii) provides a
cost-effective approach to achieving the benefits described in the application
relative to alternative approaches to achieving comparable benefits, after
taking into account the estimated uncertainty in measures of costs and benefits
associated with the project;
(iv) combines amounts
received from the Fund with other revenue sources to leverage substantial
co-investment from non-Federal sources;
(v) delivers revenue
streams from public or private sources dedicated to pay debt service, meet
ongoing operating expenses, or provide for needed maintenance and capital
renewal over the life cycle of the funded asset; and
(vi) encourages the
use of innovative procurement, asset management, or financing to optimize the
all-in-life-cycle cost-effectiveness of a project.
(f)
Investment
plans
(1)
Qualified
application requirement
After an application is certified by the
Executive Director as qualified under subsection (e)(4), the Executive Director
and the applicant shall enter a process for producing a mutually agreeable
Investment Plan. Financial assistance may not be provided to an applicant under
this section unless the applicant’s Investment Plan has been recommended by the
Board and approved by the Secretary.
(2)
Investment
planning process
The Fund shall establish an investment planning
process for determining the level, form, and terms of financial assistance to
be offered by the Fund, including a mutually agreeable financing package
that—
(A) is adequate to
fund the project or projects included in the application;
(B) maximizes total
expected project benefits relative to total expected costs; and
(C) considers the
portion of total costs to be financed by the Fund.
(3)
Considerations
When
considering the appropriate level and form of Fund resources to include in an
Investment Plan, the Fund shall—
(A) consider the
qualification score achieved by the application relative to other current
applications and previously funded applications;
(B) strive to make
investment plan decisions on the basis of maximizing total net benefits
relative to cost; and
(C) consider—
(i) the amount of
Fund budgetary resources required to complete a financing package;
(ii) the percentage
of Federal resources included in the Investment Plan in the form of
grants;
(iii) the level of
certainty of the proposed net benefits, including the risks to the Federal
taxpayer and the project sponsor in the event of project cost overrun or
failure; and
(iv) the percentage
of eligible project costs to be funded through non-Federal resources pledged by
the applicant to complete a financing package.
(4)
Investment
plans
As part of the investment planning process—
(A) the Fund shall
have the sole discretion to determine the terms of assistance to be offered to
applicants, subject to the provisions under this subchapter, the availability
of funding, and any other statutory and regulatory requirements;
(B) if the Fund and
the applicant are able to reach mutually agreeable terms, the Fund shall record
the determination on Fund assistance and the details of the complete financing
package in an Investment Plan;
(C) the Fund may not
approve an Investment Plan that does not identify a complete financing package;
and
(D) the Fund is not
required or compelled to reach agreement on an Investment Plan.
(5)
Submission to
Board
The Executive Director shall advance Investment Plans for
qualified applications to the Board at regular submission intervals, as set
forth in the Operating Guidance.
(6)
Conflict of
interest protections
The Secretary of Transportation and the Fund
shall jointly establish, in operating procedures and in the Operating Guidance,
communications practices and compliance procedures that protect professional
staff of the Fund who are responsible for negotiating Investment Plans from
outside or otherwise inappropriate influence, and conflicts of interest,
including necessary restrictions on communications between staff of the Fund
who are responsible for the investment planning process and individuals and
organizations within and outside the Department of Transportation,
including—
(A) the Board;
(B) the Office of the
Secretary;
(C) the Secretary;
and
(D) others needed to
safeguard the ability of the Fund to fairly and independently formulate
Investment Plans under this subsection.
(g)
Funding
decisions
(1)
Investment plan
submission requirement
The Board may not consider recommending an
application for funding before receiving an Investment Plan from the Executive
Director.
(2)
Application
funding recommendation
Not later than 15 days after receiving an
Investment Plan from the Executive Director, the Board shall—
(A) vote on whether
to recommend funding for the Investment Plan;
(B) notify the
Secretary of the outcome of such vote; and
(C) if funding is
recommended, forward the Investment Plan to the Secretary for approval.
