A BILL
To delegate to the Secretary of State the authority to approve or deny certain permits.
1.
Short title
This Act may be cited as the Removing Repeated Executive Delays to Transboundary Approvals of Pipelines and Engineering Act.
2.
Findings
Congress finds that—
(1) the American Society of Civil Engineers recently assessed the infrastructure system of the United
States and gave the system an overall grade of D+;
(2) recent critical infrastructure decisions have become unacceptably politicized;
(3) permit applications for the Keystone XL Pipeline have been under review for over 51/2 years; and
(4) Congress can alleviate political interference in critical infrastructure decisions by—
(A) directly
delegating to the Secretary of State the authority to expedite review of
permits necessary to accelerate the completion of energy production and
transmission projects; and
(B) providing a systematic method for evaluating and
permitting the constructing and maintenance of certain other border
crossings
for land transportation (including motor and rail vehicles) and other
facilities.
3.
Definition of Secretary
In this Act, the term Secretary means the Secretary of State.
4.
Constitutional authority
In accordance with clause 3 of section 8 of article I of the Constitution (delegating to Congress
the power to regulate commerce with foreign nations), Congress has the
power to regulate the approval of infrastructure connecting the United
States with a foreign country.
5.
Delegation of authority to the Department of State
(a)
In general
The Secretary is designated and empowered to receive all applications for permits for the
construction, connection, operation, or maintenance, at the borders of the
United States (other than applications received by the Secretary of Energy
under laws in existence on the date of enactment of this Act), of—
(1) facilities for the exportation or importation of
petroleum, petroleum products, coal, or other fuels to or from a foreign
country;
(2) pipelines, conveyor belts, and similar facilities for the exportation or importation of products
(other than the products described in paragraph (1)) to or from a foreign
country;
(3) facilities for the exportation or importation of water or sewage to or from a foreign country;
(4) facilities for the transportation of persons, things, or both persons and things to or from a
foreign country;
(5) bridges, to the extent that congressional authorization is not otherwise required under law;
(6) facilities similar to the facilities otherwise described in this subsection that are located above
or below ground; and
(7) border crossings for land transportation, including motor and rail vehicles, to or from a foreign
country, whether or not in conjunction with the facilities described in
paragraph (4).
(b)
Requests for information
(1)
In general
On receipt of a completed application under subsection (a), the Secretary shall—
(A)
(i) request any additional information needed from the applicant, as appropriate; and
(ii) refer the application to other agencies pursuant to paragraph (2);
(B) refer the application and pertinent information to, and request the views of—
(i) the Secretary of Defense, the Attorney General, the Secretary of the Interior, the Secretary of
Commerce, the Secretary of Transportation, the Secretary of Energy, the
Secretary of Homeland Security, the Administrator of the Environmental
Protection Agency (or the heads of successor agencies); and
(ii) for applications concerning the border with Mexico, the United States Commissioner of the
International Boundary and Water Commission; and
(C) refer the application and pertinent information to, and request the views of, such other Federal
department and agency heads as the Secretary determines appropriate.
(2)
Additional consultations
The Secretary—
(A) may consult with State, tribal, and local government officials and foreign governments, as the
Secretary determines appropriate, with respect to an application under
subsection (a); and
(B) shall request responses in a timely manner, not to exceed 90 days from the date of the request.
(3)
Further consideration
On receiving the views and assistance requested under paragraphs (1) and (2), the Secretary shall
consider, in light of any statutory or other requirements or other
considerations, whether additional information is necessary to evaluate
the application and, as appropriate, request the additional information
from the applicant.
(4)
Public comment
The Secretary may provide for—
(A) the publication in the Federal Register of notice of receipt of applications;
(B) the receipt of public comments on applications; and
(C) notices related to the issuance or denial of applications.
(c)
Compliance
(1)
In general
Subject to paragraph (2), a Federal agency consulted by the Secretary under subsection (b)(1) shall
comply with the request of the Secretary (consistent with the authority of
the Federal agency) as soon as practicable but not later than 90 days
after the date on which the request is submitted.
