Library / Laws / 113th / s / S. 2771 / Introduced in Senate
II
113th CONGRESS
2d Session
S. 2771
IN THE SENATE OF THE UNITED STATES
July 31, 2014
Mrs. Boxer (for herself and Mrs. Feinstein) introduced the following bill; which was read twice and referred to the Committee on Environment and Public Works
A BILL
To establish a WaterSense program, and for other purposes.
1.
Short title; table of contents
(a)
Short title
This Act may be cited as the
Water in the 21st Century Act or W21.
(b)
Table of contents
The table of contents of this Act is as follows:
Sec. 1. Short title; table of contents.
Sec. 2. Definition of Administrator.
TITLE I—Conservation and efficiency
Sec. 101. Water efficiency, conservation, and adaptation.
TITLE II—Recycling, storage, and integrated water management
Sec. 201. Definitions.
Subtitle A—Innovative financing
Sec. 211. Purposes.
Sec. 212. Authority to provide assistance.
Sec. 213. Applications.
Sec. 214. Eligibility for assistance.
Sec. 215. Determination of eligibility and project selection.
Sec. 216. Secured loans.
Sec. 217. Program administration.
Sec. 218. State and local permits.
Sec. 219. Regulations.
Sec. 220. Funding.
Sec. 221. Report to Congress.
Subtitle B—Integrated regional water management, reclamation, and recycling projects
Sec. 231. Water storage projects.
Sec. 232. Authorization of appropriations.
Subtitle C—Title transfers
Sec. 241. Authorization to transfer title.
TITLE III—Innovation through research, data, and technology
Sec. 301. Open water data system.
Sec. 302. Water Resources Research Act amendments.
Sec. 303. Reauthorization of Water Desalination Act of 1996.
Sec. 304. Review of reservoir operations.
TITLE IV—Drought preparedness and resilience
Sec. 401. National drought resilience guidelines.
Sec. 402. Drought preparedness for fisheries.
2.
Definition of Administrator
In this Act, the term Administrator means the Administrator of the Environmental Protection Agency.
I
Conservation and efficiency
101.
Water efficiency,
conservation, and adaptation
(a)
WaterSense
(1)
In
general
There is established within the Environmental Protection
Agency a WaterSense program to identify and promote water efficient products,
buildings, landscapes, facilities, processes, and services so as—
(A) to reduce water
use;
(B) to reduce the
strain on water, wastewater, and stormwater infrastructure;
(C) to conserve
energy used to pump, heat, transport, and treat water; and
(D) to preserve water
resources for future generations, through voluntary labeling of, or other forms
of communications about, products, buildings, landscapes, facilities,
processes, and services that meet the highest water efficiency and performance
criteria.
(2)
Duties
The
Administrator shall—
(A) establish—
(i) a
WaterSense label to be used for certain items; and
(ii) the
procedure by which an item may be certified to display the WaterSense
label;
(B) promote
WaterSense-labeled products, buildings, landscapes, facilities, processes, and
services in the marketplace as the preferred technologies and services
for—
(i) reducing water
use; and
(ii) ensuring product
and service performance;
(C) work to enhance
public awareness of the WaterSense label through public outreach, education,
and other means;
(D) preserve the
integrity of the WaterSense label by—
(i) establishing and
maintaining performance criteria so that products, buildings, landscapes,
facilities, processes, and services labeled with the WaterSense label perform
as well or better than less water-efficient counterparts;
(ii) overseeing
WaterSense certifications made by third parties;
(iii) conducting
reviews of the use of the WaterSense label in the marketplace and taking
corrective action in any case in which misuse of the label is identified;
and
(iv) carrying out
such other measures as the Administrator determines to be appropriate;
(E) regularly review
and, if appropriate, update WaterSense criteria for categories of products,
buildings, landscapes, facilities, processes, and services, at least once every
6 years;
(F) to the maximum
extent practicable, regularly estimate and make available to the public the
production and relative market shares of, and the savings of water, energy, and
capital costs of water, wastewater, and stormwater infrastructure attributable
to the use of WaterSense-labeled products, buildings, landscapes, facilities,
processes, and services, at least annually;
(G) solicit comments
from interested parties and the public prior to establishing or revising a
WaterSense category, specification, installation criterion, or other criterion;
(H) provide
reasonable notice to interested parties and the public of any changes
(including effective dates), on the adoption of a new or revised category,
specification, installation criterion, or other criterion, along with—
(i) an
explanation of the changes; and
(ii) as
appropriate, responses to comments submitted by interested parties and the
public;
(I) provide
appropriate lead time (as determined by the Administrator) prior to the
applicable effective date for a new or significant revision to a category,
specification, installation criterion, or other criterion, taking into account
the timing requirements of the manufacturing, marketing, training, and
distribution process for the specific product, building and landscape, or
service category addressed;
(J) identify and, if
appropriate, implement other voluntary approaches in commercial, institutional,
residential, industrial, and municipal sectors to encourage recycling and reuse
technologies to improve water efficiency or lower water use; and
(K) if appropriate,
authorize the WaterSense label for use on products that are labeled by the
Energy Star program implemented by the Administrator and the Secretary of
Energy.
(3)
Authorization
of appropriations
There are authorized to be appropriated to
carry out this section—
(A) $5,000,000 for
fiscal year 2015;
(B) $10,000,000 for
fiscal year 2016;
(C) $15,000,000 for
fiscal year 2017;
(D) $20,000,000 for
fiscal year 2018; and
(E) for each
subsequent fiscal year, the applicable amount for the preceding fiscal year, as
adjusted to reflect changes for the 12-month period ending the preceding
November 30 in the Consumer Price Index for All Urban Consumers published by
the Bureau of Labor Statistics of the Department of Labor.
(b)
State
residential water efficiency and conservation incentives program
(1)
Definitions
In
this subsection:
(A)
Eligible
entity
The term eligible entity means a State
government, local or county government, tribal government, wastewater or
sewerage utility, municipal water authority, energy utility, water utility, or
nonprofit organization that meets the requirements of paragraph (2).
(B)
Incentive
program
The term incentive program means a program
for administering financial incentives for consumer purchase and installation
of water-efficient products, buildings (including new water-efficient homes),
landscapes, processes, or services described in paragraph (2)(A).
(C)
Residential
water-efficient product, building, landscape, process, or service
(i)
In
general
The term residential water-efficient product,
building, landscape, process, or service means a product, building,
landscape, process, or service for a residence or its landscape that is rated
for water efficiency and performance—
(I) by
the WaterSense program; or
(II) if
a WaterSense specification does not exist, by the Energy Star program or an
incentive program approved by the Administrator.
