Library / Laws / 113th / s / S. 2652 / Introduced in Senate
II
113th CONGRESS
2d Session
S. 2652
IN THE SENATE OF THE UNITED STATES
July 24, 2014
Mrs. Fischer introduced the following bill; which was read twice and referred to the Committee on Homeland Security and Governmental Affairs
A BILL
To improve the design-build process in Federal contracting.
1.
Design-build construction process improvement
(a)
Civilian contracts
Section 3309 of title 41, United States Code, is amended—
(1) in subsection (d), by striking The maximum number specified in the solicitation shall not exceed 5 unless the agency determines
with respect to and all that follows through the period at the end and inserting the following: The maximum number specified in the solicitation shall not exceed 5 unless the head of the
contracting activity approves the contracting officer's justification that
an individual solicitation must have greater than 5 finalists to be in the
Federal Government’s interest. The contracting officer shall provide
written documentation of how a maximum number of offerors exceeding 5 is
consistent with the purposes and objectives of the two-phase selection
process.; and
(2) by adding at the end the following new subsection:
(f)
Design and construction contracts
Two-phase selection procedures shall be used for entering into a contract for the design and
construction of a public building, facility, or work when a contracting
officer determines that the contract has a value of $750,000 or
greater, as adjusted for inflation in accordance with section 1908 of
title 41, United States Code.
.
(b)
Defense contracts
Section 2305a(d) of title 10, United States Code, is amended—
(1) in subsection (d) by striking The maximum number specified in the solicitation shall not exceed 5 unless the agency determines
with respect to and all that follows through the period at the end and inserting the following: The maximum number specified in the solicitation shall not exceed 5 unless the head of the agency
contracting activity approves the contracting officers justification that
an individual solicitation must have greater than 5 finalists to be in the
Federal Government’s interest. The contracting officer shall provide
written documentation of how a maximum number of offerors exceeding 5 is
consistent with the purposes and objectives of the two-phase selection
process.; and
(2) by adding at the end the following new subsection:
(f)
Design and construction contracts
Two-phase selection procedures shall be used for entering into a contract for the design and
construction of a public building, facility, or work when a contracting
officer determines that the contract has a value of $750,000 or
greater, as adjusted for inflation in accordance with section 1908 of
title 41, United States Code.
.
(c)
Reports
(1)
Reports regarding agency actions
(A)
In general
There shall be compiled for each executive agency an annual report of each instance in which the
agency awarded a design-build
contract pursuant to section 3309 of title 41, United States Code, or
section 2305a(d) of title 10, United States Code, as
amended by this Act, in which—
(i) more than 5 finalists were selected for phase-two requests for competitive proposals; or
(ii) the contract was awarded without using two-phase selection procedures.
(B)
Responsibility
The Director of the Office of Management and Budget shall designate the head of each executive
agency
to serve as executive agent for the compilation of the report required by
subparagraph (A) and to facilitate public access to the report through
electronic means. A notice of the availability of each report shall be
published in the Federal Register.
(C)
Deadline
The first report shall include reportable instances during the fiscal year that includes the date
of enactment of this Act. Additional reports shall be issued for the
subsequent 4 fiscal years. Each report shall be issued within 60 days
after the end of the fiscal year covered by the report.
(2)
GAO report
Not later than 270 days after the deadline for the final report required under paragraph (1),
the Comptroller General of the United States shall issue a report
analyzing the compliance of the various executive agencies in complying
with
the requirements of section 3309 of title 41, United States Code, and
section 2305a(d) of title 10, United States Code, as applicable, as
amended by this
section.
(3)
Executive agency defined
In this subsection, the term executive agency has the meaning given the term in section 133 of title 41, United States Code.