Library / Laws / 113th / hr / H.R. 2687 / Introduced in House
I
113th CONGRESS
1st Session
H. R. 2687
IN THE HOUSE OF REPRESENTATIVES
July 15, 2013
Mr. Palazzo (for
himself and Mr. Smith of Texas)
introduced the following bill; which was referred to the
Committee on Science, Space, and
Technology
A BILL
To authorize the programs of the National Aeronautics and
Space Administration, and for other purposes.
1.
Short title; table of
contents
(a)
Short
title
This Act may be cited
as the National Aeronautics and Space
Administration Authorization Act of 2013.
(b)
Table of
contents
The table of contents for this Act is as follows:
Sec. 1. Short title; table of contents.
Sec. 2. Definitions.
Title I—Authorization of Appropriations
Sec. 101. Fiscal year 2014.
Sec. 102. Fiscal year 2015.
Sec. 103. Budget control.
Title II—Human Space Flight
Subtitle A—Exploration
Sec. 201. Space exploration policy.
Sec. 202. Stepping stone approach to exploration.
Sec. 203. Space Launch System.
Sec. 204. Orion crew capsule.
Sec. 205. Advanced booster competition.
Subtitle B—Space Operations
Sec. 211. Findings.
Sec. 212. International Space Station.
Sec. 213. Commercial crew report.
Sec. 214. Flight readiness demonstration.
Sec. 215. Certification Products Contract phase
two.
Sec. 216. Space communications.
Title III—Science
Subtitle A—General
Sec. 301. Science portfolio.
Sec. 302. Assessment of science mission extensions.
Sec. 303. Radioisotope thermoelectric generators.
Sec. 304. Congressional declaration of policy and
purpose.
Subtitle B—Astrophysics
Sec. 311. Decadal cadence.
Sec. 312. Extrasolar planet exploration strategy.
Sec. 313. James Webb Space Telescope.
Sec. 314. Wide-Field Infrared Survey Telescope.
Sec. 315. National Reconnaissance Office telescope
donation.
Subtitle C—Planetary Science
Sec. 321. Decadal cadence.
Sec. 322. Near-Earth objects.
Sec. 323. Astrobiology strategy.
Sec. 324. Public-private partnerships.
Subtitle D—Heliophysics
Sec. 331. Decadal cadence.
Sec. 332. Review of space weather.
Sec. 333. Deep Space Climate Observatory.
Subtitle E—Earth Science
Sec. 341. Goal.
Sec. 342. Decadal cadence.
Sec. 343. Research to operations.
Sec. 344. Interagency coordination.
Sec. 345. Joint Polar Satellite System climate
sensors.
Sec. 346. Land imaging.
Sec. 347. Sources of Earth science data.
Title IV—Aeronautics
Sec. 401. Sense of Congress.
Sec. 402. Unmanned aerial systems research and
development.
Sec. 403. Research program on composite materials used in
aeronautics.
Sec. 404. Hypersonic research.
Sec. 405. Supersonic research.
Sec. 406. Research on NextGen airspace management concepts and
tools.
Sec. 407. Rotorcraft research.
Title V—Space Technology
Sec. 501. Space technology.
Title VI—Education
Sec. 601. Education.
Title VII—Policy Provisions
Sec. 701. Asteroid Retrieval Mission.
Sec. 702. Termination liability.
Sec. 703. Indemnification extension.
Sec. 704. Baseline and cost controls.
Sec. 705. Project and program reserves.
Sec. 706. Independent reviews.
Sec. 707. Space Act Agreements.
Sec. 708. Human spaceflight accident
investigations.
Sec. 709. Commercial technology transfer program.
Sec. 710. Orbital debris.
Sec. 711. NASA leadership.
Sec. 712. NASA Advisory Council.
Sec. 713. Cost estimation.
2.
Definitions
In this Act:
(1)
Administration
The term Administration
means the National Aeronautics and Space Administration.
(2)
Administrator
The term Administrator means
the Administrator of the Administration.
(3)
Orion crew
capsule
The term Orion
crew capsule refers to the multipurpose crew vehicle described in
section 303 of the National Aeronautics and Space Administration Authorization
Act of 2010 (42 U.S.C. 18323).
(4)
Space Act
Agreement
The term
Space Act Agreement means an agreement created under the
authority to enter into other transactions under section
20113(e) of title 51, United States Code.
(5)
Space Launch
System
The term Space Launch System refers to the
follow-on Government-owned civil launch system developed, managed, and operated
by the Administration to serve as a key component to expand human presence
beyond low-Earth orbit, as described in section 302 of the National Aeronautics
and Space Administration Authorization Act of 2010 (42 U.S.C. 18322).