(ii)
Inclusions
The
term residential water-efficient product, building, landscape, process,
or service includes—
(I) faucets;
(II) irrigation
technologies and services;
(III) point-of-use
water treatment devices;
(IV) reuse and
recycling technologies;
(V) toilets;
(VI) clothes
washers;
(VII) dishwashers;
(VIII) showerheads;
(IX) xeriscaping and
other landscape conversions that replace irrigated turf;
(X) new
water efficient homes certified under the WaterSense program;
(XI) green stormwater installations such as permeable pavement, rain gardens, rain barrels, and green
roofs;
(XII) composting solutions complementary to water use and water quality; and
(XIII) other water-efficient products, services, processes, or behavioral water efficiency solutions that
address the objectives of the WaterSense program.
(D)
WaterSense
program
The term WaterSense program means the
program established by subsection (a).
(2)
Eligible
entities
An entity shall be eligible to receive an allocation
under paragraph (3) if the entity—
(A) establishes (or
has established) an incentive program to provide financial incentives to
residential consumers for the purchase of residential water-efficient products,
buildings, landscapes, processes, or services;
(B) submits an
application for the allocation at such time, in such form, and containing such
information as the Administrator may require; and
(C) provides
assurances satisfactory to the Administrator that the entity will use the
allocation to supplement, but not supplant, non-Federal funds made available to
carry out
the incentive program.
(3)
Amount of
allocations
For each fiscal year, the Administrator shall
determine the amount to allocate to each eligible entity to carry out paragraph
(4), taking into consideration—
(A) the population
served by the eligible entity during the most recent calendar year for which
data are available;
(B) the targeted
population of the incentive program of the eligible entity, such as general
households, low-income households, or first-time homeowners, and the probable
effectiveness of the incentive program for that population;
(C) for existing
programs, the effectiveness of the program in encouraging the adoption of
water-efficient products, buildings, landscapes, facilities, processes, and
services;
(D) any allocation to
the eligible entity for a preceding fiscal year that remains unused; and
(E) the per capita
water demand of the population served by the eligible entity during the most
recent calendar year for which data are available and the availability or
reliability of
water supplies to the eligible entity.
(4)
Use of
allocated funds
Funds allocated to an eligible entity under
paragraph (3) may be used to pay up to 50 percent of the cost of establishing
and carrying out an incentive program.
(5)
Issuance of
incentives
(A)
In
general
Financial incentives may be provided to residential
consumers that meet the requirements of the applicable incentive
program.
(B)
Manner of
issuance
An eligible entity may—
(i) issue
all financial incentives directly to residential consumers; or
(ii) with
approval of the Administrator, delegate all or part of financial incentive
administration to other organizations, including local governments, municipal
water authorities, water utilities, and nonprofit organizations.
(C)
Amount
The
amount of a financial incentive shall be determined by the eligible entity,
taking into consideration—
(i) the
amount of any Federal or State tax incentive available for the purchase of the
residential water-efficient product or service;
(ii) the
amount necessary to change consumer behavior to purchase water-efficient
products and services; and
(iii) the
consumer expenditures for onsite preparation, assembly, and original
installation of the product.
(6)
Authorization
of appropriations
There are authorized to be appropriated to the
Administrator to carry out this subsection—
(A) $100,000,000 for fiscal year 2015;
(B) $150,000,000 for fiscal year 2016;
(C) $200,000,000 for fiscal year 2017;
(D) $150,000,000 for fiscal year 2018;
(E) $100,000,000 for
fiscal year 2019; and
(F) for each
subsequent fiscal year, the applicable amount for the preceding fiscal year, as
adjusted to reflect changes for the 12-month period ending the preceding
November 30 in the Consumer Price Index for All Urban Consumers published by
the Bureau of Labor Statistics of the Department of Labor.
(c)
Water system mitigation and adaptation grants
(1)
Definitions
In
this subsection:
(A)
Owner or
operator
(i)
In
general
The term owner or operator means a person
(including a regional, State, local, municipal, or private entity) that owns or
operates a water system.
(ii)
Inclusion
The
term owner or operator includes a non-Federal entity that has
operational responsibilities for a federally owned water system.
(B)
Water
system
The term water system means—
(i) a
community water system (as defined in section 1401 of the Safe Drinking Water
Act (42 U.S.C. 300f));
(ii) a
publicly owned treatment works (as defined in section 212 of the Federal Water
Pollution Control Act (33 U.S.C. 1292)), including a municipal separate storm
sewer system;
(iii) a
decentralized wastewater treatment system for domestic sewage;
(iv) a
groundwater storage and replenishment system; or
(v) a
system for transport and delivery of water for irrigation or
conservation.
(2)
Grants
Beginning
in fiscal year 2015, the Administrator shall make grants to owners or operators
of water systems to address any ongoing or forecasted (based on the best
available research and data) climate-related impact on the water quality or
quantity of a region of the United States, for the purposes of mitigating or
adapting to the impacts of climate change.
(3)
Eligible
uses
In carrying out this subsection, the Administrator shall
make grants to assist in the planning, design, construction, implementation, or
maintenance of any program or project to increase the resilience of a water
system to climate change by—
(A) conserving water
or enhancing water use efficiency, including through the use of water metering
to measure the effectiveness of a water efficiency program;
(B) modifying or
relocating existing water system infrastructure made or projected to be made
inoperable by climate change impacts;
(C) preserving or
improving water quality, including through measures to manage, reduce, treat,
or reuse municipal stormwater, wastewater, or drinking water;
(D) investigating,
designing, or constructing groundwater remediation, recycled water, or
desalination facilities or systems;
(E) enhancing water
management by increasing watershed preservation and protection, such as through
the use of natural or engineered green infrastructure in the management,
conveyance, or treatment of water, wastewater, or stormwater;
(F) enhancing energy
efficiency or the use and generation of renewable energy in the management,
conveyance, or treatment of water, wastewater, or stormwater;
(G) supporting the
adoption and use of advanced water treatment, water supply management (such as
reservoir reoperation), or water demand management technologies, projects, or
processes (such as water reuse and recycling or adaptive conservation pricing)
that maintain or increase water supply or improve water quality;
(H) modifying or
replacing existing systems or constructing new systems for existing communities
or land currently in agricultural production to improve water availability,
storage, or conveyance in a manner that—
(i) promotes more
efficient use of available water supplies; and
(ii) does
not further exacerbate stresses on ecosystems;
(I) supporting
practices and projects, such as improved irrigation systems, water banking and
other forms of water transactions, groundwater recharge, stormwater capture,
and reuse or recycling of drainage water, to improve water quality or promote
more efficient water use, including on land currently in agricultural
production;
(J) conducting and
completing studies or assessments to project how climate change may impact the
future operations and sustainability of water systems;
(K) developing and
implementing mitigation measures to rapidly address impacts on water systems
most susceptible to abrupt climate change, including those in the Colorado
River Basin and coastal regions at risk from rising sea levels; or
(L) funding of transactions costs and credit enhancement for pay-for-performance-based public-private
initiatives intended to advance the eligible uses of the program or
project.
