Library / Laws / 113th / s / S. 1317 / Introduced in Senate
II
113th CONGRESS
1st Session
S. 1317
IN THE SENATE OF THE UNITED STATES
July 17, 2013
Mr. Nelson (for himself
and Mr. Rockefeller) introduced the
following bill; which was read twice and referred to the
Committee on Commerce, Science, and
Transportation
A BILL
To authorize the programs of the National Aeronautics and
Space Administration for fiscal years 2014 through 2016 and for other purposes.
1.
Short
title; table of contents
(a)
Short
title
This Act may be cited
as the National Aeronautics and Space
Administration Authorization Act of 2013.
(b)
Table of
contents
The table of contents of this Act is as follows:
Sec. 1. Short title; table of
contents.
Sec. 2. Findings.
Sec. 3. Definitions.
TITLE I—Authorization of appropriations
Sec. 101. Fiscal year 2014.
Sec. 102. Fiscal year 2015.
Sec. 103. Fiscal year 2016.
TITLE II—Human space flight exploration and
operations
Subtitle A—Exploration
Sec. 201. Missions and destinations.
Sec. 202. NASA processing and launch
infrastructure.
Sec. 203. Naming of the space launch system.
Sec. 204. Report; space suit system.
Subtitle B—Maximizing ISS utilization
Sec. 221. Operation and utilization of the ISS.
Sec. 222. Research roles and responsibilities.
Sec. 223. ISS national laboratory; property rights in
inventions.
Sec. 224. Commercial cargo and crew capabilities.
Subtitle C—Other matters
Sec. 231. Safety and mission assurance in human space
flight.
Sec. 232. Launch liability provisions.
TITLE III—Science
Subtitle A—Earth Science
Sec. 301. Earth science.
Subtitle B—Space Science
Sec. 321. Human exploration and science
collaboration.
Sec. 322. Maintaining a balanced space science
portfolio.
Sec. 323. Science mission extensions.
Sec. 324. Planetary science.
Sec. 325. Space weather.
Sec. 326. James Webb space telescope.
Sec. 327. University class science missions.
TITLE IV—Aeronautics
Sec. 401. Sense of Congress on NASA aeronautics.
TITLE V—Space technology
Sec. 501. Space technology.
TITLE VI—Education
Sec. 601. Education and outreach activities.
TITLE VII—Other matters
Sec. 701. Sense of Congress on NASA's cross agency
support.
Sec. 702. Space communications network.
Sec. 703. Astronaut occupational healthcare.
Sec. 704. Helium capture and recovery.
Sec. 705. Information technology governance.
Sec. 706. Improvements to baselines and cost controls breach
reporting process.
Sec. 707. Infrastructure.
Sec. 708. Knowledge management.
2.
Findings
Congress makes the following
findings:
(1) A robust and balanced space program
enhances the United States long-term national and economic security by—
(A) stimulating development of advanced
technologies with widespread applications;
(B) increasing the United States technological
competitiveness;
(C) enhancing global prosperity and security
through cooperation in shared interests, such as advancement of science,
understanding of Earth and the universe, and protection from space borne
threats, such as asteroids;
(D) opening the solar system to the full range
of peaceful human activity; and
(E) inspiring
students to pursue disciplines in science, technology, engineering, and
mathematics.
(2) The Nation’s space program should
include—
(A) national security and civil space
activities;
(B) robotic and human exploration;
(C) advancement of scientific knowledge and
engagement of the general public;
(D) U.S. Government led launch capability
development, including the Space Launch System and the Orion multi-purpose crew
vehicle, and partnerships with commercial and international entities;
(E) advancement of the space frontier and
stimulation of commerce; and
(F) searching outward to further our
understanding of the universe and observing Earth to expand knowledge of our
home planet.
3.
Definitions
In this Act:
(1)
Administration
The
term Administration means the National Aeronautics and Space
Administration.
(2)
Administrator
The
term Administrator means the Administrator of the National
Aeronautics and Space Administration.
(3)
Appropriate
committees of Congress
The term appropriate committees of
Congress means—
(A) the Committee on
Commerce, Science, and Transportation of the Senate; and
(B) the Committee on
Science, Space, and Technology of the House of Representatives.
(4)
ISS
The
term ISS means the International Space Station.
(5)
NASA
The
term NASA means the National Aeronautics and Space
Administration.
(6)
Orion
The
term Orion means the multi-purpose crew vehicle described under
section 303 of the National Aeronautics and Space Administration Authorization
Act of 2010 (42 U.S.C. 18323).
(7)
Space Launch
System
The term Space Launch System has the meaning
given the term under section 3 of the National Aeronautics and Space
Administration Authorization Act of 2010 (42 U.S.C. 18302).
I
Authorization of
appropriations
101.
Fiscal year
2014
There are authorized to
be appropriated to NASA for fiscal year 2014, $18,100,000,000, as
follows:
(1) For Exploration, $4,275,000,000, of
which—
(A) $1,600,000,000 shall be for Space Launch
System;
(B) $1,200,000,000 shall be for the Orion
multi-purpose crew vehicle;
(C) $350,000,000 shall be for Exploration
Ground Systems;
(D) $325,000,000 shall be for Exploration
Research and Development; and
(E) $800,000,000 shall be for Commercial Space
Flight.
(2) For Space Operations, $3,832,000,000, of
which—
(A) $3,000,000,000 shall be for the ISS
program; and
(B) $832,000,000 for Space and Flight
Support.
(3) For Science, $5,154,000,000, of
which—
(A) $1,800,000,000 shall be for Earth
Sciences;
(B) $1,400,000,000 shall be for Planetary
Science;
(C) $642,000,000 shall be for
Astrophysics;
(D) $658,000,000 shall be for the James Webb
Space Telescope; and
(E) $654,000,000 shall be for
Heliophysics.
(4) For Aeronautics, $570,000,000.
(5) For Space Technology, $635,000,000.
(6) For Education, $136,000,000.
(7) For Cross-Agency Support Programs,
$2,850,000,000.
(8) For Construction and Environmental
Compliance and Restoration, $610,000,000.
(9) For Inspector General, $38,000,000.
102.
Fiscal year
2015
There are authorized to
be appropriated to NASA for fiscal year 2015, $18,462,000,000, as
follows
(1) For Exploration, $4,522,000,000, of
which—
(A) $1,725,000,000 shall be for Space Launch
System;
(B) $1,225,000,000 shall be for the Orion
multi-purpose crew vehicle;
(C) $425,000,000 shall be for Exploration
Ground Systems;
(D) $332,000,000 shall be for Exploration
Research and Development; and
(E) $815,000,000 shall be for Commercial Space
Flight.
(2) For Space Operations, $3,948,000,000, of
which—
(A) $3,103,000,000 shall be for the ISS
program; and
(B) $845,000,000 for Space and Flight
Support.
