IN THE HOUSE OF REPRESENTATIVES
July 30, 2014
Mr. Welch (for himself and Mr. Ben Ray Luján of New Mexico) introduced the following bill; which was referred to the Committee on Energy and Commerce
A BILL
To amend title VI of the Public Utility Regulatory Policies Act of 1978 to establish a Federal
renewable electricity standard for retail electricity suppliers and a
Federal energy efficiency resource standard for electricity and natural
gas suppliers, and for other purposes.
1.
Short title
This Act may be cited as the American Renewable Energy and Efficiency Act.
2.
Federal renewable electricity standard
Title VI of the Public Utility Regulatory Policies Act of 1978 (16 U.S.C. 2601 et seq.) is amended
by adding after section 609 (7 U.S.C. 918c) the following:
610.
Federal renewable electricity standard
(a)
Findings
Congress finds that—
(1) 118 countries have national goals for renewable electricity production and 30 States and the
District of Columbia have enacted mandatory renewable electricity
standards;
(2) the Federal renewable electricity standard established by this section establishes a market-based
policy to create ongoing competition among renewable electricity
generators across the United States and provide the greatest quantity of
clean electricity for the lowest price; and
(3) the United States has vast wind, solar, hydropower, biomass, and geothermal resources that—
(A) are renewable;
(B) are dispersed widely across different regions of the United States; and
(C) can be harnessed to generate a significant share of electricity in the United States.
(b)
Definitions
In this section:
(1)
Brownfield site generation facility
The term brownfield site generation facility means a facility that—
(A) generates renewable electricity; and
(B) occupies a brownfield site (as that term is defined in section 101 of the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (42 U.S.C. 9601)).
(2)
Distributed renewable generation facility
The term distributed renewable generation facility means a facility that—
(A) generates renewable electricity;
(B) primarily serves one or more electric consumers at or near the facility site; and
(C) has not more than 2 megawatts in capacity.
(3)
Federal renewable electricity credit
The term Federal renewable electricity credit means a credit, representing 1 megawatt hour of renewable electricity, issued pursuant to
subsection (f).
(4)
Indian land
The term Indian land means—
(A) any land within the limits of any Indian reservation, pueblo, or rancheria;
(B) any land not within the limits of any Indian reservation, pueblo, or rancheria, title to which was
on the date of enactment of this section held by—
(i) the United States for the benefit of any Indian tribe or individual; or
(ii) any Indian tribe or individual subject to restriction by the United States against alienation;
(C) any dependent Indian community; or
(D) any land conveyed under the Alaska Native Claims Settlement Act (43 U.S.C. 1601 et seq.) to any
Native Corporation (as that term is defined in section 3 of that Act (43
U.S.C. 1602)).
(5)
Indian tribe
The term Indian tribe means any Indian tribe, band, nation, or other organized group or community (including any Native
village, Regional Corporation, or Village Corporation (as those terms are
defined in section 3 of the Alaska Native Claims Settlement Act (43 U.S.C.
1602))) that is recognized as eligible for the special programs and
services provided by the United States to Indians because of their status
as Indians.
(6)
Qualified hydropower
The term qualified hydropower means—
(A) energy produced from increased efficiency achieved, or additions of capacity made, on or after
January 1, 2001, at a hydroelectric facility that—
(i) was placed in service before that date; and
(ii) does not include additional energy generated as a result of operational changes not directly
associated with efficiency improvements or capacity additions; or
(B) energy produced from generating capacity added to a dam on or after January 1, 2001, if the
Commission certifies that—
(i) the dam—
(I) was placed in service before the date of enactment of this section;
(II) was operated for flood control, navigation, or water supply purposes; and
(III) was not producing hydroelectric power prior to the addition of the capacity; and
(ii) the hydroelectric project installed on the dam—
(I) is licensed or is exempt from licensing by the Commission;
(II) is in compliance with—
(aa) the terms and conditions of the license or exemption; and
(bb) other applicable legal requirements for the protection of environmental quality, including
applicable fish passage requirements; and
(III) is operated so that the water surface elevation at any given location and time that would have
occurred in the absence of the hydroelectric project is maintained,
subject to any license or exemption requirements that require changes in
water surface elevation for the purpose of improving the environmental
quality of the affected waterway.
(7)
Qualified renewable biomass
The term qualified renewable biomass means renewable biomass that, when combusted, yields, on a weighted-average basis, a 50-percent
reduction in lifecycle greenhouse gas emissions (as defined in section
4(a) of the American Renewable Energy and Efficiency Act) per unit of useful energy, as compared to the operation of a combined cycle natural gas electric
generating facility using the most efficient commercially available
technology, when calculated over a 20-year life cycle.
(8)
Renewable biomass
The term renewable biomass means—
(A) crops, crop byproducts, or crop residues harvested from actively managed or fallow agricultural
land that is—
(i) nonforested; and
(ii) cleared prior to the date of enactment of this section;
(B) planted trees, brush, slash, and all residues from an actively managed tree farm located on
non-Federal land cleared prior to the date of enactment of this section;
(C) precommercial-sized thinnings, slash, brush, and residue from milled trees, from forested land that
is not—
(i) old-growth or mature forest;
(ii) identified under a State natural heritage program as rare, imperiled, or critically imperiled; or
(iii) Federal land;
(D) algae;
(E) nonhazardous plant matter derived from waste—
(i) including separated yard waste, landscape right-of-way trimmings, or food waste; but
(ii) not including municipal solid waste, recyclable waste paper, painted, treated or pressurized wood,
or wood contaminated with plastic or metals;
(F) animal waste or animal byproducts, including products of animal waste digesters;
(G) vegetative matter removed from within 200 yards of any manmade structure or campground; and
(H) slash and precommercial-sized thinnings harvested—
(i) in environmentally sustainable quantities, as determined by the appropriate Federal land manager;
and
(ii) from National Forest System land or public lands (as defined in section 103 of the Federal Land
Policy and Management Act of 1976 (43 U.S.C. 1702)), other than—
(I) components of the National Wilderness Preservation System established under the Wilderness Act (16
U.S.C. 1131 et seq.);
(II) Wilderness Study Areas, as identified by the Bureau of Land Management;
(III) inventoried roadless areas and all unroaded areas of at least 5,000 acres;
(IV) old growth and late seral stands;
(V) components of the National Landscape Conservation System administered by the Bureau of Land
Management; and
(VI) national monuments.
(9)
Renewable electricity
The term renewable electricity means electricity generated (including by means of a fuel cell) from a renewable energy resource.
