Library / Laws / 113th / s / S. 1514 / Placed on Calendar (Senate)
II
Calendar No. 191
113th CONGRESS
1st Session
S. 1514
IN THE SENATE OF THE UNITED STATES
September 17, 2013Mr. McConnell introduced the following bill; which was read the first time
September 18, 2013Read the second time and placed on the calendar
A BILL
To save coal jobs, and for other purposes.
1.
Short title; table of contents
(a)
Short title
This Act may be cited as the
Saving Coal Jobs Act of 2013.
(b)
Table of contents
The table of contents of this Act is as follows:
Sec. 1. Short title; table of contents.TITLE I—Prohibition on energy taxSec. 101. Prohibition on energy tax.TITLE II—PermitsSec. 201. National pollutant discharge elimination system.Sec. 202. Permits for dredged or fill material.Sec. 203. Impacts of Environmental Protection Agency regulatory activity on employment and economic activity.Sec. 204. Identification of waters protected by the Clean Water Act.Sec. 205. Limitations on authority to modify State water quality standards.Sec. 206. State authority to identify waters within boundaries of the State.
I
Prohibition
on energy tax
101.
Prohibition
on energy tax
(a)
Findings;
purposes
(1)
Findings
Congress
finds that—
(A) on June 25, 2013,
President Obama issued a Presidential memorandum directing the Administrator of
the Environmental Protection Agency to issue regulations relating to power
sector carbon pollution standards for existing coal fired power plants;
(B) the issuance of
that memorandum circumvents Congress and the will of the people of the United
States;
(C) any action to
control emissions of greenhouse gases from existing coal fired power plants in
the United States by mandating a national energy tax would devastate major
sectors of the economy, cost thousands of jobs, and increase energy costs for
low-income households, small businesses, and seniors on fixed income;
(D) joblessness
increases the likelihood of hospital visits, illnesses, and premature
deaths;
(E) according to
testimony on June 15, 2011, before the Committee on Environment and Public
Works of the Senate by Dr. Harvey Brenner of Johns Hopkins University,
The unemployment rate is well established as a risk factor for elevated
illness and mortality rates in epidemiological studies performed since the
early 1980s. In addition to influences on mental disorder, suicide and alcohol
abuse and alcoholism, unemployment is also an important risk factor in
cardiovascular disease and overall decreases in life
expectancy.;
(F) according to the
National Center for Health Statistics, children in poor families were
four times as likely to be in fair or poor health as children that were not
poor;
(G) any major
decision that would cost the economy of the United States millions of dollars
and lead to serious negative health effects for the people of the United States
should be debated and explicitly authorized by Congress, not approved by a
Presidential memorandum or regulations; and
(H) any policy
adopted by Congress should make United States energy as clean as practicable,
as quickly as practicable, without increasing the cost of energy for struggling
families, seniors, low-income households, and small businesses.
(2)
Purposes
The
purposes of this section are—
(A) to ensure
that—
(i) a
national energy tax is not imposed on the economy of the United States;
and
(ii) struggling
families, seniors, low-income households, and small businesses do not
experience skyrocketing electricity bills and joblessness;
(B) to protect the
people of the United States, particularly families, seniors, and children, from
the serious negative health effects of joblessness;
(C) to allow
sufficient time for Congress to develop and authorize an appropriate mechanism
to address the energy needs of the United States and the potential challenges
posed by severe weather; and
(D) to restore the
legislative process and congressional authority over the energy policy of the
United States.
(b)
Presidential
memorandum
Notwithstanding
any other provision of law, the head of a Federal agency shall not promulgate
any regulation relating to power sector carbon pollution standards or any
substantially similar regulation on or after June 25, 2013, unless that
regulation is explicitly authorized by an Act of Congress.
II
Permits
201.
National pollutant discharge
elimination system
(a)
Applicability of
guidance
Section 402 of the Federal Water Pollution Control Act
(33 U.S.C. 1342) is amended by adding at the end the following:
(s)
Applicability of
guidance
(1)
Definitions
In
this subsection:
(A)
Guidance
(i)
In
general
The term guidance means draft, interim, or
final guidance issued by the Administrator.