(3) For Science, $5,234,400,000, of
which—
(A) $1,836,000,000 shall be for Earth
Sciences;
(B) $1,450,000,000 shall be for Planetary
Science;
(C) $670,000,000 shall be for
Astrophysics;
(D) $645,400,000 shall be for the James Webb
Space Telescope; and
(E) $633,000,000 shall be for
Heliophysics.
(4) For Aeronautics, $581,000,000.
(5) For Space Technology, $650,000,000.
(6) For Education, $139,800,000.
(7) For Cross-Agency Support Programs,
$2,907,000,000.
(8) For Construction and Environmental
Compliance and Restoration, $441,000,000.
(9) For Inspector General, $38,800,000.
103.
Fiscal year
2016
There are authorized to
be appropriated to NASA for fiscal year 2016, $18,831,000,000, as
follows:
(1) For Exploration, $4,660,000,000, of
which—
(A) $1,800,000,000 shall be for Space Launch
System;
(B) $1,250,000,000 shall be for the Orion
multi-purpose crew vehicle;
(C) $435,000,000 shall be for Exploration
Ground Systems;
(D) $350,000,000 shall be for Exploration
Research and Development; and
(E) $825,000,000 shall be for Commercial Space
Flight.
(2) For Space Operations, $4,010,000,000, of
which—
(A) $3,196,000,000 shall be for the ISS
program; and
(B) $814,000,000 for Space and Flight
Support.
(3) For Science, $5,315,800,000, of
which—
(A) $1,872,000,000 shall be for Earth
Sciences;
(B) $1,500,000,000 shall be for Planetary
Science;
(C) $686,800,000 shall be for
Astrophysics;
(D) $620,000,000 shall be for the James Webb
Space Telescope; and
(E) $637,000,000 shall be for
Heliophysics.
(4) For Aeronautics, $593,000,000.
(5) For Space Technology, $665,000,000.
(6) For Education, $142,000,000.
(7) For Cross-Agency Support Programs,
$2,965,000,000.
(8) For Construction and Environmental
Compliance and Restoration, $441,000,000.
(9) For Inspector General, $39,200,000.
II
Human space
flight exploration and operations
A
Exploration
201.
Missions and
destinations
(a)
In
general
Congress reaffirms that the long-term goal of the human
space flight and exploration efforts of NASA shall be to expand permanent human
presence beyond low-Earth orbit and to do so, where practical, in a manner
involving international partners, as stated in section 202(a) of the National
Aeronautics and Space Administration Authorization Act of 2010 (42 U.S.C.
18312(a)).
(b)
Human
exploration of Mars
Section 202(b) of the National Aeronautics
and Space Administration Authorization Act of 2010 (42 U.S.C. 18312(b)) is
amended—
(1) by striking
and at the end of paragraph (3);
(2) by striking the
period at the end of paragraph (4) and inserting ; and;
and
(3) by adding at the
end the following:
(5) to achieve human
exploration of Mars, including the establishment of a capability for human
habitation on the surface of
Mars.
.
(c)
Development of
exploration strategy
(1)
In
general
Not later than 270 days after the date of enactment of
this Act, and biennially thereafter, the Administrator shall submit to the
appropriate committees of Congress a strategy to achieve the objective under
section 202(b)(5) of the National Aeronautics and Space Administration
Authorization Act of 2010, as amended (42 U.S.C. 18312(b)(5)) through a series
of successive, free-standing, but complementary missions making robust
utilization of cis-lunar space and employing the Space Launch System, Orion,
and other capabilities provided under titles III, IV, V, and IX of that Act (42
U.S.C. 18301 et seq.).
(2)
Strategy
requirements
In developing the strategy under paragraph (1), the
Administrator shall include—
(A) the utility of an
expanded human presence in cis-lunar space toward enabling missions to various
lunar orbits, the lunar surface, asteroids, the Mars system, and other
destinations of interest for future human exploration and development;
(B) the utility of an
expanded human presence in cis-lunar space for economic, scientific, and
technological advances;
(C) the opportunities
for collaboration with—
(i) international
partners;
(ii) private
industry; and
(iii) other Federal
agencies, including missions relevant to national security or scientific
needs;
(D) the opportunities
specifically afforded by the ISS to support high priority scientific and
technological developments useful in expanding and sustaining a human presence
in cis-lunar space and beyond;
(E) a range of
exploration mission architectures and approaches for the missions identified
under paragraph (1); and
(F) standards for
ensuring crew health and safety, including limits regarding radiation exposure
and countermeasures necessary to meet those limits, means and methods for
addressing urgent medical conditions or injuries, and other such safety,
health, and medical issues that can be anticipated in the conduct of the
missions identified under paragraph (1).
(3)
Comparison of
mission architectures and approaches
(A)
In
general
The strategy shall include a comparison of mission
architectures and approaches identified under paragraph (2)(E) with a primary
objective of identifying the architectures and approaches that—
(i) best support the
long-term goal under section 202(a) of the National Aeronautics and Space
Administration Authorization Act of 2010 (42 U.S.C. 18312(a)); and
(ii) are enabled by
the Space Launch System, Orion, and other transportation capabilities and
technologies provided under titles III, IV, V, and IX of the National
Aeronautics and Space Administration Authorization Act of 2010 (42 U.S.C. 18301
et seq.) and by other capabilities that may be available commercially or
internationally.
(B)
Factors
The
comparison of mission architectures and approaches under subparagraph (A) shall
include options that assess cost, schedule, safety, sustainability,
opportunities for international collaboration, the enabling of new markets and
opportunities for U.S. private industry, compelling scientific opportunities or
national security considerations and requirements, the flexibility of the
architecture to adjust to evolving technologies, leadership, and priorities,
and contributions made to U.S. technological excellence, competitiveness, and
leadership.
(C)
National
security collaboration
In identifying opportunities for
collaboration under paragraph (2)(C)(iii), the Administrator, in collaboration
with the Secretary of Defense and Director of National Intelligence, shall
include a discussion of the work, cost, and schedule required to enable and
utilize a cargo variant of the Space Launch System, including the 70-, 105-,
and 130-metric ton configurations, with both a 5-meter or 8-meter
faring.
(4)
Additional
requirements
The strategy shall include—
(A) technical
information as needed to identify interest from the scientific and national
security communities; and
(B) an assessment of
the Space Launch System to enable and sustain near-Earth object surveillance of
potentially Earth-threatening objects for the purpose of planetary
protection.
202.
NASA
processing and launch infrastructure
(a)
Policy
It
is the policy of the United States that the Exploration Ground Systems to
process and launch the Space Launch System, Orion, and related exploration
elements, and the 21st Century Space Launch Complex to enable and facilitate
civil, defense, and private launches are complementary efforts to modernize
infrastructure, reduce costs, and maintain capabilities for current and future
missions.
