Library / Laws / 113th / s / S. 2152 / Introduced in Senate
II
113th CONGRESS
2d Session
S. 2152
IN THE SENATE OF THE UNITED STATES
March 25, 2014Ms. Heitkamp introduced the following bill; which was read twice and referred to the Committee on Finance
A BILL
To direct Federal investment in carbon capture and storage and other clean coal technologies, and
for other purposes.
1.
Short title; table of contents
(a)
Short title
This Act may be cited as the
Advanced Clean Coal Technology Investment in Our Nation Act of 2014 or the ACCTION Act of 2014.
(b)
Table of contents
The table of contents of this Act is as follows:
Sec. 1. Short title; table of contents.
Sec. 2. Findings.
TITLE I—Federal investment in clean coal technologies
Sec. 101. Large-scale carbon storage program.
Sec. 102. Research, development and demonstration programs.
Sec. 103. Innovative technology loan guarantee program.
Sec. 104. Coordination of clean coal generating projects.
TITLE II—Federal incentives for private investment in clean coal technologies
Sec. 201. Seven-year amortization for certain systems installed on coal-fired electric generation
units.
Sec. 202. Credit for carbon sequestration from coal facilities.
Sec. 203. Variable price support for carbon dioxide sequestration.
Sec. 204. Clean energy coal bonds.
TITLE III—Reports required
Sec. 301. Definitions.
Sec. 302. Reports to Congress.
2.
Findings
Congress finds that—
(1) the President believes that the United States energy policy must have an all-of-the-above strategy for the 21st century that develops every source of American-made
energy;
(2) according to the Energy Information Administration, 37 percent of all energy generated in the
United States comes from coal and by 2040, coal will still account for 32
percent of energy generation in the United States;
(3) the United States has enough recoverable coal reserves to last at least another 250 years;
(4) as the world becomes increasingly carbon constrained, coal-fired power plants must increasingly be
integrated
with carbon capture and storage systems;
(5) efficiency improvements to the coal fleet will decrease carbon emissions and use less coal while
providing the same power;
(6) the potential to increase efficiency is evident in the current fleet of power plants in the United
States, as the top 10 percent of coal plants have efficiencies as high as
37 percent while the average plant has an efficiency of 32 percent;
(7) efficiencies as high as 48 percent may be attained with ultrasupercritical coal-fired power plants;
(8) replacing the average subcritical coal-fired power plant with a supercritical or ultrasupercritical
coal-fired power plant would reduce carbon emissions by 18 to 22 percent
per megawatt hour of energy generated; and
(9) the coal industry is a significant source of jobs in the United States as in 2012 alone, coal was
responsible for 137,650 jobs for coal miners, 92,472 jobs for operator
employees, and 45,178 jobs for contractors.
I
Federal investment in clean coal technologies
101.
Large-scale
carbon storage program
(a)
In
general
Subtitle F of title
IX of the Energy Policy Act of 2005 (42 U.S.C. 16291 et
seq.) is amended by inserting after section 963 (42 U.S.C. 16293) the
following:
963A.
Large-scale
carbon storage program
(a)
Definitions
In
this section:
(1)
Industrial
source
The term industrial source means any source
of carbon dioxide that is not naturally occurring.
(2)
Large-scale
The
term large-scale means the injection from industrial sources into a geological
formation of—
(A) over 1,000,000 tons of
carbon dioxide each year; or
(B) carbon dioxide to a scale that
demonstrates the ability to inject and sequester several million metric
tons of industrial source carbon dioxide for a large number of years.
(3)
Secretary
concerned
The term Secretary concerned means—
(A) the Secretary of
Agriculture (acting through the Chief of the Forest Service), with
respect to
National Forest System land; and
(B) the Secretary of
the Interior, with respect to land managed by the Bureau of Land
Management
(including land held for the benefit of an Indian tribe).
(b)
Program
The Secretary shall carry out a program to demonstrate
the
integration of systems for the capture,
transportation, and injection of carbon dioxide from industrial sources,
either for the purpose of
long-term geological storage or enhanced oil recovery at a commercial
scale.
(c)
Authorized
assistance
(1)
In general
In carrying out the program, the Secretary may enter
into cooperative agreements to provide financial and technical
assistance to up
to 10 large-scale geological storage or enhanced oil recovery
projects.
(2)
Limitation
Not fewer than 3 of the 10 projects selected shall be large-scale projects
that undertake site characterization and permitting to qualify the
projects as ready for long-term saline storage sites.
(d)
Project
selection
The Secretary shall competitively select recipients of
cooperative agreements under this section from among applicants
that—
(1) provide the
Secretary with sufficient geological site information (including
hydrogeological and geophysical information) to establish that the
proposed
geological formation is capable of use for enhanced oil recovery
and, in the case of geological storage, is capable of long-term storage of
the
injected carbon
dioxide, including—
(A) the location,
extent, and storage capacity of the geological storage unit at the
site into
which the carbon dioxide will be injected;
(B) the principal
potential modes of geomechanical failure in the geological storage
unit;
(C) the ability of
the geological storage unit to retain injected carbon dioxide;
(D) the measurement,
monitoring, and verification requirements necessary to ensure
adequate
information on the operation of the geological storage unit during
and after
the injection of carbon dioxide; and
(E) a study and report on the rate of injection of carbon dioxide from power plants (based on operating
the plant on a 24-hours-a-day, 7-days-a-week, and 365-days-a-year basis
over several decades) necessary to avoid—
(i) imbalances of carbon dioxide; and
(ii) making the proposed geological formation of the site into which the carbon dioxide will be injected
unusable, unstable, or such that there would be forced stoppages of
injection;
(2) have legal authority to use the land
or interests in land necessary for—
(A) the injection of the carbon dioxide at the proposed geological storage unit or enhanced oil
recovery site;
and
(B) the storage, closure,
monitoring, and long-term stewardship of the geological storage
unit for geological storage of carbon dioxide; and
(3) sequester not fewer than 500,000 metric tons of carbon dioxide in 1 contiguous geographic and
geologic formation.
(e)
Terms and
conditions
The Secretary shall condition receipt of financial
assistance pursuant to a cooperative agreement under this section
on the
recipient agreeing—
(1) to comply with all
applicable Federal and State laws (including regulations),
including—
(A) the requirements of the underground injection control program under part C
of the Safe Drinking Water Act (42 U.S.C. 300h
et seq.) (referred to in this section as the UIC program); and
(B) any other Federal and State requirements to protect drinking
water
supplies; and
(2) in the case of
industrial sources subject to the Clean Air Act (42 U.S.C.