(10)
Renewable energy resource
The term renewable energy resource means each of the following:
(A) Wind energy.
(B) Solar energy.
(C) Geothermal energy.
(D) Qualified renewable biomass.
(E) Biogas derived from qualified renewable biomass.
(F) Biofuels derived from qualified renewable biomass.
(G) Qualified hydropower.
(H) Marine and hydrokinetic renewable energy (as defined in section 632 of the Energy Independence and
Security Act of 2007 (42 U.S.C. 17211)).
(I) Landfill gas.
(11)
Retail electric supplier
(A)
In general
The term retail electric supplier means, for any calendar year, an electric utility that sells not fewer than 1,000,000 megawatt
hours of electric energy to electric consumers for purposes other than
resale during the preceding calendar year.
(B)
Inclusions and limitations
For purposes of determining whether an electric utility qualifies as a retail electric supplier
under subparagraph (A)—
(i) the sales made by any affiliate of the electric utility to electric consumers, other than sales to
lessees or tenants of the affiliate, for purposes other than resale shall
be considered to be sales made by the electric utility; and
(ii) sales made by the electric utility to an affiliate, lessee, or tenant of the electric utility shall
not be treated as sales to electric consumers.
(C)
Affiliate
In this paragraph, the term affiliate when used in relation to a person, means another person that directly or indirectly owns or
controls, is owned or controlled by, or is under common ownership or
control with, that person, as determined under regulations promulgated by
the Commission.
(12)
Retail electric supplier's base quantity
The term retail electric supplier's base quantity means the total quantity of electric energy sold by the retail electric supplier, expressed in
megawatt hours, to electric customers for purposes other than resale
during the relevant calendar year, excluding—
(A) electricity generated by a hydroelectric facility, other than qualified hydropower; and
(B) electricity generated by the combustion of municipal solid waste.
(13)
Retire and retirement
The terms retire and retirement with respect to a Federal renewable electricity credit, means to disqualify the credit for any
subsequent use under this section, regardless of whether the use is a
sale, transfer, exchange, or submission in satisfaction of a compliance
obligation.
(c)
Annual compliance obligation
Except as otherwise provided in subsection (g), for each of calendar years 2015 through 2040, not
later than March 31 of the following calendar year, each retail electric
supplier shall submit to the Commission a quantity of Federal renewable
electricity credits that is equal to at least the annual target of the
retail electric supplier under subsection (e).
(d)
Establishment of program
(1)
In general
Not later than 1 year after the date of enactment of this section, the Commission shall promulgate
regulations to implement and enforce the requirements of this section.
(2)
Considerations
In promulgating regulations under paragraph (1), the Commission shall, to the maximum extent
practicable—
(A) preserve the integrity and incorporate best practices of existing State and tribal renewable
electricity programs;
(B) rely on existing and emerging State, tribal, or regional tracking systems that issue and track
non-Federal renewable electricity credits; and
(C) cooperate with States and Indian tribes—
(i) to facilitate coordination between State, tribal, and Federal renewable electricity programs; and
(ii) to minimize administrative burdens and costs to retail electric suppliers.
(e)
Annual compliance requirement
(1)
Annual targets
For each of calendar years 2015 through 2040, the annual target of a retail electric supplier shall
be equal to the product obtained by multiplying—
(A) the required annual percentage for that calendar year under paragraph (2); and
(B) the retail electric supplier's base quantity for that calendar year.
(2)
Required annual percentage
(A)
Calendar years 2015 through 2040
Subject to subparagraph (B), for each of calendar years 2015 through 2040, the required annual
percentage shall be as follows:
Required annual
Year:percentage:
20156
20167
20179
201811
201913
202015
202117
202219
202321
202423
2025–204025.
(B)
Increase authorized for calendar years 2026 through 2040
The Commission may issue orders increasing the required annual percentage amounts for each of
calendar years 2026 through 2040 to reflect the maximum achievable level
of renewable electricity generation potential, taking into account
regional resource availability, economic feasibility, and technological
capability.
(f)
Federal renewable electricity credits
(1)
In general
(A)
Issuance; tracking; verification
The regulations promulgated under this section shall include provisions governing the issuance,
tracking, and verification of Federal renewable electricity credits.
(B)
Credit ratio
Except as provided in paragraphs (2) through (4), the Commission shall issue to each generator of
renewable electricity, 1 Federal renewable electricity credit for each
megawatt hour of renewable electricity generated by the generator after
December 31, 2014.
(C)
Serial number
The Commission shall assign a unique serial number to each Federal renewable electricity credit.
(2)
Generation from certain State renewable electricity programs
(A)
In general
If renewable electricity is generated with the support of payments from a retail electric supplier
pursuant to a State renewable electricity program (whether through State
alternative compliance payments or through payments to a State renewable
electricity procurement fund or entity), the Commission shall issue
Federal renewable electricity credits to the retail electric supplier for
the portion of the relevant renewable electricity generation that is
attributable to payments made by the retail electric supplier, as
determined pursuant to regulations promulgated by the Commission.
(B)
Remaining portion
For any remaining portion of the relevant renewable electricity generation, the Commission shall
issue Federal renewable electricity credits to the generator, as provided
in paragraph (1), except that not more than 1 Federal renewable
electricity credit shall be issued for the same megawatt hour of
electricity.
(C)
State guidance
In determining how Federal renewable electricity credits will be apportioned among retail electric
suppliers and generators under this paragraph, the Commission shall
consider information and guidance issued by the applicable one or more
States.
(3)
Certain power sales contracts
Except as otherwise provided in paragraph (2), if a generator has sold renewable electricity to a
retail electric supplier under a contract for power from a facility placed
in service before the date of enactment of this section, and the contract
does not provide for the determination of ownership of the Federal
renewable electricity credits associated with the generation, the
Commission shall issue the Federal renewable electricity credits to the
retail electric supplier for the duration of the contract.
(4)
Credit multipliers
(A)
In general
Except as provided in subparagraph (B), the Commission shall issue—
(i) not more than 3 Federal renewable electricity credits for each megawatt hour of renewable
electricity generated by a distributed renewable generation facility;
(ii) not more than 2 Federal renewable electricity credits for each megawatt hour of renewable
electricity generated on Indian land; and
(iii) not more than 2 Federal renewable electricity credits for each megawatt hour of renewable
electricity generated by a brownfield site generation facility.