(b)
Development of
the processing and launch support infrastructure
In executing the
programs described under subsection (a), the Administrator, to the extent
practicable—
(1) may not exclude
the ability of Exploration Ground Systems to support efforts under section
305(b) of the National Aeronautics and Space Administration Authorization Act
of 2010 (42 U.S.C. 18325(b));
(2) shall allow for
cost-sharing opportunities by providing multi-use systems and capabilities to
current and future users of the 21st Century Space Launch Complex through
modernization, refurbishment, or development of infrastructure; and
(3) shall pursue, in
collaboration with local, State, or Federal agencies, or private industry,
capabilities and investments that support multiple entities to advance NASA's
current and future missions and benefit NASA by creating new
partnerships.
203.
Naming of the
space launch system
(a)
Findings
Congress
finds that education and outreach to encourage the next generation of
scientists and engineers to become involved in science and space exploration is
one of the Administration's most important missions.
(b)
Report
Not
later than 30 days after the date of enactment of this Act, the Administration
shall submit to the appropriate committees of Congress a plan to engage the
public, including science students in elementary and secondary education
programs, throughout the United States in naming the Space Launch
System.
204.
Report; space
suit system
Not later than 90
days after the date of enactment of this Act, the Administration shall submit
to the appropriate committees of Congress a report updating Congress on the
Constellation Space Suit System. The report shall include justification as to
whether another competition to award contracts for the design, development,
certification, production, and sustaining engineering of this space suit system
is required to meet the needs of NASA's human exploration program.
B
Maximizing ISS
utilization
221.
Operation and
utilization of the ISS
(a)
Sense of
Congress
It is the sense of Congress that—
(1) maximum
utilization of partnerships, scientific research, commercial applications, and
exploration test bed capabilities of the ISS is essential to ensuring the
greatest return on investments made by the United States and its international
partners in the development, assembly, and operations of that unique facility;
and
(2) every effort
should be made to ensure that decisions regarding the service life of the ISS
are made on the basis of its projected capability to continue providing
effective and productive research and exploration test bed capabilities.
(b)
Continuation of
the international space station
Congress reaffirms the policy
stated in section 501(a) of the National Aeronautics and Space Administration
Authorization Act of 2010 (42 U.S.C. 18351(a)) that it shall be the policy of
the United States, in consultation with its international partners in the ISS
program, to support full and complete utilization of the ISS through at least
2020.
(c)
NASA
actions
In furtherance of the policy under subsection (b), the
Administrator shall ensure, to the extent practicable, that the ISS, as a
designated national laboratory—
(1) remains viable as
an element of overall exploration and partnership strategies and approaches;
and
(2) remains an
effective, functional vehicle providing research and test bed capabilities for
the United States through 2020, up to 2028, and possibly beyond.
(d)
Report
The
Administrator, in consultation with the Office of Science and Technology
Policy, shall determine, through analyses and discussions with ISS partners,
the feasible and preferred service life of the ISS as a unique scientific,
commercial, and exploration-related facility. Not later than 120 days after the
date of enactment of this Act, and triennially thereafter, the Administrator
shall submit to the appropriate committees of Congress a report that, at a
minimum, includes—
(1) an assessment of
whether ISS operations can be extended to at least 2028, including—
(A) a description of
any activities that would be required of the international partnership to
ensure that safety requirements are met;
(B) a general
discussion of international partner capabilities and interest in extension, to
include the potential for participation by additional countries;
(C) a review of
essential systems or equipment upgrades that would be necessary for ISS
extension and utilization to at least 2028;
(D) an evaluation of
the cost and schedule requirements associated with the development and delivery
of essential systems or equipment upgrades identified under subparagraph (C);
and
(E) an identification
of possible partner contributions and program transitions to provide the
upgrades identified under subparagraph (C);
(2) an evaluation of
the potential for expanding the use of ISS facilities to accommodate the needs
of researchers and other users, including changes to policies, regulations, and
laws that would stimulate greater private and public involvement on the ISS;
and
(3) such other
information as may be necessary to fully describe the justification for and
feasibility of extending the service life of the ISS, including the potential
scientific or technological benefits to the Federal Government or public, or to
academic or commercial entities that, within the United States-owned modules of
the ISS or in partner-owned facilities of the ISS allocated for United States
utilization by international agreement, are or may become engaged in research
and testing activities sponsored, conducted, and managed by the Administration
or by the ISS management entity.
(e)
Definition of
ISS management entity
In this section, the term ISS
management entity means the organization with which the Administrator
enters into a cooperative agreement under section 504(a) of the National
Aeronautics and Space Administration Authorization Act of 2010 (42 U.S.C.
18354(a)).
222.
Research roles
and responsibilities
(a)
Sense of
Congress
It is the sense of
Congress that—
(1) expansion of the non-NASA utilization of
the ISS is critical to maximizing the research potential of the ISS national
laboratory and to facilitating expanded commercial activity in low-Earth orbit;
and
(2) in order to expand the non-NASA scientific
utilization of ISS research capabilities and facilities, it is essential to
clarify the roles and responsibilities of the entities managing research within
the U.S. Segment of the ISS.
(b)
Management of
the ISS national laboratory
Section 504 of the National
Aeronautics and Space Administration Authorization Act of 2010 (42 U.S.C.
18354) is amended—
(1) in subsection
(b), by adding at the end the following:
(3)
Conflicts of
interest
The Administrator shall ensure that the liaison function
under this subsection is implemented in a manner that precludes any conflict of
interest between the objectives and activities of the entities identified under
subsection
(e).
;
(2) in subsection
(d)(2)—
(A) by inserting
(A) In
general.— before If any NASA research
plan and adjusting the text accordingly;
(B) by inserting
and subject to subparagraph (B) after Until September 30,
2020 in subparagraph (A), as redesignated; and
(C) by adding at the
end the following:
(B)
Mutual
agreement
An exception under subparagraph (A) may only be granted
if there is mutual agreement between the entities identified under subsection
(e).
;
and
(3) by adding at the
end the following:
(e)
Clarification
of roles
The organization with which the Administrator enters
into a cooperative agreement under subsection (a) for management of the ISS
national laboratory shall be considered a separate and equal partner of any
NASA organizational entity responsible for management of the NASA research plan
onboard the
ISS.
.
(c)
Report
(1)
In
general
Not later than 180 days after the date of enactment of
this Act, the Administrator shall submit to the appropriate committees of
Congress a report on the following:
(A) Options for
expanding the Administration’s collaboration with its ISS partners,
including—
(i) providing U.S.
personnel expanded access to international partner research facilities;
and
(ii) coordinating
research efforts to minimize the duplication of effort, unless duplication is a
justified element of the scientific process or essential for backup or
redundant capability.
(B) The potential for
increasing ISS crew size to maximize utilization and applications.
(C) Efforts
undertaken by the Administration and the ISS management entity—
(i) to enhance
collaborative research between the Administration and other Federal science
agencies, such as the National Institutes of Health and the National Science
Foundation; and
(ii) to expand the
use of the ISS national laboratory capabilities by Federal science
agencies.
(2)
Definition of
ISS management entity
In this subsection, the term ISS
management entity means the organization with which the Administrator
enters into a cooperative agreement under section 504(a) of the National
Aeronautics and Space Administration Authorization Act of 2010 (42 U.S.C.