7401 et seq.), to inject only carbon dioxide captured from
industrial
sources in
compliance with that Act.
(f)
Indemnification
agreements for geological storage
(1)
Definition of
liability
In this subsection, the term liability
means any legal liability for—
(A) bodily injury,
sickness, disease, or death;
(B) loss of or damage
to property, or loss of use of property; or
(C) injury to or
destruction or loss of natural resources, including fish, wildlife,
and
drinking water supplies.
(2)
Agreements
Not
later than 1 year after the date of the receipt by the Secretary of
a completed
application for assistance authorized under subsection (c), the
Secretary may agree to
indemnify
and hold harmless the recipient of a cooperative agreement under
this section
from liability arising out of or resulting from a demonstration
project in
excess of the amount of liability covered by financial protection
maintained by
the recipient in accordance with the requirements of the UIC
program.
(3)
Exception for
gross negligence and intentional misconduct
Notwithstanding
paragraph (1), the Secretary may not indemnify the recipient of a
cooperative
agreement under this section from liability arising out of conduct
of a
recipient that is grossly negligent or that constitutes intentional
misconduct.
(4)
Collection of
fees
(A)
In
general
The Secretary shall collect a fee from any person with
whom an agreement for indemnification is executed under this
subsection in an
amount that is equal to the net present value of payments made by
the United
States to cover liability under the indemnification agreement.
(B)
Amount
The
Secretary shall establish, by regulation, criteria for determining
the amount
of the fee, taking into account—
(i) the likelihood of
an incident resulting in liability to the United States under the
indemnification agreement; and
(ii) other factors
pertaining to the hazard of the indemnified project.
(C)
Use of
fees
Fees collected under this paragraph shall be deposited in
the Treasury and credited to miscellaneous receipts.
(5)
Contracts in
advance of appropriations
(A)
In
general
Subject to subparagraph (B), the Secretary
may enter into agreements of indemnification under this subsection
in advance
of appropriations and incur obligations without regard to section
1341 of title
31, United States Code (commonly known as the Anti-Deficiency
Act), or section 11 of title 41, United States Code
(commonly known as the Adequacy of Appropriations
Act).
(B)
Limitation
The
amount of indemnification under this subsection shall not exceed
$10,000,000,000 (adjusted not less than once during each 5-year
period
following the date of enactment of this section, in accordance with
the
aggregate percentage change in the Consumer Price Index since the
previous
adjustment under this subparagraph), in the aggregate, for all
persons
indemnified in connection with an agreement and for each project,
including
such legal costs as are approved by the Secretary.
(6)
Conditions of
agreements of indemnification
(A)
In general
The
agreement shall provide that, if the Secretary makes a
determination that there is a substantial likelihood that the United
States will be required to make indemnity payments under
the
agreement, the Attorney General—
(i) shall collaborate
with the recipient of an award under this subsection; and
(ii) may—
(I) approve the
payment of any claim under the agreement of indemnification;
(II) appear on behalf
of the recipient;
(III) take charge of
an action; and
(IV) settle or defend
an action.
(B)
Settlement of
claims
(i)
In
general
The Attorney General shall have final authority on behalf
of the United States to settle or approve the settlement of any
claim under
this subsection on a fair and reasonable basis with due regard for
the purposes
of this subsection.
(ii)
Expenses
The
settlement shall not include expenses in connection with the claim
incurred by
the recipient.
(g)
Federal
land
(1)
In
general
The Secretary concerned may authorize the siting of a
project on Federal land under the jurisdiction of the Secretary
concerned in a
manner consistent with applicable laws and land management plans
and subject to
such terms and conditions as the Secretary concerned determines to
be
necessary.
(2)
Framework for
geological carbon sequestration on public land
In determining
whether to authorize a project on Federal land, the Secretary
concerned shall
take into account the framework for geological carbon sequestration
on public
land prepared in accordance with section 714 of the Energy
Independence and Security Act of 2007 (Public Law 110–140; 121 Stat.
1715).
(h)
Acceptance of
title and long-Term monitoring
(1)
In
general
As a condition of a cooperative agreement under this
section, the Secretary may accept title to, or transfer of
administrative
jurisdiction from another Federal agency over, any land or interest
in land
necessary for the monitoring, remediation, or long-term stewardship
of a
project site.
(2)
Long-term
monitoring activities for geological storage
After accepting title to, or transfer of, a
site closed in accordance with this section, the Secretary shall
monitor the
site and conduct any remediation activities to ensure the
geological integrity
of the site and prevent any endangerment of public health or
safety.
(3)
Funding
There
is appropriated to the Secretary, out of funds of the Treasury not
otherwise
appropriated, such sums as are necessary to carry out paragraph
(2).
(i)
Authorization of appropriations
There are authorized to be appropriated to carry out this section such sums as are necessary.
.
102.
Research, development and demonstration programs
(a)
In general
Section 962 of the Energy Policy Act of 2005 (42 U.S.C. 16292) is amended—
(1) in subsection (a)—
(A) in paragraph (10), by striking and at the end;
(B) in paragraph (11), by striking the period at the end and inserting ; and; and
(C) by adding at
the end the following:
(12) specific additional programs to address water use and reuse;
(13) the testing, including the construction of testing facilities, for high temperature materials for
use in advanced systems for combustion or use of coal; and
(14) innovations to application of existing coal conversion systems designed to increase efficiency
of conversion, flexibility of operation, and other modifications to
address
existing usage requirements.
;
(2) by redesignating subsections (b) through (d) as subsections (c) through (e), respectively;
(3) by inserting after subsection (a) the following:
(b)
Transformational coal technology program
(1)
In general
As part of the program established under subsection (a), the Secretary may carry out a program
designed to
undertake research, development, and demonstration of
technologies, including the accelerated development of—
(A) chemical
looping technology;
(B) supercritical carbon dioxide power generation cycles;
(C) pressurized oxycombustion, including new and retrofit technologies; and
(D) other
technologies that are characterized by the use of—
(i) alternative energy cycles;
(ii) thermionic devices using waste heat;
(iii) fuel cells;
(iv) replacement of chemical
processes with biotechnology;
(v) nanotechnology;
(vi) new materials in
applications (other than extending cycles to higher temperature and
pressure), such as membranes or ceramics;
(vii) carbon utilization (other than enhanced oil recovery), such as construction materials, using low
quality energy to reconvert back
to a fuel, or manufactured food;
(viii) advanced gas separation concepts; and
(ix) other technologies, including—
(I) modular, manufactured components; and
(II) innovative production or research techniques, such as using 3–D printer systems, for the
production of early research and
development prototypes.