(B)
Adjustment
Except as provided in subparagraph (C), not later than January 1, 2017, and not less frequently
than every 4 years thereafter, the Commission shall review the effect of
this paragraph on the aggregate quantity of renewable electricity produced
under the standard and shall, as necessary and after providing 1 year of
notice, reduce the number of Federal renewable electricity credits per
megawatt hour issued under this paragraph for any given energy source or
facility, but not below one, to ensure that the number is no higher than
the Commission determines is necessary—
(i) to incentivize incremental renewable energy generation on Indian land and brownfield sites; and
(ii) to make distributed renewable generation facilities cost competitive with other sources of
renewable electricity generation.
(C)
Facilities placed in service after enactment
(i)
In general
For any renewable generation facility placed in service after the date of enactment of this
section, subparagraph (B) shall not apply for the first 10 years after the
date on which the facility is placed in service.
(ii)
Initial period
For each year during the 10-year period described in clause (i), the Commission shall issue to the
facility the same number of Federal renewable electricity credits per
megawatt hour as are issued to that facility in the year in which the
facility is placed in service.
(iii)
Subsequent period
After the 10-year period described in clause (i), the Commission shall issue Federal renewable
electricity credits to the facility in accordance with subparagraph (B).
(5)
Credits based on qualified hydropower
For purposes of this subsection, the number of Federal renewable electricity credits issued for
qualified hydropower shall be calculated—
(A) based solely on the increase in average annual generation directly resulting from the efficiency
improvements or capacity additions described in subsection (a)(6)(A); and
(B) using the same water flow information used to determine a historic average annual generation
baseline for the hydroelectric facility, as certified by the Commission.
(6)
Generation from mixed renewable and nonrenewable resources
If electricity is generated using both a renewable energy resource and an energy source that is not
a renewable energy resource (such as cofiring of renewable biomass and
fossil fuel), the Commission shall issue Federal renewable electricity
credits based on the proportion of the electricity that is attributable to
the renewable energy resource.
(7)
Prohibition against double-counting
The Commission shall ensure that—
(A) no Federal renewable electricity credit is used more than once for compliance with this section;
and
(B) except as provided in paragraph (4), not more than 1 Federal renewable electricity credit is issued
for any megawatt hour of renewable electricity.
(8)
Trading
The lawful holder of a Federal renewable electricity credit may—
(A) sell, exchange, or transfer the credit;
(B) submit the credit for compliance under subsection (c); or
(C) submit the credit for retirement by the Commission.
(9)
Banking
(A)
In general
A Federal renewable electricity credit may be submitted in satisfaction of the compliance
obligation under subsection (c) for the compliance year in which the
credit was issued or for any of the 3 immediately subsequent compliance
years.
(B)
Retirement
The Commission shall retire any Federal renewable electricity credit that has not been retired by
April 2 of the calendar year that is 3 years after the calendar year
during which the credit was issued.
(10)
Retirement
The Commission shall retire a Federal renewable electricity credit immediately upon submission by
the lawful holder of the credit, whether in satisfaction of a compliance
obligation under subsection (c) or for another reason.
(g)
Alternative compliance payments
(1)
In general
A retail electric supplier may satisfy the requirements of subsection (c) in whole or in part by
submitting in accordance with this subsection, in lieu of each Federal
renewable electricity credit that would otherwise be due, a payment equal
to $50, adjusted for inflation on January 1 of each year following
calendar year 2015, in accordance with regulations promulgated by the
Commission.
(2)
Payment to State funds
(A)
In general
Except as otherwise provided in this paragraph, payments made under this subsection shall be made
directly to one or more States in which the retail electric supplier sells
electric energy, in proportion to the portion of the retail electric
supplier's base quantity that is sold within each applicable State, if—
(i) the payments are deposited directly into a fund of the State treasury established for that purpose;
and
(ii) the State uses the funds in accordance with paragraphs (3) and (4).
(B)
Noncompliance
If the Commission determines that a State is in substantial noncompliance with paragraph (3) or
(4), the Commission shall direct that any future alternative compliance
payments that would otherwise be paid to the State under this subsection
shall instead be paid to the Commission and deposited in the Treasury.
(3)
State use of funds
As a condition of receipt of alternative compliance payments under this subsection, a State shall
use the payments exclusively for—
(A) deploying technologies that generate electricity from renewable energy resources; or
(B) implementing cost-effective energy efficiency programs to achieve energy savings.
(4)
Reporting
(A)
In general
As a condition of receipt of alternative compliance payments pursuant to this subsection, a State
shall submit to the Commission an annual report, in accordance with
regulations promulgated by the Commission, containing a full accounting of
the use of the payments, including a detailed description of the
activities funded by the payments and demonstrating compliance with the
requirements of this subsection.
(B)
Deadline
A State shall submit a report under this paragraph—
(i) not later than 1 year after the date on which the first alternative compliance payment is received;
and
(ii) every 1 year thereafter until all alternative compliance payments are expended.
(h)
Information collection
(1)
In general
The Commission may require any retail electric supplier, renewable electricity generator, or any
other entity that the Commission determines appropriate, to provide any
information the Commission determines appropriate to carry out this
section.
(2)
Failure to submit; false or misleading information
Any entity required to submit information under paragraph (1) that fails to submit the information
or submits false or misleading information shall be in violation of this
section.
(i)
Enforcement and judicial review
(1)
Failure to submit credits
If any person fails to comply with the requirements of subsection (c) or (g), the person shall be
liable to pay to the Commission a civil penalty equal to the product
obtained by multiplying—
(A) double the alternative compliance payment calculated under subsection (g)(1); and
(B) the aggregate quantity of Federal renewable electricity credits or equivalent alternative
compliance payments that the person failed to submit in violation of the
requirements of subsections (c) and (g).
(2)
Enforcement
The Commission shall assess a civil penalty under paragraph (1) in accordance with the procedures
described in section 31(d) of the Federal Power Act (16 U.S.C. 823b(d)).
(3)
Violation of requirement of regulations or orders
(A)
In general
Any person who violates or fails or refuses to comply with any requirement of a regulation
promulgated or order issued under this section shall be subject to a civil
penalty under section 316A(b) of the Federal Power Act (16 U.S.C.
825o–1(b)).
(B)
Assessment
The penalty under subparagraph (A) shall be assessed by the Commission in the same manner as in the
case of a violation referred to in section 316A(b) of that Act.
(4)
Judicial review
(A)
In general
Any person aggrieved by a final action taken by the Commission under this section, other than the
assessment of a civil penalty under paragraphs (1) through (3), may use
the procedures for review described in section 313 of the Federal Power
Act (16 U.S.C. 825l).
(B)
Reference
For purposes of this paragraph, references to an order in section 313 of that Act shall be
considered to refer also to all other final actions of the Commission
under this section other than the assessment of a civil penalty under
paragraphs (1) through (3).
