Library / Laws / 113th / s / S. 2823 / Introduced in Senate
II
113th CONGRESS
2d Session
S. 2823
IN THE SENATE OF THE UNITED STATES
September 16, 2014Mr. Hoeven (for himself, Mr. Donnelly, Ms. Murkowski, and Mr. Manchin) introduced the following bill; which was read twice and referred to the Committee on Energy and Natural Resources
A BILL
To require approval for the construction, connection, operation, or maintenance of oil or natural
gas pipelines or electric transmission facilities at the national boundary
of the United States for the import or export of oil, natural gas, or
electricity to or from Canada or Mexico, and for other purposes.
1.
Short title
This Act may be cited as the North American Energy Infrastructure Act.
2.
Finding
Congress finds that the United States should establish a more uniform, transparent, and modern
process for the construction, connection, operation, and maintenance of
oil and natural gas pipelines and electric transmission facilities for the
import and export of oil and natural gas and the transmission of
electricity to and from Canada and Mexico, in pursuit of a more secure and
efficient North American energy market.
3.
Authorization of certain energy infrastructure projects at the national boundary of the United
States
(a)
Authorization
Except as provided in subsection (c) and section 7, no person may construct, connect, operate, or
maintain a cross-border segment of an oil pipeline or electric
transmission facility for the import or export of oil or the transmission
of electricity to or from Canada or Mexico without obtaining a certificate
of crossing for the construction, connection, operation, or maintenance of
the cross-border segment under this section.
(b)
Certificate of crossing
(1)
Requirement
Not later than 120 days after final action is taken under the National Environmental Policy Act of
1969 (42 U.S.C. 4321 et seq.) with respect to a cross-border segment for which a request is received under this section, the
relevant official identified under paragraph (2), in consultation with
appropriate Federal agencies, shall issue a certificate of crossing for
the cross-border segment unless the relevant official finds that the
construction, connection, operation, or maintenance of the cross-border
segment is not in the public interest of the United States.
(2)
Relevant official
The relevant official referred to in paragraph (1) is—
(A) the Secretary of State with respect to oil pipelines; and
(B) the Secretary of Energy with respect to electric transmission facilities.
(3)
Additional requirement for electric transmission facilities
In the case of a request for a certificate of crossing for the construction, connection, operation,
or maintenance of a cross-border segment of an electric transmission
facility, the Secretary of Energy shall require, as a condition of issuing
the certificate of crossing for the request under paragraph (1), that the
cross-border segment of the electric transmission facility be constructed,
connected, operated, or maintained consistent with all applicable policies
and standards of—
(A) the Electric Reliability Organization and the applicable regional entity; and
(B) any Regional Transmission Organization or Independent System Operator with operational or
functional control over the cross-border segment of the electric
transmission facility.
(c)
Exclusions
This section shall not apply to any construction, connection, operation, or maintenance of a
cross-border segment of an oil pipeline or electric transmission facility
for the import or export of oil or the transmission of electricity to or
from Canada or Mexico—
(1) if the cross-border segment is operating for such import, export, or transmission as of the date of
enactment of this Act;
(2) if a permit described in section 6 for such construction, connection, operation, or maintenance has
been issued;
(3) if a certificate of crossing for such construction, connection, operation, or maintenance has
previously been issued under this section; or
(4) if an application for a permit described in section 6 for such construction, connection, operation,
or maintenance is pending on the date of enactment of this Act, until the
earlier of—
(A) the date on which such application is denied; or
(B) July 1, 2016.
(d)
Effect of other laws
(1)
Application to projects
Nothing in this section or section 7 shall affect the application of any other Federal statute to a
project for which a certificate of crossing for the construction,
connection, operation, or maintenance of a cross-border segment is sought
under this section.
(2)
Energy Policy and Conservation Act
Nothing in this section or section 7 shall affect the authority of the President under section
103(a) of the Energy Policy and Conservation Act.
4.