18354(a)).
223.
ISS national
laboratory; property rights in inventions
Section 20135 of title 51, United States
Code, is amended—
(1) in subsection
(g), by striking Each such waiver and inserting Except as
provided under subsection (l), each such waiver; and
(2) by adding at the
end the following:
(l)
Waiver of
rights to inventions; commercial microgravity research
(1)
In
general
With respect to any
invention or class of inventions made or which may be made by any person or
class of persons in the performance of any non-NASA scientific utilization of
the ISS national laboratory, the Administrator may waive the license reserved
by the Administrator under subsection (g), in whole or in part and according to
negotiated terms and conditions, including the terms and conditions under
paragraphs (1), (2), (3), and (5) of section 202(c) of title 35, if the
Administrator finds that the reservation of the license by the Administrator
would substantially inhibit the commercialization of an invention.
(2)
Construction
Nothing in this subsection shall be
construed to affect the rights of the Federal Government under any other
procurement contract, grant, understanding, arrangement, agreement, or
transaction.
.
224.
Commercial
cargo and crew capabilities
(a)
Findings
Congress finds that—
(1) NASA’s Commercial Orbital Transportation
Services, Cargo Resupply Services, and Commercial Crew Program demonstrate the
potential for procuring routine, commercially provided access to the ISS and to
low-Earth orbit using innovative and cost-effective development and procurement
strategies;
(2) Federal investments in the U.S. private
space industry have the ability to provide for lower cost access to space for
researchers and for commercial ventures;
(3) commercially provided space transportation
is critical to maximizing utilization of the ISS;
(4) encouraging competition among launch
service providers and maintaining multiple space transportation options helps
to reduce long-term costs to the Federal Government and to induce continual
improvement in available private-sector services; and
(5) consistent with section 201(b) of the
National Aeronautics and Space Administration Authorization Act of 2010 (42
U.S.C. 18311(b)), maintaining multiple launch service providers helps ensure
uninterrupted access to the space environment should a particular provider’s
services become unavailable.
(b)
Sense of
Congress
It is the sense of
Congress that the Administration—
(1) should continue to support the development
of safe, reliable, and cost effective commercial launch capabilities for the
primary purpose of securing domestic access to the ISS as quickly and safely as
possible; and
(2) should encourage a viable commercial market
for the capabilities under paragraph (1).
(c)
United States
policy
It is the policy of
the United States that, to foster the competitive development, operation, and
improvement of private space transportation services, services for Federal
Government access to and return from the ISS, whenever feasible, shall be
procured via fair and open competition for well-defined, milestone-based,
Federal Acquisition Regulation-based contracts under section 201(a) of the
National Aeronautics and Space Administration Authorization Act of 2010 (42
U.S.C. 18311(a)).
(d)
Selection of
commercial providers
In
evaluating commercial space transportation service providers, the
Administrator—
(1) shall aim to minimize the life-cycle costs
of obtaining transportation services;
(2) shall assure compliance with all safety and
mission assurance requirements;
(3) shall consider contractor financial
investment into the development of transportation capabilities; and
(4) for commercial crew transport
services—
(A) shall consider flexibility in design,
including sample return capabilities; and
(B) shall provide a written notification and
justification to the appropriate committees of Congress if the price per seat
exceeds the cost negotiated by NASA for crew transport in April 2013.
(5)
Strategy for
procuring commercial services
In implementing the policy under subsection
(c), the Administrator shall submit to the appropriate committees of Congress,
not later than 120 days after the date of enactment of this Act, a strategy for
transitioning from Space Act Agreements to Federal Acquisition Regulation-based
contracts for the procurement of crew transportation services to and from the
ISS. The strategy shall include—
(A) a comparison of potential procurement
strategies based on—
(i) maximizing safety and mission
assurance;
(ii) the total projected costs to the Federal
Government through 2020, given multiple projections of Government demand for
launch services;
(iii) the feasibility of the procurement strategy
and timeline, given projected funding availabilities;
(iv) the potential for supporting the research
and exploration test bed needs of the Federal Government and of the independent
entity responsible for ISS national laboratory activities for the purposes
described under section 504(d) of the National Aeronautics and Space
Administration Authorization Act of 2010 (42 U.S.C. 18354(d)); and
(v) the projected impacts on developing a
viable market for commercial launch services;
(B) an evaluation of the costs and benefits of
ensuring the availability of at least 2 U.S.-based launch service providers,
considering—
(i) the potential need for diversified cargo
and sample return capabilities, including a soft-landing capability as
described under section 404 of the National Aeronautics and Space
Administration Authorization Act of 2010 (124 Stat. 2822); and
(ii) the ability of multiple cargo or crew
launch service providers to meet private or non-NASA Government mission
requirements and the subsequent benefit to the United States of such
ability;
(C) justification for the procurement strategy
selected from among those considered; and
(D) for the selected procurement strategy,
identification of additional or modified authorities, regulations, or
guidelines that are necessary for successful implementation.
C
Other
matters
231.
Safety and
mission assurance in human space flight
(a)
Findings
Congress
makes the following findings:
(1) In the early part
of the space race, the United States took over 3 years from the launch of the
first American satellite, Explorer I, to the launch of the first American to
space, Alan B. Shepard, Jr.
(2) It was known
then, as it is now, that the exploration of space by humans is an inherently
dangerous endeavor.
(3) Access to space
requires complex propulsion systems, such as the now retired Space Shuttle,
which generated over 7,000,000 pounds of thrust.
(4) Adding humans to
the complex systems required to reach space requires additional safeguards,
life support systems, and other measures to protect from the harsh environment
of space in order to minimize risk to human life.
(b)
Sense of
Congress
It is the sense of Congress that—
(1) meticulousness
and attention to detail helps ensure that all humans are safe and protected to
the best of the abilities of all those involved in helping achieve the reaches
of space;
(2) those who strive
to send humans into space should make every effort to ensure the success of
missions and programs through independent safety and mission assurance
analyses;
(3) diligent
oversight efforts ensure adherence to safety, reliability, and quality
assurance policies and procedures for missions and programs; and
(4) lessons learned
from mishaps and near misses should be implemented into designs, decisions,
policy, and procedures to reduce the risk of future incidents that could
jeopardize crew safety or mission success.
232.
Launch
liability provisions
(a)
Liability
extension
Section 50915(f) of title 51, United States Code, is
amended by striking December 31, 2013 and inserting
December 31, 2016.
(b)
Protection for
launch activities
Subchapter
III of chapter 201 of title 51, United States Code is amended by inserting
after section 20147 the following:
20148.
