Library / Laws / 113th / hr / H.R. 5125 / Introduced in House
I
113th CONGRESS
2d Session
H. R. 5125
IN THE HOUSE OF REPRESENTATIVES
July 16, 2014
Mr. Latta (for himself, Mr. Issa, Ms. Eshoo, and Ms. Matsui) introduced the following bill; which was referred to the Committee on Energy and Commerce
A BILL
To promote unlicensed spectrum use in the 5 GHz band, to maximize the use of the band for shared
purposes in order to bolster innovation and economic development, and for
other purposes.
1.
Short title
This Act may be cited as the Wi-Fi Innovation Act .
2.
Promoting unlicensed spectrum
(a)
Definitions
In this section:
(1)
Commission
The term Commission means the Federal Communications Commission.
(2)
Dedicated Short-Range Communications Services
The term Dedicated Short-Range Communications Services has the meaning given the term in section 90.7 of title 47, Code of Federal Regulations.
(3)
Dynamic Frequency Selection
The term Dynamic Frequency Selection has the meaning given the term in section 15.403 of title 47, Code of Federal Regulations.
(4)
5850–5925 MHz band
The term 5850–5925 MHz band has the meaning given the term in section 6406(c) of the Middle Class Tax Relief and Job Creation
Act of 2012 (47 U.S.C. 1453(c)).
(5)
NTIA
The term NTIA means the National Telecommunications and Information Administration.
(6)
Technical rules suitable for the widespread commercial development of unlicensed operations
The term technical rules suitable for the widespread commercial development of unlicensed operations means technical rules that, to the maximum extent feasible—
(A) permit outdoor unlicensed operations;
(B) permit unlicensed operations at a maximum conducted transmitter output power limit of not less than
1 watt; and
(C) do not require unlicensed devices to employ Dynamic Frequency Selection.
(b)
Modification of regulations To promote unlicensed use in the 5 GHz band
(1)
In general
(A)
Provision of additional unlicensed spectrum
The Commission shall modify title 47, Code of Federal Regulations, to provide additional unlicensed
spectrum in the 5850–5925 MHz band under technical rules suitable for the
widespread commercial development of unlicensed operations in the band, as
specified under paragraph (2).
(B)
NTIA cooperation
The NTIA shall facilitate the modification described in subparagraph (A) by cooperating with the
Commission to identify the spectrum management actions necessary to
accommodate the regulatory changes specified under paragraph (2).
(2)
Required actions and modifications
(A)
In general
(i)
Office of Engineering and Technology public notice
Not later than 3 months after the date of enactment of this Act, the Office of Engineering and
Technology of the Commission shall issue a public notice seeking comment
on proposals for—
(I) interference-mitigation techniques and technologies, and potential rechannelization, that would
accommodate both incumbent licensees, including Dedicated Short Range
Communications Services licensees, and widespread commercial unlicensed
operations in the 5850–5925 MHz band; and
(II) deployment timelines for the technologies described in subclause (I).
(ii)
NTIA response
The NTIA, in response to the public notice issued under clause (i), shall publicly submit to the
Office of Engineering and Technology a description of any current and
anticipated further Federal uses of the 5850–5925 MHz band.
(B)
Test plan
(i)
In general
Not later than 6 months after the date of enactment of this Act, the Commission shall, in
consultation with the Department of Transportation and the NTIA, develop
and publish a test plan, including a timeline, for the use of unlicensed
devices in the 5850–5925 MHz band.
(ii)
Requirement
The test plan developed and published under clause (i) shall be designed to allow the Commission to
evaluate technologies for allowing unlicensed devices to utilize the
5850–5925 MHz band without causing harmful interference to incumbent
licensees, including Dedicated Short Range Communications Services
licensees.
(iii)
Testing multiple methods
The Commission may choose to test multiple methods of sharing the 5850–5925 MHz band.