(j)
Administration
Nothing in this section—
(1) diminishes or qualifies any authority of a State, a political subdivision of a State, or an Indian
tribe—
(A) to adopt or enforce any law or regulation respecting renewable electricity, including any law or
regulation establishing requirements that are more stringent than those
established by this section, provided that no such law or regulation may
relieve any person of any requirement otherwise applicable under this
section; or
(B) to regulate the acquisition and disposition of Federal renewable electricity credits by retail
electric suppliers within the jurisdiction of the State, political
subdivision, or Indian tribe, including the authority to require the
retail electric supplier to acquire and submit to the Commission for
retirement Federal renewable electricity credits in excess of those
submitted under this section; or
(2) affects the application of or the responsibility for compliance with any other provision of law or
regulation, including environmental and licensing requirements.
(k)
Sunset
The authority provided by this section expires on December 31, 2041.
.
3.
Clarifying state authority to adopt renewable energy incentives
Section 210 of the Public Utility Regulatory Policies Act of 1978 (16 U.S.C. 824a–3) is amended by
adding at the end the following:
(o)
Clarification of State authority To adopt renewable energy incentives
(1)
Definition of State-approved production incentive program
In this subsection, the term State-approved production incentive program means a requirement imposed pursuant to State law or by a State regulatory authority acting within
its authority under State law that an electric utility purchase renewable
energy (as defined in section 609(a)) at a specified rate.
(2)
State authority to adopt renewable energy incentives
Notwithstanding any other provision of this Act or the Federal Power Act (16 U.S.C. 791a et seq.),
a State legislature or regulatory authority may set the rates for a sale
of electric energy by a facility generating electric energy from renewable
energy sources pursuant to a State-approved production incentive program
under which the facility voluntarily participates in the State-approved
production incentive program.
.
4.
Guidelines for determining qualified renewable biomass
(a)
Definitions
In this section:
(1)
Administrator
The term Administrator means the Administrator of the Environmental Protection Agency.
(2)
Lifecycle greenhouse gas emissions
(A)
In general
The term lifecycle greenhouse gas emissions means the aggregate quantity of greenhouse gas emissions, adjusted to account for the relative
global warming potential of the emissions relative to all greenhouse gas
emissions.
(B)
Inclusions
For purposes of subparagraph (A), the term greenhouse gas emissions includes—
(i) direct emissions; and
(ii) significant indirect emissions, including from—
(I) land use changes and temporal changes in forest carbon sequestration;
(II) biomass harvests, regrowth, and avoided decomposition related to the full fuel lifecycle, including
all stages of fuel and feedstock production and distribution; and
(III) feedstock generation or extraction through the distribution and delivery of the finished fuel to
the ultimate consumer.
(b)
Guidelines
Not later than 1 year after the date of enactment of this Act, the Administrator shall, recognizing
the recommendations of and coordinating with the Scientific Advisory Board
of the Environmental Protection Agency regarding the accounting of
biogenic carbon dioxide emissions and after notice and public comment,
issue guidelines for calculating lifecycle greenhouse gas emissions for
renewable biomass (as that term is defined in section 610(b) of the Public
Utility Regulatory Policies Act of 1978).
5.
Energy efficiency resource standard for retail electricity and natural gas suppliers
(a)
In general
Title VI of the Public Utility Regulatory Policies Act of 1978 (16 U.S.C. 2601 et seq.) (as amended
by section 2) is amended by adding after section 610 the following:
611.
Federal energy efficiency resource standard for retail electricity and natural gas suppliers
(a)
Findings
Congress finds that—
(1) the Federal energy efficiency resource standard established by this section—
(A) establishes nationwide minimum levels of electricity and natural gas savings to be achieved through
utility efficiency programs, building energy codes, appliance standards,
and related efficiency measures; and
(B) rewards energy-saving improvements achieved through—
(i) end-use energy efficiency upgrades;
(ii) reduced losses in transmission and distribution of energy; and
(iii) fuel-switching, to the extent that the switching results in reduced primary energy use; and
(2) in light of the cost-effective energy efficiency opportunities that exist across the United States
in every sector of the economy, retail electricity suppliers, retail
natural gas suppliers, and States should—
(A) consider energy efficiency as a resource in utility planning and procurement activities; and
(B) seek to achieve all energy efficiency that is available at lower cost than other energy supply
options.
(b)
Definitions
In this section:
(1)
Affiliate
The term affiliate when used in relation to a person, means another person that owns or controls, is owned or
controlled by, or is under common ownership control with, that person, as
determined under regulations promulgated by the Secretary.
(2)
ASHRAE, ansi, and iesna
The terms ASHRAE, ANSI, and IESNA mean the American Society of Heating, Refrigerating and Air Conditioning Engineers, the American
National Standards Institute, and the Illuminating Engineering Society of
North America, respectively.
(3)
Base quantity
(A)
In general
The term base quantity, with respect to a retail electricity supplier or retail natural gas supplier, means, for each
calendar year for which a performance standard is established under
subsection (d), the average annual quantity of electricity or natural gas
delivered by the retail electricity supplier or retail natural gas
supplier to retail customers during the 3 calendar years immediately
preceding the year that compliance is required under subsection (d)(1).
(B)
Exclusion
The term base quantity, with respect to a retail natural gas supplier, does not include natural gas delivered for
purposes of electricity generation.
(4)
CHP savings
The term CHP savings means—
(A) CHP system savings from a combined heat and power system that commences operation after the date of
enactment of this section; and
(B) the increase in CHP system savings from upgrading or replacing, after the date of enactment of this
section, a combined heat and power system that commenced operation on or
before the date of enactment of this section.
(5)
CHP system savings
The term CHP system savings means the electric output, and the electricity saved due to the mechanical output, of a combined
heat and power system, adjusted to reflect any increase in fuel
consumption by that system as compared to the fuel that would have been
required to produce an equivalent useful thermal energy output in a
separate thermal-only system, as determined in accordance with regulations
promulgated by the Secretary.
(6)
Codes and standards savings
(A)
In general
The term codes and standards savings means a reduction in end-use electricity or natural gas consumption by a retail electricity
supplier or in the service territory of a retail natural gas supplier as a
result of the adoption and implementation, after the date of enactment of
this section, of new or revised appliance and equipment efficiency
standards or building energy codes.