(ii)
Inclusions
The
term guidance includes—
(I) the comprehensive
guidance issued by the Administrator and dated April 1, 2010;
(II) the proposed
guidance entitled Draft Guidance on Identifying Waters Protected by the
Clean Water Act and dated April 28, 2011;
(III) the final
guidance proposed by the Administrator and dated July 21, 2011; and
(IV) any other
document or paper issued by the Administrator through any process other than
the notice and comment rulemaking process.
(B)
New
permit
The term new permit means a permit covering
discharges from a structure—
(i) that is issued
under this section by a permitting authority; and
(ii) for which an
application is—
(I) pending as of the
date of enactment of this subsection; or
(II) filed on or after
the date of enactment of this subsection.
(C)
Permitting
authority
The term permitting authority
means—
(i) the Administrator;
or
(ii) a
State, acting pursuant to a State program that is equivalent to the program
under this section and approved by the Administrator.
(2)
Permits
(A)
In
general
Notwithstanding any other provision of law, in making a
determination whether to approve a new permit or a renewed permit, the
permitting authority—
(i) shall base the
determination only on compliance with regulations issued by the Administrator
or the permitting authority; and
(ii) shall not base
the determination on the extent of adherence of the applicant for the new
permit or renewed permit to guidance.
(B)
New
permits
If the permitting
authority does not approve or deny an application for a new permit by the date
that is 270 days after the date of receipt of the application for the new
permit, the applicant may operate as if the application were approved in
accordance with Federal law for the period of time for which a permit from the
same industry would be approved.
(C)
Substantial
completeness
In determining whether an application for a new
permit or a renewed permit received under this paragraph is substantially
complete, the permitting authority shall use standards for determining
substantial completeness of similar permits for similar facilities submitted in
fiscal year
2007.
.
(b)
State permit
programs
(1)
In
general
Section 402 of the Federal Water Pollution Control Act
(33 U.S.C. 1342) is amended by striking subsection (b) and inserting the
following:
(b)
State permit
programs
(1)
In
general
At any time after the
promulgation of the guidelines required by section 304(a)(2), the Governor of
each State desiring to administer a permit program for discharges into
navigable waters within the jurisdiction of the State may submit to the
Administrator—
(A) a full and complete description of the
program the State proposes to establish and administer under State law or under
an interstate compact; and
(B) a statement from the attorney general (or
the attorney for those State water pollution control agencies that have
independent legal counsel), or from the chief legal officer in the case of an
interstate agency, that the laws of the State, or the interstate compact, as
applicable, provide adequate authority to carry out the described
program.
(2)
Approval
The Administrator shall approve each
program for which a description is submitted under paragraph (1) unless the
Administrator determines that adequate authority does not exist—
(A) to issue permits
that—
(i) apply, and ensure
compliance with, any applicable requirements of sections 301, 302, 306, 307,
and 403;
(ii) are for fixed
terms not exceeding 5 years;
(iii) can be
terminated or modified for cause, including—
(I) a violation of any
condition of the permit;
(II) obtaining a
permit by misrepresentation or failure to disclose fully all relevant facts;
and
(III) a change in any
condition that requires either a temporary or permanent reduction or
elimination of the permitted discharge; and
(iv) control the
disposal of pollutants into wells;
(B)
(i) to issue permits that
apply, and ensure compliance with, all applicable requirements of section 308;
or
(ii) to inspect, monitor, enter, and
require reports to at least the same extent as required in section 308;
(C) to ensure that the
public, and any other State the waters of which may be affected, receives
notice of each application for a permit and an opportunity for a public hearing
before a ruling on each application;
(D) to ensure that the
Administrator receives notice and a copy of each application for a
permit;
(E) to ensure that any
State (other than the permitting State), whose waters may be affected by the
issuance of a permit may submit written recommendations to the permitting State
and the Administrator with respect to any permit application and, if any part