Indemnification;
NASA launch services
(a)
In
general
Under such regulations in conformity with this section as
the Administrator shall prescribe taking into account the availability, cost,
and terms of liability insurance, any contract between the Administration and a
provider may provide that the United States will indemnify a provider against
claims (including reasonable expenses of litigation or settlement) by third
parties for death, bodily injury, or loss of or damage to property resulting
from activities that the contract defines as unusually hazardous or nuclear in
nature, but—
(1) only to the
extent that such claims are not compensated by liability insurance of the
provider; and
(2) only to the
extent that such claims arise out of the direct performance of the
contract.
(b)
Limitation
Indemnification
under subsection (a) may be limited to claims resulting from other than the
actual negligence or willful misconduct of the provider.
(c)
Terms of
indemnification
A contract made under subsection (a) that
provides indemnification shall also provide for—
(1) notice to the
United States of any claim or suit against the provider for death, bodily
injury, or loss of or damage to property; and
(2) control of or
assistance in the defense by the United States, at its election, of that suit
or claim.
(d)
Liability
insurance of the provider
Each provider that is a party to a
contract made under subsection (a) shall have and maintain liability insurance
in such amounts as the Administrator shall require to cover liability to third
parties and loss of or damage to property.
(e)
No
indemnification without cross-Waiver
Notwithstanding subsection
(a), the Administrator may not indemnify a provider under this section unless
there is a cross-waiver between the Administration and the provider as
described in subsection (f).
(f)
Cross-Waivers
The
Administrator, on behalf of the United States, and its departments, agencies,
and instrumentalities, may reciprocally waive claims with a provider under
which each party to the waiver agrees to be responsible, and agrees to ensure
that its own related entities are responsible, for damage or loss to its
property for which it is responsible, or for losses resulting from any injury
or death sustained by its own employees or agents, as a result of activities
connected to the contract.
(g)
Certification
of just and reasonable amount
No payment may be made under
subsection (a) unless the Administrator or the Administrator's designee
certifies that the amount is just and reasonable.
(h)
Payments
Upon
the approval by the Administrator, payments under subsection (a) may be made,
at the Administrator's election, either from—
(1) funds obligated
for the performance of the agreement concerned;
(2) funds available
for research and development not otherwise obligated; or
(3) funds
appropriated for such payments.
(i)
Relationship to
other laws
The Administrator may not provide indemnification
under this section for an activity that requires a license or permit under
chapter 509.
(j)
Construction
The
authority to indemnify under this section shall not create any rights in third
persons that would not otherwise exist by law.
(k)
Definitions
In
this section:
(1)
Launch
services
The term launch services has the meaning
given the term in section 50902.
(2)
Provider
The
term provider means a person that provides domestic launch
services in support of any space activity the Government carries out for the
Government.
.
(c)
Conforming
amendment
The table of
contents for subchapter III of chapter 201 of title 51, United States Code, is
amended by inserting after the item relating to section 20147 the
following:
20148. Indemnification; NASA
launch
services.
.
III
Science
A
Earth
Science
301.
Earth
science
(a)
Findings
Congress
finds that—
(1) continuous,
long-term Earth observation data supports the preparation for and management of
natural and human-induced disasters, benefits resource management and
agricultural forecasting, improves our understanding of climate, and encourages
environmental and economic sustainability;
(2) due to the scope
of activities required, Earth science research and Earth observation are
multi-agency endeavors requiring significant cooperation and information
sharing among government, international, and scientific community
partners;
(3) in developing
Earth observation technologies, conducting Earth science satellite missions,
and providing research products to the scientific community, NASA plays a
crucial role in advancing Earth science; and
(4) the loss of
observational capabilities in Earth science, as predicted by the National
Research Council’s midterm update to its Earth Science Decadal Survey, risks
reversing gains in weather forecast accuracy, reducing disaster response
capabilities, and creating an irreversible gap in Earth science data.
(b)
Sense of
Congress
It is the sense of Congress that—
(1) given the
importance of Earth science and Earth observation data, NASA Earth science
efforts—
(A) should be
conducted in coordination with other Federal agencies; and
(B) should be
cognizant of international efforts and the needs of the scientific and
businesses communities; and
(2) whenever
feasible, NASA and other Federal agencies should consider the potential for
reducing costs by purchasing commercially available Earth science data and
services.
(c)
Mission
prioritization
(1)
National
strategy for Earth observation
The Office of Science and
Technology Policy, in implementing its National Strategy for Earth Observation
and in developing a National Plan for Civil Earth Observations, shall
prioritize Federal Earth science and observation investments based on—
(A) its assessment of
Earth science and observation data requirements;
(B) the capability
requirements as identified by the National Academies decadal surveys;
(C) the projected
costs of Earth science missions and data gathering activities; and
(D) the projected and
available budgets.
(2)
National plan
for civil Earth observations
The Administration, in prioritizing
future Earth science and Earth observation missions and technology development
under the National Plan for Civil Earth Observations and chapter 201 of title
51, United States Code, shall consider potential cost-reduction opportunities,
including—
(A) if feasible,
co-locating Earth science sensors on other satellites; and
(B) purchasing
commercially available Earth science data and services, including launch access
to orbital and sub-orbital space.
B
Space
Science
321.
Human
exploration and science collaboration
The Administrator shall ensure that the
Science Mission Directorate and the Human Exploration and Operations Mission
Directorate coordinate in researching and reducing the risks that space
exploration beyond low-Earth orbit pose to astronaut health. Not later than 90
days after the date of enactment of this Act, the Administrator shall provide
to the appropriate committees of Congress a report detailing the results of
previous research in this area and identifying opportunities for future science
missions to contribute to the understanding of these risks.
322.
Maintaining a
balanced space science portfolio
(a)
In
general
Section 803 of the
National Aeronautics and Space Administration Authorization Act of 2010 (124
Stat. 2832) is amended to read as follows:
803.
Overall
science portfolio; sense of Congress
Congress reaffirms its sense that a
balanced and adequately funded set of activities, consisting of research and
analysis grants programs, technology development, small, medium, and large
space missions, and suborbital research activities, contributes to a robust and
productive science program and serves as a catalysis for innovation and
discovery. The Administrator should set science priorities by following the
guidance provided by the scientific community through the National Academies’
decadal
surveys.
.
(b)
Conforming
amendment
The item relating to section 803 in the table of
contents in section 1(b) of the National Aeronautics and Space Administration
Authorization Act of 2010 (124 Stat. 2806) is amended by striking
Overall science portfolio-sense of the Congress and inserting
Overall science portfolio; sense of Congress.
323.
Science
mission extensions
Section
30504 of title 51, United States Code is amended to read as follows:
30504.
Assessment
of science mission extensions
(a)
Assessment
The Administrator shall carry out biennial
reviews within each of the Science divisions to assess the cost and benefits of
extending the date of the termination of data collection for those missions
that have exceeded their planned mission lifetime. In conducting these
assessments, the Administrator shall consider—
(1) the potential continued benefit of
instruments on missions that are beyond their planned mission lifetime;
and
(2) the cost and schedule impacts, if any, of
mission extension on other NASA activities and science missions.
(b)
Consultation
requirement
When deciding
whether to extend science missions with an operational component, the
Administrator shall consult with the National Oceanic and Atmospheric
Administration and any other affected Federal
agency.