Importation or exportation of natural gas to Canada and Mexico
Section 3(c) of the Natural Gas Act (15 U.S.C. 717b(c)) is amended—
(1) by striking, For purposes of subsection (a) of this section and inserting the following:
(1)
In general
For purposes of subsection (a)
; and
(2) by adding at the end the following:
(2)
Deadline for approval of applications relating to canada and Mexico
In the case of an application for the importation or exportation of natural gas to or from Canada
or Mexico, the Commission shall approve the application not later than
30 days after the date of receipt of the application.
.
5.
Transmission of electric energy to Canada and Mexico
(a)
Repeal of requirement To secure order
Section 202(e) of the Federal Power Act (16 U.S.C. 824a(e)) is repealed.
(b)
Conforming amendments
(1)
State regulations
Section 202(f) of the Federal Power Act (16 U.S.C. 824a(f)) is amended by striking insofar as such State regulation does not conflict with the exercise of the Commission's powers
under or relating to subsection 202(e).
(2)
Seasonal diversity electricity exchange
Section 602(b) of the Public Utility Regulatory Policies Act of 1978 (16 U.S.C. 824a–4(b)) is amended by striking the Commission has conducted hearings and made the findings required under section 202(e) of the
Federal Power Act and all that follows through the period at the end and inserting the Secretary has conducted hearings and finds that the proposed transmission facilities would not
impair the sufficiency of electric supply within the United States or
would not impede or tend to impede the coordination in the public interest
of facilities subject to the jurisdiction of the Secretary..
6.
No Presidential permit required
No Presidential permit (or similar permit) required under Executive Order No. 13337 (3 U.S.C. 301 note), Executive Order No. 11423 (3 U.S.C. 301 note), section 301 of title 3, United States Code, Executive Order No. 12038, Executive Order No. 10485, or any other
Executive order shall be necessary for the construction, connection,
operation, or maintenance of an oil or natural gas pipeline or electric
transmission facility, or any cross-border segment thereof.
7.
Modifications to existing projects
No certificate of crossing under section 3, or permit described in section 6, shall be required for
a modification to the construction, connection, operation, or maintenance
of an oil or natural gas pipeline or electric transmission facility—
(1) that is operating for the import or export of oil or natural gas or the transmission of electricity
to or from Canada or Mexico as of the date of enactment of the Act;
(2) for which a permit described in section 6 for such construction, connection, operation, or
maintenance has been issued; or
(3) for which a certificate of crossing for the cross-border segment of the pipeline or facility has
previously been issued under section 3.
8.
Effective date; rulemaking deadlines
(a)
Effective date
Sections 3 through 7, and the amendments made by such sections, shall take effect on July 1, 2015.
(b)
Rulemaking deadlines
Each relevant official described in section 3(b)(2) shall—
(1) not later than 180 days after the date of enactment of this Act, publish in the Federal Register
notice of a proposed rulemaking to carry out the applicable requirements
of section 3; and
(2) not later than 1 year after the date of enactment of this Act, publish in the Federal Register a
final rule to carry out the applicable requirements of section 3.
9.
Definitions
In this Act—
(1) the term cross-border segment means the portion of an oil or natural gas pipeline or electric transmission facility that is
located at the national boundary of the United States with either Canada
or Mexico;
(2) the term modification includes a change in ownership, volume expansion, downstream or
upstream interconnection, or adjustment to maintain flow (such as a
reduction or increase in the number of pump or compressor stations);
(3) the term natural gas has the meaning given that term in section 2 of the Natural Gas Act (15 U.S.C. 717a);
(4) the term oil means petroleum or a petroleum product;
(5) the terms Electric Reliability Organization and regional entity have the meanings given those terms in section 215 of the Federal Power Act (16 U.S.C. 824o); and
(6) the terms Independent System Operator and Regional Transmission Organization have the meanings given those terms in section 3 of the Federal Power Act (16 U.S.C. 796).