(B)
Baselines
In calculating codes and standards savings under subparagraph (A)—
(i) the baseline for calculating savings from building codes shall be the more stringent of—
(I)
(aa) the 2009 International Energy Conservation Code for residential buildings; or
(bb) the ASHRAE/ANSI/IESNA Standard 90.1–2007 for commercial buildings; or
(II) the applicable State building code in effect on the date of enactment of this section; and
(ii) the baseline for calculating savings from appliance standards shall be the average efficiency of
new appliances in the applicable one or more categories prior to the
adoption and implementation of the new standard.
(7)
Combined heat and power system
The term combined heat and power system means a system that uses the same energy source both for the generation of electrical or
mechanical power and the production of steam or another form of useful
thermal energy, if—
(A) the system meets any requirements relating to efficiency and other operating characteristics that
the Secretary promulgates by regulation; and
(B) the net wholesale sales of electricity by a facility does not exceed 50 percent of total annual
electric generation by the facility.
(8)
Cost-effective
The term cost-effective, with respect to an energy efficiency measure, means that the measure achieves a net present value
of economic benefits over the life of the measure, both directly to the
energy consumer and to the economy, that is greater than the net present
value of the cost of the measure over the life of the measure, both
directly to the energy consumer and to the economy, using the societal
benefit-cost test calculated using the weighted average utility cost of
capital as the discount rate.
(9)
Customer facility savings
The term customer facility savings means a reduction in end-use electricity or natural gas consumption (including waste heat energy
savings) at a facility of an end-use consumer of electricity or natural
gas served by a retail electricity supplier or natural gas supplier, as
compared to—
(A) in the case of a new facility, consumption at a reference facility of average efficiency;
(B) in the case of an existing facility, consumption at the facility during a base period of not less
than 1 year;
(C) in the case of new equipment that replaces existing equipment at the end of the useful life of the
existing equipment, consumption by new equipment of average efficiency of
the same equipment type, except that customer savings under this
subparagraph shall not be counted towards customer savings under
subparagraph (A) or (B); and
(D) in the case of new equipment that replaces existing equipment with remaining useful life—
(i) consumption of the existing equipment for the remaining useful life of the equipment; and
(ii) thereafter, consumption of new equipment of average efficiency.
(10)
Electricity savings
The term electricity savings means reductions in electricity consumption achieved through measures implemented after the date
of enactment of this section, as determined in accordance with regulations
promulgated by the Secretary, that are limited to—
(A) customer facility savings of electricity, adjusted to reflect any associated increase in fuel
consumption at the facility;
(B) reductions in distribution system losses of electricity achieved by a retail electricity supplier,
as compared to losses attributable to new or replacement distribution
system equipment of average efficiency, as defined in regulations
promulgated by the Secretary;
(C) CHP savings;
(D) codes and standards savings of electricity; and
(E) fuel switching energy savings that results in net savings of electricity.
(11)
Fuel switching energy savings
(A)
In general
The term fuel-switching energy savings means net energy savings, calculated in accordance with subparagraph (B), from end-user switches
from 1 energy source to another, as determined in accordance with
regulations promulgated by the Secretary.
(B)
Calculation
For purposes of calculating fuel-switching net energy savings—
(i) electricity use shall be evaluated based on the average quantity of fuel burned at a power plant to
provide each kilowatt hour of electricity;
(ii) electricity and natural gas use shall include losses in the transmission and distribution system;
and
(iii) fuel-switching that is not cost-effective to the end-user shall not be counted.
(12)
Natural gas savings
The term natural gas savings means reductions in natural gas consumption from measures implemented after the date of enactment
of this section, as determined in accordance with regulations promulgated
by the Secretary, that are limited to—
(A) customer facility savings of natural gas, adjusted to reflect any associated increase in
electricity consumption or consumption of other fuels at the facility;
(B) reductions in leakage, operational losses, and consumption of natural gas fuel to operate a gas
distribution system, achieved by a retail natural gas supplier, as
compared to similar leakage, losses, and consumption during a base period
of not less than 1 year;
(C) codes and standards savings of natural gas; and
(D) fuel switching energy savings that results in net savings of natural gas.
(13)
Power pool
The term power pool means an association of two or more interconnected electric systems that have entered into an
agreement to coordinate operations and planning for improved reliability
and efficiencies, including a Regional Transmission Organization or an
Independent System Operator, as determined by the Secretary.
(14)
Reporting period
The term reporting period means—
(A) calendar year 2015; and
(B) each successive 2-calendar-year period thereafter.
(15)
Retail electricity supplier
(A)
In general
The term retail electricity supplier means, for any given calendar year, an electric utility that sells not less than 1,000,000
megawatt hours of electric energy to electric consumers for purposes other
than resale during the preceding calendar.
(B)
Inclusions and limitations
For purposes of determining whether an electric utility qualifies as a retail electricity supplier
under subparagraph (A)—
(i) deliveries by any affiliate of an electric utility to electric consumers for purposes other than
resale shall be considered to be deliveries by the electric utility; and
(ii) deliveries by any electric utility to a lessee, tenant, or affiliate of the electric utility shall
not be considered to be deliveries to electric consumers.
(16)
Retail natural gas supplier
(A)
In general
The term retail natural gas supplier means, for any given calendar year, a local distribution company (as defined in section 2 of the
Natural Gas Policy Act of 1978 (15 U.S.C. 3301)), that delivered to
natural gas consumers more than 5,000,000,000 cubic feet of natural gas
for purposes other than resale during the preceding calendar year.
(B)
Inclusions and limitations
For purposes of determining whether a person qualifies as a retail natural gas supplier under
subparagraph (A)—
(i) deliveries of natural gas by any affiliate of a local distribution company to consumers for
purposes other than resale shall be considered to be deliveries by the
local distribution company; and
(ii) deliveries of natural gas to a lessee, tenant, or affiliate of a local distribution company shall
not be considered to be deliveries to natural gas consumers.
(17)
Third-party efficiency provider
The term third-party efficiency provider means any retailer, building owner, energy service company, financial institution or other
commercial, industrial or nonprofit entity that is capable of providing
electricity savings or natural gas savings in accordance with subsections
(e) and (f).
(18)
Waste heat energy savings
(A)
In general
The term waste heat energy savings means a reduction in electricity or natural gas consumption that results from a modification of an
industrial or commercial system that commenced operation before the date
of enactment of this section, in order to recapture electrical,
mechanical, or thermal energy that would otherwise be wasted, as
determined in accordance with regulations promulgated by the Secretary.
(B)
Inclusion
Such savings shall be included as part of customer facility savings.