of the written recommendations are not accepted by the permitting State, that
the permitting State will notify the affected State and the Administrator in
writing of the failure of the State to accept the recommendations, including
the reasons for not accepting the recommendations;
(F) to ensure that no
permit will be issued if, in the judgment of the Secretary of the Army (acting
through the Chief of Engineers), after consultation with the Secretary of the
department in which the Coast Guard is operating, anchorage and navigation of
any of the navigable waters would be substantially impaired by the issuance of
the permit;
(G) to abate
violations of the permit or the permit program, including civil and criminal
penalties and other means of enforcement;
(H) to ensure that any
permit for a discharge from a publicly owned treatment works includes
conditions to require the identification in terms of character and volume of
pollutants of any significant source introducing pollutants subject to
pretreatment standards under section 307(b) into the treatment works and a
program to ensure compliance with those pretreatment standards by each source,
in addition to adequate notice, which shall include information on the quality
and quantity of effluent to be introduced into the treatment works and any
anticipated impact of the change in the quantity or quality of effluent to be
discharged from the publicly owned treatment works, to the permitting agency
of—
(i) new introductions
into the treatment works of pollutants from any source that would be a new
source (as defined in section 306(a)) if the source were discharging
pollutants;
(ii) new introductions
of pollutants into the treatment works from a source that would be subject to
section 301 if the source were discharging those pollutants; or
(iii) a substantial
change in volume or character of pollutants being introduced into the treatment
works by a source introducing pollutants into the treatment works at the time
of issuance of the permit; and
(I) to ensure that any
industrial user of any publicly owned treatment works will comply with sections
204(b), 307, and 308.
(3)
Administration
Notwithstanding
paragraph (2), the Administrator may not disapprove or withdraw approval of a
program under this subsection on the basis of the following:
(A) The failure of the
program to incorporate or comply with guidance (as defined in subsection
(s)(1)).
(B) The implementation of a water quality
standard that has been adopted by the State and approved by the Administrator
under section
303(c).
.
(2)
Conforming
amendments
(A) Section 309 of the
Federal Water Pollution Control Act (33 U.S.C. 1319) is amended—
(i) in
subsection (c)—
(I) in paragraph
(1)(A), by striking 402(b)(8) and inserting
402(b)(2)(H); and
(II) in paragraph
(2)(A), by striking 402(b)(8) and inserting
402(b)(2)(H); and
(ii) in
subsection (d), in the first sentence, by striking 402(b)(8) and
inserting 402(b)(2)(H).
(B) Section 402(m) of
the Federal Water Pollution Control Act (33 U.S.C. 1342(m)) is amended in the
first sentence by striking subsection (b)(8) of this section and
inserting subsection (b)(2)(H).
(c)
Suspension of
Federal program
Section 402(c) of the Federal Water Pollution
Control Act (33 U.S.C. 1342(c)) is amended—
(1) by redesignating
paragraph (4) as paragraph (5); and
(2) by inserting after
paragraph (3) the following:
(4)
Limitation on
disapproval
Notwithstanding paragraphs (1) through (3), the
Administrator may not disapprove or withdraw approval of a State program under
subsection (b) on the basis of the failure of the following:
(A) The failure of the program to incorporate
or comply with guidance (as defined in subsection (s)(1)).
(B) The implementation
of a water quality standard that has been adopted by the State and approved by
the Administrator under section
303(c).
.
(d)
Notification of
Administrator
Section 402(d)(2) of the Federal Water Pollution
Control Act (33 U.S.C. 1342(d)(2)) is amended—
(1) by striking
(2) and all that follows through the end of the first sentence and inserting the following:
(2)
Objection by
Administrator
(A)
In
general
Subject to subparagraph (C), no permit shall issue
if—
(i) not later than 90
days after the date on which the Administrator receives notification under
subsection (b)(2)(E), the Administrator objects in writing to the issuance of
the permit; or
(ii) not later than 90
days after the date on which the proposed permit of the State is transmitted to
the Administrator, the Administrator objects in writing to the issuance of the
permit as being outside the guidelines and requirements of this
Act.
