Library / Laws / 113th / s / S. 181 / Introduced in Senate
II
113th CONGRESS
1st Session
S. 181
IN THE SENATE OF THE UNITED STATES
January 30, 2013
Ms. Murkowski (for
herself and Mr. Begich) introduced the
following bill; which was read twice and referred to the
Committee on Energy and Natural
Resources
A BILL
To authorize the establishment of the Niblack and Bokan
Mountain mining area road corridors in the State of Alaska, and for other
purposes.
1.
Short
title
This Act may be cited as
the Niblack and Bokan Mountain Mining
Area Roads Authorization Act.
2.
Niblack and
Bokan Mountain mining area road corridors
(a)
Establishment
Notwithstanding any prohibition against
road construction in inventoried roadless areas under the Roadless Area
Conservation Rule established under part 294 of title 36, Code of Federal
Regulations (and successor regulations), not later than 180 days after the date
of enactment of this Act, the Secretary of Agriculture, acting through the
Chief of the Forest Service, shall, for purposes of connecting the Prince of
Wales Island road system in the State of Alaska to the area of the Niblack and
Bokan Mountain patented mineral claims on the southeast side of Prince of Wales
Island, establish—
(1) a road corridor that follows 1 of the 2
routes identified as Niblack Route 1 or Niblack Route
2 on the map entitled Road to Niblack Mine and Bokan Mountain
Route Extension, numbered 1, and dated June 21, 2012; and
(2) a road corridor to the Bokan Mountain mine
that branches off the Niblack Mine road corridor established under paragraph
(1).
(b)
Requirements
A
road corridor established under subsection (a) shall—
(1) minimize the
economic costs of the road corridor by using, to the maximum extent
practicable, the road network in existence on the date of the
establishment;
(2) minimize effects
of the road corridor on surface resources;
(3) prevent
unnecessary or unreasonable surface disturbance; and
(4) comply with all
applicable laws (including regulations).
(c)
Cooperating
agencies
The State of Alaska and the Prince of Wales Community
Advisory Council may participate as cooperating agencies during the preparation
of any environmental impact statement prepared with respect to a road corridor
under subsection (a).
(d)
Federal
permits
It is the intent of Congress that any Federal permit
required for construction of a road corridor established under subsection (a)
be issued or denied by the date that is not later than 1 year after the date of
application for the permit.