(c)
Establishment of program
(1)
Regulations
Not later than 1 year after the date of enactment of this section, the Secretary shall, by
regulation, establish a program to implement and enforce the requirements
of this section, including by—
(A) establishing measurement and verification procedures and standards under subsection (f);
(B) establishing requirements under which retail electricity suppliers and retail natural gas suppliers
shall—
(i) demonstrate, document, and report the compliance of the retail electricity suppliers and retail
natural gas suppliers with the performance standards under subsection (d);
and
(ii) estimate the impact of the standards on current and future electricity and natural gas use in the
service territories of the suppliers; and
(C) establishing requirements governing applications for, and implementation of, delegated State
administration under subsection (h).
(2)
Coordination with state programs
In establishing and implementing this section, the Secretary shall, to the maximum extent
practicable, preserve the integrity and incorporate best practices of
existing State energy efficiency programs.
(d)
Performance standards
(1)
Compliance obligation
Not later than May 1 of the calendar year immediately following each reporting period—
(A) each retail electricity supplier shall submit to the Secretary a report, in accordance with
regulations promulgated by the Secretary, demonstrating that the retail
electricity supplier has achieved annual electricity savings (adjusted to
account for any attrition of savings measures implemented in prior years)
in each calendar year that are equal to the applicable percentage,
established under paragraph (2), (3), or (4), of the base quantity of the
retail electricity supplier; and
(B) each retail natural gas supplier shall submit to the Secretary a report, in accordance with
regulations promulgated by the Secretary, demonstrating that it has
achieved cumulative natural gas savings (adjusted to account for any
attrition of savings measures implemented in prior years) in each calendar
year that are equal to the applicable percentage, established under
paragraph (2), (3), or (4), of the base quantity of such retail natural
gas supplier, subject to business-as-usual consumption projections
calculated in accordance with subsection (f)(1)(P).
(2)
Standards for 2015 through 2025
For each of calendar years 2015 through 2025, the applicable percentages are as follows:
Calendar YearCumulative Electricity Savings PercentageCumulative Natural Gas Savings Percentage
2015 1.00 0.50
2016 2.00 1.25
2017 3.00 2.00
2018 4.25 3.00
2019 5.50 4.00
2020 7.00 5.00
2021 8.50 6.00
2022 10.00 7.00
2023 11.50 8.00
2024 13.25 9.00
2025 15.0010.00.
(3)
Subsequent years
(A)
Calendar years 2026 through 2040
Not later than December 31, 2023, the Secretary shall promulgate regulations establishing
performance standards (expressed as applicable percentages of base
quantity for both cumulative electricity savings and cumulative natural
gas savings) for each of calendar years 2026 through 2040.
(B)
Subsequent extensions
Except as provided in subparagraph (A), not later than December 31 of the penultimate reporting
period for which performance standards have been established under this
paragraph, the Secretary shall promulgate regulations establishing
performance standards (expressed as applicable percentages of base
quantity for both cumulative electricity savings and cumulative natural
gas savings) for the 10-calendar-year period following the last calendar
year for which performance standards previously were established.
(C)
Requirements
The Secretary shall establish standards under this paragraph at levels reflecting the maximum
achievable level of cost-effective energy efficiency potential, taking
into account—
(i) cost-effective energy savings achieved by leading retail electricity suppliers and retail natural
gas suppliers;
(ii) opportunities for new codes and standard savings;
(iii) technology improvements; and
(iv) other indicators of cost-effective energy efficiency potential.
(D)
Minimum percentage
In no case shall the applicable percentages for any calendar year be less than the applicable
percentages for calendar year 2025 (including any increase in the standard
for calendar year 2025 established pursuant to paragraph (4)).
(4)
Midcourse review and adjustment of standards
(A)
In general
Not later than December 31, 2020, and at 10-year intervals thereafter, the Secretary shall—
(i) review the most recent standards established under paragraph (2) or (3); and
(ii) increase the standards by regulation if the Secretary determines that additional cost-effective
energy efficiency potential is achievable, taking into account the
requirements described in paragraph (3)(C).
(B)
Lead time
If the Secretary revises standards under this paragraph, the regulations shall provide adequate
lead time to ensure that compliance with the increased standards is
feasible.
(5)
Delay of submission for first reporting period
(A)
In general
Notwithstanding paragraphs (1) and (2), for the 2015 reporting period, the Secretary may accept a
request from a retail electricity supplier or a retail natural gas
supplier to delay the required submission of documentation of all or part
of the required savings for up to 2 years.
(B)
Plan for compliance
The request for delay under subparagraph (A) shall include a plan for coming into full compliance
by the end of the 2016–2017 reporting period.
(6)
Applying unused savings to future years
If savings achieved in a year exceed the performance standards specified in this subsection, any
savings in excess of the performance standards may be applied toward
performance standards specified for future years.
(e)
Transfers of electricity or natural gas savings
(1)
Bilateral contracts for savings transfers
Subject to the limitations of this subsection, a retail electricity supplier or retail natural gas
supplier may use electricity savings or natural gas savings purchased
pursuant to a bilateral contract from another retail electricity supplier
or retail natural gas supplier, a State, or a third-party efficiency
provider to meet the applicable performance standard under subsection (d).
(2)
Requirements
Electricity savings or natural gas savings purchased and used for compliance under this subsection
shall be—
(A) measured and verified in accordance with subsection (f);
(B) reported in accordance with subsection (d); and
(C) achieved within the same State as is served by the retail electricity supplier or retail natural
gas supplier.
(3)
Exception
Notwithstanding paragraph (2)(C), a State regulatory authority may authorize a retail electricity
supplier or a retail natural gas supplier regulated by the State
regulatory authority to purchase savings achieved in a different State,
if—
(A) the savings are achieved within the same power pool; and
(B) the State regulatory authority that regulates the purchaser oversees the measurement and
verification of the savings pursuant to the procedures and standards
applicable in the State in which the purchaser is located.
(4)
Regulatory approval
Nothing in this subsection limits or affects the authority of a State regulatory authority to
require a retail electricity supplier or retail natural gas supplier that
is regulated by the State regulatory authority to obtain the authorization
or approval of the State regulatory authority of a contract for transfer
of electricity savings or natural gas savings under this paragraph.
(5)
Limitations
To optimize the achievement of cost-effective efficiency potential, the Secretary may prescribe
such limitations as the Secretary determines appropriate with respect to
the proportion of the compliance obligation of a retail electricity or
natural gas supplier under the applicable performance standards under
subsection (d) that may be met using electricity savings or natural gas
savings that are purchased under this subsection.