(2)
Cost share
In carrying out the program described in paragraph (1), the Secretary may enter into
partnerships with private entities to share the costs of carrying out the
program.
; and
(4) in subsection (c) (as so redesignated)—
(A) by striking paragraph (1) and inserting the following:
(1)
In general
In carrying out programs authorized by this section, during each of calendar years 2015, 2017,
2020, and annually thereafter, the Secretary shall identify cost and
performance goals for coal-based technologies that would permit the
continued cost-competitive use of coal for the production of electricity,
chemical feedstocks, transportation fuels, and other marketable products.
; and
(B) in paragraph (2), by
striking date of enactment of this Act each place it appears and inserting date of enactment of the Advanced Clean Coal Technology Investment in Our Nation Act of 2014.
(b)
Advisory committee; authorization of appropriations
Section 963 of the Energy Policy Act of 2005 (42 U.S.C. 16293) is amended—
(1) in subsection (c), by striking paragraph (6) and inserting the following:
(6)
Advisory committee
(A)
In general
Subject to subparagraph (B), the Secretary shall establish an advisory committee—
(i) to undertake, not less frequently than once every 3 years, a review and prepare a report on the
progress being made by the Department of Energy to achieve the
goals described in subsections (a) and (b) of section 962 and subsection
(b) of this section; and
(ii) to assess and
provide recommendations on how the capture of carbon from other fossil
fuels could be supported through the objectives described in subsection
(b).
(B)
Membership requirements
Members of the advisory committee under subparagraph (A) shall be appointed by the President.
; and
(2) by striking subsection (d) and inserting the following:
(d)
Authorization of appropriations
There are authorized to be appropriated to carry out section 962 and this section—
(1) $1,654,000,000 for fiscal years 2015 through 2018;
(2) $5,283,000,000 for fiscal years 2019 through 2025; and
(3) $3,300,000,000 for fiscal years 2026 through 2035.
.
(c)
Cost sharing reduction
Section 988(b) of the Energy Policy Act of 2005 (42 U.S.C. 16352(b)) is amended by striking
paragraph (3) and inserting the following:
(3)
Reduction
The Secretary shall reduce or eliminate the requirement of paragraph (1) for a research and
development activity of an applied nature if the Secretary—
(A) is petitioned for a reduction by a non-Federal source; and
(B) determines that the reduction is necessary and appropriate to achieve the purposes and goals of—
(i) this Act; and
(ii) the program or activity for which the research or development activity is being undertaken.
.
103.
Innovative technology loan guarantee program
(a)
In general
Section 1703 of the Energy Policy Act of 2005 (42 U.S.C. 16513) is amended by adding at the end
the following:
(f)
Other forms of Federal support allowed
An eligible project that is eligible for or in receipt of other forms of Federal financial
assistance shall not be precluded from receiving a loan guarantee made
pursuant to this section.
(g)
Timeline for loan guarantee approval for certain projects
Notwithstanding any other provision of law, not later than 2 years after the date of enactment of
the Advanced Clean Coal Technology Investment in Our Nation Act of 2014, the Secretary shall—
(1) give final approval to
applications for loan guarantees under subsection (a) for projects
described in subsection (b)(2); and
(2) make loans for those projects in amounts equal to $2,000,000,000.
.
(b)
Conforming amendments
(1) Title III of division C of the Omnibus Appropriations Act, 2009 (Public Law 111–8; 123 Stat. 619)
is amended in the matter under the heading Title 17 innovative technology loan guarantee program, by striking the seventh, eighth, and ninth provisos.
(2) The Supplemental Appropriations Act, 2009 (Public Law 111–32) is amended by striking section 408
(123 Stat. 1878).
104.
Coordination of clean coal generating projects
(a)
Definitions
In this section, the term eligible clean coal generating projects means any project undertaken to
install and operate an advanced carbon capture and storage technology at a
new or existing steam generating unit.
(b)
Lead agency
The Department of Energy shall be the lead agency for the purposes of coordinating all requirements
under Federal law with
respect to eligible clean coal generating projects, including any
requirements of—
(1) the Clean Air
Act (42 U.S.C. 7401 et seq.);
(2) the Federal
Water Pollution Control Act (33 U.S.C. 1251 et
seq.);
(3) the Endangered Species Act of 1973 (16 U.S.C. 1531
et seq.);
(4) the
National Environmental Policy Act of
1969 (42 U.S.C. 4321 et seq.); and
(5) the Safe Drinking Water Act (42 U.S.C. 300f
et seq.).
(c)
Schedule
In carrying out subsection (b), the Secretary of Energy shall establish a schedule for all Federal
authorizations with respect to each eligible project, including by—
(1) setting binding intermediate milestones and deadlines to ensure expeditious completion of all
proceedings and final action on all Federal authorizations relating to the
eligible project;
(2) requiring that all permit decisions and related environmental reviews under applicable Federal law
shall be completed not later than 1 year after the date on which a
complete
application for each environmental review is submitted, or as soon as
practicable thereafter; and
(3) coordinating, to the maximum extent practicable, any State permitting and environmental
requirements.
(d)
Memoranda of understanding
To streamline and expedite review of Federal authorizations for eligible clean coal generating
projects, the Secretary of Energy shall—
(1) enter
into memoranda of understanding with applicable Federal agencies;
(2) facilitate
a pre-application review process with applicable Federal agencies; and
(3) consolidate all environmental reviews of the eligible clean coal generating
project into a single environmental review document.
(e)
Judicial review
With respect to an application for Federal authorization relating to an eligible clean coal
generating project, the
applicable Federal circuit court may review and remedy—
(1) any
failure by a Federal agency to complete action on the application by the
date that is 1
year after the date on which the complete application was submitted to the
agency; and
(2) any issuance of an action or order
by a Federal agency with respect to the application that is inconsistent
with applicable Federal law.
II
Federal incentives for private investment in clean coal technologies
201.
