A BILL
To amend the Federal Water Pollution Control Act to provide guidance and clarification regarding
issuing new and renewal permits, and for other purposes.
1.
Short title
This Act may be cited as the Coal Jobs Protection Act of 2014.
2.
National pollutant discharge elimination system
(a)
Applicability of guidance
Section 402 of the Federal Water Pollution Control Act (33 U.S.C. 1342) is amended by adding at the
end the following:
(s)
Applicability of guidance
(1)
Definitions
In this subsection:
(A)
Guidance
(i)
In general
The term guidance means draft, interim, or final guidance issued by the Administrator.
(ii)
Inclusions
The term guidance includes—
(I) the interim guidance memorandum issued by the Administrator on April 1, 2010, entitled Detailed Guidance: Improving EPA Review of Appalachian Surface Coal Mining Operations under the
Clean Water Act, National Environmental Policy Act, and the Environmental
Justice Executive Order;
(II) the proposed guidance described in the notice of availability and request for comments entitled EPA and Army Corps of Engineers Guidance Regarding Identification of Waters Protected by the Clean
Water Act (76 Fed. Reg. 24479 (May 2, 2011));
(III) the final guidance memorandum issued by the Administrator on July 21, 2011, entitled Improving EPA Review of Appalachian Surface Coal Mining Operations Under the Clean Water Act,
National Environmental Policy Act, and the Environmental Justice Executive
Order;
(IV) the proposed guidance submitted to the Office of Information and Regulatory Affairs of the Office
of Management and Budget for regulatory review under Executive Order 12866
entitled Guidance on Identifying Waters Protected By the Clean Water Act and dated February 17, 2012 (referred to as Clean Water Protection Guidance, Regulatory Identifier Number (RIN) 2040–ZA11, received February 21, 2012);
(V) any successor document to, or any substantially similar guidance based in whole or in part on, any
of the foregoing guidance documents; and
(VI) any other document or paper proposed or issued by the Administrator through any process other than
the notice and comment rulemaking process.
(B)
New permit
The term new permit means a permit covering discharges from a point source—
(i) that is issued under this section by a permitting authority; and
(ii) for which an application is—
(I) pending as of the date of enactment of this subsection; or
(II) filed on or after the date of enactment of this subsection.
(C)
Permitting authority
The term permitting authority means—
(i) the Administrator; or
(ii) a State, acting pursuant to a permit program under subsection (b).
(2)
Permits
(A)
In general
Notwithstanding any other provision of law, in making a determination whether to approve a new
permit or a renewed permit, the permitting authority—
(i) shall base the determination only on compliance with regulations issued by the Administrator or the
permitting authority; and
(ii) shall not base the determination on the extent of adherence of the applicant for the new permit or
renewed permit to guidance.
(B)
New permits
If the permitting authority does not approve or deny an application for a new permit by the date
that is 270 days after the date of receipt of a substantially complete
application for the new permit, the applicant may discharge as if the
application were approved in accordance with Federal law for the period of
time for which a similar permit would be approved.
(C)
Substantial completeness
In determining whether an application for a new permit or a renewed permit received under this
paragraph is substantially complete, the permitting authority shall use
standards for determining substantial completeness of similar permits for
similar facilities submitted in fiscal year 2007.
.
(b)
State permit programs
(1)
In general
Section 402 of the Federal Water Pollution Control Act (33 U.S.C. 1342) is amended by striking
subsection (b) and inserting the following:
(b)
State permit programs
(1)
In general
At any time after the promulgation of the guidelines required by section 304(i)(2), the Governor of
each State desiring to administer a permit program for discharges into
navigable waters within the jurisdiction of the State may submit to the
Administrator—
(A) a full and complete description of the program the State proposes to establish and administer under
State law or under an interstate compact; and
(B) a statement from the attorney general (or the attorney for those State water pollution control
agencies that have independent legal counsel), or from the chief legal
officer in the case of an interstate agency, that the laws of the State,
or the interstate compact, as applicable, provide adequate authority to
carry out the described program.