(4)
Application
To
be eligible to receive a grant from the Administrator under paragraph (2), the
owner or operator of a water system shall submit to the Administrator an
application that—
(A) includes a
proposal of the program, strategy, or infrastructure improvement to be planned,
designed, constructed, implemented, or maintained by the water system;
(B) cites the best
available research or data that demonstrates—
(i) the
risk to the water resources or infrastructure of the water system as a result
of ongoing or forecasted changes to the hydrological system brought about by
factors arising from climate change, including rising sea levels and changes in
precipitation levels; and
(ii) how
the proposed program, strategy, or infrastructure improvement would perform
under the anticipated climate conditions;
(C) explains how the
proposed program, strategy, or infrastructure improvement is expected to
enhance the resiliency of the water system, including source water protection
for community water systems, to these risks or reduce the direct or indirect
greenhouse gas emissions of the water system; and
(D) demonstrates that
the program, strategy, or infrastructure improvement is—
(i) consistent with
any approved State and tribal climate adaptation plan; and
(ii) not
inconsistent with any approved natural resources plan.
(5)
Competitive
process
(A)
In
general
Each calendar year, the Administrator shall conduct a
competitive process to select and fund applications under this
subsection.
(B)
Priority
requirements and weighting
In carrying out the process, the
Administrator shall—
(i) prioritize
funding of applications that are submitted by the owners or operators of water
systems that are, based on the best available research and data, at the
greatest and most immediate risk of facing significant climate-related negative
impacts on water quality or quantity;
(ii) in
selecting among the priority applications determined under clause (i), ensure
that the final list of applications funded for each year includes a substantial
number that, to the maximum extent practicable, includes each eligible use
described in paragraph (3);
(iii) solicit
applications from water systems that are—
(I) located in all
regions of the United States; and
(II) facing varying
risks as a result of climate change; and
(iv) provide for
solicitation and consideration of public input in the development of criteria
used in evaluating applications.
(6)
Cost
sharing
(A)
Federal
share
The Federal share of the cost of any program, strategy, or
infrastructure improvement that is the subject of a grant awarded by the
Administrator to a water system under paragraph (2) shall not exceed 50 percent
of the cost of the program, strategy, and infrastructure improvement.
(B)
Calculation of
non-Federal share
In calculating the non-Federal share of the
cost of a program, strategy, or infrastructure improvement proposed by a water
system through an application submitted by the water system under paragraph
(4), the Administrator shall—
(i) include
the value of any in-kind services that are integral to the completion of the
program, strategy, or infrastructure improvement, as determined by the
Administrator; and
(ii) not
include any other amount that the water system receives from a Federal
agency.
(7)
Labor
standards
(A)
In
general
All laborers and mechanics employed on infrastructure
improvements funded directly by or assisted in whole or in part by this
subsection shall be paid wages at rates not less than those prevailing for the
same type of work on similar construction in the immediate locality, as
determined by the Secretary of Labor in accordance with subchapter IV of
chapter 31 of part A of subtitle II of title 40, United States Code.
(B)
Authority and
functions
With respect to the labor standards in this paragraph,
the Secretary of Labor shall have the authority and functions set forth in
Reorganization Plan Numbered 14 of 1950 (64 Stat. 1267; 5 U.S.C. App.) and
section 3145 of title 40, United States Code.
(8)
Local hiring
(A)
In general
The recipient of assistance may advertise and award a contract for construction containing
requirements for the employment of individuals residing in or adjacent to
any of the areas in which the work is to be performed under the contract,
if—
(i) all or part of the construction work performed under the contract occurs in an area that has—
(I) a per capita income of 80 percent or less of the national average per capita income; or
(II) an unemployment rate that is, for the most recent 24-month period for which data are available, at
least 1 percent greater than the national average unemployment rate;
(ii) the estimated cost of the project of which the contract is a part is greater than $1,000,000; and
(iii) the recipient does not hire individuals who do not have the necessary skills to
perform work in the applicable craft or trade, except for individuals who
are subject
to an apprenticeship program or other training program meeting, as
determined by the Secretary.
(B)
Advertisement
In advertising and awarding a contract under this subsection, the Secretary or recipient of
assistance shall ensure that the requirements contained in the
advertisement would not—
(i) compromise the quality of the project;
(ii) unreasonably delay the completion of the project; or
(iii) unreasonably increase the cost of the project.
(9)
Efficient, integrated procurement for programs jointly funded with the Department of Housing and
Urban Development
(A)
Definition of eligible project
In this paragraph, the term eligible project means a project for which the amount of funding provided by the Department of Housing and Urban
Development is
10 percent or more of the amount of funding provided under this
subsection.
(B)
Preferences
Notwithstanding the competitive bidding requirements of this section (including regulations),
in the case of an eligible project funded jointly with funding provided by
the
Department of Housing and Urban Development that is covered by section 3
of the Housing and Urban Development Act of 1968 (82 Stat. 846; 12 U.S.C.
1701u), a contracting agency
may apply the preferences required for the funding by the Department of
Housing and Urban Development under section 3 of that Act (including
regulations) with respect to the funding,
to the elements of the project funded in any part under this subsection.
(C)
Permissible restrictions
A State or local law governing contracting practices that prohibits the awarding of contracts to
businesses that have solicited or made contributions to political
candidates, political parties, and holders of public office shall not be
considered a violation of this section.
(10)
Regulations
(A)
In
general
Not later than 1 year after the date of enactment of this
Act, the Administrator shall promulgate final regulations to carry out this
subsection.
(B)
Special rule
for the construction of treatment works
In carrying out this
paragraph, the Administrator shall incorporate all relevant and appropriate
requirements of title VI of the Federal Water Pollution Control Act (33 U.S.C.
1381 et seq.) applicable to the construction of treatment works that are
carried out under this subsection.
(11)
Report to
Congress
Not later than 3 years after the date of enactment of
this Act, and every 3 years thereafter, the Administrator shall submit to Congress
a report on progress in implementing this subsection, including
information on project applications received and funded annually.
(12)
Authorization
of appropriations
There are authorized to be appropriated to
carry out this subsection such sums as are necessary.
II
Recycling, storage, and integrated water management
201.