(f)
Measurement and verification of savings
The regulations promulgated pursuant to subsection (c) shall include—
(1) procedures and standards for defining and measuring electricity savings and natural gas savings
that can be counted towards the performance standards established under
subsection (d), that shall—
(A) specify the types of energy efficiency and energy conservation measures that can be counted;
(B) require that energy consumption estimates for customer facilities or portions of facilities in the
applicable base and current years be adjusted, as appropriate, to account
for changes in weather, level of production, and building area;
(C) account for the useful life of measures;
(D) include assigned savings values for specific, commonly used measures;
(E) allow for savings from a program to be estimated based on extrapolation from a representative
sample of participating customers;
(F) include procedures for calculating and documenting CHP savings, fuel-switching energy savings, and
waste heat energy savings;
(G) establish methods for calculating codes and standards energy savings, including the use of verified
compliance rates;
(H) include procedures for calculating and documenting—
(i) customer facility savings and reductions in distribution system losses of electricity and natural
gas that are achieved as a result of smart grid deployment, as described
in section 1301 of the Energy Independence and Security Act of 2007 (42
U.S.C. 17381); and
(ii) reductions in natural gas distribution system losses attributable to pipeline repair and
replacement programs;
(I) count only measures and savings that are additional to business-as-usual customer purchase
practices;
(J) ensure that the retail electricity supplier or retail natural gas supplier claiming the electricity
savings or natural gas savings, including codes and standards savings,
played a significant role in achieving the savings (including through the
activities of a designated agent of the supplier or through the purchase
of transferred electricity savings or natural gas savings);
(K) avoid double-counting of savings used for compliance with this section, including transferred
savings;
(L) include electricity savings or natural gas savings from programs administered by the retail
electric supplier or natural gas supplier that are funded by Federal,
State, or other sources;
(M) credit large customer self-directed electricity savings or natural gas savings to the retail
electricity supplier or the retail natural gas supplier if the large
customers receive incentives or rate reductions from the retail supplier
for self-directed energy efficiency improvements;
(N) include procedures for counting electricity savings and natural gas savings achieved by solar water
heating, solar light pipe technology, geothermal heat pumps, and other
technologies utilizing renewable resources that reduce on-site energy use;
(O) in any State in which the State regulatory authority has designated one or more entities to
administer electric ratepayer-funded efficiency programs approved by the
State regulatory authority, provide that electricity savings and natural
gas savings achieved through the programs shall be distributed
proportionally among retail electric suppliers and retail natural gas
suppliers; and
(P) include guidance for utilities to calculate and document business-as-usual consumption projections;
and
(2) procedures and standards for third-party verification of reported electricity savings or natural
gas savings.
(g)
Enforcement and judicial review
(1)
Review of retail supplier reports
(A)
In general
The Secretary shall review each report submitted to the Secretary by a retail electricity supplier
or retail natural gas supplier under subsection (d) to verify that the
applicable performance standards under subsection (d) have been met.
(B)
Exclusion
In determining compliance with the applicable performance standards under subsection (d), the
Secretary shall exclude reported electricity savings or natural gas
savings that are not adequately demonstrated and documented, in accordance
with the regulations promulgated under subsections (d), (e), and (f).
(2)
Penalty for failure to document adequate savings
If a retail electricity supplier or a retail natural gas supplier fails to demonstrate compliance
with an applicable performance standard under subsection (d), or to pay to
the State an applicable alternative compliance payment under subsection
(h)(4), the Secretary shall assess against the retail electricity supplier
or retail natural gas supplier a civil penalty for each failure in an
amount equal to, as adjusted for inflation in accordance with such
regulations as the Secretary may promulgate—
(A) $100 per megawatt hour of electricity savings or alternative compliance payment that the retail
electricity supplier failed to achieve or make, respectively; or
(B) $10 per million Btu of natural gas savings or alternative compliance payment that the retail
natural gas supplier failed to achieve or make, respectively.
(3)
Offsetting state penalties
The Secretary shall reduce the amount of any penalty under paragraph (2) by the amount paid by the
relevant retail electricity supplier or retail natural gas supplier to a
State for failure to comply with the requirements of a State energy
efficiency resource standard during the same compliance period, if the
State standard—
(A) is comparable in type to the Federal standard established under this section; and
(B) is more stringent than the applicable performance standards under subsection (d).
(4)
Enforcement procedures
The Secretary shall assess a civil penalty, as provided under paragraph (2), in accordance with the
procedures described in section 333(d) of the Energy Policy and
Conservation Act (42 U.S.C. 6303(d)).
(5)
Judicial review
(A)
In general
Any person adversely affected by a final action taken by the Secretary under this section, other
than the assessment of a civil penalty, may use the procedures for review
described in section 336(b) of the Energy Policy and Conservation Act (42
U.S.C. 6306(b)).
(B)
Reference
In this paragraph, references to a rule in section 336(b) of the Energy Policy and Conservation Act
(42 U.S.C. 6306(b)) shall be considered to refer also to all other final
actions of the Secretary under this section other than the assessment of a
civil penalty.
(h)
State administration
(1)
In general
Upon receipt of an application from the Governor of a State (including the Mayor of the District of
Columbia), the Secretary may delegate to the State responsibility for
administering this section within the territory of the State if the
Secretary determines that the State will implement an energy efficiency
program that meets or exceeds the requirements of this section, including—
(A) achieving electricity savings and natural gas savings that are at least as great as those required
under the applicable performance standards established under subsection
(d);
(B) reviewing reports and verifying electricity savings and natural gas savings achieved in the State
(including savings transferred from outside the State); and
(C) collecting any alternative compliance payments under paragraph (4) and using the payments to
implement cost-effective efficiency programs.
(2)
Secretarial determination
Not later than 180 days after the date on which a complete application is received by the
Secretary, the Secretary shall make a substantive determination approving
or disapproving a State application, after public notice and comment.
(3)
Alternative measurement and verification procedures and standards
As part of an application submitted under paragraph (1), a State may request to use alternative
measurement and verification procedures and standards from the procedures
and standards described in subsection (f), if the State demonstrates that
the alternative procedures and standards provide a level of accuracy of
measurement and verification that are at least equivalent to the Federal
procedures and standards under subsection (f).
(4)
Alternative compliance payments
(A)
In general
As part of an application submitted under paragraph (1), a State may permit retail electricity
suppliers or retail natural gas suppliers to pay to the State, by not
later than April 1 of the calendar year immediately following the
applicable reporting period, an alternative compliance payment in an
amount equal to, as adjusted for inflation in accordance with such
regulations as the Secretary may promulgate, not less than—
(i) $50 per megawatt hour of electricity savings needed to make up any deficit with regard to a
compliance obligation under the applicable performance standard; or
(ii) $5 per million Btu of natural gas savings needed to make up any deficit with regard to a compliance
obligation under the applicable performance standard.