(2)
Approval
The Administrator shall approve each program for which a description is submitted under paragraph
(1) unless the Administrator determines that adequate authority does not
exist—
(A) to issue permits that—
(i) apply, and ensure compliance with, any applicable requirements of sections 301, 302, 306, 307, and
403;
(ii) are for fixed terms not exceeding 5 years;
(iii) can be terminated or modified for cause, including—
(I) a violation of any condition of the permit;
(II) obtaining a permit by misrepresentation or failure to disclose fully all relevant facts; and
(III) a change in any condition that requires either a temporary or permanent reduction or elimination of
the permitted discharge; and
(iv) control the disposal of pollutants into wells;
(B)
(i) to issue permits that apply, and ensure compliance with, all applicable requirements of section
308; or
(ii) to inspect, monitor, enter, and require reports to at least the same extent as required in section
308;
(C) to ensure that the public, and any other State the waters of which may be affected, receives notice
of each application for a permit and an opportunity for a public hearing
before a ruling on each application;
(D) to ensure that the Administrator receives notice and a copy of each application for a permit;
(E) to ensure that any State (other than the permitting State), the waters of which may be affected by
the issuance of a permit may submit written recommendations to the
permitting State and the Administrator with respect to any permit
application and, if any part of the written recommendations are not
accepted by the permitting State, that the permitting State will notify
the affected State and the Administrator in writing of the failure of the
permitting State to accept the recommendations, including the reasons for
not accepting the recommendations;
(F) to ensure that no permit will be issued if, in the judgment of the Secretary of the Army acting
through the Chief of Engineers, after consultation with the Secretary of
the department in which the Coast Guard is operating, anchorage and
navigation of any of the navigable waters would be substantially impaired
by the issuance of the permit;
(G) to abate violations of the permit or the permit program, including civil and criminal penalties and
other means of enforcement;
(H) to ensure that any permit for a discharge from a publicly owned treatment works includes conditions
to require the identification in terms of character and volume of
pollutants of any significant source introducing pollutants subject to
pretreatment standards under section 307(b) into the treatment works and a
program to ensure compliance with those pretreatment standards by each
source, in addition to adequate notice, which shall include information on
the quality and quantity of effluent to be introduced into the treatment
works and any anticipated impact of the change in the quantity or quality
of effluent to be discharged from the publicly owned treatment works, to
the permitting agency of—
(i) new introductions into the treatment works of pollutants from any source that would be a new source
as defined in section 306 if the source were discharging pollutants;
(ii) new introductions of pollutants into the treatment works from a source that would be subject to
section 301 if the source were discharging those pollutants; or
(iii) a substantial change in volume or character of pollutants being introduced into the treatment works
by a source introducing pollutants into the treatment works at the time of
issuance of the permit; and
(I) to ensure that any industrial user of any publicly owned treatment works will comply with sections
204(b), 307, and 308.
.
(2)
Conforming amendments
(A)
Federal enforcement
Section 309 of the Federal Water Pollution Control Act (33 U.S.C. 1319) is amended—
(i) in subsection (c)—
(I) in paragraph (1)(A), by striking 402(b)(8) and inserting 402(b)(2)(H); and
(II) in paragraph (2)(A), by striking 402(b)(8) and inserting 402(b)(2)(H); and
(ii) in subsection (d), in the first sentence, by striking 402(b)(8) and inserting 402(b)(2)(H).
(B)
Additional pretreatment
Section 402(m) of the Federal Water Pollution Control Act (33 U.S.C. 1342(m)) is amended in the
first sentence by striking subsection (b)(8) of this section and inserting subsection (b)(2)(H).
3.
Permits for dredged or fill material
(a)
In general
Section 404(a) of the Federal Water Pollution Control Act (33 U.S.C. 1344(a)) is amended—
(1) by striking (a) The Secretary may issue and inserting the following:
(a)
Permits
(1)
In general
The Secretary may issue
; and
(2) by adding at the end the following:
(2)
Deadline for approval
(A)
Permit applications
(i)
In general
Except as provided in clause (ii), if an environmental assessment or environmental impact
statement, as appropriate, is required under the National Environmental
Policy Act of 1969 (42 U.S.C. 4321 et seq.), the Secretary shall—
(I) ensure that the environmental review process begins not later than 90 days after the date on which
the Secretary receives a permit application; and
(II) approve or deny an application for a permit under this subsection not later than—
(aa) if an agency carries out an environmental assessment that leads to a finding of no significant
impact, the date on which the finding of no significant impact is issued;
or
(bb) if an agency carries out an environmental assessment that leads to a record of decision, 15 days
after the date on which the record of decision on the environmental impact
statement is issued.