Seven-year
amortization for certain systems installed on coal-fired electric
generation
units
(a)
In
general
Subsection (d) of section 169 of the Internal Revenue
Code of 1986 is amended by adding at the end the following new
paragraph:
(6)
Special rule for
systems installed on coal-fired electric generation units
(A)
In
general
Any mechanical or electronic system—
(i) which is installed on a coal-fired electric
generation unit after the date of the enactment of this paragraph,
and
(ii) which reduces
carbon dioxide emissions per net megawatt hour of electricity
generation by 1
or more of the means described in subparagraph (B) or any other
means,
shall
be treated for purposes of this section as a new identifiable
treatment
facility which abates or controls atmospheric pollution or
contamination by
removing, altering, disposing, storing, or preventing the creation
or emission
of pollutants, contaminants, wastes, or heat. Paragraph (1)(C) of
this
subsection, and subsection (e), shall not apply to any system which
is so
treated.
(B)
Means for
reducing emissions
The means described in this subparagraph
are—
(i) optimizing
combustion,
(ii) optimizing
sootblowing and heat transfer,
(iii) upgrading steam
temperature control capabilities,
(iv) reducing exit gas
temperatures (air heater modifications),
(v) predrying low rank
coals using power plant waste heat,
(vi) modifying steam
turbines or change the steam path/blading,
(vii) replacing single
speed motors with variable speed drives for fans and pumps, and
(viii) improving
operational controls, including neural networks.
(C)
Special rule for
minimum tax
Section 56(a)(5) shall not apply to property to which
this paragraph
applies.
.
(b)
Effective
date
The amendment made by this section shall apply to property
placed in service after the date of the enactment of this Act.
202.
Credit for
carbon sequestration from coal facilities
(a)
In
general
Subpart E of part IV
of subchapter A of chapter 1 of the Internal Revenue Code of 1986 is
amended by
inserting after section 48D the following new section:
48E.
Qualifying
carbon dioxide capture, transport, and storage equipment credit
(a)
General
rule
For purposes of section
46, the qualifying carbon dioxide capture, transport, and storage
equipment
credit for any taxable year is an amount equal to 30 percent of the
qualified
investment for such taxable year.
(b)
Qualified
investment
(1)
In
general
For purposes of
subsection (a), the qualified investment for any taxable year is
the basis of
eligible carbon dioxide capture, transport, and storage property
placed in
service by the taxpayer during such taxable year which is part of a
qualifying
clean coal project—
(A)
(i) the construction, reconstruction, or
erection of which is completed by the taxpayer, or
(ii) which is acquired by the taxpayer
if the original use of such property commences with the taxpayer,
and
(B) with respect to
which depreciation (or amortization in lieu of depreciation) is
allowable.
(2)
Special rule for
certain subsidized property
Rules similar to section 48(a)(4) shall
apply for purposes of this section.
(3)
Certain
qualified progress expenditures rules made applicable
Rules similar to the rules of subsections
(c)(4) and (d) of section 46 (as in effect on the day before the
enactment of
the Revenue Reconciliation Act of 1990) shall apply for purposes of
this
section.
(c)
Definitions
For
purposes of this section—
(1)
Coal
The term coal means bituminous
coal, subbituminous coal, and lignite.
(2)
Eligible carbon
dioxide capture, transport, and storage property
The term
eligible carbon dioxide capture, transport, and storage property
means any property—
(A) which is used to
capture, transport, or store carbon dioxide emitted at a qualifying
clean coal
project, including equipment used to separate and pressurize carbon
dioxide for
transport (including equipment to operate such equipment),
(B)
(i) the construction,
reconstruction, or erection of which is completed by the taxpayer,
or
(ii) which is acquired by the taxpayer
if the original use of such property commences with the taxpayer,
and
(C) with respect to
which depreciation (or amortization in lieu of depreciation) is
allowable.
(3)
Qualified polygeneration plant
The term qualified polygeneration plant means a plant that produces 2 or more marketable products, including electricity, chemicals,
liquid or gaseous fuels, and carbon
dioxide for beneficial use or sale.
(4)
Qualifying
clean coal project
(A)
In
general
The term qualifying clean coal project means
any project if such project—
(i) uses—
(I) gasification
technology (as defined in section 48B(c)(2)), or
(II) coal as not less than 75 percent of the project fuel source,
to produce
electricity or is a polygeneration plant,
and
(ii)
(I) is a new project which
is designed to meet the requirements of subparagraph (B), or
(II) consists of retrofits to existing
equipment such that the project meets the requirements of
subparagraph (B).
(B)
Requirements
(i)
In
general
A project shall meet the emission
requirement of
clause (ii) and the carbon capture requirement of clause (iii).
(ii)
Emission
requirement
The requirement of this clause is met if the project
is designed—
(I) to emit carbon
dioxide at an average annual rate of less than 1,100 pounds per net
megawatt
hour of electrical generation, or
(II) such that the
carbon dioxide emissions of such project are no greater than half
of the
average carbon dioxide emissions for facilities producing
electricity during
2005 from the same coal rank as such project, as determined under
regulations
prescribed by the Secretary in consultation with the Secretary of
Energy and
the Administrator of the Environmental Protection Agency.
(iii)
Carbon
capture requirement
The requirement of this clause is met—
(I) if such unit is
among the first 1,000 megawatts of electric generation units
certified by the
Secretary under subsection (e), to capture and sequester not less
than 500,000
metric tons per year of carbon dioxide,
(II) if such unit is among the next 3,000
megawatts of electric generation units certified by the Secretary
under
subsection (e), to capture and sequester not less than 1,000,000
metric tons
per year of carbon dioxide, and
(III) for any other
unit, to capture and sequester not less than 2,000,000 metric tons
per year of
carbon dioxide.
(d)
Aggregate
credits
(1)
In
general
No credit shall be allowed under this section with
respect to any qualifying clean coal project unless such project is
certified
by the Secretary under subsection (e).
(2)
Limitation on
projects certified
The Secretary may certify under subsection (e)
no more than—
(A) 20 projects
described in subsection (c)(4)(A)(ii)(I), and
(B) 20 projects
described in subsection (c)(4)(A)(ii)(II).
(e)
Certification
(1)
Certification
process
The Secretary, in
consultation with the Secretary of Energy and the Administrator of
the
Environmental Protection Agency, shall establish a certification
process to
determine if a project meets all criteria and other requirements to
be
recognized as a qualifying clean coal project.