(3)
No
modification
Neither the Board nor the Secretary may modify any
Investment Plan.
(4)
Funding
consideration
(A)
Determination
After
considering an Investment Plan recommended by the Board, the Secretary shall
approve or reject the Investment Plan.
(B)
Approval
If
the Investment Plan is approved by the Secretary, it shall be funded in
accordance with the provisions of the Investment Plan.
(C)
Rejection
If
the Investment Plan is rejected by the Secretary, the Investment Plan—
(i) shall be returned
to the Executive Director with a detailed justification for rejecting the
Investment Plan, which shall be forwarded to the applicant; and
(ii) may be
reconsidered by the Fund not earlier than 1 year after such date of
return.
(h)
Project
sponsorship; public benefit analysis; legal compliance
(1)
Compliance with
applicable laws
(A)
In
general
Subject to subparagraphs (B) and (C), the Fund shall
determine which requirements under this title or title 23 shall be applicable
to projects receiving financial assistance under this subchapter that would
otherwise be eligible for financial assistance under such titles.
(B)
Labor
standards
(i)
In
general
All laborers and mechanics employed on projects assisted
in whole or in part by and through the Fund pursuant to this subchapter shall
be paid wages at rates not less than those prevailing on projects of a
character similar in the locality as determined by the Secretary of Labor in
accordance with subchapter IV of chapter 31 of title 40.
(ii)
Authority;
functions
With respect to the labor standards specified in this
subparagraph, the Secretary of Labor shall have the authority and functions set
forth in Reorganization Plan Numbered 14 of 1950 (64 Stat. 1267; 5 U.S.C. App.)
and section 3145 of title 40, United States Code.
(iii)
Requirements
Projects
funded directly by or assisted in whole or in part by and through the Fund
pursuant to this subchapter shall be subject to the requirements of section
5333(b) of title 49, United States Code.
(C)
Planning and
environmental laws
A project that receives financial assistance
under this subchapter shall comply with—
(i) the applicable
planning and programming requirements under section 134 and 135 of title 23;
and
(ii) all applicable
environmental laws and requirements, including the National Environmental
Policy Act of 1969 (42 U.S.C. 4321 et seq.) and the National Historic
Preservation Act of 1966 (16 U.S.C. 470 et seq.).
(2)
Lead
agency
(A)
In
general
The Department of Transportation shall be the Federal
lead agency in the environmental review process for a project that receives
financial assistance under this subchapter. Subject to subparagraphs (B)
through (D), the Secretary of Transportation may delegate this responsibility
to an operating administration.
(B)
Joint lead
Federal agency
Nothing in this paragraph precludes another
Federal agency from being a joint lead agency in accordance with the
regulations adopted by the President’s Council on Environmental Quality.
(C)
Joint lead
State agency
A non-Federal government entity, agency, or
instrumentality receiving funds under this subchapter may—
(i) serve as a joint
lead agency with the Department of Transportation under the National
Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.); and
(ii) at the
discretion of the lead Federal agency, prepare any environmental document
required in support of the project if the lead Federal agency—
(I) furnishes
guidance in such preparation; and
(II) independently
evaluates, approves, and adopts the State or local government’s environmental
documentation before taking any action on the project.
(D)
Nongovernmental
funding recipients
If a project is undertaken by a
nongovernmental entity, the non-Federal government entity, agency, or
instrumentality cosponsor of the project shall—
(i) serve as a
joint lead agency with the Department of Transportation; and
(i) have the
authority to prepare the environmental documents described in subparagraph
(C)(ii).
(3)
Determination
of applicable modal requirements
If a project has cross-modal
components, the Fund may designate the specific requirements that shall apply
to the project.
(4)
Use of American
iron, steel, and manufactured goods
(A)
In
general
None of the funds made available under this subchapter
may be used for a project for the construction, alteration, maintenance, or
repair of a public building or public work unless all of the iron, steel, and
manufactured goods used in the project are produced in the United
States.