.
324.
Planetary
science
(a)
Findings
Congress
finds that—
(1) Administration
support for planetary science is critical to enabling greater understanding of
the solar system and its origin;
(2) the United States
leads the world in planetary science and can augment its success with
appropriate international partnerships;
(3) a mix of small-,
medium-, and large-planetary science missions is required to sustain a steady
cadence of planetary exploration; and
(4) robotic planetary
exploration is a key component of preparing for future human
exploration.
(b)
Mission
priorities
In accordance with the priorities established in the
most recent decadal survey for planetary science, the Administrator shall
ensure, to the greatest extent practicable, the completion of a balanced set of
Discovery, New Frontiers, and flagship missions. The Administrator may seek, if
necessary, adjustments to mission priorities, schedule, and scope in light of
changing budget projections.
(c)
Instrumentation
To
support its science mission priorities, the Administration shall invest in a
sustained program to develop or mature scientific instrument capabilities, as
delineated in the NASA Science Instruments, Observatories, and Sensor Systems
Roadmap.
325.
Space
weather
(a)
OSTP
roadmap
In coordination with NASA, the National Oceanic and
Atmospheric Administration, and other relevant Federal agencies, the Director
of the Office of Science and Technology Policy, not later than 24 months after
the date of enactment of this Act, shall deliver to the appropriate committees
of Congress a roadmap for developing and deploying space weather forecasting
technologies. The roadmap shall, at a minimum—
(1) aim to relieve
capability gaps identified by the National Space Weather Program Council review
of space weather observing systems, as requested by the National Aeronautics
and Space Administration Authorization Act of 2010 (42 U.S.C. 18301 et seq.);
and
(2) consider ongoing
and future requirements for space weather modeling, monitoring, and
prediction.
(b)
NASA technology
roadmaps
The Administration shall update and further develop its
technology roadmaps as required to address mitigating a wide range of space
weather effects on both satellites and spacecraft.
(c)
Alert
protocol
The Director of the Office of Science and Technology
Policy shall coordinate relevant Federal agencies to propose protocols for
communicating and responding to space weather forecasts. Protocol assessment
shall consider the needs of both government and private sector entities. The
Director of the Office of Science and Technology Policy shall deliver a report
on proposed protocols to Congress not later than 24 months after the date of
enactment of this Act.
326.
James Webb
space telescope
It is the
sense of Congress that—
(1) the James Webb Space Telescope will
significantly advance our understanding of star and planet formation, improve
our knowledge of the early universe, and support U.S. leadership in
astrophysics;
(2) significant
progress has been made with regard to overcoming the James Webb Space
Telescope’s technical challenges and in improving NASA management
oversight;
(3) the on-time and
on-budget completion of the James Webb Space Telescope should remain a top NASA
priority; and
(4) consistent with
annual Government Accountability Office reviews of the James Webb Space
Telescope program, the Administrator should continue to improve the James Webb
Space Telescope's cost and schedule estimates and oversight procedures in order
to enhance NASA’s ability to successfully deliver the James Webb Space
Telescope on time and on budget.
327.
University
class science missions
(a)
Sense of
Congress
It is the sense of Congress that principal
investigator-led small orbital science missions, including CubeSat, University
Explorer (UNEX), Small Explorer (SMEX), and Venture class missions, offer
valuable, lower-cost opportunities to advance science, train the next
generation of scientists and engineers, and provide opportunities for program
participants to acquire skills in systems engineering and systems integration
that are critical to maintaining the Nation’s leadership in space.
(b)
Review of
principal investigator led small orbital science missions
(1)
In
general
Not later than 120 days after the date of enactment of
this Act, the Administrator shall enter into an arrangement with the National
Academy of Sciences to conduct a review of the small orbital science missions
described under subsection (a).
(2)
Requirements
The
review under paragraph (1) shall include the following:
(A) The status,
capability, and availability of existing small orbital science mission programs
in which the missions are led by principal investigators and enable significant
participation by university scientists and students.
(B) The opportunities
that the small orbital science missions described under subsection (a) provide
for scientific research, training, and education, including scientific and
engineering workforce development.
(C) The use of
commercial applications, such as hosted payloads, free flyers, and data buys,
as vehicles to further the goals of small orbital science missions, while
preserving the principle of independent peer review as the basis for mission
selection.
(c)
Report
(1)
In
general
Not later than 15 months after the date of enactment of
this Act, the Administrator shall submit to the appropriate committees of
Congress a report on the review required by this section.
(2)
Contents
The
report shall include—
(A) a summary of the
review under subsection (b);
(B) the findings of
the Administrator with respect to that review; and
(C) recommendations
regarding principal investigator led small orbital science missions conducted
by the Administration.
IV
Aeronautics
401.
Sense of
Congress on NASA aeronautics
(a)
Findings
Congress
finds that—
(1) aviation is vital
to the United States economy, with the industry supporting nearly 1,000,000
jobs, conducting nearly 10,000,000 commercial flights per year within the
United States alone, and contributing to the aerospace industry’s positive
trade balance in 2012;
(2) in helping test
and mature new technologies for quiet and efficient air transportation, NASA’s
Aeronautics Research Mission Directorate addresses major aviation trends, such
as the rapid growth in passengers, increasing fuel costs, and the demand for
faster vehicles;
(3) the Directorate
works closely with industry and academia to address long-term challenges to the
air transportation system that require improving aviation safety, increasing
the capacity of the increasingly crowded national airspace system, and reducing
environmental impacts;
(4) through its
Aeronautics Test Program, the Directorate manages the flight operations and
test infrastructure at 4 NASA centers, providing both NASA and its industry
partners with access to critical facilities;
(5) NASA’s
contribution to aeronautics is evidenced in the use of its technologies in
almost every modern aircraft; and
(6) the Directorate
has identified otherwise unknown safety issues and helped optimize aircraft
routes, yielding millions of dollars in potential savings to airlines and
benefitting passengers.
(b)
Sense of
Congress
It is the sense of Congress that—
(1) the Aeronautics
Research Mission Directorate builds on the successful legacy of NASA’s
predecessor, the National Advisory Committee for Aeronautics, which worked
closely with industry partners to advance both military and civil aviation
until its dissolution in 1958;
(2) NASA aeronautics
research, development, and test activities, including investments into
composite structures, new fuels, and innovative aircraft concepts, must
continue in order to support U.S. leadership in aviation;
(3) the Directorate’s
efforts to collaborate with the aviation industry to gather and analyze data
and to prototype and test algorithms that optimize flight routes, manage air
traffic, and account for weather impacts are critical to supporting the safe
use of the national airspace; and
(4) continued
cooperation between NASA’s Aeronautics Research Mission Directorate and the
Federal Aviation Administration is vital to providing the data and tools
necessary to best regulate the national airspace and to ensure that new
technologies are effectively tested and acquire timely regulatory
approval.