(2)
Feedstock
requirements
After the date
of publication by the Secretary of the final certification process
referred to
in paragraph (1), the Secretary shall allocate the limitation in
subsection
(d)(2) in equal amounts among—
(A) projects using
bituminous coal as a primary feedstock,
(B) projects using
subbituminous coal as a primary feedstock, and
(C) projects using
lignite as a primary feedstock.
(3)
Redistribution
The Secretary may reallocate credits if the
Secretary determines that there is an insufficient quantity of
qualifying
applications for certification, pending at the time of review, to
comply with
the feedstock requirements of paragraph (2). The Secretary may
conduct an
additional program for applications for certification and
reallocate available
credits without regard to the feedstock requirement which was not
satisfied as
a result of insufficient applications for certification.
(4)
Requirements for
applications for certification
An application for certification
shall contain such information as the Secretary may require in
order to make a
determination to accept or reject the application and establish
applicable
credit entitlement. Any information contained in the application
shall be
protected as provided in section 552(b)(4) of title 5, United
States
Code.
(f)
Denial of double
benefit
No credit shall be allowed under this section for any
property for which credit is allowed under sections 48A, 48B, or
48C.
.
(b)
Conforming
amendments
(1) Section 46 of such Code (relating to amount
of credit) is amended by striking and at the end of paragraph
(5), by striking the period at the end of paragraph (6) and inserting ,
and, and by adding at the end the following new paragraph:
(7) the qualifying carbon dioxide capture,
transport, and storage equipment
credit.
.
(2) Subparagraph (C) of section 49(a)(1) of
such Code is amended by striking and at the end of clause (v),
by striking the period at the end of clause (vi) and inserting ,
and, and by adding after clause (vi) the following new clause:
(vii) the basis of any qualifying carbon dioxide
capture, transport, and storage equipment under section
48E.
.
(3) The table of sections for subpart E of part
IV of subchapter A of chapter 1 of such Code is amended by inserting after
the
item relating to section 48D the following new item:
Sec. 48E. Qualifying carbon dioxide capture, transport, and
storage equipment
credit.
.
(c)
Effective
date
The amendments made by
this section shall apply to periods after the date of the enactment of
this Act
under rules similar to the rules of section 48(m) of the Internal Revenue
Code
of 1986 (as in effect on the day before the date of the enactment of the
Revenue Reconciliation Act of 1990).
203.
Variable price support for carbon dioxide sequestration
(a)
Definitions
In this section:
(1)
Carbon dioxide price difference
The term carbon dioxide price difference means the amount calculated in accordance with subsection (f)(1).
(2)
Design capacity
The term design capacity means a project that has the capacity to capture—
(A) not fewer than 3,000,000 tons of carbon dioxide annually; or
(B) fewer than 3,000,000 tons of carbon dioxide annually if agreed to by the
Secretary and project owner.
(3)
Eligible project
The term eligible project means a project that—
(A) captures and sells carbon dioxide that is used for enhanced recovery and generates electricity or
gaseous or liquid
fuels, or is a qualified polygeneration plant (as defined in section
48E(c) of the Internal Revenue Code of 1986);
(B) is located in the United States;
(C) uses coal as not less than 75 percent of the project fuel source;
(D) captures not less than 50 percent of carbon dioxide produced by coal conversion;
(E) has reached design capacity; and
(F) has a contract with an enhanced recovery company that is for a period that is equal to or greater
than the subsidy period.
(4)
Enhanced recovery
The term enhanced recovery means enhanced oil recovery and enhanced gas recovery.
(5)
Lowest bid
The term lowest bid means a bid made by an applicant to the program that has the least cost to the Federal Government,
as compared to competing bids.
(6)
Market price of oil
The term market price of oil means the price of oil as reported in a public oil market index such as the New York Mercantile
Exchange.
(7)
Program
The term program means the Enhanced Recovery Program established under subsection (b).
(8)
Qualifying carbon dioxide
The term qualifying carbon dioxide means carbon dioxide that is captured from an eligible project and is eligible for variable price
support.
(9)
Rate
The term rate means the ratio bid by the project owner of the price of carbon dioxide to the market price of
oil, and that is
used to calculate the synthetic price of carbon dioxide.
(10)
Secretary
The term Secretary means the Secretary of Energy.
(11)
Strike price of carbon dioxide
The term strike price of carbon dioxide means the price of carbon dioxide bid by the project owner—
(A) below which a project will receive a subsidy; and
(B) above which the project owner will make payments to the Federal Government.
(12)
Subsidy period
The term subsidy period means the period of time, not to exceed 10 years, bid by the project owner during which the
eligible project will be eligible to receive a subsidy under this section.
(13)
Synthetic price of carbon dioxide
The term synthetic price of carbon dioxide means the price of carbon dioxide calculated by multiplying the market price of oil by the rate.
(14)
Variable price support
The term variable price support means financial support provided by the Federal Government in an amount equal to the carbon
dioxide price difference for each ton of
qualifying carbon dioxide provided directly to the owner of an eligible
project selected to receive assistance under this section.
(b)
Establishment; purpose
(1)
In general
There is established in the Department of Energy a variable price support program, to be known as
the Enhanced Recovery Program, to accelerate the construction and operation of eligible advanced coal-fueled projects that
capture carbon dioxide emissions and sell or use the carbon dioxide for
enhanced recovery.
(2)
Purpose
The purpose of the program shall be—
(A) to reduce the cost of carbon capture by providing variable price support to carbon capture and
sequestration project owners to enable the owner to finance eligible
projects;
(B) to advance the development and widespread use of carbon capture technology; and
(C) to increase the domestic production of oil and natural gas in the United States.
(c)
Variable price support
(1)
In general
In carrying out the program, the Secretary, in consultation with the Secretary of the Treasury, is
authorized to provide variable price support for
eligible projects—
(A) for which an application is submitted to the Secretary under subsection (d);
(B) that are selected under the competitive bidding process under subsection (e); and
(C) for which a variable price support agreement to implement the payment terms described in
subsections
(f) and (g) is executed.
(2)
Period
The Secretary shall provide variable price support to an eligible project under this section for a
period of not more than 10 years beginning on the date on which the
eligible project reaches design capacity.
(3)
Profit sharing agreements
(A)
In general
To be eligible to receive variable price support under paragraph (1), a project owner shall enter
into a profit-sharing agreement with the Secretary at the time that the
variable price support agreement is executed.