(B)
Exception
Subparagraph
(A) shall not apply in any case or category of cases in which the Secretary
finds that—
(i) applying
subparagraph (A) would be inconsistent with the public interest;
(ii) iron, steel, and
the relevant manufactured goods are not produced in the United States in
sufficient and reasonably available quantities and of a satisfactory quality;
or
(iii) inclusion of
iron, steel, and manufactured goods produced in the United States will increase
the cost of the overall project by more than 25 percent.
(C)
Publication of
waivers
If the Secretary determines that it is necessary to waive
the application of subparagraph (A) based on a finding under subparagraph (B),
the head of the department or agency shall publish in the Federal Register a
detailed written justification as to why the provision is being waived.
(D)
International
agreements
This paragraph shall be applied in a manner consistent
with United States obligations under international agreements.
(i)
Investment-Grade
rating requirement
The Fund shall maintain a portfolio of
projects whose average rating is not less than investment grade.
365.
Studies and
reports
(a)
Annual
financial audits
(1)
In
general
The Fund shall be subject to an annual financial audit by
an independent public accounting firm selected by the Board to ensure that its
operations meet generally accepted accounting principles.
(2)
Dissemination
The
Fund shall—
(A) submit the
results of each audit under paragraph (1) to the Committee on Commerce,
Science, and Transportation of the Senate and the Committee on Transportation
and Infrastructure of the House of Representatives; and
(B) post such audit
results on the Fund’s website.
(b)
Comptroller
General Report
(1)
In
general
Not later than 5 years after the date of enactment of the
American Infrastructure Investment Fund
Act, the Comptroller General of the United States shall prepare
and submit to the Committee on Commerce, Science, and Transportation of the
Senate and the Committee on Transportation and Infrastructure in the House of
Representatives a report that evaluates the operations of the Fund and assesses
the effectiveness of the Fund at facilitating and financing infrastructure
projects. The Comptroller General shall provide periodic oversight and
monitoring of the Fund as it is established and report on such oversight, as
agreed to with the appropriate congressional committees.
(2)
Contents
(A)
In
general
The Comptroller General shall review and include in the
report under paragraph (1), at minimum, the following:
(i) The type of
projects selected and financing used.
(ii) The level of
Federal funding provided to support the Fund and the projects selected for
funding.
(iii) The level of
private sector funds that were contributed to specific projects.
(iv) The process,
criteria, and analysis used to select projects and how the process, criteria,
and analysis could be improved.
(v) The monitoring
and evaluation processes the Fund uses to determine if an individual project is
meeting its objectives.
(B)
Considerations
The
Government Accountability Office shall—
(i) analyze current
trends in the financing infrastructure in the United States;
(ii) identify lessons
the analysis under clause (i) may imply for improvements or modifications to
the structure or operations of the Fund;
(iii) analyze the
experiences of other industrialized countries that have developed alternative
forms of financing public infrastructure; and
(iv) identify lessons
that the foreign experiences under clause (iii) may have for the operations and
efficiency of the Fund.
(c)
Biennial
report
(1)
In
general
Every 2 years after the date of the enactment of the
American Infrastructure Investment Fund
Act, the Board, in consultation with the Director of the Office
of Management and Budget and the Fund Advisory Committee—
(A) shall prepare a
report that—
(i) evaluates the
Fund’s performance; and
(ii) includes an
assessment of the Fund as a model for infrastructure investment; and
(B) may include a
recommendation in the report under subparagraph (A) on whether to extend the
Fund’s activities to nontransportation infrastructure sectors likely to benefit
the United States, including—
(i) renewable energy
generation;
(ii) energy
transmission and storage;
(iii) energy
efficiency;
(iv) drinking water
and wastewater systems;
(v) telecommunications;
and
(vi) other
infrastructure activities.
(2)
Dissemination
The
Board shall—
(A) submit the report
prepared under paragraph (1) to the Committee on Commerce, Science, and
Transportation of the Senate and the Committee on Transportation and
Infrastructure of the House of Representatives; and
(B) post the report
on the Fund’s website.