(B)
Use of payments
Alternative compliance payments collected by a State under subparagraph (A) shall be used by the
State to administer the delegated authority of the State under this
section and to implement cost-effective energy efficiency programs that—
(i) to the maximum extent practicable, achieve electricity savings and natural gas savings in the State
sufficient to make up the deficit associated with the alternative
compliance payments; and
(ii) can be measured and verified in accordance with the applicable procedures and standards under
subsection (f) or paragraph (3), as applicable.
(5)
Review of state implementation
(A)
Periodic review
Every 2 years, the Secretary shall review State implementation of this section for conformance with
the requirements of this section in approximately ½ of the States that have received approval under this subsection to administer the program, so that
each State shall be reviewed at least every 4 years.
(B)
Report
To facilitate the review under subparagraph (A), the Secretary may require the State to submit a
report demonstrating the conformance of the State with the requirements of
this section, including—
(i) reports submitted by retail electricity suppliers and retail natural gas suppliers to the State
demonstrating compliance with applicable performance standards;
(ii) the impact of the standards on projected electricity and natural gas demand within the State;
(iii) an accounting of the use of alternative compliance payments by the State and the resulting
electricity savings and natural gas savings achieved; and
(iv) any other information that the Secretary determines appropriate.
(C)
Review upon petition
Notwithstanding subparagraph (A), upon receipt of a public petition containing credible allegation
of substantial deficiencies, the Secretary shall promptly review the State
implementation of delegated authority under this section.
(D)
Deficiencies
(i)
In general
In completing a review under this paragraph, if the Secretary finds deficiencies, the Secretary
shall—
(I) notify the State of the deficiencies;
(II) direct the State to correct the deficiencies; and
(III) require the State to report to the Secretary on progress made by not later than 180 days after the
date on which the State receives notice under subclause (I).
(ii)
Substantial deficiencies
If the deficiencies are substantial, the Secretary shall—
(I) disallow the reported electricity savings or natural gas savings that the Secretary determines are
not credible due to deficiencies;
(II) re-review the State not later than 2 years after the date on which the original review was
completed; and
(III) if substantial deficiencies remain uncorrected after the review provided for under subclause (II),
revoke the authority of the State to administer the program established
under this section.
(6)
Calls for revision of State applications
As a condition of maintaining the delegated authority of a State to administer this section, the
Secretary may require a State to submit a revised application under
paragraph (1) if the Secretary has—
(A) promulgated new or revised performance standards under subsection (d);
(B) promulgated new or substantially revised measurement and verification procedures and standards
under subsection (f); or
(C) otherwise substantially revised the program established under this section.
(7)
Cost recovery, fixed cost recovery and shareholder incentives
State utility regulatory commissions are encouraged to review the rules and regulations of the
commission to ensure that utilities under the jurisdiction of the
commission can—
(A) recover the direct costs of energy efficiency programs;
(B) fully recover authorized fixed costs, including lost margins from lower annual sales due to energy
efficiency programs; and
(C) earn an incentive for shareholders if the energy efficiency standards are achieved.
(i)
Information and reports
In accordance with section 13 of the Federal Energy Administration Act of 1974 (15 U.S.C. 772), the
Secretary may require any retail electricity supplier, retail natural gas
supplier, third-party efficiency provider, or any other entity that the
Secretary determines appropriate, to provide any information the Secretary
determines appropriate to carry out this section.
(j)
State law
Nothing in this section diminishes or qualifies any authority of a State or political subdivision
of a State to adopt or enforce any law or regulation respecting
electricity savings or natural gas savings, including any law or
regulation establishing energy efficiency requirements that are more
stringent than those under this section, except that no State law or
regulation shall relieve any person of any requirement otherwise
applicable under this section.
.
6.
Program review
(a)
National academy of sciences review
The Secretary of Energy shall enter into a contract with the National Academy of Sciences under
which the Academy shall, not later than July 1, 2019, and every 10 years
thereafter, submit to Congress, the Federal Energy Regulatory Commission,
and the Secretary of Energy a comprehensive evaluation of all aspects of
the programs established under this Act and under sections 610 and 611 of
the Public Utility Regulatory Policies Act of 1978 (as added by this Act),
including—
(1) an evaluation of the effectiveness of the programs, including the specific design elements of the
programs, in increasing the efficiency of retail natural gas and
electricity distribution and consumption and increasing the deployment of
renewable electricity capacity;
(2) the opportunities for additional technologies and sources of efficiency and renewable electricity
that have emerged since the date of enactment of this Act;
(3) the impact of the programs on the reliability of electricity and natural gas supply;
(4) the net benefits or costs of the programs to the United States and the States, including—
(A) the effects on electricity and natural gas demand and prices;
(B) the economic development benefits of investment;
(C) environmental costs and benefits;
(D) the impacts on public health and health care costs; and
(E) avoided costs related to environmental and congestion mitigation investments that otherwise would
have been required;
(5) an assessment of the benefits and costs of increasing the performance standards established under
section 611(d) of the Public Utility Regulatory Policies Act of 1978 (as
added by this Act);
(6) the feasibility, advantages, and disadvantages of alternative models for demonstrating compliance
with a Federal energy efficiency resource standard, including—
(A) establishing a national trading system for energy efficiency credits; or
(B) demonstrating compliance through actual reductions in delivery or sales of electricity and natural
gas, rather than on program savings; and
(7) recommendations regarding potential changes to this section, to regulations and procedures for
implementing this section, or to related public policies.
(b)
Recommendations to Congress
Not later than January 1, 2020, and every 10 years thereafter, the Secretary of Energy shall submit
to the Committee on Energy and Commerce of the House of Representatives
and the Committee on Energy and Natural Resources of the Senate a report
making recommendations for modifications and improvements to the programs
established under this Act and under sections 610 and 611 of the Public
Utility Regulatory Policies Act of 1978 (as added by this Act), including
an explanation of the inconsistencies, if any, between the recommendations
of the Secretary of Energy and the recommendations included in the
evaluation of the National Academy of Sciences under paragraph (1).
7.
Conforming amendment
The table of contents of the Public Utility Regulatory Policies Act of 1978 (16 U.S.C. prec. 2601)
is amended by adding at the end of the items relating to title VI the
following:
Sec. 609. Rural and remote communities electrification grants.
Sec. 610. Federal renewable electricity standard.
Sec. 611. Federal energy efficiency resource standard for retail electricity and natural gas
suppliers.
.