(B)
Payments
Once every calendar quarter, for each project owner subject to a profit-sharing agreement executed
under subparagraph (A), the Secretary shall calculate whether the
synthetic
price of carbon dioxide is greater than the strike price of carbon
dioxide, and, if so, request from the project owner a profit-sharing
payment for that quarter, in an amount equal to—
(i) the difference between the synthetic price of carbon dioxide and the strike price of carbon
dioxide;
less
(ii) any repayments made under subsection (g) during that calendar quarter.
(d)
Applications
An owner of an eligible project desiring variable price support under this section shall submit to
the
Secretary an application at such time, in such manner, and containing such
information as the Secretary may require.
(e)
Selection; competitive bidding process
(1)
In general
Once every year, the Secretary shall solicit bids from applicants for an allocation of the funding
made available under subsection (h) to provide variable price support to
eligible projects.
(2)
Bid submission
Applicants participating in the competitive bidding process shall submit a bid for an eligible
project that includes—
(A) the strike price of carbon dioxide for a ton of qualifying carbon dioxide;
(B) a rate;
(C) a plan for the project for a period of not more than 10 years; and
(D) the projected tonnage of qualifying carbon dioxide that the eligible project will capture and sell
for enhanced recovery over the project period.
(3)
Selection
For each fiscal year, the Secretary shall—
(A) determine the cost to the Federal Government of each bid
submitted under
paragraph (2); and
(B)
(i) select 1 or more of the lowest bids until all of the
available funding authorized by subsection (h) is obligated; or
(ii) if the Secretary determines that no bids submitted under paragraph (2) are acceptable to the
Secretary, reject the bids.
(f)
Administration
(1)
In general
In carrying out a variable price support agreement entered into under subsection (c), the Secretary
shall calculate the carbon dioxide price difference as a
dollar amount equal to—
(A) the strike price of carbon dioxide; less
(B) the synthetic price of carbon dioxide in a qualifying ton.
(2)
Payments
Payments between the Secretary and the project owner shall be made as follows:
(A) If the amount calculated in paragraph (1) is a positive number, the
Secretary shall pay to the project owner an amount equal to the product
obtained by multiplying—
(i) the carbon dioxide price difference calculated under paragraph (1); and
(ii) the quantity in tons of qualifying carbon dioxide sold for enhanced
recovery.
(B) If the amount calculated in paragraph (1) is a negative number, the
project owner shall pay to the Secretary an amount equal to the product
obtained by multiplying—
(i) the absolute value of the carbon dioxide price difference calculated under
paragraph (1); and
(ii) the quantity in tons of qualifying carbon
dioxide sold for enhanced recovery.
(C) Payments between the Secretary and the project owner made under subparagraphs (A) and (B) shall be
reconciled on an annual basis based on—
(i) daily carbon dioxide sales records reported by the project owner; and
(ii) the daily price of West Texas intermediate crude oil listed in the New York Mercantile
Exchange.
(g)
Payments to the Federal Government
(1)
In general
The Secretary shall establish terms and conditions for a variable price support agreement entered
into under subsection (c)(1)(C).
(2)
Repayments
The repayment terms of any variable price support agreement shall commence if, during the subsidy
period of the agreement, and subject to the limitations described in
paragraph (3), the amount calculated under subsection (f)(1) is a positive
number.
(3)
Limitations
(A)
In general
The repayment terms described in paragraph (2) shall be subject to the following limitations:
(i) If, during any calendar quarter during the subsidy period of the variable price support agreement,
the synthetic price of carbon dioxide is less than the strike price of
carbon dioxide, the project owner may elect to defer all or part of the
repayment obligations of the project owner due in that quarter and any
unpaid obligations will continue to accrue interest.
(ii) If, during any calendar quarter during the subsidy period of the variable price support agreement,
the synthetic price of carbon dioxide is greater than the strike price of
carbon dioxide, the project owner—
(I) shall meet the scheduled repayment obligations plus any deferred repayment obligations; but
(II) shall not be required to pay in that quarter an amount that is greater than the amount equal to the
product obtained by multiplying—
(aa) the excess of the synthetic price of carbon dioxide over the strike price of carbon dioxide; and
(bb) the output of the project.
(B)
Repayments beyond subsidy term
At the end of the subsidy period of the agreement, the cumulative amount of any deferred repayment
obligations, together with accrued interest, shall be amortized (with
interest) over the remainder of the full term of the agreement.
(h)
Funding
(1)
In general
Prior to selecting bids under subsection (e)(3) for a fiscal year, the Secretary shall make
available to carry out
the program the following amounts, to be allocated from unobligated funds
of the Department of Energy. Years:Available Credit:Year
1$1,350,000Year
2$1,350,000Year
3$1,350,000Year
4$2,700,000Year
5$2,700,000Year 6$2,700,000Year 7$4,050,000Year 8$5,400,000Year 9 and
thereafter$6,750,000.
(2)
Extension
If the amounts made available under paragraph (1) for a fiscal year are not used during the
applicable fiscal year—
(A) the program shall be extended for an additional fiscal year; and
(B) the amounts authorized under paragraph (1) that were not used during the applicable fiscal year
shall be carried over to carry out the program during the additional
fiscal year.
204.
Clean energy
coal bonds
(a)
In
general
(1)
Treatment as
tax credit bonds
Subpart I of
part IV of subchapter A of chapter 1 of the Internal Revenue Code of 1986
is
amended by adding at the end the following new section:
54G.
Clean energy
coal bonds
(a)
Clean energy
coal bond
For purposes of this subchapter—
(1)
In
general
The term clean energy coal bond means any
bond issued as part of an issue if—
(A) the bond is
issued by a qualified issuer pursuant to an allocation by the
Secretary to such
issuer of a portion of the national clean energy coal bond
limitation under
subsection (b)(2),
(B) so much of
the available project proceeds from the sale of such issue as is
equal to 95 percent of the excess of—
(i) the total available project proceeds from the sale of such issue, over
(ii) the amounts in a reasonably required reserve (within the meaning of section 150(a)(3)) with respect
to such issue,
are to
be used for
capital expenditures incurred by qualified borrowers for 1 or more
qualified
projects,
(C) the qualified issuer makes an irrevocable election to have this section apply,
(D) the qualified
issuer designates such bond for purposes of this section and the
bond is in
registered form, and
(E) in lieu of the
requirements of section 54A(d)(2), the issue meets the requirements
of
subsection (c).