I
Authorization of
Appropriations
101.
Fiscal year
2014
There are authorized to
be appropriated to the Administration for fiscal year 2014 $16,865,200,000 as
follows:
(1) For Space
Exploration, $4,007,400,000, of which—
(A) $1,802,400,000
shall be for the Space Launch System;
(B) $1,200,000,000
shall be for the Orion crew capsule;
(C) $305,000,000 shall
be for Exploration Research and Development; and
(D) $700,000,000 shall
be for Commercial Crew Development activities.
(2) For Space
Operations, $3,817,900,000, of which—
(A) $2,984,100,000
shall be for the International Space Station Program; and
(B) $833,800,000 shall
be for Space and Flight Support.
(3) For Science,
$4,626,900,000, of which—
(A) $1,200,000,000
shall be for Earth Science;
(B) $1,500,000,000
shall be for Planetary Science, of which $30,000,000 shall be for the
Astrobiology Institute;
(C) $642,300,000 shall
be for Astrophysics;
(D) $658,200,000 shall
be for the James Webb Space Telescope; and
(E) $626,400,000 shall
be for Heliophysics.
(4) For Aeronautics,
$565,700,000.
(5) For Space
Technology, $500,000,000.
(6) For Education,
$125,000,000.
(7) For Cross-Agency
Support, $2,600,000,000, of which—
(A) $2,000,000,000
shall be for Center Management and Operations; and
(B) $600,000,000 shall
be for Agency Management and Operations.
(8) For Construction
and Environmental Compliance and Restoration, $587,000,000, of which—
(A) $542,000,000 shall
be for Construction and Facilities; and
(B) $45,000,000 shall
be for Environmental Compliance and Restoration.
(9) For Inspector
General, $35,300,000.
102.
Fiscal year
2015
There are authorized to
be appropriated to the Administration for fiscal year 2015 $16,865,200,000 as
follows:
(1) For Space
Exploration, $4,007,400,000, of which—
(A) $1,802,400,000
shall be for the Space Launch System;
(B) $1,200,000,000
shall be for the Orion crew capsule;
(C) $305,000,000 shall
be for Exploration Research and Development; and
(D) $700,000,000 shall be for Commercial Crew
Development activities.
(2) For Space
Operations, $3,817,900,000, of which—
(A) $2,984,100,000
shall be for the International Space Station Program; and
(B) $833,800,000 shall
be for Space and Flight Support.
(3) For Science,
$4,626,900,000, of which—
(A) $1,200,000,000
shall be for Earth Science;
(B) $1,500,000,000 shall be for Planetary
Science, of which $30,000,000 shall be for the Astrobiology Institute;
(C) $642,300,000 shall
be for Astrophysics;
(D) $658,200,000 shall
be for the James Webb Space Telescope; and
(E) $626,400,000 shall
be for Heliophysics.
(4) For Aeronautics,
$565,700,000.
(5) For Space
Technology, $500,000,000.
(6) For Education,
$125,000,000.
(7) For Cross-Agency
Support, $2,600,000,000, of which—
(A) $2,000,000,000
shall be for Center Management and Operations; and
(B) $600,000,000 shall
be for Agency Management and Operations.
(8) For Construction
and Environmental Compliance and Restoration, $587,000,000, of which—
(A) $542,000,000 shall
be for Construction and Facilities; and
(B) $45,000,000 shall
be for Environmental Compliance and Restoration.
(9) For Inspector
General, $35,300,000.
103.
Budget
control
The amounts authorized
to be appropriated to the Administration for fiscal years 2014 and 2015 are
consistent with the Budget Control Act of 2011 (Public Law 112–25). If such Act
is repealed or replaced with an Act that increases allocations, there are
authorized to be appropriated to the Administration such sums as that increase
allows, with increases allocated as follows:
(1) One-third of such
increase shall be for the International Space Station Program.
(2) One-third of such increase shall be for the
Space Launch System.
(3) One-third of such increase shall be divided
evenly between—
(A) Commercial Crew
Development activities; and
(B) the Orion crew
capsule.
II
Human Space
Flight
A
Exploration
201.
Space
exploration policy
(a)
Findings
Congress
finds the following:
(1) Congress supports
a human exploration program that is not critically dependent on the achievement
of milestones by fixed dates and an exploration technology development program
to enable lunar human and robotic operations, as described in paragraphs (1)
and (2) of section 70502 of title 51, United States Code.
(2) Congress supports
the expansion of permanent human presence beyond low-Earth orbit, in a manner
involving international partners where practical.