;
(2) in the second
sentence, by striking Whenever the Administrator and inserting
the following:
(B)
Requirements
If
the Administrator
;
and
(3) by adding at the
end the following:
(C)
Exception
The
Administrator shall not object to or deny the issuance of a permit by a State
under subsection (b) or (s) based on the following:
(i) Guidance, as that
term is defined in subsection (s)(1).
(ii) The interpretation of the Administrator of a
water quality standard that has been adopted by the State and approved by the
Administrator under section
303(c).
.
202.
Permits for
dredged or fill material
(a)
In
general
Section 404 of the
Federal Water Pollution Control Act (33 U.S.C. 1344) is amended—
(1) by striking the section heading and all
that follows through Sec. 404. (a) The Secretary may issue and
inserting the following:
404.
Permits for
dredged or fill material
(a)
Permits
(1)
In
general
The Secretary may
issue
;
and
(2) in subsection (a), by adding at the
end the following:
(2)
Deadline for
approval
(A)
Permit
applications
(i)
In
general
Except as provided in clause (ii), if an environmental
assessment or environmental impact statement, as appropriate, is required under
the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.), the
Secretary shall—
(I) begin the process
not later than 90 days after the date on which the Secretary receives a permit
application; and
(II) approve or deny
an application for a permit under this subsection not later than the latter
of—
(aa) if
an agency carries out an environmental assessment that leads to a finding of no
significant impact, the date on which the finding of no significant impact is
issued; or
(bb) if
an agency carries out an environmental assessment that leads to a record of
decision, 15 days after the date on which the record of decision on an
environmental impact statement is issued.
(ii)
Processes
Notwithstanding
clause (i), regardless of whether the Secretary has commenced an environmental
assessment or environmental impact statement by the date described in clause
(i)(I), the following deadlines shall apply:
(I) An environmental
assessment carried out under the National Environmental Policy Act of 1969 (42
U.S.C. 4321 et seq.) shall be completed not later than 1 year after the
deadline for commencing the permit process under clause (i)(I).
(II) An environmental
impact statement carried out under the National Environmental Policy Act of
1969 (42 U.S.C. 4321 et seq.) shall be completed not later than 2 years after
the deadline for commencing the permit process under clause (i)(I).
(B)
Failure to
act
If the Secretary fails to act by the deadline specified in
clause (i) or (ii) of subparagraph (A)—
(i) the application,
and the permit requested in the application, shall be considered to be
approved;
(ii) the Secretary
shall issue a permit to the applicant; and
(iii) the permit shall
not be subject to judicial
review.
.
(b)
State Permitting
Programs
Section 404
of the Federal Water Pollution Control Act (33 U.S.C. 1344) is amended by
striking subsection (c) and inserting the following:
(c)
Authority of Administrator
(1)
In general
Subject to paragraphs (2) through (4), until the Secretary has issued
a permit under this section, the Administrator is authorized to prohibit the
specification (including the withdrawal of specification) of any defined area
as a disposal site, and deny or restrict the use of any
defined area for specification (including the withdrawal of specification) as a
disposal site, if the Administrator determines, after notice and opportunity for public
hearings, that the discharge of the materials into the area will have an
unacceptable adverse effect on municipal water supplies, shellfish beds or
fishery areas (including spawning and breeding areas), wildlife, or
recreational areas.
(2)
Consultation
Before making a determination under paragraph (1), the Administrator shall
consult with the Secretary.
(3)
Findings
The Administrator shall set forth in writing and
make public the findings of the Administrator and the reasons of the Administrator for making any determination under
this subsection.
(4)
Authority of
State permitting programs
This subsection shall not apply to any
permit if the State in which the discharge originates or will originate does
not concur with the determination of the Administrator that the discharge will
result in an unacceptable adverse effect as described in paragraph
(1).
.
(c)
State
Programs
Section 404(g)(1) of the Federal Water Pollution Control Act (33 U.S.C. 1344(g)(1)) is amended in the first sentence by striking
for the discharge and inserting for all or part of the
discharges.
