Library / Laws / 113th / s / S. 2010 / Introduced in Senate
II
113th CONGRESS
2d Session
S. 2010
IN THE SENATE OF THE UNITED STATES
February 10, 2014
Mr. Barrasso introduced the following bill; which was read twice and referred to the Committee on Energy and Natural Resources
A BILL
To amend the Water Conservation and Utilization Act to authorize the development of non-Federal
hydropower and issuance of leases of power privileges at projects
constructed pursuant to the authority of the Water Conservation and
Utilization Act, and for other purposes.
1.
Short title
This Act may be cited as the Bureau of Reclamation Conduit Hydropower Development Equity and Jobs Act.
2.
Amendment
Section 9 of the Act entitled An Act authorizing construction of water conservation and utilization projects in the Great Plains
and arid semiarid areas of the United States, approved August 11, 1939 (16 U.S.C. 590z–7; commonly known as the Water Conservation and Utilization Act), is amended—
(1)
by striking In connection with and inserting (a) In connection with; and
(2)
by adding at the end the following:
(b)
Notwithstanding subsection (a), the Secretary is authorized to enter into leases of power
privileges for electric power generation in connection with any project
constructed under this Act, and shall have authority in addition to and
alternative to any authority in existing laws relating to particular
projects, including small conduit hydropower development.
(c)
When entering into leases of power privileges under subsection (b), the Secretary shall use the
processes applicable to such leases under section 9(c) of the Reclamation
Project Act of 1939 (43 U.S.C. 485h(c)).
(d)
Lease of power privilege contracts shall be at such rates as, in the Secretary’s judgment, will
produce revenues at least sufficient to cover the appropriate share of the
annual operation and maintenance cost of the project and such fixed
charges, including interest, as the Secretary deems proper. Lease of power
privilege contracts shall be for periods not to exceed 40 years.
(e)
No findings under section 3 shall be required for a lease under subsection (b).
(f)
All right, title, and interest to installed power facilities constructed by non-Federal entities
pursuant to a lease of power privilege, and direct revenues derived
therefrom, shall remain with the lessee unless otherwise required under
subsection (g).
(g)
Notwithstanding section 8, lease revenues and fixed charges, if any, shall be covered into the
Reclamation Fund to be credited to the project from which those revenues
or charges were derived.
(h)
When carrying out this section, the Secretary shall first offer the lease of power privilege to an
irrigation district or water users’ association operating the applicable
transferred conduit, or to the irrigation district or water users’
association receiving water from the applicable reserved conduit. The
Secretary shall determine a reasonable timeframe for the irrigation
district or water users’ association to accept or reject a lease of power
privilege offer. If the irrigation district or water users’ association
elects not to accept a lease of power privilege offer under subsection
(b), the Secretary shall offer the lease of power privilege to other
parties using the processes applicable to such leases under section 9(c)
of the Reclamation Project Act of 1939 (43 U.S.C. 485h(c)).
(i)
The Bureau of Reclamation shall apply its categorical exclusion process under the National
Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) to small conduit hydropower development under this section, excluding siting of associated
transmission facilities on Federal lands.
(j)
Nothing in this section shall obligate the Western Area Power Administration or the Bonneville
Power Administration to purchase or market any of the power produced by
the facilities covered under this section and none of the costs associated
with production or delivery of such power shall be assigned to project
purposes for inclusion in project rates.
(k)
Nothing in this section shall alter or impede the delivery and management of water by Bureau of
Reclamation facilities, as water used for conduit hydropower generation
shall be deemed incidental to use of water for the original project
purposes. Lease of power privilege shall be made only when, in the
judgment of the Secretary, the exercise of the lease will not be
incompatible with the purposes of the project or division involved and
shall not create any unmitigated financial or physical impacts to the
project or division involved. The Secretary shall notify and consult with
the irrigation district or legally organized water users’ association
operating the transferred conduit in advance of offering the lease of
power privilege and shall prescribe such terms and conditions necessary to
adequately protect the planning, design, construction, operation,
maintenance, and other interests of the United States and the project or
division involved.
(l)
Nothing in this section shall alter or affect any agreements in effect on the date of the enactment
of the Bureau of Reclamation Conduit Hydropower Development Equity and
Jobs Act for the development of conduit hydropower projects or disposition
of revenues.
(m)
In this section:
(1)
The term conduit means any Bureau of Reclamation tunnel, canal, pipeline, aqueduct, flume, ditch, or similar
manmade water conveyance that is operated for the distribution of water
for agricultural, municipal, or industrial consumption and not primarily
for the generation of electricity.
(2)
The term irrigation district means any irrigation, water conservation or conservancy, multi-county water conservation or
conservancy district, or any separate public entity composed of two or
more such districts and jointly exercising powers of its member districts.
(3)
The term reserved conduit means any conduit that is included in project works the care, operation, and maintenance of which
has been reserved by the Secretary, through the Commissioner of the Bureau
of Reclamation.
(4)
The term transferred conduit means any conduit that is included in project works the care, operation, and maintenance of which
has been transferred to a legally organized water users’ association or
irrigation district.
(5)
The term small conduit hydropower means a facility capable of producing 5 megawatts or less of electric capacity.
.