(3) Congress remains committed to ensuring that
authorized budgets for the human space flight program should allow the
Administration to maintain high safety standards.
(4) Exploration deeper
into the solar system should be the core mission of the Administration.
(5) Congress strongly
supports the development of the Space Launch System and the Orion crew capsule
as the enabling elements for human exploration, advanced scientific missions,
and national security priorities beyond low-Earth orbit.
(b)
Policy
It is the policy of the United States that
the development of capabilities and technologies necessary for human missions
to lunar orbit, the surface of the Moon, the surface of Mars, and beyond shall
be the goal of the Administration’s human space flight program.
(c)
Vision for space
exploration
Section 20302 of title 51, United States Code, is
amended—
(1) by striking
subsection (a) and inserting the following:
(a)
In
general
The Administrator
shall establish a program to develop a sustained human presence on the Moon and
the surface of Mars, including a robust precursor program that follows the
stepping stone plan required in section 70504 to promote exploration, science,
commerce, and United States preeminence in space. The Administrator is further
authorized to develop and conduct appropriate international collaborations in
pursuit of such program, but the absence of an international partner may not be
justification for failure to pursue such program in a timely
manner.
;
(2) in subsection
(b)—
(A) by striking
paragraph (1) and inserting the following:
(1) Returning Americans to the
Moon.
;
(B) by striking
paragraph (2) and inserting the following:
(2) Launching the first crewed mission of the
fully integrated Orion crew capsule with the Space Launch System as close to
2020 as possible.
;
and
(C) in paragraph (4),
by striking from Mars and and inserting from the Moon,
Mars, and; and
(3) by adding at the
end the following:
(c)
Definitions
In this section:
(1)
Orion crew
capsule
The term Orion crew capsule refers to the
multipurpose crew vehicle described in section 303 of the National Aeronautics
and Space Administration Authorization Act of 2010 (42 U.S.C. 18323).
(2)
Space Launch
System
The term Space
Launch System refers to the follow-on Government-owned civil launch
system developed, managed, and operated by the Administration to serve as a key
component to expand human presence beyond low-Earth orbit, as described in
section 302 of the National Aeronautics and Space Administration Authorization
Act of 2010 (42 U.S.C.
18322).
.
(d)
Key
objectives
Section 202(b) of the National Aeronautics and Space
Administration Authorization Act of 2010 (42 U.S.C. 18312(b)) is
amended—
(1) in paragraph (3),
by striking and after the semicolon;
(2) in paragraph (4),
by striking the period at the end and inserting ; and;
and
(3) by adding at the
end the following:
(5) to accelerate the development of
capabilities to enable a human exploration mission to the surface of Mars and
beyond through the prioritization of those technologies and capabilities best
suited for such a mission in accordance with the Mars Human Exploration Roadmap
under section 70504 of title 51, United States
Code.
.
(e)
Use of
non-United States human space flight transportation
capabilities
Section 201(a) of the National Aeronautics and Space
Administration Authorization Act of 2010 (42 U.S.C. 18311(a)) is amended to
read as follows:
(a)
Use of
non-United States human space flight transportation capabilities
(1)
In
general
NASA may not obtain non-United States human space flight
capabilities unless no domestic commercial provider is available to provide
such capabilities.
(2)
Definition
For
purposes of this subsection, the term domestic commercial
provider means a person providing space transportation services or
other space-related activities, the majority control of which is held by
persons other than a Federal, State, local, or foreign government, foreign
company, or foreign
national.
.
(f)
Repeal of Space
Shuttle capability assurance
Section 203 of the National Aeronautics and
Space Administration Authorization Act of 2010 (42 U.S.C. 18313) is
amended—
(1) by striking
subsection (b);
(2) in subsection (d), by striking
subsection (c) and inserting subsection (b);
and
(3) by redesignating subsections (c) and (d) as
subsections (b) and (c), respectively.
202.
Stepping stone
approach to exploration
(a)
In
general
Section 70504 of
title 51, United States Code, is amended to read as follows:
70504.
Stepping
stone approach to exploration
(a)
In
general
In order to maximize
the cost effectiveness of the long-term space exploration and utilization
activities of the United States, the Administrator shall direct the Human
Exploration and Operations Mission Directorate to develop a Mars Human
Exploration Roadmap to define the specific capabilities and technologies
necessary to extend human presence to the surface of Mars and the mission sets
required to demonstrate such capabilities and technologies.