203.
Impacts of Environmental Protection Agency
regulatory activity on employment and economic activity
(a)
Definitions
In
this section:
(1)
Administrator
The term Administrator means
the Administrator of the Environmental Protection Agency.
(2)
Covered
action
The term covered action means any of the
following actions taken by the Administrator under the Federal Water Pollution
Control Act (33 U.S.C. 1251 et seq.):
(A) Issuing a regulation, policy statement,
guidance, response to a petition, or other requirement.
(B) Implementing a new or substantially altered
program.
(3)
More than a de
minimis negative impact
The term more than a de minimis
negative impact means the following:
(A) With respect to
employment levels, a loss of more than 100 jobs, except that any offsetting job gains that
result from the hypothetical creation of new jobs through new technologies or
government employment may not be used in the job loss calculation.
(B) With respect to
economic activity, a decrease in economic activity of more than $1,000,000 over
any calendar year, except that any offsetting economic activity that results from the
hypothetical creation of new economic activity through new technologies or
government employment may not be used in the economic activity
calculation.
(b)
Analysis of
impacts of actions on employment and economic activity
(1)
Analysis
Before taking a covered action, the
Administrator shall analyze the impact, disaggregated by State, of the covered
action on employment levels and economic activity, including estimated job
losses and decreased economic activity.
(2)
Economic
models
(A)
In
general
In carrying out paragraph (1), the Administrator shall
use the best available economic models.
(B)
Annual GAO
report
Not later than December 31st of each year, the Comptroller
General of the United States shall submit to Congress a report on the economic
models used by the Administrator to carry out this subsection.
(3)
Availability of
information
With respect to any covered action, the Administrator
shall—
(A) post the analysis
under paragraph (1) as a link on the main page of the public Internet Web site
of the Environmental Protection Agency; and
(B) request that the Governor of any State
experiencing more than a de minimis negative impact post the analysis in the
Capitol of the State.
(c)
Public
hearings
(1)
In
general
If the Administrator
concludes under subsection (b)(1) that a covered action will have more than a
de minimis negative impact on employment levels or economic activity in a
State, the Administrator shall hold a public hearing in each such State at
least 30 days prior to the effective date of the covered action.
(2)
Time, location,
and selection
(A)
In general
A public hearing required under paragraph (1) shall
be held at a convenient time and location for impacted residents.
(B)
Priority
In selecting
a location for such a public hearing, the Administrator shall give priority to
locations in the State that will experience the greatest number of job
losses.
(d)
Notification
If the Administrator concludes under
subsection (b)(1) that a covered action will have more than a de minimis
negative impact on employment levels or economic activity in any State, the
Administrator shall give notice of such impact to the congressional
delegation, Governor, and legislature of the State at least 45 days before the effective
date of the covered action.
204.
Identification of
waters protected by the Clean
Water Act
(a)
In
general
The Secretary of the
Army and the Administrator of the Environmental Protection Agency may
not—
(1) finalize, adopt,
implement, administer, or enforce the proposed guidance described in the notice
of availability and request for comments entitled EPA and Army Corps of
Engineers Guidance Regarding Identification of Waters Protected by the Clean
Water Act (EPA–HQ–OW–2011–0409) (76 Fed. Reg. 24479 (May 2, 2011));
and
(2) use the guidance
described in paragraph (1), any successor document, or any substantially
similar guidance made publicly available on or after December 3, 2008, as the
basis for any decision regarding the scope of the Federal Water Pollution
Control Act (33 U.S.C. 1251 et seq.) or any rulemaking.
(b)
Rules
The
use of the guidance described in subsection (a)(1), or any successor document
or substantially similar guidance made publicly available on or after December
3, 2008, as the basis for any rule shall be grounds for vacating the
rule.
205.