(d)
Investment plan
and decisions
Not later than 90 days after the Board’s decision
on an Investment Plan, the Fund Advisory Committee shall post a report on the
Fund’s website that assesses—
(1) the adherence of
each funding decision to the requirements of the Investment Prospectus,
Operating Guidance, and this subchapter;
(2) the consistency
of funded applications with the primary objective, the secondary objectives,
the Fund strategy, and the requirements under this subchapter;
(3) the validity of
the qualification certification of each funded application;
(4) the return on
Federal investment likely to result from each funded Investment Plan;
and
(5) the return on
total investment likely to result from each funded Investment
Plan.
.
(b)
Authorization
of appropriations
(1)
Amounts
authorized
(A)
In
general
There is authorized to be appropriated to carry out
subchapter IV of chapter 3 of title 49, United States Code, as added by
subsection (a), $5,000,000,000 for each of fiscal years 2014 and 2015.
(B)
Availability of
funds
Amounts made available under subparagraph (A) shall remain
available until expended.
(2)
Administrative
expenses
Of the amounts appropriated under paragraph (1), the
Fund may expend, to pay the reasonable costs of administering such subchapter
IV, inclusive of any fees collected under such subchapter—
(A) not more than
$50,000,000 in fiscal year 2014; and
(B) not more than
$51,000,000 in fiscal year 2015.
3.
National
infrastructure investment grants
(a)
Establishment
of program
Chapter 55 of title 49, United States Code, is amended
by adding at the end the following:
III
Financial
Assistance
5581.
National
infrastructure investment grants
(a)
Establishment
of program
The Secretary of Transportation shall establish a
competitive grant program to provide financial assistance for projects that
will have a significant impact on the Nation, a metropolitan area, or a
region.
(b)
Eligible
projects
An applicant is eligible for a grant under this section
for a project that is part of, or related to, a transportation improvement,
including projects related to the construction or improvement of—
(1) a passenger or
freight rail line;
(2) a highway;
(3) a bridge;
(4) an
airport;
(5) an air traffic
control system;
(6) a port or marine
facility;
(7) an inland
waterway;
(8) a transmission or
distribution pipeline;
(9) public
transportation facilities or systems;
(10) intercity
passenger bus or passenger rail facilities or equipment;
(11) freight rail
facilities or equipment; or
(12) planning,
preparation, or design of any project described in paragraphs (1) through
(11).
(c)
Project
selection criteria
In determining whether to award a grant to an
eligible applicant under this section, the Secretary shall consider the extent
to which the project—
(1) leverages Federal
investment by encouraging non-Federal contributions to the project, including
contributions from public-private partnerships;
(2) improves the
mobility of people, goods, and commodities;
(3) incorporates new
and innovative technologies, including intelligent transportation
systems;
(4) improves energy
efficiency or reduces greenhouse gas emissions;
(5) helps maintain or
protect the environment, including reducing air and water pollution;
(6) reduces
congestion;
(7) improves the
condition of transportation infrastructure, including bringing it into a state
of good repair;
(8) improves safety,
including reducing transportation accidents, injuries, and fatalities;
(9) demonstrates that
the proposed project cannot be readily and efficiently realized without Federal
support and participation; and
(10) enhances
national or regional economic development, growth, and competitiveness.
(d)
Priority
The
Secretary shall give priority to projects that have the highest system
performance improvement relative to their benefit-cost analysis.
(e)
Letters of
intent
(1)
In
general
The Secretary may issue a letter of intent to an
applicant announcing an intention to obligate, for a major capital project
under this subsection, an amount from future available budget authority
specified in law that is not more than the amount stipulated as the financial
participation of the Secretary in the project.
(2)
Notification
Not
later than 30 days before issuing a letter under paragraph (1), the Secretary
shall submit written notification of the proposed letter or agreement to the
Committee on Commerce, Science, and Transportation of the Senate and the
Committee on Transportation and Infrastructure of the House of Representatives,
which shall include—
(A) a copy of the
proposed letter or agreement;
(B) the criteria used
under subsection (c) for selecting the project for a grant award; and
(C) a description of
how the project meets such criteria.