Definitions
In this title:
(1)
Eligible entity
The term eligible entity means—
(A) a corporation;
(B) a partnership;
(C) a joint venture;
(D) a trust;
(E) a Federal, State, or local governmental entity, agency, or instrumentality; and
(F) a conservancy district, irrigation district, canal company, mutual water company, water users’
association, Indian tribe, agency created by interstate compact, or any
other entity that has the capacity to contract with the United States
under Federal reclamation law.
(2)
Federal credit instrument
The term Federal credit instrument means a secured loan, loan guarantee, or other credit enhancement authorized to be made available
under this title with
respect to a project.
(3)
Investment-grade rating
The term investment-grade rating means a rating of BBB minus, Baa3, bbb minus, BBB (low), or higher as assigned by a rating agency
to project obligations.
(4)
Lender
(A)
In general
The term lender means any non-Federal qualified institutional buyer (as defined in section 230.144A(a) of title
17, Code of Federal Regulations (or a successor regulation) (commonly
known as Rule
144A(a) of the Securities and Exchange Commission and issued under the
Securities Act of 1933 (15 U.S.C. 77a et seq.))).
(B)
Inclusions
The term lender includes—
(i) a qualified retirement plan (as defined in section 4974 of the Internal Revenue Code of 1986)
that is a qualified institutional buyer; and
(ii) a governmental plan (as defined in section 414 of the Internal Revenue Code of 1986) that is a
qualified institutional buyer.
(5)
Loan guarantee
The term loan guarantee means any guarantee or other pledge by the Secretary to pay all or part of the principal of, and
interest on, a loan or other debt obligation issued by an obligor and
funded by a lender.
(6)
Obligor
The term obligor means an eligible entity that is primarily liable for payment of the principal of, or interest on,
a Federal credit instrument.
(7)
Project obligation
(A)
In general
The term project obligation means any note, bond, debenture, or other debt obligation issued by an obligor in connection with
the financing of a project.
(B)
Exclusion
The term project obligation does not include a Federal credit instrument.
(8)
Rating agency
The term rating agency means a credit rating agency registered with the Securities and Exchange Commission as a
nationally recognized statistical rating organization (as defined in
section 3(a) of the Securities Exchange Act of 1934 (15 U.S.C. 78c(a)).
(9)
Reclamation State
The term Reclamation State means any of the States of—
(A) Arizona;
(B) California;
(C) Colorado;
(D) Idaho;
(E) Kansas;
(F) Montana;
(G) Nebraska;
(H) Nevada;
(I) New Mexico;
(J) North Dakota;
(K) Oklahoma;
(L) Oregon;
(M) South Dakota;
(N) Texas;
(O) Utah;
(P) Washington; and
(Q) Wyoming.
(10)
Secretary
The term Secretary means the Secretary of the Interior.
(11)
Secured loan
The term secured loan means a direct loan or other debt obligation issued by an obligor and funded by the Secretary in
connection with the financing of a project under subtitle A.
(12)
Subsidy amount
The term subsidy amount means the amount of budget authority sufficient to cover the estimated long-term cost to the
Federal Government of a Federal credit instrument, as calculated on a net
present value basis, excluding administrative costs and any incidental
effects on Governmental receipts or outlays in accordance with the Federal
Credit Reform Act of 1990 (2 U.S.C. 661 et seq.).
(13)
Substantial completion
The term substantial completion, with respect to a project, means the earliest date on which a project is considered to perform
the functions for which the project is designed.
A
Innovative financing
211.
Purposes
The purposes of this subtitle are—
(1) to promote increased development of critical water resources infrastructure by establishing
additional
opportunities for financing water resources projects;
(2) to attract new investment capital to infrastructure projects that are capable of generating revenue
streams through user fees or other dedicated funding sources;
(3) to complement existing Federal funding sources and address budgetary constraints on Bureau of
Reclamation programs; and
(4) to leverage private investment in water resources infrastructure.
212.
Authority to provide assistance
(a)
In general
The Secretary may provide financial assistance under this subtitle to carry out projects within—
(1) any Reclamation State;
(2) any other State in which the Bureau of Reclamation is
authorized to provide project assistance; and
(3) the States of Alaska and Hawaii.
(b)
Selection
In selecting projects to receive financial assistance under subsection (a), the Secretary shall
ensure diversity with respect to—
(1) project types; and
(2) geographical locations.
213.
Applications
To be eligible to receive assistance under this subtitle, an eligible entity shall submit to the
Secretary an
application at such time, in such manner, and containing such information
as the Secretary may require.
214.
Eligibility for assistance
(a)
Eligible projects
The following projects may be carried out using assistance made available under this subtitle:
(1) A project for the reclamation and reuse of municipal, industrial, domestic, and agricultural
wastewater, and naturally impaired ground and surface waters, which the
Secretary, acting through the Commissioner of Reclamation, is
authorized to undertake.
(2) Any water infrastructure project not specifically authorized by law that—
(A) the Secretary determines,
through the completion of an appraisal investigation and feasibility
study, would contribute to a safe, adequate water supply for domestic,
agricultural, environmental, or municipal and industrial use; and
(B) is
otherwise eligible for assistance under this title.
(3) A project for enhanced energy efficiency in the operation of a water system.
(4) A project for accelerated repair and replacement of an aging water distribution facility.
(5) A brackish or sea water desalination project.
(6) Acquisition of real property or an interest in real property for water storage, reclaimed or
recycled water, or wastewater, if the acquisition is integral to a project
described in paragraphs (1) through (5).
(7) A combination of projects, each of which is eligible under paragraphs (1) through (6), for which an
eligible entity submits a single application.
(b)
Activities eligible for assistance
For purposes of this subtitle, an eligible activity with respect to an eligible project under
subsection (a) includes the
cost of—
(1) development-phase activities, including planning, feasibility analysis, revenue forecasting,
environmental review, permitting, transaction costs, preliminary
engineering and design work,
and other preconstruction activities;
(2) construction, reconstruction, rehabilitation, and replacement activities;
(3) the acquisition of real property (including water rights, land relating to the project, and
improvements to land), environmental mitigation, construction
contingencies, and acquisition of equipment;
(4) capitalized interest necessary to meet market requirements, reasonably required reserve funds,
capital issuance expenses, and other carrying costs during construction;
(5) refinancing interim construction funding, long-term project obligations, or a secured loan, loan
guarantee, or other credit enhancement made under this subtitle;
(6) reimbursement or success payments to any public or private entity that achieves predetermined
outcomes on a pay-for-performance or pay-for-success basis; and
(7) grants, loans, or credit enhancement for community development financial institutions, green banks,
and other financial intermediaries providing ongoing finance for projects
that meet the purposes of this subtitle.
215.
