Library / Laws / 113th / hr / H.R. 3301 / Reported in House
IB
Union Calendar No. 358
113th CONGRESS
2d Session
H. R. 3301
[Report No. 113–482, Part I]
IN THE HOUSE OF REPRESENTATIVES
October 22, 2013
Mr. Upton (for himself, Mr. Gene Green of Texas, Mr. Barton, Mr. Collins of New York, Mr. Costa, Mr. Cramer, Mr. Cuellar, Mr. Gallego, Mr. Hinojosa, Mr. Matheson, Mrs. McMorris Rodgers, Mr. Peterson, Mr. Pompeo, Mr. Terry, Mr. Vela, and Mr. Whitfield) introduced the following bill; which was referred to the Committee on Energy and Commerce, and in addition to the Committees on Transportation and Infrastructure and Natural Resources, for a period to be subsequently determined by the Speaker, in each case for consideration of such
provisions as fall within the jurisdiction of the committee concerned
June 19, 2014
Additional sponsors: Mr. Latta, Mr. Cassidy, Mrs. Walorski, Mr. Bilirakis, and Mr. Walberg
June 19, 2014
Reported from the Committee on Energy and Commerce with an amendment
Strike out all after the enacting clause and insert the part printed in italic
June 19, 2014
The Committees on Transportation and Infrastructure and Natural Resources discharged; committed to
the Committee of the Whole House on the State of the Union and ordered to
be printed
For text of introduced bill, see copy of bill as introduced on October 22, 2013
A BILL
To require approval for the construction, connection, operation, or maintenance of oil or natural
gas pipelines or electric transmission facilities at the national boundary
of the United States for the import or export of oil, natural gas, or
electricity to or from Canada or Mexico, and for other purposes.
1.
Short title
This Act may be cited as the North American Energy Infrastructure Act.
2.
Finding
Congress finds that the United States should establish a more uniform, transparent, and modern
process for the construction, connection, operation, and maintenance of
oil and natural gas pipelines and electric transmission facilities for the
import and export of oil and natural gas and the transmission of
electricity to and from Canada and Mexico, in pursuit of a more secure and
efficient North American energy market.
3.
Authorization of certain energy infrastructure projects at the national boundary of the United
States
(a)
Authorization
Except as provided in subsection (c) and section 7, no person may construct, connect, operate, or
maintain a cross-border segment of an oil pipeline or electric
transmission facility for the import or export of oil or the transmission
of electricity to or from Canada or Mexico without obtaining a certificate
of crossing for the construction, connection, operation, or maintenance of
the cross-border segment under this section.
(b)
Certificate of crossing
(1)
Requirement
Not later than 120 days after final action is taken under the National Environmental Policy Act of
1969 (42 U.S.C. 4321 et seq.) with respect to a cross-border segment for
which a request is received under this section, the relevant official
identified under paragraph (2), in consultation with appropriate Federal
agencies, shall issue a certificate of crossing for the cross-border
segment unless the relevant official finds that the construction,
connection, operation, or maintenance of the cross-border segment is not
in the public interest of the United States.
(2)
Relevant official
The relevant official referred to in paragraph (1) is—
(A) the Secretary of State with respect to oil pipelines; and
(B) the Secretary of Energy with respect to electric transmission facilities.
(3)
Additional requirement for electric transmission facilities
In the case of a request for a certificate of crossing for the construction, connection, operation,
or maintenance of a cross-border segment of an electric transmission
facility, the Secretary of Energy shall require, as a condition of issuing
the certificate of crossing for the request under paragraph (1), that the
cross-border segment of the electric transmission facility be constructed,
connected, operated, or maintained consistent with all applicable policies
and standards of—
(A) the Electric Reliability Organization and the applicable regional entity; and
(B) any Regional Transmission Organization or Independent System Operator with operational or
functional control over the cross-border segment of the electric
transmission facility.
(c)
Exclusions
This section shall not apply to any construction, connection, operation, or maintenance of a
cross-border segment of an oil pipeline or electric transmission facility
for the import or export of oil or the transmission of electricity to or
from Canada or Mexico—
(1) if the cross-border segment is operating for such import, export, or transmission as of the date of
enactment of this Act;
(2) if a permit described in section 6 for such construction, connection, operation, or maintenance has
been issued;
(3) if a certificate of crossing for such construction, connection, operation, or maintenance has
previously been issued under this section; or
(4) if an application for a permit described in section 6 for such construction, connection, operation,
or maintenance is pending on the date of enactment of this Act, until the
earlier of—
(A) the date on which such application is denied; or
(B) July 1, 2016.