(3)
Commitment
An
obligation or administrative commitment may be made only when amounts are made
available. The letter of intent shall state that the contingent commitment is
not an obligation of the Federal Government, and is subject to the availability
of funds under Federal law and to Federal laws in force or enacted after the
date of the contingent commitment.
(f)
Federal share
of net project cost
(1)
In
general
The Federal share of a grant for the project shall not
exceed 80 percent of the project net capital cost.
(2)
Estimate
The
Secretary shall estimate the net project cost based on engineering studies,
studies of economic feasibility, and information on the expected use of
equipment or facilities.
(3)
Priority
The
Secretary shall give priority in allocating future obligations and contingent
commitments to incur obligations to grant requests seeking a lower Federal
share of the project net capital cost.
(g)
Cooperative
agreements
(1)
In
general
An applicant may enter into an agreement with any public,
private, or nonprofit entity to cooperatively implement any project funded with
a grant under this subchapter.
(2)
Forms of
participation
Participation by an entity under paragraph (1) may
consist of—
(A) ownership or
operation of any land, facility, vehicle, or other physical asset associated
with the project;
(B) cost-sharing of
any project expense or non-Federal share of the project cost, including in-kind
contributions;
(C) carrying out
administration, construction management, project management, project operation,
or any other management or operational duty associated with the project;
and
(D) any other form of
participation approved by the Secretary.
(h)
Oversight
program
(1)
Establishment
(A)
In
general
The Secretary shall establish an oversight program to
monitor the effective and efficient use of funds authorized to carry out this
section.
(B)
Minimum
requirement
At a minimum, the program shall be responsive to all
areas relating to financial integrity and project delivery.
(2)
Financial
integrity
(A)
Financial
management systems
The Secretary shall perform annual reviews
that address elements of the applicant’s financial management systems that
affect projects approved under subsection (a).
(B)
Project
costs
The Secretary shall develop minimum standards for
estimating project costs and shall periodically evaluate the practices of
applicants for estimating project costs, awarding contracts, and reducing
project costs.
(3)
Project
delivery
The Secretary shall perform annual reviews that address
elements of the project delivery system of an applicant, which elements include
one or more activities that are involved in the life cycle of a project from
conception to completion of the project.
(4)
Responsibility
of the applicants
(A)
In
general
Each applicant shall submit to the Secretary for approval
such plans, specifications, and estimates for each proposed project as the
Secretary may require.
(B)
Applicant
subrecipients
The applicant shall be responsible for determining
that a subrecipient of Federal funds under this section has—
(i) adequate project
delivery systems for projects approved under this section; and
(ii) sufficient
accounting controls to properly manage such Federal funds.
(C)
Periodic
review
The Secretary shall periodically review the monitoring of
subrecipients by the applicant.
(5)
Specific
oversight responsibilities
Nothing in this section shall affect
or discharge any oversight responsibility of the Secretary specifically
provided for under this title or other Federal law.
(i)
Major
Projects
(1)
In
general
A recipient of a grant for a project under this section
with an estimated total cost of $500,000,000 or more, and a recipient for such
other projects as may be identified by the Secretary, shall submit to the
Secretary for each project—
(A) a project
management plan; and
(B) an annual
financial plan.
(2)
Project
management plan
A project management plan shall document—
(A) the procedures
and processes that are in effect to provide timely information to the project
decision makers to effectively manage the scope, costs, schedules, and quality
of, and the Federal requirements applicable to, the project; and
(B) the role of the
agency leadership and management team in the delivery of the project.
(3)
Financial
plan
A financial plan shall—
(A) be based on
detailed estimates of the cost to complete the project; and
(B) provide for the
annual submission of updates to the Secretary that are based on reasonable
assumptions, as determined by the Secretary, of future increases in the cost to
complete the project.
(j)
Other
Projects
A recipient of Federal financial assistance for a
project under this section with an estimated total cost of $100,000,000 or more
that is not covered by subsection (i) shall prepare an annual financial plan.