(2)
Qualified
project; special use rules
(A)
In
general
The term qualified project means a qualified
clean coal project (as defined in subsection (h)(1)) placed in
service by a
qualified borrower.
(B)
Refinancing
rules
For purposes of paragraph (1)(B), a qualified project may
be refinanced with proceeds of a clean energy coal bond only if the
indebtedness being refinanced (including any obligation directly or
indirectly
refinanced by such indebtedness) was originally incurred by a
qualified
borrower after the date of the enactment of this section.
(C)
Reimbursement
For
purposes of paragraph (1)(B), a clean energy coal bond may be
issued to
reimburse a qualified borrower for amounts paid after the date of
the enactment
of this section with respect to a qualified project, but only if—
(i) prior to the
payment of the original expenditure, the qualified borrower
declared its intent
to reimburse such expenditure with the proceeds of a clean energy
coal
bond,
(ii) not later than
60 days after payment of the original expenditure, the qualified
issuer adopts
an official intent to reimburse the original expenditure with such
proceeds,
and
(iii) reimbursement
is not made later than 18 months after the date the original
expenditure is
paid or the date the project is placed in service or abandoned, but
in no event
more than 3 years after the original expenditure is paid.
(D)
Treatment of
changes in use
For purposes of paragraph (1)(B), the proceeds of
an issue shall not be treated as used for a qualified project to
the extent
that a qualified borrower takes any action within its control which
causes such
proceeds not to be used for a qualified project. The Secretary
shall prescribe
regulations specifying remedial actions that may be taken
(including conditions
to taking such remedial actions) to prevent an action described in
the
preceding sentence from causing a bond to fail to be a clean energy
coal
bond.
(b)
Limitation on
amount of bonds designated
(1)
National
limitation
There is a national clean energy coal bond limitation
of $5,000,000,000.
(2)
Allocation by
Secretary
The Secretary shall allocate the amount described in
paragraph (1) among qualified projects in such manner as the
Secretary
determines appropriate.
(c)
Special rules
relating to expenditures
(1)
In
general
An issue shall be treated as meeting the requirements of
this subsection if, as of the date of issuance, the qualified
issuer reasonably
expects—
(A) 100 percent or
more of the available project proceeds from the sale of the issue
are to be
spent for 1 or more qualified projects within the 5-year period
beginning on
the date of issuance of the clean energy bond,
(B) a binding
commitment with a third party to spend at least 10 percent of such
available
project proceeds from the sale of the issue will be incurred within
the 6-month
period beginning on the date of issuance of the clean energy bond
or, in the
case of a clean energy bond the available project proceeds of which
are to be
loaned to 2 or more qualified borrowers, such binding commitment
will be
incurred within the 6-month period beginning on the date of the
loan of such
proceeds to a qualified borrower, and
(C) such projects
will be completed with due diligence and the available project
proceeds from
the sale of the issue will be spent with due diligence.
(2)
Extension of
period
Upon submission of a request prior to the expiration of
the period described in paragraph (1)(A), the Secretary may extend
such period
if the qualified issuer establishes that the failure to satisfy the
5-year
requirement is due to reasonable cause and the related projects
will continue
to proceed with due diligence.
(3)
Failure to
spend required amount of bond proceeds within 5 years
To the
extent that less than 100 percent of the available project proceeds
of such
issue are expended by the close of the 5-year period beginning on
the date of
issuance (or if an extension has been obtained under paragraph (2),
by the
close of the extended period), the qualified issuer shall redeem
all of the
nonqualified bonds within 90 days after the end of such period. For
purposes of
this paragraph, the amount of the nonqualified bonds required to be
redeemed
shall be determined in the same manner as under section 142.
(d)
Reduced credit
amount
The annual credit determined under section 54A(b) with
respect to any clean coal energy bond shall be 70 percent of the
amount so
determined without regard to this subsection.
(e)
Cooperative
electric company; qualified energy tax credit bond lender;
governmental body;
qualified borrower
For purposes of this section—
(1)
Cooperative
electric company
The term cooperative electric
company means a mutual or cooperative electric company described in
section 501(c)(12) or section 1381(a)(2)(C), or a not-for-profit
electric
utility which has received a loan or loan guarantee under the Rural
Electrification Act.
(2)
Clean energy
bond lender
The term clean energy bond lender means
a lender which is a cooperative which is owned by, or has
outstanding loans to,
100 or more cooperative electric companies and is in existence on
February 1,
2002, and shall include any affiliated entity which is controlled
by such
lender.
(3)
Public power
entity
The term public power entity means a State
utility with a service obligation, as such terms are defined in
section 217 of
the Federal Power Act (as in effect on the date of enactment of
this
paragraph).
(4)
Qualified
issuer
The term qualified issuer means—
(A) a clean energy
bond lender,
(B) a cooperative
electric company, or
(C) a public power
entity.
(5)
Qualified
borrower
The term qualified borrower means—
(A) a mutual or
cooperative electric company described in section 501(c)(12) or
1381(a)(2)(C),
or
(B) a public power
entity.
(f)
Special rules
relating to pool bonds
No portion of a pooled financing bond may
be allocable to any loan unless the borrower has entered into a
written loan
commitment for such portion prior to the issue date of such issue.
(g)
Gross-Up of payment to issuers in case of sequestration
In the case of any payment due under section 6431(b) by reason of section 6431(f)(3)(A)(v) which is
subject to reduction in accordance with a sequestration report prepared by
the Director of the Office of Management and Budget pursuant to the
Balanced Budget and Emergency Deficit Control Act of 1985 or the Statutory
Pay-As-You-Go Act of 2010—
(1) the amount of such payment shall be increased to an amount equal to the product of—
(A) the amount of such payment as determined before the reduction in accordance with the sequestration
report, and
(B) a fraction the numerator of which is 1 and the denominator of which is the excess of—
(i) 100, over
(ii) the percentage by which such payment is reduced (without regard to this subsection) in accordance
with the sequestration report, and
(2) such increase shall be treated as not subject to the sequestration report.