(ii)
Processes
Notwithstanding clause (i), regardless of whether the Secretary has commenced an environmental
assessment or environmental impact statement by the date described in
clause (i)(I), the following deadlines shall apply:
(I) An environmental assessment carried out under the National Environmental Policy Act of 1969 (42
U.S.C. 4321 et seq.) shall be completed not later than 1 year after the
deadline for commencing the environmental review process under clause
(i)(I).
(II) An environmental impact statement carried out under the National Environmental Policy Act of 1969
(42 U.S.C. 4321 et seq.) shall be completed not later than 2 years after
the deadline for commencing the environmental review process under clause
(i)(I).
(B)
Failure to act
If the Secretary fails to act by the deadline specified in clause (i) or (ii) of subparagraph (A)—
(i) the application, and the permit requested in the application, shall be considered to be approved;
(ii) the Secretary shall issue a permit to the applicant; and
(iii) the permit shall not be subject to judicial review.
.
(b)
State permitting programs
Section 404(c) of the Federal Water Pollution Control Act (33 U.S.C. 1344(c)) is amended—
(1) by striking (c) and inserting (c)(1); and
(2) by adding at the end the following:
(2) Paragraph (1) shall not apply to any permit if the State in which the discharge originates or will
originate does not concur with the Administrator’s determination that the
discharge will result in an unacceptable adverse effect as described in
paragraph (1).
.
(c)
State programs
The first sentence of section 404(g)(1) of such Act (33 U.S.C. 1344(g)(1)) is amended by striking for the discharge and inserting for some or all of the discharges.
(d)
Deadline for agency comments
Section 404 of such Act (33 U.S.C. 1344) is amended—
(1) in subsection (m) by striking ninetieth day and inserting 30th day (or the 60th day if additional time is requested); and
(2) in subsection (q)—
(A) by striking (q) and inserting (q)(1); and
(B) by adding at the end the following:
(2) The Administrator and the head of a department or agency referred to in paragraph (1) shall each
submit any comments with respect to an application for a permit under
subsection (a) or (e) not later than the 30th day (or the 60th day if
additional time is requested) after the date of receipt of an application
for a permit under that subsection.
.
4.
Impacts of EPA regulatory activity on employment and economic activity
(a)
Analysis of impacts of actions on employment and economic activity
(1)
Analysis
Before taking a covered action, the Administrator shall analyze the impact, disaggregated by State,
of the covered action on employment levels and economic activity,
including estimated job losses and decreased economic activity.
(2)
Economic models
(A)
In general
In carrying out paragraph (1), the Administrator shall utilize the best available economic models.
(B)
Annual GAO report
Not later than December 31 of each year, the Comptroller General of the United States shall submit
to Congress a report on the economic models used by the Administrator to
carry out this subsection.
(3)
Availability of information
With respect to any covered action, the Administrator shall—
(A) post the analysis under paragraph (1) as a link on the main page of the public Internet Web site of
the Environmental Protection Agency; and
(B) request that the Governor of any State experiencing more than a de minimis negative impact post
such analysis in the Capitol of such State.
(b)
Public hearings
(1)
In general
If the Administrator concludes under subsection (a)(1) that a covered action will have more than a
de minimis negative impact on employment levels or economic activity in a
State, the Administrator shall hold a public hearing in the State at least
30 days prior to the effective date of the covered action.
(2)
Time, location, and selection
A public hearing required under paragraph (1) shall be held at a convenient time and location for
impacted residents. In selecting a location for such a public hearing, the
Administrator shall give priority to locations in the State that will
experience the greatest number of job losses.
(c)
Notification
If the Administrator concludes under subsection (a)(1) that a covered action will have more than a
de minimis negative impact on employment levels or economic activity in a
State, the Administrator shall give notice of such impact to the State’s
congressional delegation, Governor, and legislature at least 45 days
before the effective date of the covered action.