Limitations on
authority to modify State water quality standards
(a)
State water
quality standards
Section
303(c)(4) of the Federal Water Pollution Control Act (33 U.S.C. 1313(c)(4)) is
amended—
(1) by redesignating
subparagraphs (A) and (B) as clauses (i) and (ii), respectively, and indenting appropriately;
(2) by striking
(4) The and inserting the following:
(4)
Promulgation of revised or new standards
(A)
In general
The
;
(3) by striking
The Administrator shall promulgate and inserting the
following:
(B)
Deadline
The Administrator shall
promulgate;
and
(4) by adding at the
end the following:
(C)
State water quality standards
Notwithstanding any other provision of this paragraph, the
Administrator may not promulgate a revised or new standard for a pollutant in
any case in which the State has submitted to the Administrator and the
Administrator has approved a water quality standard for that pollutant, unless
the State concurs with the determination of the Administrator that the revised or
new standard is necessary to meet the requirements of this
Act.
.
(b)
Federal licenses
and permits
Section 401(a) of
the Federal Water Pollution Control Act (33 U.S.C. 1341(a)) is amended by adding at the end the
following:
(7)
State or interstate agency determination
With respect to any discharge, if a State
or interstate agency having jurisdiction over the navigable waters at the point
at which the discharge originates or will originate determines under paragraph (1)
that the discharge will comply with the applicable provisions of sections 301,
302, 303, 306, and 307, the Administrator may not take any action to supersede
the
determination.
.
206.
State authority
to identify waters within boundaries of the State
Section 303(d) of the Federal Water Pollution
Control Act (33 U.S.C. 1313(d)) is amended by striking paragraph (2) and
inserting the following:
(2)
State authority
to identify waters within boundaries of the State
(A)
In general
Each State shall submit
to the Administrator from time to time, with the first such submission not
later than 180 days after the date of publication of the first identification
of pollutants under section 304(a)(2)(D), the waters identified and the loads
established under subparagraphs (A), (B), (C), and (D) of paragraph (1).
(B)
Approval or disapproval by Administrator
(i)
In general
Not later
than 30 days after the date of submission, the Administrator shall approve the State identification and load
or announce the disagreement of the Administrator with the State identification and load.
(ii)
Approval
If the Administrator approves the
identification and load submitted by the State under this
subsection, the State shall incorporate the identification and load into the current plan of the State under
subsection (e).
(iii)
Disapproval
If the Administrator announces the disagreement of the Administrator with the identification and load submitted by the State under this subsection. the Administrator shall submit, not later than 30 days after
the date that the Administrator announces the disagreement of the Administrator with the submission of the State, to the State the written recommendation of the Administrator of those additional waters
that the Administrator identifies and such loads for such waters as the Administrator believes are necessary
to implement the water quality standards applicable to the waters.
(C)
Action by State
Not later than 30 days after receipt of the recommendation of the Administrator, the State shall—
(i) disregard the recommendation of the Administrator in full and incorporate its own identification and load into the current plan of the State under subsection (e);
(ii) accept the recommendation of the Administrator in full and incorporate its identification and load as amended
by the recommendation of the Administrator into the current plan of the State under subsection
(e); or
(iii) accept the recommendation of the Administrator in part, identifying certain additional waters and certain
additional loads proposed by the Administrator to be added to the State’s
identification and load and incorporate the State’s identification and
load as amended into the current plan of the State under subsection (e).
(D)
Noncompliance by Administrator
(i)
In general
If the Administrator
fails to approve the State identification and load or announce the
disagreement of the Administrator with the State identification and load within the time specified
in this subsection—
(I) the identification and load of the State shall be considered approved;
and
(II) the State shall incorporate the identification and load that the State submitted
into the current plan of the State under subsection (e).
(ii)
Recommendations not submitted
If the Administrator announces the
disagreement of the Administrator with the identification and load of the State but fails to submit the written recommendation of the Administrator to the State within 30 days as required by subparagraph
(B)(iii)—
(I) the identification and load of the State shall be considered approved; and
(II) the State shall incorporate the identification and load that the State submitted into the current plan of the State under subsection (e).
(E)
Application
This section shall apply to any
decision made by the Administrator under this subsection issued on or after
March 1,
2013.
.
September 18, 2013Read the second time and placed on the calendar