(d)
Effect of other laws
(1)
Application to projects
Nothing in this section or section 7 shall affect the application of any other Federal statute to a
project for which a certificate of crossing for the construction,
connection, operation, or maintenance of a cross-border segment is sought
under this section.
(2)
Natural Gas Act
Nothing in this section or section 7 shall affect the requirement to obtain approval or
authorization under sections 3 and 7 of the Natural Gas Act for the
siting, construction, or operation of any facility to import or export
natural gas.
(3)
Energy Policy and Conservation Act
Nothing in this section or section 7 shall affect the authority of the President under section
103(a) of the Energy Policy and Conservation Act.
4.
Importation or exportation of natural gas to Canada and Mexico
Section 3(c) of the Natural Gas Act (15 U.S.C. 717b(c)) is amended by adding at the end the
following: No order is required under subsection (a) to authorize the export or import of any natural gas to
or from Canada or Mexico..
5.
Transmission of electric energy to Canada and Mexico
(a)
Repeal of requirement To secure order
Section 202(e) of the Federal Power Act (16 U.S.C. 824a(e)) is repealed.
(b)
Conforming amendments
(1)
State regulations
Section 202(f) of the Federal Power Act (16 U.S.C. 824a(f)) is amended by striking insofar as such State regulation does not conflict with the exercise of the Commission's powers
under or relating to subsection 202(e).
(2)
Seasonal diversity electricity exchange
Section 602(b) of the Public Utility Regulatory Policies Act of 1978 (16 U.S.C. 824a–4(b)) is
amended by striking the Commission has conducted hearings and made the findings required under section 202(e) of the
Federal Power Act and all that follows through the period at the end and inserting the Secretary has conducted hearings and finds that the proposed transmission facilities would not
impair the sufficiency of electric supply within the United States or
would not impede or tend to impede the coordination in the public interest
of facilities subject to the jurisdiction of the Secretary..
6.
No Presidential permit required
No Presidential permit (or similar permit) required under Executive Order 13337 (3 U.S.C. 301
note), Executive Order 11423 (3 U.S.C. 301 note), section 301 of title 3,
United States Code, Executive Order 12038, Executive Order 10485, or any
other Executive Order shall be necessary for the construction, connection,
operation, or maintenance of an oil or natural gas pipeline or electric
transmission facility, or any cross-border segment thereof.
7.
Modifications to existing projects
No certificate of crossing under section 3, or permit described in section 6, shall be required for
a modification to the construction, connection, operation, or maintenance
of an oil or natural gas pipeline or electric transmission facility—
(1) that is operating for the import or export of oil or natural gas or the transmission of electricity
to or from Canada or Mexico as of the date of enactment of the Act;
(2) for which a permit described in section 6 for such construction, connection, operation, or
maintenance has been issued; or
(3) for which a certificate of crossing for the cross-border segment of the pipeline or facility has
previously been issued under section 3.
8.
Effective date; rulemaking deadlines
(a)
Effective date
Sections 3 through 7, and the amendments made by such sections, shall take effect on July 1, 2015.
(b)
Rulemaking deadlines
Each relevant official described in section 3(b)(2) shall—
(1) not later than 180 days after the date of enactment of this Act, publish in the Federal Register
notice of a proposed rulemaking to carry out the applicable requirements
of section 3; and
(2) not later than 1 year after the date of enactment of this Act, publish in the Federal Register a
final rule to carry out the applicable requirements of section 3.
9.
Definitions
In this Act—
(1) the term cross-border segment means the portion of an oil or natural gas pipeline or electric transmission facility that is
located at the national boundary of the United States with either Canada
or Mexico;
(2) the term modification includes a reversal of flow direction, change in ownership, volume expansion, downstream or
upstream interconnection, or adjustment to maintain flow (such as a
reduction or increase in the number of pump or compressor stations);
(3) the term natural gas has the meaning given that term in section 2 of the Natural Gas Act (15 U.S.C. 717a);
(4) the term oil means petroleum or a petroleum product;
(5) the terms Electric Reliability Organization and regional entity have the meanings given those terms in section 215 of the Federal Power Act (16 U.S.C. 824o); and
(6) the terms Independent System Operator and Regional Transmission Organization have the meanings given those terms in section 3 of the Federal Power Act (16 U.S.C. 796).
June 19, 2014
Reported from the Committee on Energy and Commerce with an amendment
June 19, 2014
The Committees on Transportation and Infrastructure and Natural Resources discharged; committed to
the Committee of the Whole House on the State of the Union and ordered to
be printed