Library / Laws / 113th / s / S. 3002 / Introduced in Senate
II
113th CONGRESS
2d Session
S. 3002
IN THE SENATE OF THE UNITED STATES
December 11, 2014Ms. Stabenow (for herself, Mr. Levin, Mr. Brown, and Ms. Baldwin) introduced the following bill; which was read twice and referred to the Committee on Environment and Public Works
A BILL
To control the spread of aquatic invasive species between the Great Lakes basin and the Mississippi
River basin, and for other purposes.
1.
Short title
This Act may be cited as the Guarding Our Great Lakes Act.
2.
Aquatic invasive species control zone at Brandon Road Lock and Dam, Joliet Illinois
(a)
In general
The Secretary of the Army, acting through the Chief of Engineers, the Secretary of the Interior,
acting through the Director of the United States Fish and Wildlife Service
and the Director of the United States Geological Survey, the Administrator
of the Environmental Protection Agency, and each other applicable Federal
agency shall take actions to prevent the transfer of aquatic invasive
species, with a focus on Asian carp species, through the Brandon Road Lock
and Dam.
(b)
Construction
(1)
Required measures
The Chief of Engineers shall construct measures to improve the Brandon Road Lock and Dam to prevent
the upstream transfer of swimming aquatic invasive species through the
lock and dam, including—
(A) an engineered channel in the approach from the Mississippi River direction, as outlined in the
report issued pursuant to section 1538 of Public Law 112–141;
(B) adding additional structures necessary for aquatic invasive species control; and
(C) the construction and operation of electric dispersal barriers.
(2)
Cost estimate and schedule
Not later than 6 months after the date of enactment of this Act, the Chief of Engineers shall
submit to Congress a cost estimate for, and schedule for completion of,
measures to be constructed under this subsection.
(c)
Other measures
The Director of the United States Fish and Wildlife Service, in consultation with the Director of
the United States Geological Survey, the Chief of Engineers, the
Commandant of the United States Coast Guard, the Administrator of the
Environmental Protection Agency, and the heads of other relevant agencies,
shall implement all appropriate measures in compliance with applicable
State and Federal law around the Brandon Road Lock and Dam on the Illinois
River to prevent the upstream and downstream transfer of swimming and
floating aquatic invasive species, with a focus on Asian carp species,
including—
(1) implementing existing Asian carp monitoring and control strategies at the Brandon Road location, as
applicable;
(2) using the Brandon Road location to the greatest extent possible to test new aquatic invasive
species control technologies;
(3) implementing all control strategies identified through this testing necessary to fulfill the
objectives of this section; and
(4) developing best management practices to mitigate aquatic invasive species transfer by boat and
barge operators on the Illinois River and Chicago Sanitary and Shipping
Canal and working with operators to implement them.
(d)
Administration
(1)
Acquisition of real estate
The Chief of Engineers, the Director of the United States Fish and Wildlife Service, and the
Director of the United States Geological Survey may acquire any real
estate necessary to carry out this section.
(2)
Cooperation
In carrying out this section, the Chief of Engineers, the Director of the United States Fish and
Wildlife Service, and the Director of the United States Geological Survey
shall coordinate with each other and—
(A) the Governors of Illinois, Indiana, Michigan, Minnesota, New York, Ohio, Pennsylvania, and
Wisconsin;
(B) the Metropolitan Water Reclamation District of Greater Chicago;
(C) the Asian Carp Regional Coordinating Committee;
(D) the Great Lakes Commission;
(E) the Great Lakes Fishery Commission;
(F) the Great Lakes and St. Lawrence Cities Initiative; and
(G) any other applicable State, local, or international government entity.
3.
Actions related to permanent prevention of aquatic invasive species transfer between the Great
Lakes and Mississippi River basins
(a)
Construction
The Administrator of the Environmental Protection Agency, acting through the Great Lakes
Interagency Task Force, shall coordinate with the Governor of Illinois,
the City of Chicago, and the Metropolitan Water Reclamation District of
Greater Chicago to carry out engineering and construction of flood
mitigation and water quality measures on the Chicago Area Waterway System
related to permanent prevention of the transfer of aquatic nuisance
species between the Great Lakes and Mississippi River basins.
(b)
Requirements
In carrying out subsection (a), the Administrator shall—
(1) coordinate with Chicago and the Metropolitan Water Reclamation District of Greater Chicago to
combine infrastructure to the greatest extent practicable with the Tunnel
and Reservoir Plan of the Metropolitan Water Reclamation District of
Greater Chicago;
(2) ensure flood mitigation in the vicinity of the Chicago Area Waterway System is not degraded;
(3) ensure water quality is protected in the Great Lakes and Chicago Waterway System, consistent with
the Federal Water Pollution Control Act (33 U.S.C. 1251 et seq.);
(4) provide for continued commercial and recreational watercraft traffic on the Chicago Area Waterway
System to the greatest practical extent, which may include new
infrastructure to minimize the impact of physical barriers necessary for
aquatic invasive species control; and
(5) prioritize efforts to prevent the transfer of the highest risk aquatic invasive species, including
Asian carp.
(c)
Administration
(1)
Consultation
In carrying out this section, the Administrator shall consult with the Asian Carp Regional
Coordinating Committee.
(2)
Assistance from Corps
The Chief of Engineers shall provide to the Administrator all documentation relating to the report
issued pursuant to section 1538 of Public Law 112–141 and technical and
other assistance, as requested by the Administrator.
(3)
Delegation
In carrying out this section, the Administrator may delegate parts of the project to any of the
non-Federal entities referred to in this Act.
(4)
Identification of partners
In carrying out this section, the Administrator shall work to identify non-Federal cost-share
partners when applicable.
(5)
Federal share
The Federal share of the cost of a project carried out under this section may be up to 100 percent.
(d)
Report
Not later than 18 months after the date of enactment of this Act, the Administrator shall submit to
Congress a report describing the progress made, and a plan for further
actions to be taken, under this section.