Determination of eligibility and project selection
(a)
Eligibility requirements
To be eligible to receive financial assistance under this subtitle, a project shall meet the
following
criteria, as determined by the Secretary:
(1)
Creditworthiness
(A)
In general
Subject to subparagraph (B), the project shall be creditworthy, as determined by the
Secretary, who shall ensure that any financing for the project has
appropriate security features, such as a rate covenant, to ensure
repayment.
(B)
Preliminary rating opinion letter
The Secretary shall require each applicant to provide a preliminary rating opinion letter
from at least 1 rating agency indicating that the senior obligations of
the project (which may be the Federal credit instrument) have the
potential to achieve an investment-grade rating.
(2)
Eligible project costs
The eligible project costs of a project and other projects in a watershed shall be reasonably
anticipated to be not less than
$10,000,000.
(3)
Dedicated revenue sources
The Federal credit instrument for the project shall be repayable, in whole or in part, from
dedicated revenue sources that also secure the project obligations.
(4)
Public sponsorship of private entities
In the case of a project carried out by an entity that is not a State or local government or an
agency or instrumentality of a State or local government, the project
shall be publicly sponsored.
(b)
Selection criteria
(1)
Establishment
The Secretary shall establish criteria for the selection of projects that meet the eligibility
requirements of subsection (a), in accordance with paragraph (2).
(2)
Criteria
The selection criteria shall include the following:
(A) The extent to which the project is nationally or regionally significant.
(B) The extent to which assistance under this section would foster innovative public-private
partnerships and attract private debt or equity investment.
(C) The likelihood that assistance under this section would enable the project to proceed at an earlier
date than the project would otherwise be able to proceed.
(D) The extent to which the project uses new or innovative approaches.
(E) The extent to which projects track evidence about the effectiveness of the 1 or more projects
financed and
the availability of the evidence and project information to the public to
facilitate replication.
(F) The amount of budget authority required to fund the Federal credit instrument made available under
this subtitle.
(G) The extent to which the project helps maintain or protect the environment.
(H) The extent to which the project supports the local economy and provides local jobs.
(c)
Receipt of other Federal funding
Receipt of a Federal grant or contract or other Federal funding to support an eligible project
shall not preclude the project from being eligible for assistance
under this subtitle.
(d)
Federal requirements
(1)
Effect of section
Nothing in this section supersedes the applicability of other requirements of Federal law
(including regulations).
(2)
NEPA
A Federal action carried out regarding a loan or loan
guarantee provided under this subtitle shall not be considered to be a
Federal action
for purposes of the National Environmental Policy Act of 1969
(42 U.S.C. 4321 et seq.).
216.
Secured loans
(a)
Agreements
(1)
In general
Subject to paragraphs (2) through (4), the Secretary may enter into agreements with 1 or more
obligors to make secured loans, the proceeds of which shall be used—
(A) to finance eligible project costs of any project selected under section 206;
(B) to refinance interim construction financing of eligible project costs of any project selected under
section 206; or
(C) to refinance long-term project obligations or Federal credit instruments, if that refinancing
provides
additional funding capacity for the completion, enhancement, or expansion
of any project that—
(i) is selected under section 206; or
(ii) otherwise meets the requirements of section 206.
(2)
Limitation on refinancing of interim construction financing
A secured loan under paragraph (1) shall not be used to refinance interim construction financing
under paragraph (1)(B) later than 1 year after the date of substantial
completion of the applicable project.
(3)
Risk assessment
Before entering into an agreement under this subsection for a secured loan, the Secretary, in
consultation with the Director of the Office of Management and Budget and
each rating agency providing a preliminary rating opinion letter under
section 206(a)(1)(B), shall determine an appropriate capital reserve
subsidy amount for the secured loan, taking into account each such
preliminary rating opinion letter.
(4)
Investment-grade rating requirement
The execution of a secured loan under this section shall be contingent on receipt by the senior
obligations of the project of an investment-grade rating.
(b)
Terms and limitations
(1)
In general
A secured loan provided for a project under this section shall be subject to such terms and
conditions, and contain such covenants, representations, warranties, and
requirements (including requirements for audits), as the Secretary
determines to be appropriate.
(2)
Maximum amount
The amount of a secured loan under this section shall not exceed the lesser of—
(A) an amount equal to 100 percent of the reasonably anticipated eligible project costs; and
(B) if the secured loan does not receive an investment-grade rating, the amount of the senior project
obligations of the project.
(3)
Payment
A secured loan under this section—
(A) shall be payable, in whole or in part, from State or local taxes, user fees, or other dedicated
revenue sources that also secure the senior project obligations of the
relevant project;
(B) shall include a rate covenant, coverage requirement, or similar security feature supporting the
project obligations; and
(C) may have a lien on revenues described in subparagraph (A), subject to any lien securing project
obligations.
(4)
Interest rate
The interest rate on a secured loan under this section shall be not more than the yield on United
States Treasury securities of a similar maturity to the maturity of the
secured loan on the date of execution of the loan agreement, as determined
by the Secretary.
(5)
Maturity date
The final maturity date of a secured loan under this section shall be not later than 35 years after
the date of substantial completion of the relevant project.
(6)
Nonsubordination
A secured loan under this section shall not be subordinated to the claims of any holder of project
obligations in the event of bankruptcy, insolvency, or liquidation of the
obligor of the project.
(7)
Fees
The Secretary may establish fees at a level sufficient to cover all or a portion of the costs to
the Federal Government of making a secured loan under this section.
(8)
Non-Federal share
The proceeds of a secured loan under this section may be used to pay any non-Federal share of
project costs required if the loan is repayable from non-Federal funds.
(c)
Repayment
(1)
Schedule
The Secretary shall establish a repayment schedule for each secured loan provided under this
section, based on the projected cash flow from project revenues and other
repayment sources.
(2)
Commencement
Scheduled loan repayment of principal or interest on a secured loan under this section shall
commence not later than 5 years after the date of substantial
completion of the project.
(3)
Deferred payments
(A)
Authorization
If, at any time after the date of substantial completion of a project for which a secured loan is
provided under this section, the project is unable to generate sufficient
revenues to pay the scheduled loan repayments of principal and interest on
the secured loan, the Secretary may allow the
obligor, subject to subparagraph (C), to add unpaid principal and interest
to the outstanding balance of
the secured loan.
(B)
Interest
Any payment deferred under subparagraph (A) shall—
(i) continue to accrue interest in accordance with subsection (b)(4) until fully repaid; and
(ii) be scheduled to be amortized over the remaining term of the secured loan.
(C)
Criteria
(i)
In general
Any payment deferral under subparagraph (A) shall be contingent on the project meeting such
criteria as the Secretary may establish.