(b)
Roadmap
requirements
In developing the Mars Human Exploration Roadmap,
the Administrator shall—
(1) include the specific set of capabilities
and technologies required to extend human presence to the surface of Mars and
the mission sets necessary to demonstrate the proficiency of these capabilities
and technologies with an emphasis on using the International Space Station,
lunar landings, cis-lunar space, trans-lunar space, Lagrangian points, and the
natural satellites of Mars, Phobos and Deimos, as testbeds, as necessary, and
shall include the most appropriate process for developing such capabilities and
technologies;
(2) provide a specific process for the
evolution of the capabilities of the fully integrated Orion crew capsule with
the Space Launch System and how these systems demonstrate the capabilities and
technologies described in paragraph (1);
(3) provide a description of the capabilities
and technologies that could be demonstrated or research data that could be
gained through the utilization of the International Space Station and the
status of the development of such capabilities and technologies;
(4) describe a framework for international
cooperation in the development of all technologies and capabilities required in
this section, as well as an assessment of the risks posed by relying on
international partners for capabilities and technologies on the critical path
of development;
(5) describe a process
for utilizing nongovernmental entities for future human exploration beyond
trans-lunar space and specify what, if any, synergy could be gained
from—
(A) partnerships using
Space Act Agreements (as defined in section 2 of the
National Aeronautics and Space Administration
Authorization Act of 2013); or
(B) other acquisition
instruments; and
(6) include in the Roadmap an addendum from the
NASA Advisory Council, and an addendum from the Aerospace Safety Advisory
Panel, each with a statement of review of the Roadmap that shall
include—
(A) subjects of
agreement;
(B) areas of concern;
and
(C) recommendations.
(c)
Updates
The
Administrator shall update such Roadmap at least every 4 years and include it
in the budget for that fiscal year transmitted to Congress under section
1105(a) of title 31, and describe—
(1) the achievements
and goals reached in the process of developing such capabilities and
technologies during the 4-year period prior to the submission of the Roadmap to
Congress; and
(2) the expected goals
and achievements in the following 4-year period.
(d)
Definitions
The
terms Orion crew capsule and Space Launch System
have the meanings given such terms in section
20302.
.
(b)
Report
(1)
In
general
Not later than 1 year after the date of enactment of this
Act, the Administrator shall transmit a copy of the Mars Human Exploration
Roadmap developed under section 70504 of title 51, United States Code, to the
Committee on Science, Space, and Technology of the House of Representatives and
the Committee on Commerce, Science, and Transportation of the Senate.
(2)
Updates
The Administrator shall transmit a copy of
each updated Mars Human Exploration Roadmap to the Committee on Science, Space,
and Technology of the House of Representatives and the Committee on Commerce,
Science, and Transportation of the Senate not later than 7 days after such
Roadmap is updated under section 70504(b)(6) of such title.
203.
Space Launch
System
(a)
Findings
Congress finds that—
(1) the Space Launch
System is the most practical approach to reaching the Moon, Mars, and beyond,
and Congress reaffirms the policy and minimum capability requirements for the
Space Launch System contained in section 302 of the National Aeronautics and
Space Administration Authorization Act of 2010 (42 U.S.C. 18322);
(2) the primary goal for the design of the
fully integrated Space Launch System is to safely carry a total payload of 130
tons or more to low-Earth orbit to enable human space exploration of the Moon,
Mars, and beyond over the course of the next century as required in section
302(c) of the National Aeronautics and Space Administration Authorization Act
of 2010 (42 U.S.C. 18322(c));
(3) the uncrewed
flight test of the 70-ton core element of the Space Launch System fully
integrated with the Orion crew capsule as described in section 302(c)(1) of the
National Aeronautics and Space Administration Authorization Act of 2010 (42
U.S.C. 18322(c)(1)) is a necessary flight demonstration in an overall program
plan, subject to appropriations; and
(4) the schedule of
the 70-ton core element crewed flight demonstration in 2021 with the Space
Launch System fully integrated with the Orion crew capsule as described in
section 302(c)(1) of the National Aeronautics and Space Administration
Authorization Act of 2010 (42 U.S.C. 18322(c)(1)) is subject to
appropriations.
(b)
In
general
As required in
section 302(c)(2) of the National Aeronautics and Space Administration
Authorization Act of 2010 (42 U.S.C. 18322(c)(2)), the Administration shall
design the Space Launch System as a fully integrated vehicle capable of
carrying a total payload of 130 tons or more into low-Earth orbit in
preparation for transit for missions beyond low-Earth orbit.
