Library / Laws / 113th / hr / H.R. 2742 / Introduced in House
I
113th CONGRESS
1st Session
H. R. 2742
IN THE HOUSE OF REPRESENTATIVES
July 18, 2013
Mrs. Noem (for
herself and Mr. Cramer) introduced the
following bill; which was referred to the Committee on Transportation and
Infrastructure
A BILL
To require the Army Corps of Engineers to notify the
public of certain flood predictions regarding the Missouri River System, and
for other purposes.
1.
Short title
This Act may be cited as the
Army Corps of Engineers Communications
Accountability Act of 2013.
2.
Notification and
consultation requirements
(a)
In
general
If the Chief of
Engineers makes an upper quartile determination or an upper decile
determination, the Chief of Engineers shall notify the public of such
determination, and consult with affected governments, in accordance with this
section.
(b)
Notification
Not later than 7 days after making a
determination described in subsection (a), the Chief of Engineers shall notify
the public that such determination has been made.
(c)
Consultation
(1)
In
general
If the Chief of
Engineers makes an upper decile determination, an affected government may
request a consultation with the Chief of Engineers.
(2)
Deadline
If an affected government requests a
consultation under paragraph (1), the Chief of Engineers shall provide such
consultation not later than 7 days after receiving the request.
(3)
Contents
The Chief of Engineers may provide in a
consultation under this subsection—
(A) information
regarding expected water levels;
(B) advice regarding
appropriate preparedness actions;
(C) technical
assistance; and
(D) any other information or assistance
determined appropriate by the Chief of Engineers.
(d)
Definitions
In
this section:
(1)
Affected
government
The term
affected government means a State, local, or tribal government
with jurisdiction over an area that will be affected by a flood occurring in
the Missouri River System, as determined by the Chief of Engineers in an upper
decile determination.
(2)
Annual operating
plan
The term annual operating plan means a plan
prepared by the Chief of Engineers that describes potential water conditions
scenarios for the Missouri River System for a year.
(3)
Upper decile
determination
The term upper decile determination
means a determination that runoff conditions in the Missouri River System are
likely to reach the upper decile scenario specified for a year in an annual
operating plan.
(4)
Upper quartile
determination
The term upper quartile determination
means a determination that runoff conditions in the Missouri River System are
likely to reach the upper quartile scenario specified for a year in an annual
operating plan.