(ii)
Repayment standards
The criteria established under clause (i) shall include standards for reasonable assurance of
repayment.
(4)
Prepayment
(A)
Use of excess revenues
Any excess revenues that remain after satisfying scheduled debt service requirements on the project
obligations and secured loan and all deposit requirements under the terms
of any trust agreement, bond resolution, or similar agreement securing
project obligations may be applied annually to prepay a secured loan under
this section without penalty.
(B)
Use of proceeds of refinancing
A secured loan under this section may be prepaid at any time without penalty from the proceeds of
refinancing from non-Federal funding sources.
(d)
Sale of secured loans
(1)
In general
Subject to paragraph (2), as soon as practicable after the date of substantial completion of a
project and after providing a notice to the obligor, the Secretary may
sell to another entity or reoffer into the capital markets a secured loan
for a project under this section, if the Secretary determines that the
sale or reoffering can be made on favorable terms.
(2)
Consent of obligor
In making a sale or reoffering under paragraph (1), the Secretary may not change the original terms
and conditions of the secured loan without the written consent of the
obligor.
(e)
Loan guarantees
(1)
In general
The Secretary may provide a loan guarantee to a lender in lieu of making a secured loan under this
section, if the Secretary determines that the budgetary cost of the loan
guarantee is substantially the same as that of a secured loan.
(2)
Terms
The terms of a loan guarantee provided under this subsection shall be consistent with the terms
established in this section for a secured loan, except that the rate on
the guaranteed loan and any prepayment features shall be negotiated
between the obligor and the lender, with the consent of the Secretary.
217.
Program administration
(a)
Requirement
The Secretary shall establish a uniform system to service the Federal credit instruments made
available under this subtitle.
(b)
Fees
The Secretary may collect and spend fees, contingent on authority being provided in appropriations
Acts, at a level that is sufficient to cover—
(1) the costs of services of expert firms retained pursuant to subsection (d); and
(2) all or a portion of the costs to the Federal Government of servicing the Federal credit instruments
provided under this subtitle.
(c)
Servicer
(1)
In general
The Secretary may appoint a financial entity to assist the Secretary in servicing the Federal
credit instruments provided under this subtitle.
(2)
Duties
A servicer appointed under paragraph (1) shall act as the agent for the Secretary.
(3)
Fee
A servicer appointed under paragraph (1) shall receive a servicing fee, subject to approval by the
Secretary.
(d)
Assistance from experts
The Secretary may retain the services, including counsel, of any organization or entity with
expertise in the field of municipal and project finance to assist in the
underwriting and servicing of Federal credit instruments provided under
this subtitle.
(e)
Loan coordination; interagency cooperation
The Secretary—
(1) shall coordinate implementation of loan guarantees under this section with the
Administrator to avoid duplication and enhance the effectiveness of
implementation of the
State revolving funds established under the Federal
Water Pollution Control Act (33 U.S.C. 1251 et
seq.) and the Safe Drinking Water Act (42 U.S.C. 300f
et seq.);
(2) shall consult with the Secretary of Agriculture before promulgating criteria with respect to
financial appraisal functions and loan guarantee administration for
activities carried out under this subtitle; and
(3) may enter into a memorandum of agreement providing for Department of Agriculture financial
appraisal functions and loan guarantee administration for activities
carried out under this subtitle.
218.
State and local permits
The provision of financial assistance for a project under this subtitle shall not—
(1) relieve any recipient of the assistance of any obligation to obtain any required State or local
permit or approval with respect to the project;
(2) limit the right of any unit of State or local government to approve or regulate any rate of return
on private equity invested in the project; or
(3) otherwise supersede any State or local law (including any regulation) applicable to the
construction or operation of the project.
219.
Regulations
The Secretary may promulgate such regulations as the Secretary determines to be appropriate to
carry out this subtitle.
220.
Funding
(a)
In general
There is authorized to be appropriated to the Secretary to carry out this subtitle $50,000,000 for
each of fiscal years 2015 through 2019, to remain available until
expended.
(b)
Administrative costs
Of the funds made available to carry out this subtitle, the Secretary may use for the
administration
of this subtitle not more than $2,200,000 for each of fiscal years 2015
through 2019.
221.
Report to Congress
Not later than 2 years after the date of enactment of this Act, and every 2 years thereafter,
the Secretary shall submit to the Committee on Energy and Natural
Resources of the Senate and the Committee on Natural Resources of the
House of Representatives a report summarizing the financial performance
and on-the-ground outcomes of
the projects that are receiving, or have received, assistance under this
subtitle, including an assessment of whether the objectives of this
subtitle are being met.
B
Integrated regional water management, reclamation, and recycling projects
231.
Water storage projects
(a)
Agreements
The Secretary may enter into a cost-shared financial assistance agreement with any
non-Federal entity in a Reclamation State or the State of Hawaii to carry
out the
planning, design, and construction of any permanent water storage and
conveyance facility used solely to regulate and maximize the water supply
arising from a project that is eligible for assistance under this title or
any other provision of law—
(1) to recycle wastewater, impaired surface
water, and ground water; or
(2) to use integrated and coordinated water
management on a watershed or regional scale.
(b)
Financial assistance
In providing financial assistance under this section, the Secretary shall give priority to storage
and conveyance components that—
(1) ensure the efficient and beneficial use of water or reuse of the recycled water;
(2) make maximum use of natural systems;
(3) consistent with Secretarial Order No. 3297, dated February 22,
2010, support sustainable water management practices and the water
sustainability objectives of 1 or more offices of the Department of the
Interior or any other Federal agency;
(4)
(A) increase the availability of usable water supplies in a watershed or region to benefit people,
the economy, and the environment; and
(B) include adaptive measures needed to
address climate change and future demands;
(5) where practicable—
(A) provide flood control or recreation benefits; and
(B) include the development of
incremental hydroelectric power generation;
(6) include partnerships that go beyond political and institutional jurisdictions to support the
efficient use of the limited water resources of the United States and the
applicable region;
(7) generate environmental benefits, such as benefits to fisheries, wildlife and habitat, and
water quality and water-dependent ecological systems, as well as water
supply benefits to agricultural and urban water users; and
(8) the financing of which leverages private and other non-Federal resources.
(c)
Federal share
The Federal share of the cost of a project carried out under subsection (a) shall be—
(1) equal to the lesser of—
(A) 50
percent of total cost of the project; and
(B) $15,000,000, adjusted for inflation; and
(2) nonreimbursable.
(d)
Non-Federal share
The non-Federal share of the cost of a project carried out under subsection (a) may include in-kind
contributions to the planning, design, and construction of a project.
