A BILL
To amend title 41, United States Code, to require the use
of two-phase selection procedures when design-build contracts are suitable for
award to small business concerns, and for other purposes.
1.
Short title
This Act may be cited as the
Design-Build Efficiency and Jobs Act
of 2013.
2.
Design-build
selection procedures
Section
3309 of title 41, United States Code, is amended—
(1) in subsection (d)
by striking agency determines with respect to and all that
follows through the period at the end, and inserting the following: the
head of the agency approves the contracting officer’s justification that an
individual solicitation must have greater than 5 finalists to be in the Federal
Government’s interest. The contracting officer must provide written
documentation of how a maximum number of offerors exceeding 5 is consistent
with the purposes and objectives of the two-phase selection process.;
and
(2) by adding at the
end the following:
(f)
Design and
construction contracts
Two-phase selection procedures shall be
used for entering into a contract for the design and construction of a public
building, facility, or work when a contracting officer determines that the
contract has a value of $750,000 or greater, as adjusted for inflation in
accordance with section 1908 of title 41, United States Code.
(g)
Reports
(1)
Agency
reports
Beginning on the date that is 1 year after the effective
date of this subsection, and for each of the 4 years thereafter, each agency
shall submit to the Comptroller General of the United States and publish in the
Federal Register, an annual report regarding all cases in the preceding year in
which—
(A) more than 5
finalists were selected for phase-two requests for competitive proposals;
or
(B) for a contract
that has a value of $750,000 (as adjusted for inflation in accordance with
section 1908 of title 41, United States Code) or greater for which the
two-phase selection procedures was not used.
(2)
GAO
report
On the first full fiscal year that is 5 years after the
effective date of this subsection, the Comptroller General of the United States
shall publish a report that, based on the information provided in the agency
reports required under paragraph (1), analyzes the degree to which agencies
have complied with the requirements of this
section.
.