V
Space
technology
501.
Space
technology
(a)
Sense of
Congress
It is the sense of the Congress that—
(1) previous
investments in space technologies have not only enabled space exploration and
research missions, but also have improved the quality of life on Earth;
(2) by improving
affordability, reliability, and operational capability, continued space
technology developments will enable NASA missions that otherwise would be
unachievable;
(3) investments in
space technology engage the talent of the Administration and of the Nation’s
academic and business enterprises; and
(4) space technology
roadmaps serve as a useful framework for NASA, academic, and industry
development efforts.
(b)
Space
technology directive
To advance NASA’s space exploration and
space research goals, the Administrator shall continue a program with
responsibility for NASA investments in space technologies and capabilities. To
the greatest extent possible, the Administrator shall synergize all NASA space
technology investments, encourage collaboration in space technology development
with academia and industry, and minimize duplication of space technology
development efforts across the Administration and the private sector unless
duplication is required to maintain mission safety, security, or backup
capability.
(c)
Space
technology roadmap report
In carrying out the policy under
subsection (b), the Administrator shall submit to the appropriate committees of
Congress, not later than 24 months after the date of enactment of this Act, a
progress report on the development, testing, and demonstration of the 14
technological areas of the Space Technology Roadmaps.
VI
Education
601.
Education and
outreach activities
(a)
Sense of
Congress
It is the sense of Congress that—
(1) the
Administration is uniquely recognized in the educational and global communities
for its aerospace knowledge, passionate workforce, and unique capabilities and
facilities;
(2) U.S.
competitiveness in aerospace requires engaging the science, technology,
engineering, and mathematics (STEM) talent in all States and
jurisdictions;
(3) the
Administration’s education and outreach programs, including the Experimental
Program to Stimulate Competitive Research (EPSCoR) and the Space Grant College
and Fellowship Program, reflect the Administration’s successful commitment to
growing and diversifying the national science and engineering workforce;
(4) the
Administration’s outreach efforts to underrepresented and underserved
communities, by helping minorities to pursue higher education in STEM fields
and to attain STEM careers, benefit the overall national workforce; and
(5) the
Administration’s efforts to improve the management and execution of its
education portfolio and to evaluate program success using evidence-based
approaches should continue.
(b)
In
general
The Administration shall—
(1) continue to
execute its educational and outreach programs, including providing a wide range
of academic research opportunities and engaging the public interest in science,
technology, engineering and mathematics;
(2) continue to
collaborate with minority institutions to increase student participation in
science, technology, engineering, and mathematics; and
(3) seek partnerships
with industry, academia, and with other communities to best respond to the
Nation’s aerospace-related educational and workforce needs.
(c)
Space
grant
To enhance the United States STEM education and workforce,
the Administrator shall continue to operate the National Space Grant College
and Fellowship program through a national network of regional consortia. The
program shall provide hands-on research, training, and education programs, use
measurable outcomes to gauge success, and allow States flexibility in its
execution.
VII
Other
matters
701.
Sense of
Congress on NASA's cross agency support
(a)
Findings
Congress
makes the following findings:
(1) Cross Agency
Support operates and maintains the Administration’s centers and facilities,
including headquarters, enabling the accomplishment of the Administration’s
missions while protecting human health and the environment.
(2) Cross Agency
Support provides for the unique facilities, skilled personnel, and
administrative support that NASA programs, research, and development activities
require at the centers.
(3) Cross Agency
Support provides the Administration with the capability to improve mission
success by supplying safety and mission assurance, engineering technical
authority, and health and medical oversight across all of NASA's programs,
research, and operations.
(4) The Orbital
Debris Program Office is located in Cross Agency Support and leads the
Administration’s effort in addressing the orbital debris issue, which is an
issue resulting from over 50 years of spaceflight.
(5) Cross Agency
Support delivers the information technology services used throughout the
Administration that allow its workforce to work and communicate efficiently and
effectively, not only internal to the Administration, but with the citizens of
the world which provides them the opportunity to be included and participate in
the Administration’s accomplishments.
(6) The
Administration’s public affairs, located in Cross Agency Support, provided
worldwide live coverage of the Curiosity Rover’s landing on Mars, the largest
rover ever sent to Mars, in August of 2012.
(7) The authority and
execution of the Administration’s offices responsible for finance, budget,
acquisition, external relations, legislative affairs, training, security, and
human capital management are performed under Cross Agency Support.
(b)
Sense of
Congress
It is the sense of Congress that—
(1) Cross Agency
Support represents a variety of functions vital to the strength and success of
the Administration and is essential to the Administration’s vision;
(2) the centers and
facilities in the Administration are a vital part of the many advances in
science and technology the Administration has provided and continues to provide
to this Nation and the world since the Administration was created in
1958;
(3) at the
Administration’s core is safety and mission success that, through Cross Agency
Support, is carried out by the highly talented and dedicated workforce at the
Administration’s centers and facilities;
(4) as the
Administration looks to continue international, interagency, and industry
cooperation and partnerships, Cross Agency Support will continue to provide the
overseeing and execution of these efforts; and
(5) Cross Agency
Support be given the necessary resources to keep the Administration capable of
meeting the goals set forth by Congress and continue to be a global leader in
space and aeronautics.
702.
Space
communications network
(a)
Plan
The
Administrator shall prepare an updated plan for NASA’s near-Earth, space, and
deep space communications network and infrastructure. The plan shall—
(1) identify steps to
sustain the existing network and infrastructure;
(2) assess the
capabilities, including any upgrades, needed to support NASA’s programs;
(3) identify
priorities for how resources should be used to implement the plan; and
(4) assess the impact
on missions if resources are not secured at the level needed.
(b)
Transmittal
Not
later than 270 days after the date of enactment of this Act, the Administrator
shall transmit the plan to the appropriate committees of Congress.
703.
Astronaut
occupational healthcare
(a)
In
general
Chapter 313 of title
51, United States Code, is amended by adding at the end the following:
31303.
Astronaut
occupational healthcare
(a)
In
general
Notwithstanding any
other provision of law, the Administrator, as the Administrator considers
necessary, may provide for the medical monitoring, diagnosis, and treatment of
a crewmember for conditions that the Administrator considers associated with
human space flight, including scientific and medical tests for psychological
and medical conditions.
(b)
Records
Consistent with applicable Federal privacy
laws, the Administration shall retain access to all medical records and other
health data from the provision of healthcare under subsection (a).
(c)
Definition of
crewmember
In this section,
the term crewmember means—
(1) a former NASA
astronaut/payload specialist who has flown on at least 1 space mission;
(2) a management NASA
astronaut who has flown at least 1 space mission and is currently employed by
the U.S. Government; or
(3) an active NASA
astronaut/payload specialist assigned, waiting assignment, or training for an
assignment to a NASA human space
flight.
.
(b)
Conforming
amendment
The table of
contents for chapter 313 of title 51, United States Code, is amended by adding
after the item relating to section 31302 the following:
31303. Astronaut occupational
healthcare.