(e)
Title and costs
A non-Federal entity entering into a financial assistance agreement under this section shall—
(1) hold title to all facilities constructed under this section; and
(2) be solely responsible for the costs of operating and maintaining those facilities.
232.
Authorization of appropriations
There is authorized to be appropriated $150,000,000 to carry out this subtitle.
C
Title transfers
241.
Authorization to transfer title
The Secretary may transfer to any non-Federal operating entity title to any Reclamation project or
facility, or any separable
element of such a project or facility, that is authorized before the date
of enactment of this Act, if—
(1) all previous Federal construction contract obligations or other related repayment contracts or
agreements associated with the project have been paid out by a non-Federal
project beneficiary;
(2)
(A) a project facility or separable element of such a facility is in need of rehabilitation or
improvement, as determined by the Secretary;
and
(B) the non-Federal operating entity is otherwise eligible for a loan
guarantee under this title;
(3) the title transfer meets all applicable Federal laws and regulations, as determined by the
Secretary; and
(4)
(A) the Secretary notifies each congressional committee of jurisdiction of the transfer by not later
than 60 days before the date of the transfer;
and
(B) no objection to the transfer is raised by any such committee.
III
Innovation through research, data, and technology
301.
Open water data system
(a)
Definitions
In this section:
(1)
Educational institution
The term educational institution means—
(A) a public or private elementary or secondary school;
(B) an institution of vocational, professional, or higher education (including a junior college or
teachers' college); and
(C) an association of schools or institutions described in subparagraphs (A) and (B).
(2)
Indian tribe
The term Indian tribe has the meaning given that term in section 4 of the Indian
Self-Determination and Education Assistance Act (25 U.S.C.
450b).
(3)
Secretary
The term Secretary means the Secretary of the Interior, acting through the Director of the United States
Geological Survey.
(4)
State
The
term State means—
(A) a
State;
(B) the District of
Columbia;
(C) the Commonwealth
of Puerto Rico; and
(D) any other
territory or possession of the United States.
(5)
System
The term system means the open water data system established under subsection (b).
(b)
System
The Secretary shall establish and maintain an open water data system within the United States
Geological Survey to advance the availability, timely distribution, and widespread
use of water data and information for water management, education,
research, assessment, and monitoring purposes.
(c)
Purposes
The purposes of the system are—
(1) to advance the quantification of the availability, use of, and risks to, water resources throughout
the United States;
(2) to increase accessibility to, and expand the use of, water data and information in a standard,
easy-to-use format by Federal, State, local, and tribal governments,
communities, educational institutions, and the private sector; and
(3) to facilitate the open exchange of water information particularly in the face of climate change and
unprecedented drought.
(d)
Activities
In carrying out this section, the Secretary shall—
(1) integrate water data and information into a interoperable, national, geospatially referenced water
data framework;
(2) identify new water data and information needs, including data on surface and groundwater quality
and quantity, sediment, erosion, transport, water chemistry,
precipitation, reservoir storage, water cycle, landscape variables,
hydrography, climate and weather impacts, soil moisture, and human use;
(3) leverage existing shared databases, infrastructure, and tools to provide a platform for water data
and information innovation, modeling and data sharing, and solution
development;
(4) support water data and information sharing, applied research, and educational programs of State,
local, and tribal governments, communities, educational institutions, and
the private sector; and
(5) promote cooperation and sharing of expertise regarding water data and information among State,
local, and tribal governments, communities, educational institutions, and
the private sector.
(e)
Authorization of appropriations
There are authorized to be appropriated to carry out this section such sums as are necessary.
302.
Water Resources Research Act
amendments
(a)
Congressional findings and
declarations
Section 102 of the Water Resources Research Act of
1984 (42 U.S.C. 10301) is amended—
(1) by redesignating paragraphs (7) through (9)
as paragraphs (8) through (10), respectively;
(2) in paragraph (8) (as so redesignated), by
striking and at the end; and
(3) by inserting after paragraph (6) the
following:
(7) additional research is required to
increase the effectiveness and efficiency of new and existing
treatment works
through alternative approaches, including—
(A) nonstructural alternatives;
(B) decentralized approaches;
(C) water use efficiency and conservation; and
(D) actions to reduce energy consumption or
extract energy from
wastewater;
.
(b)
Water resources research and technology institutes
Section 104 of the Water Resources Research Act of
1984 (42 U.S.C. 10303) is amended—
(1) in subsection (b)(1)—
(A) in subparagraph
(B)(ii), by striking water-related phenomena and inserting
water resources; and
(B) in subparagraph
(D), by striking the period at the end and inserting ;
and;
(2) in subsection (c)—
(A) by striking
From the and inserting (1)
In general.—From
the; and
(B) by adding at the
end the following:
(2)
Report
Not
later than December 31 of each fiscal year, the Secretary shall
submit to the
Committee on Environment and Public Works of the Senate, the
Committee on the
Budget of the Senate, the Committee on Transportation and
Infrastructure of the
House of Representatives, and the Committee on the Budget of the
House of
Representatives a report regarding the compliance of each funding
recipient
with this subsection for the immediately preceding fiscal
year.
;
(3) by striking subsection (e) and inserting the following:
(e)
Evaluation of water resources research
program
(1)
In general
The Secretary shall conduct a careful and
detailed evaluation of each institute at least once every 3 years
to
determine—
(A) the quality and relevance of the water
resources research of the institute;
(B) the effectiveness of the institute at
producing measured results and applied water supply research; and
(C) whether the effectiveness of the institute
as an institution for planning, conducting, and arranging for
research warrants
continued support under this section.
(2)
Prohibition on further
support
If, as a result of an
evaluation under paragraph (1), the Secretary determines that an
institute does
not qualify for further support under this section, no further
grants to the
institute may be provided until the qualifications of the institute
are
reestablished to the satisfaction of the
Secretary.
;
(4) in subsection (f)(1), by striking $12,000,000 for each of fiscal years 2007 through
2011 and inserting $7,500,000 for each of fiscal years 2015
through 2020; and
(5) in subsection (g)(1), in the first sentence, by striking
$6,000,000 for each of fiscal years 2007 through 2011 and
inserting $1,500,000 for each of fiscal years 2015 through
2020.
303.
Reauthorization of Water Desalination Act of 1996
Section 8 of the Water Desalination Act of 1996 (42 U.S.C. 10301 note; Public Law 104–298) is
amended—
(1) in the first sentence of subsection (a), by striking 2013 and inserting 2020; and
(2) in subsection (b), by striking for each of fiscal years 2012 through 2013 and inserting for each of fiscal years 2015 through 2020.
304.