(2)
Timing
If a Federal agency consulted by the Secretary under subsection (b)(1) requests from the Secretary
additional information that is necessary to carry out the request, the
compliance deadline under paragraph (1) shall not begin until the date on
which the additional information is received.
(d)
National interest determination
(1)
In general
After consideration of the views, assistance, and public comment received under subsection (b), if
the Secretary finds that issuance of a permit to the applicant would serve
the national interest, the Secretary shall—
(A) prepare a permit, in such form and with such terms and conditions as the national interest
requires, as determined by the Secretary; and
(B) notify the officials required to be consulted under subsection (b)(1)(B) of the proposed
determination that a permit be issued.
(2)
Proposed denial
After consideration of the views, assistance, and public comment received under subsection (b), if
the Secretary finds that issuance of a permit to the applicant would not
serve the national interest, the Secretary shall notify the officials
required to be consulted under subsection (b)(1)(B) of the proposed
determination that the application be denied.
(e)
Issuance or denial
The Secretary shall issue or deny the permit in accordance with the proposed determination under
subsection (d).
(f)
Regulations
The Secretary may promulgate such rules and regulations and prescribe such procedures (including
rules, regulations, and procedures relating to the International Boundary
and Water Commission) as the Secretary determines necessary to carry out
this section.
(g)
Pending applications
Except as provided in section 6, this section shall apply only to applications for permits filed on
or after the date of enactment of this Act.
(h)
Effect
Except as explicitly provided in this Act, nothing in this section limits the application of, or
obligation to comply with, the requirements of any other Federal
department or agency.
(i)
Final rule
The decision made by the Secretary under subsection (e) shall be deemed to be a rule for purposes
of chapter 8 of title 5, United States Code (commonly known as the Congressional Review Act).
6.
Keystone XL pipeline approval
(a)
In
general
TransCanada Keystone
Pipeline, L.P. may construct, connect, operate, and maintain the pipeline
and cross-border facilities described in the application filed on May 4,
2012, by TransCanada Corporation to the Department of State (including any
subsequent revision to the pipeline route within the State of Nebraska
required or authorized by the State of Nebraska).
(b)
Environmental
impact statement
The Final Supplemental Environmental Impact Statement issued
by the Secretary of State in January 2014,
regarding the pipeline referred to in subsection (a), and the
environmental analysis, consultation, and review described in that
document (including appendices) shall be considered
to
fully satisfy—
(1)
all requirements
of the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.);
and
(2)
any other
provision of law that requires Federal agency consultation or review
(including the consultation or review required under section 7(a) of the Endangered Species Act of 1973 (16 U.S.C. 1536(a))) with
respect to the pipeline and facilities referred to in subsection (a).
(c)
Permits
Any
Federal permit or authorization issued before the date of enactment of
this Act
for the pipeline and cross-border facilities referred to in subsection (a)
shall remain in effect.
(d)
Federal
judicial review
Any legal challenge to a Federal agency action regarding the pipeline and cross-border facilities
described in subsection (a), and the related facilities in the United
States,
that are approved by this Act, and any permit, right-of-way, or other
action taken to construct or complete the project pursuant to Federal law,
shall only be subject to judicial review on direct appeal to the United
States
Court of Appeals for the District of Columbia Circuit.
(e)
Private property savings clause
Nothing in this Act alters any Federal, State, or local process or condition in effect on the date
of enactment of this Act that is necessary to secure access from an owner
of private property to construct the pipeline and cross-border facilities
described in subsection (a).
7.
Review of certain Executive orders
The Comptroller General of the United States shall—
(1) conduct a review of any Executive order issued by the President that is not based on the exclusive
constitutional authority of the President; and
(2) not later than 180 days after the date of enactment of this Act, submit to Congress a report on the
results of the review.