(iv)
Considerations
In developing the test plan under clause (i), the Commission shall consider—
(I) the comments filed in response to the public notice issued under subparagraph (A)(i);
(II) the comments filed in response to ET Docket No. 13–49;
(III) the functions currently authorized under exclusive allocation that could be performed by unlicensed
or shared spectrum;
(IV) whether a system of priority access could substitute for exclusive licensing and, if so, whether
the system of priority access should be confined to—
(aa) particular portions of the 5850–5925 MHz band; and
(bb) functions critical for dedicated short-range communications crash avoidance;
(V) whether non-exclusive licensing or other forms of shared spectrum access could substitute for
exclusive licensing;
(VI) whether the Commission could promulgate rules to migrate existing licensees to an alternative band;
(VII) whether, to protect critical public safety communications, the Commission could allow sharing in
only a portion of the 5850–5925 MHz spectrum; and
(VIII) whether shared use or a system of priority access—
(aa) causes harmful interference to incumbent licensees; or
(bb) compromises safety-of-life uses by incumbent licensees that are necessary for advancing motor
vehicle safety.
(C)
Testing; results
Not later than 15 months after the date of enactment of this Act, the Commission, in consultation
with the Department of Transportation and the NTIA, shall—
(i) conduct testing in accordance with the test plan developed under subparagraph (B);
(ii) publish a summary of the results of the testing to the docket relating to the 5850–5925 MHz band;
and
(iii) reference the results of the testing and the comments filed under subparagraph (A) in determining
unlicensed device use of the 5850–5925 MHz band.
(D)
Regulations
(i)
In general
Not later than 24 months after the date of enactment of this Act—
(I) if the Commission determines that a mitigation technology, rechannelization, or other approach
would allow unlicensed operations in the 5850–5925 MHz band that will not
cause harmful interference to existing licensees of that band, the
Commission shall modify part 15 of title 47, Code of Federal Regulations,
to adopt technical rules suitable for the widespread commercial deployment
of unlicensed operations for the 5850–5925 MHz band; or
(II) if the Commission determines that no mitigation technology, rechannelization, or other sharing
approach would prevent unlicensed operations in the 5850–5925 MHz band
from causing harmful interference to existing licensees of that band, the
Commission—
(aa) shall provide notification of the determination to—
(AA) Congress;
(BB) the Department of Transportation; and
(CC) the NTIA; and
(bb) may not modify part 15 of title 47, Code of Federal Regulations, to adopt technical rules suitable
for the widespread commercial deployment of unlicensed operations for the
5850–5925 MHz band until the Commission can ensure that such operations
will not cause harmful interference to existing licensees of that band.
(ii)
Intelligent transportation systems
The Commission shall modify subpart M of part 90 of title 47, Code of Federal Regulations (relating
to the Intelligent Transportation Systems radio service), and subpart L of
part 95 of title 47, Code of Federal Regulations (relating to dedicated
short-range communications service on-board units), if the Commission
determines that such a modification would maximize the utility of the
5850–5925 MHz band while protecting existing licensees from harmful
interference.
3.
Assessing unlicensed spectrum and wi-fi use in low-income neighborhoods
(a)
Study
(1)
In general
The Federal Communications Commission (in this section referred to as the Commission) shall conduct a study to evaluate the availability of broadband Internet access using unlicensed
spectrum and wireless networks in low-income neighborhoods.
(2)
Requirements
In conducting the study under paragraph (1), the Commission shall consider and evaluate—
(A) any barriers preventing or limiting the deployment and use of wireless networks in low-income
neighborhoods;
(B) how to overcome the barriers described in subparagraph (A) through incentives, policies, or
requirements that would increase the availability of unlicensed spectrum
and related technologies in low-income neighborhoods to increase broadband
adoption by elementary and secondary school-age children in schools and at
home in these communities;
(C) proposals that would encourage the home broadband adoption by not less than 50 percent of
households with elementary and secondary school-age children that are in
low-income neighborhoods; and
(D) the availability of wireless Internet hot spots and access to unlicensed spectrum for children
described in subparagraph (B).
(b)
Report
Not later than 1 year after the date of enactment of this Act, the Commission shall submit to the
Committee on Commerce, Science, and Transportation of the Senate and the
Committee on Energy and Commerce of the House of Representatives a report
that—
(1) summarizes the findings of the study conducted under subsection (a); and
(2) makes recommendations with respect to the potential incentives, policies, and requirements
described in subsection (a)(2)(B).