Review of reservoir operations
(a)
In general
Not later than 1 year after receiving a request of a non-Federal sponsor of a reservoir, the
Secretary of the
Army, in consultation with the Administrator of the National Oceanic and
Atmospheric Administration, shall review the operation of the reservoir,
including
the water control manual and rule curves, using improved weather forecasts
and run-off forecasting methods, including the Advanced Hydrologic
Prediction System of the National Weather Service and the Hydrometeorology
Testbed program of the National Oceanic and Atmospheric Administration.
(b)
Description of benefits
In conducting the review under subsection (a), the Secretary of the Army shall determine if a
change in
operations, including the use of improved weather forecasts and run-off
forecasting methods, will improve 1 or more of the core functions of the
Corps of Engineers, including—
(1) reducing risks to human life, public safety, and property;
(2) reducing the need for future disaster relief;
(3) improving local water storage capability and reliability in coordination with the non-Federal
sponsor and other water users;
(4) restoring, protecting, or mitigating the impacts of a water resources development project on the
environment; and
(5) improving fish species habitat or population within the boundaries and downstream of a water
resources project.
(c)
Results reported
Not later than 90 days after completion of a review under this section, the Secretary shall
submit a report to Congress regarding the results of the review.
(d)
Manual update
As soon as practicable, but not later than 3 years after the date on which a report under
subsection (c) is submitted to Congress, pursuant to the procedures
required under existing
authorities, if the Secretary of the Army determines based on that report
that using improved weather and run-off forecasting methods improves 1
or more core functions of the Corps of Engineers at a reservoir, the
Secretary of the Army shall—
(1) incorporate those methods in the operation of the reservoir; and
(2) update the
water control manual.
IV
Drought preparedness and resilience
401.
National drought resilience guidelines
(a)
In general
The Administrator, in conjunction with the Secretary of the Interior, the Secretary of Agriculture,
the Director of the National Oceanic and Atmospheric Administration, and
other appropriate Federal agency heads along with State and local
governments, shall develop nonregulatory national drought resilience
guidelines relating
to drought preparedness planning and investments for communities, water
utilities, and other water users and providers.
(b)
Consultation
In developing the national drought resilience guidelines, the Administrator and other Federal
agency heads referred to in subsection (a) shall consult with—
(1) State and local governments;
(2) water utilities;
(3) scientists;
(4) institutions of higher education;
(5) relevant private entities; and
(6) other stakeholders.
(c)
Contents
The national drought resilience guidelines developed under this section shall, to the maximum
extent practicable, provide recommendations for a period of 10 years
that—
(1) address a broad range of potential actions, including—
(A) analysis of the impacts of climate change and drought on the future effectiveness of water
management tools;
(B) the identification of drought-related water management challenges in a broad range of fields,
including—
(i) public health and safety;
(ii) municipal and industrial water supply;
(iii) agricultural water supply;
(iv) water quality;
(v) ecosystem health; and
(vi) water supply planning;
(C) water management tools to reduce drought-related impacts, including—
(i) water use efficiency through gallons per capita reduction goals, appliance efficiency standards,
water pricing incentives, and other measures;
(ii) water recycling;
(iii) groundwater clean-up and storage;
(iv) new technologies, such as behavioral water efficiency; and
(v) stormwater capture and reuse;
(D) water-related energy and greenhouse gas reduction strategies; and
(E) public education and engagement; and
(2) include recommendations relating to the processes that Federal, State, and local governments and
water
utilities should consider when developing drought resilience preparedness
and plans,
including—
(A) the establishment of planning goals;
(B) the evaluation of institutional capacity;
(C) the assessment of drought-related risks and vulnerabilities, including the integration of
climate-related impacts;
(D) the establishment of a development process, including an evaluation of the cost-effectiveness of
potential strategies;
(E) the inclusion of private entities, technical advisors, and other stakeholders in the development
process;
(F) implementation and financing issues; and
(G) evaluation of the plan, including any updates to the plan.
402.
Drought preparedness for fisheries
(a)
Definitions
In this section:
(1)
Indian tribe
The term Indian tribe has the meaning given the term in section 4 of the Indian Self-Determination and Education
Assistance Act (25 U.S.C. 450b).
(2)
Qualified tribal government
The term qualified tribal government means a governmental body of an Indian tribe that the Secretary of the Interior determines—
(A) is involved in salmon management and recovery activities under the Endangered Species Act of 1973 (16 U.S.C. 1531
et seq.); and
(B) has the management and organizational capability to maximize the benefits of assistance provided
under this section.
(b)
Salmon drought plan
(1)
In general
Not later than January 1, 2016, the Director of the United States Fish and Wildlife Service shall,
in consultation with the Director of the National Marine Fisheries
Service, the Commissioner of Reclamation, the Chief of Engineers, and the
head of the California Department of Fish and Wildlife, prepare a salmon
drought plan for the State of California.
(2)
Contents
The plan developed under paragraph (1) shall—
(A) contribute—
(i) to the recovery of populations listed as threatened or endangered under the Endangered Species Act
of 1973 (16 U.S.C. 1531 et seq.); and
(ii) to the goals of the Central Valley Project Improvement Act
(title XXXIV of Public Law 102–575; 106 Stat. 4706); and
(B) include options to protect salmon populations originating in the State of California, with a
particular focus on actions that can be taken to aid salmon populations in
the State of California during the driest 12 years, such as—
(i) relocating the release location and timing of hatchery fish to avoid predation and temperature
impacts;
(ii) barging hatchery release fish to improve survival and reduce straying;
(iii) coordinating with water users, the Commissioner of Reclamation, and the head of the California
Department of Water Resources regarding voluntary water transfers to
determine if water released upstream to meet the needs of downstream or
South-of-Delta water users can be managed in a way that provides
additional benefits for salmon;
(iv) hatchery management modifications, such as expanding hatchery production during the driest years of
fish listed as endangered or threatened under the Endangered Species Act
of 1973 (16 U.S.C. 1531 et seq.), if appropriate; and
(v) increasing rescue operations of upstream migrating fish.
(c)
Funding
(1)
In
general
Out of any funds in the Treasury not otherwise
appropriated, the Secretary of the Treasury shall transfer to the Director of the
United States Fish and Wildlife Service to
carry out this section $3,000,000, to remain available until expended, for urgent
fish, stream, and hatchery activities relating to extreme drought
conditions, including work carried out in conjunction with the Director of
the National Marine Fisheries Service, the Commissioner of Reclamation,
the Chief of Engineers, the head of the California Department of Fish and
Wildlife, or a qualified tribal government.
(2)
Receipt and
acceptance
The Director of the United States Fish and Wildlife Service shall be entitled to receive, shall
accept, and shall use to carry out this section the funds transferred under
paragraph (1), without further appropriation.