(d)
Definitions
In this section, the following definitions apply:
(1)
Administrator
The term Administrator means the Administrator of the Environmental Protection Agency.
(2)
Covered action
The term covered action means any of the following actions taken by the Administrator under the Federal Water Pollution
Control Act (33 U.S.C. 1201 et seq.):
(A) Issuing a regulation, policy statement, guidance, response to a petition, or other requirement.
(B) Implementing a new or substantially altered program.
(3)
More than a de minimis negative impact
The term more than a de minimis negative impact means either of the following:
(A) With respect to employment levels, a loss of more than 100 jobs. Any offsetting job gains that
result from the hypothetical creation of new jobs through new technologies
or government employment may not be used in the job loss calculation.
(B) With respect to economic activity, a decrease in economic activity of more than $1,000,000 over any
calendar year. Any offsetting economic activity that results from the
hypothetical creation of new economic activity through new technologies or
government employment may not be used in the economic activity
calculation.
5.
State authority to identify waters within its boundaries
Section 303 of the Federal Water Pollution Control Act (33 U.S.C. 1313) is amended by striking
subsection (d)(2) and inserting the following:
(2)
(A) Each State shall submit to the Administrator from time to time, with the first such submission not
later than 180 days after the date of publication of the first
identification of pollutants under section 304(a)(2)(D), the waters
identified and the loads established under paragraphs (1)(A), (1)(B),
(1)(C), and (1)(D) of this subsection. The Administrator shall approve the
State identification and load or announce his disagreement with the State
identification and load not later than 30 days after the date of
submission, and if—
(i) the Administrator approves the identification and load submitted by the State in accordance with
this subsection, such State shall incorporate them into its current plan
under subsection (e); and
(ii) the Administrator announces his disagreement with the identification and load submitted by the
State in accordance with this subsection, the Administrator shall submit,
not later than 30 days after the date on which such announcement is made,
to the State his written recommendation of those additional waters that he
identifies and such loads for such waters as he believes are necessary to
implement the water quality standards applicable to such waters.
(B) Upon receipt of the Administrator’s recommendation the State shall within 30 days either—
(i) disregard the Administrator’s recommendation in full and incorporate its own identification and
load into its current plan under subsection (e);
(ii) accept the Administrator’s recommendation in full and incorporate its identification and load as
amended by the Administrator’s recommendation into its current plan under
subsection (e); or
(iii) accept the Administrator’s recommendation in part, identifying certain additional waters and
certain additional loads proposed by the Administrator to be added to such
State’s identification and load and incorporate such State’s
identification and load as amended into its current plan under subsection
(e).
(C)
(i) If the Administrator fails to either approve the State identification and load or announce his
disagreement with the State identification and load within the time
specified in this subsection, then such State’s identification and load is
deemed approved and such State shall incorporate the identification and
load that it submitted into its current plan under subsection (e).
(ii) If the Administrator announces his disagreement with the State identification and load but fails to
submit his written recommendation to the State within 30 days as required
by subparagraph (A)(ii) then such State’s identification and load is
deemed approved and such State shall incorporate the identification and
load that it submitted into its current plan under subsection (e).
(D) This paragraph shall apply to any decision made by the Administrator under this subsection issued
on or after March 1, 2013.
.
6.
Definition of fill material
Section 502 of the Federal Water Pollution Control Act (33 U.S.C. 1362) is amended by adding at the
end the following:
(27)
Fill material
(A)
In general
The term fill material means any material placed in waters of the United States where the material has the effect of—
(i) replacing any portion of a water of the United States with dry land; or
(ii) changing the bottom elevation of any portion of a water of the United States.
(B)
Inclusions
The term fill material includes—
(i) rock;
(ii) sand;
(iii) soil;
(iv) clay;
(v) plastics;
(vi) construction debris;
(vii) wood chips;
(viii) overburden from mining or other excavation activities; and
(ix) materials used to create any structure or infrastructure in the waters of the United States.
(C)
Exclusions
The term fill material does not apply to trash or garbage.
.
7.
Applicability of amendments
Except as otherwise specifically provided, the amendments made by this Act shall apply to actions
taken on or after the date of enactment of this Act, including actions
taken with respect to permit applications pending, or revised or new
standards in the process of being promulgated, on such date of enactment.