(h)
Other
definitions and special rules
For purposes of this
section—
(1)
Qualified clean
coal project
The term
qualified clean coal project means—
(A) an atmospheric
pollution control facility (within the meaning of section
169(d)(1)),
(B) a qualifying
clean coal project (within the meaning of section 48E(c)(1)),
(C) a qualified
facility (within the meaning of section 45Q(c)), or
(D) an integrated gasification combined cycle unit, supercritical coal-fired power plant, or
ultrasupercritical coal-fired power
plant, with an energy efficiency percentage (as defined in section
48(c)(3)(C)(i))
that is not less than 5 percentage points greater than the average energy
efficiency percentage for coal electrical production facilities in the
United
States and corrected for the impact of carbon capture (as determined by
the Secretary of Energy).
(2)
Definitions
(A)
Integrated gasification combined cycle unit
The term integrated gasification combined cycle unit means an electric generation unit that produces electricity by converting coal to synthesis gas
that is used to fuel a combined-cycle plant that produces electricity from
both a combustion turbine (including a combustion turbine/fuel cell
hybrid) and a steam turbine.
(B)
Pooled
financing bond
The term pooled financing bond shall
have the meaning given such term by section
149(f)(6)(A).
(C)
Supercritical coal-fired power plant
The term supercritical coal-fired power plant means a coal-fired power plant operating at pressures such that water boils first and then is
converted to superheated
steam.
(D)
Ultrasupercritical coal-fired power plant
The term ultrasupercritical coal-fired power plant means a power plant described in subparagraph (C) operating above supercritical pressure and at
steam temperatures above 1,100 degrees
Fahrenheit.
.
(2)
Bonds not
subject to maturity limitation
Paragraph (5) of section 54A(d) of
such Code is amended by adding at the end the following new
subparagraph:
(C)
Special rule
for clean energy coal bonds
The requirements of this paragraph
shall not apply to a clean energy coal bond under section
54G.
.
(3)
Conforming
amendments
(A) Paragraph (1) of
section 54A(d) of the Internal Revenue Code of 1986 is amended by striking
or at the end of subparagraph (D), by inserting
or at the end of subparagraph (E), and by inserting after
subparagraph (E) the following new subparagraph:
(F) a clean energy
coal
bond,
.
(B) The table of
sections for subpart I of part IV of subchapter A of chapter 1 of the
Internal
Revenue Code of 1986 is amended by adding at the end the following new
item:
Sec. 54G. Clean energy coal
bonds.
.
(b)
Bonds treated
as specified tax credit bonds
(1)
In
general
Section 6431(f)(3)(A) of the Internal Revenue Code of
1986 is amended by striking or at the end of clause (iii), by
striking and at the end of clause (iv) and inserting
or, and by adding at the end the following new clause:
(v) a
clean energy coal bond (as defined in section 54G),
and
.
(2)
Special
rule
Paragraph (2) of section 6431(f) of such Code is
amended—
(A) by striking
clause (i) or (ii) and inserting clause (i), (ii), or
(v); and
(B) by striking the
heading and inserting Special rule for certain bonds.
(c)
Effective
date
The amendments made by this section shall apply to bonds
issued after the date of the enactment of this Act.
III
Reports required
301.
Definitions
In this title:
(1)
CCS
the term CCS means carbon capture and storage, including geological storage and enhanced oil recovery, as well
as other forms of carbon utilization.
(2)
Secretary
The term Secretary means the Secretary of Energy.
302.
Reports to Congress
(a)
In general
Not later than 1 year after the date of enactment of this Act, and annually thereafter, the
Secretary shall submit to Congress and make available to the public
(including on
the website of the Department of Energy) a report that—
(1) provides a comprehensive review of the annual progress made by the National Laboratories and the
offices of the Department of Energy that are currently active in
researching and developing clean coal technologies and CCS, including—
(A) the status of carbon capture, transport, storage, and utilization, including—
(i) an overview and evaluation of key technologies;
(ii) a description of existing CCS infrastructure and demonstration projects in the United States,
including the status of permitting, financing, and construction and the
expected date of commencement of operations;
(iii) the associated costs of key technologies, including the amount and type of Federal funding; and
(iv) an estimated timeline to commercial scalability;
(B) a description of the current barriers for CCS deployment and commercialization, including—
(i) market failures;
(ii) regulatory framework;
(iii) long-term liability for carbon storage;
(iv) public outreach; and
(v) annual progress on overcoming the identified barriers;
(C) possible solutions to address the barriers described in subparagraph (B), including—
(i) funding options for CCS projects;
(ii) options to improve the current legal and regulatory framework; and
(iii) suggestions for Federal Government action on effective public outreach; and
(D) a separate review that focuses on international research and projects sponsored by the Department
of Energy, including—
(i) a clear description of how the Federal Government has participated in each project, including the
amount and type of Federal funding;
(ii) the technical and economic status of each project, including the expected date of commencement of
operations; and
(iii) recommendations on—
(I) how to most efficiently engage in each project in the future; and
(II) whether a change of funding support could assist in those efforts; and
(2) addresses all of the international consortia that the Federal Government is currently engaged in
by—
(A) detailing the type of Federal Government activity in each consortium;
(B) including a description of any lessons learned by participants from the Federal Government as a direct result of consortium activity;
(C) describing the benefits derived from Federal Government involvement; and
(D) making recommendations for the involvement of the Federal Government in each consortium including—
(i) whether the Federal Government should continue to participate; and
(ii) how the Federal Government could increase the productivity of the consortium, if possible.
(b)
Additional report
Not later than 18 months after the date of enactment of this Act, and not less frequently than once
every year for the next 5 years thereafter, the Secretary shall submit to
Congress and make available to the public (including on the website of the
Department of Energy) a report that—
(1) provides an assessment of the upcoming CCS projects in Canada, including—
(A) the SaskPower Boundary Dam
Integrated CCS Demonstration Project;
(B) the Shell Quest Project; and
(C) the Alberta Carbon Trunk Line; and
(2) determines—
(A) whether operation of the CCS system is meeting the project goals;
(B) the economic status of the project, including—
(i) an overview of the ratio of private and public funds for capital costs;
(ii) whether the project is generating revenue; and
(iii) the current return on investment;
(C) whether the project is the type of project that the Federal Government should replicate in the
United States to move CCS forward on a pilot level;
(D) whether the project could comply with subparagraph (E) or (F) if the project should be replicated
under subparagraph (C);
(E) whether the Federal Government and private industry in the United States can work together to
develop a similar pilot project in the United States; and
(F) if the Federal Government and private industry cannot work together under subparagraph (E),
whether the Federal Government should work jointly with Canada on a
similar project.