Library / Laws / 113th / s / S. 1462 / Introduced in Senate
II
113th CONGRESS
1st Session
S. 1462
IN THE SENATE OF THE UNITED STATES
August 1, 2013
Mr. Thune (for himself,
Mr. Blunt, Mrs.
McCaskill, and Mr. Pryor)
introduced the following bill; which was read twice and referred to the
Committee on Commerce, Science, and
Transportation
A BILL
To extend the positive train control system
implementation deadline, and for other purposes.
1.
Short
title
This Act may be cited as
the Railroad Safety and Positive Train
Control Extension Act.
2.
Implementation
deadline
(a)
Technology
implementation plan
Section
20156(e)(4) of title 49, United States Code, is amended to read as
follows:
(4)
Positive train
control
(A)
In
general
Except as required by section 20157 (relating to the
requirements for implementation of positive train control systems), the
Secretary shall ensure that each railroad carrier's technology implementation
plan required under paragraph (1) that includes a schedule for implementation
of a positive train control system complies with that schedule.
(B)
Rule of
construction
Nothing in this section shall be construed as
requiring the installation of positive train control on railroad tracks
if—
(i) positive train
control is not required on those tracks under section 20157; and
(ii) the railroad
does not choose to implement positive train control as a technology on those
tracks under this
section.
.
(b)
Extension of
deadline
Section 20157 of title 49, United States Code, is
amended—
(1) in subsection
(a)(1)—
(A) by striking
Not later than 18 months after the date of enactment of the Rail Safety
Improvement Act of 2008, each and inserting Each;
and
(B) by striking
by December 31, 2015 and inserting by December 31,
2020; and
(2) in subsection
(a)(1)(B), by striking transported and inserting
transported on or after December 31, 2015.
3.
Authority of
Secretary of Transportation to extend implementation deadline
(a)
In
general
Section 20157 of
title 49, United States Code, as amended by section 2(b) of this Act, is
further amended—
(1) in subsection
(a)(1), by striking Each Class I and inserting Except as
provided under subsection (i), each Class I;
(2) by redesignating
subsection (i) as subsection (j); and
(3) by inserting before subsection (j), as
redesignated, the following:
(i)
Implementation
extensions
(1)
In
general
The Secretary may extend in 1-year increments, upon
application, the deadline for implementing a positive train control system
under subsection (a)(1) for an applicant, if the Secretary determines
that—
(A) full
implementation will likely be infeasible due to circumstances beyond the
control of the applicant, including funding availability, spectrum acquisition,
resource and technology availability, software development and testing,
availability of alternate risk reduction strategies, and interoperability
standards;
(B) the applicant has
demonstrated good faith in its positive train control system
implementation;
(C) the applicant has
presented a revised plan for implementing a positive train control system
indicating how the applicant will fully implement a positive train control
system as soon as feasible, but not later than December 31, 2022; and
(D) the extension
will not extend later than December 31, 2022.
(2)
Considerations
In
making a determination under paragraph (1), the Secretary shall
consider—
(A) whether the
affected areas of track have been identified as areas of greater risk to the
public and railroad employees in the applicant’s positive train control
implementation plan under section 236.1011(a)(4) of title 49, Code of Federal
Regulations (relating to PTC Implementation Plan content requirements);
and
(B) the risk of
operational failure to the affected service areas and the applicant.
(3)
Review
Not
later than 10 days after the Secretary receives an application under paragraph
(1), the Secretary shall review and approve or disapprove the
application.
.
(b)
Conforming
amendment
Section 20156(e)(2) of title 49, United States Code, is
amended by striking as defined in section 20157(i) and inserting
as defined in section 20157(j).
4.
Equipping
locomotives operating in positive train control territory
Not later than 180 days after the date of
enactment of this Act, the Secretary of Transportation shall revise section
236.1006(b)(4)(iii)(B) of title 49, Code of Federal Regulations (relating to
equipping locomotives operating in PTC territory) to extend each deadline 5
years.