.
704.
Helium capture
and recovery
(a)
In
general
Not later than 180 days after the date of enactment of
this Act, the Administrator shall submit to the appropriate committees of
Congress an agency-wide plan to recover and recycle helium, whenever possible,
that the Administration uses or will use in current, planned, and future
experimentation, tests, launches, and operations.
(b)
Considerations
In
developing the plan under subsection (a), the Administrator shall consider how
modifications, updates, or new lifecycle designs for engines, balloons,
airships, or other future programs can be designed or operated to recover and
recycle helium.
705.
Information
technology governance
(a)
Sense of
Congress
It is the sense of Congress that effective information
technology governance is critical to ensuring information security, decreased
costs, and overall mission assurance. The June 5, 2013, NASA Office of
Inspector General audit, NASA’s Information Technology
Governance, found that the NASA Chief Information Officer has limited
oversight and control over a majority of the Administration’s information
technology assets and cannot enforce security measures across the agency’s
computer networks. For nearly 2 decades, the Administration has operated under
a decentralized information technology governance structure that has resulted
in increased costs and inadequate security. At the same time, centralization of
information technology governance has resulted in increased security and lower
operating costs at other agencies.
(b)
Information
technology governance
The Administrator shall, in consultation
with Mission Directorate and NASA Center Chief Information Officers—
(1) ensure the Agency
Chief Information Officer has the appropriate resources and visibility to
oversee agency-wide information technology operations and investments;
(2) establish a
direct line of report between the Agency Chief Information Officer and the
Administrator;
(3) establish a
minimum monetary threshold for all agency information technology investments
over which the Agency Chief Information Officer shall have final approval;
and
(4) consider
appropriate revisions to the charters of information technology boards and
councils that inform information technology investment and operation
decisions.
706.
Improvements
to baselines and cost controls breach reporting process
Section 30104 of title 51, United States
Code is amended—
(1) in subsection (d)(3)—
(A) by striking the
notification; and
(B) by inserting the notification and a
timeline by which the Administrator intends to make the determination, report,
and analysis under subsection (e) before the period at the end;
(2) in subsection (e)(1), by striking
Not later than 30 days after receiving a written notification under
subsection (d)(2) and inserting In accordance with the timeline
under subsection (d)(3);
(3) in subsection (e)(1)(A), by striking
not later than 15 days after making the determination and
inserting in accordance with the timeline under subsection
(d)(3);
(4) in subsection (e)(2), by striking
not later than 6 months after the Administrator makes a determination
under this subsection and inserting in accordance with the
timeline under subsection (d)(3); and
(5) in subsection (f), by inserting or
an annual budget request that reflects this growth after a
report under subsection (e)(1)(A).
707.
Infrastructure
(a)
Sense of
Congress
It is the sense of Congress that—
(1) the
Administration has a role in providing access to unique or specialized
laboratory capabilities that are not economically viable for purchase by
commercial entities and therefore are not available outside of NASA;
(2) the deteriorating
condition of the Administration's facilities and other infrastructure is
hampering the research effectiveness and efficiency performed at those
facilities by both the Administration and industry participants;
(3) the
Administration must improve the condition of its facilities and infrastructure
to maintain the competitiveness of the U.S. aerospace industry;
(4) to ensure
continued researcher access to reliable and efficient world-class facilities,
the Administration should seek to establish strategic partnerships with other
Federal agencies, academic institutions, and industry, as appropriate;
and
(5) decisions
regarding whether to dispose of, maintain, or modernize existing facilities and
other infrastructure must be made in the context of meeting the future
laboratory needs of the Administration and other Federal agencies.
(b)
Plan
Not
later than 1 year after the date of enactment of this Act, the Administrator
shall submit to the appropriate committees of Congress a plan for retaining or
acquiring the facilities, laboratories, equipment, test capabilities, and other
infrastructure necessary to meet the Administration's mandates and its current
and future missions. The plan shall—
(1) identify the
Administration's future infrastructure needs, including facilities,
laboratories, equipment, and test capabilities;
(2) include a
strategy for identifying and removing unnecessary or duplicative infrastructure
consistent with the national strategic direction under the National Space
Policy, the National Aeronautics Research, Development, Test and Evaluation
Infrastructure Plan, the National Aeronautics and Space Administration
Authorization Act of 2010, title 51 of the United States Code, and other
Administration-related law;
(3) include a
strategy for the maintenance, repair, upgrading, and modernization of the
Administration’s facilities, laboratories, equipment, and other
infrastructure;
(4) recommend
criteria for prioritizing deferred maintenance tasks and for upgrading or
modernizing facilities, laboratories, equipment, and other
infrastructure;
(5) include an
assessment of modifications needed to maximize the use of facilities,
laboratories, equipment, and other infrastructure that offer unique and highly
specialized benefits to the aerospace industry and the public; and
(6) include
recommendations for implementation, including a timeline, milestones, and an
estimate of the resources required for carrying out the plan.
(c)
Establishment
of capital funds
The Administrator shall establish a capital fund
at each of NASA’s field centers for the modernization of facilities,
laboratories, equipment, and other infrastructure in accordance with the plan
under subsection (b). The Administrator shall ensure, to the greatest extent
practicable, that any financial savings achieved by closing an outdated or
surplus facility at a NASA field center is made available to that field
center’s capital fund for the purpose of modernizing that field center’s
facilities, laboratories, equipment, and other infrastructure in accordance
with the plan under subsection (b).
708.
Knowledge
management
(a)
Sense of
Congress
It is the sense of
the Congress that—
(1) the Administration's success relies heavily
on the accumulated technical knowledge of its skilled civil servant and
contractor workforce;
(2) in light of an aging workforce, it is
imperative that the Administration preserve, to the maximum extent possible,
both critical technical skills and all knowledge valuable to future mission
planning and operation; and
(3) exercising best practice knowledge
management systems within the Administration will benefit the future NASA
workforce and help ensure future mission successes.
(b)
Knowledge
management system
The
Administrator shall establish an Administration-wide knowledge management
system and implement industry-standard best practices for capturing, archiving,
and retrieving heritage and future information. The information under this
subsection shall be accessible to all Administration employees unless otherwise
prohibited because of the classified or sensitive nature of the
information.
(c)
Report
Not
later than 12 months after the date of enactment of this Act, the Administrator
shall submit to the appropriate committees of Congress a report that, at a
minimum, includes—
(1) a description of
any actions necessary to create or modify an Administration-wide knowledge
management system;
(2) a plan for
implementing the knowledge management system, including employee training and
the provision of secure access to information, as required for all personnel
working on Administration programs, projects, and research;
(3) a summary of
implementation costs for the knowledge management system; and
(4) a timeline and
progress report for implementation.
(d)
Workforce
stabilization and critical skills preservation
Section 1105 of
the National Aeronautics and Space Administration Authorization Act of 2010 (42
U.S.C. 18431) is amended by striking 2013 and inserting
2016.