Annual financial plans prepared under this subsection shall be made available
to the Secretary for review upon the request of the Secretary.
(k)
Other Terms and
Conditions
The Secretary shall determine what additional grant
terms and conditions are necessary and appropriate to meet the requirements of
this section.
(l)
Regulations
Not
later than 1 year after the date of enactment of the
American Infrastructure Investment Fund
Act, the Secretary shall prescribe regulations to implement this
section.
(m)
Applicant
Defined
In this subchapter, the term applicant
includes a State, a political subdivision of a State, government-sponsored
authorities and corporations, and the District of Columbia.
(n)
Secretarial
Oversight
(1)
Construction
management contracts
The Secretary may use not more than 1
percent of amounts made available in a fiscal year for capital projects under
this subchapter to enter into contracts to oversee the construction of such
projects.
(2)
Compliance
reviews
The Secretary may use amounts available under paragraph
(1) to make contracts for safety, procurement, management, and financial
compliance reviews and audits of a recipient of amounts under paragraph
(1).
(3)
Federal
costs
The Federal Government shall pay the entire cost of
carrying out a contract under this subsection.
(o)
Compliance with
applicable laws
(1)
Labor
standards
The provisions of subchapter IV of chapter 31 of title
40, shall apply to funds made available under this subchapter.
(2)
Planning and
environmental laws
A project that receives financial assistance
under this subchapter shall comply with—
(A) the applicable
planning and programming requirements under sections 134 and 135 of title 23;
and
(B) all applicable
environmental laws and requirements, including the National Environmental
Policy Act of 1969 (42 U.S.C. 4321 et seq.) and the National Historic
Preservation Act of 1966 (16 U.S.C. 470 et seq.).
(p)
User of
American iron, steel, and manufactured goods
(1)
In
general
None of the funds made available under this subchapter
may be used for a project for the construction, alteration, maintenance, or
repair of a public building or public work unless all of the iron, steel, and
manufactured goods used in the project are produced in the United
States.
(2)
Exception
Paragraph
(1) shall not apply in any case or category of cases in which the Secretary
finds that—
(A) applying
paragraph (1) would be inconsistent with the public interest;
(B) iron, steel, and
the relevant manufactured goods are not produced in the United States in
sufficient and reasonably available quantities and of a satisfactory quality;
or
(C) inclusion of
iron, steel, and manufactured goods produced in the United States will increase
the cost of the overall project by more than 25 percent.
(3)
Publication of
waivers
If the Secretary determines that it is necessary to waive
the application of paragraph (1) based on a finding under paragraph (2), the
head of the department or agency shall publish in the Federal Register a
detailed written justification as to why the provision is being waived.
(4)
International
agreements
This subsection shall be applied in a manner
consistent with United States obligations under international
agreements.
(q)
Performance
evaluation
(1)
Annual
reports
(A)
In
general
The Comptroller General of the United States shall
conduct an annual assessment to evaluate the overall performance of grants made
under the program established under subsection (a).
(B)
Dissemination
The
Comptroller General shall submit a report containing the results of the
evaluation under subparagraph (A) to the Committee on Commerce, Science, and
Transportation of the Senate and the Committee on Transportation and
Infrastructure of the House of Representatives.
(2)
Biannual
report
Not later than 1 year after the date of enactment of the
American Infrastructure Investment Fund
Act, and every 6 months thereafter, the Secretary of
Transportation shall submit a report to the congressional committees set forth
in paragraph (1)(B) that documents—
(A) the number of
applications received under this section;
(B) the status of
such applications;
(C) the outcome of
application evaluations; and
(D) the status of
grants awarded under the program established under subsection (a).
(r)
Authorization
of appropriations
There is authorized to be appropriated to the
Secretary $600,000,000 for each of fiscal years 2014 and 2015 to carry out this
section.
.
(b)
Conforming
amendment
The table of sections for chapter 55 of title 49,
United States Code, is amended by adding at the end the following:
SUBCHAPTER III—Financial
Assistance
5581. National infrastructure
investment
grants.
.