(c)
Progress
report
(1)
In
general
Using the President’s
budget request for fiscal year 2014 and notional numbers requested therein as a
baseline, not later than 90 days after the date of enactment of this Act the
Administrator shall transmit to the Committee on Science, Space, and Technology
of the House of Representatives and the Committee on Commerce, Science, and
Transportation of the Senate an estimate of—
(A) when the 70-ton
core element of the Space Launch System fully integrated with the Orion crew
capsule may be demonstrated as an operational capability;
(B) when the 130-ton
Space Launch System fully integrated with the Orion crew capsule may be
demonstrated as an operational capability;
(C) the projected
annual operational costs through 2030 for the 130-ton Space Launch System fully
integrated with the Orion crew capsule after its operational capability has
been demonstrated; and
(D) the projected
flight rate for the 130-ton Space Launch System fully integrated with the Orion
crew capsule through 2030.
(2)
Contingency
funding estimates
If the Administrator determines that the
uncrewed test flight of the 70-ton core element of the Space Launch System
fully integrated with the Orion crew capsule will not occur on or before
December 31, 2017, or that the crewed test flight of the 70-ton core element of
the Space Launch System fully integrated with the Orion crew capsule will not
occur on or before December 31, 2021, the report transmitted under paragraph
(1) shall include an estimate of additional funds required through annual
appropriations for fiscal years 2015 through 2021 which may be necessary to
meet such goals in those years.
(d)
Utilization
Report
The Administrator, in
consultation with the Secretary of Defense and the Director of National
Intelligence, shall prepare a report that addresses the effort and budget
required to enable and utilize a cargo variant of the 130-ton Space Launch
System configuration described in section 302(c) of the National Aeronautics
and Space Administration Authorization Act of 2010 (42 U.S.C. 18322(c)). This
report shall also include consideration of the technical requirements of the
scientific and national security communities related to such Space Launch
System and shall directly assess the utility and estimated cost savings
obtained by using such Space Launch System for national security and space
science missions. The Administrator shall transmit such report to the Committee
on Science, Space, and Technology of the House of Representatives and the
Committee on Commerce, Science, and Transportation of the Senate not later than
180 days after the date of enactment of this Act.
204.
Orion crew
capsule
(a)
In
general
The Orion crew
capsule shall meet the practical needs and the minimum capability requirements
described in section 303 of the National Aeronautics and Space Administration
Authorization Act of 2010 (42 U.S.C. 18323).
(b)
Report
Not later than 60 days after the date of
enactment of this Act, the Administrator shall transmit a report to the
Committee on Science, Space, and Technology of the House of Representatives and
the Committee on Commerce, Science, and Transportation of the Senate—
(1) detailing those components and systems of
the Orion crew capsule that ensure it is in compliance with section 303(b) of
such Act (42 U.S.C. 18323(b));
(2) detailing the
expected date that the Orion crew capsule will be available to transport crew
and cargo to the International Space Station; and
(3) certifying that
the requirements of section 303(b)(3) of such Act (42 U.S.C. 18323(b)(3)) will
be met by the Administration in time for the first crewed test flight in
2021.
205.
Advanced
booster competition
(a)
Report
Not later than 90 days after the date of
enactment of this Act, the Associate Administrator of the National Aeronautics
and Space Administration shall transmit to the Committee on Science, Space, and
Technology of the House of Representatives and the Committee on Commerce,
Science, and Transportation of the Senate a report that—
(1) describes the
estimated total development cost of an advanced booster for the Space Launch
System; and
(2) details any
reductions or increases to the development cost of the Space Launch System
which may result from conducting a competition for an advanced booster.
(b)
Competition
If
the Associate Administrator reports reductions pursuant to paragraph (2) of
subsection (a), then the Administration shall conduct a full and open
competition for an advanced booster for the Space Launch System to meet the
requirements described in section 302(c) of the National Aeronautics and Space
Administration Authorization Act of 2010 (42 U.S.C. 18322(c)), to begin not
later than 1 year after the Associate Administrator transmits the report
required under subsection (a).
B
Space
Operations
211.
Findings
Congress finds the following:
(1) The International Space Station is the
ideal short-term testbed for future exploration systems development, including
long-duration space travel.
(2) The use of the
private market to provide cargo and crew transportation services is currently
the most expeditious process to restore domestic access to the International
Space Station and low-Earth orbit.
(3) Government-assured
access to low-Earth orbit is paramount to the continued success of the
International Space Station and National Laboratory.
(4) Acquiring and
maintaining an operational domestic commercial crew transportation service by
the year 2017 is of the utmost importance for the future viability of the
International Space Station and National Laboratory.
212.
International
Space Station
(a)
In
general
The following is the
policy of the United States:
(1) The International Space Station shall be
utilized to the maximum extent practicable for the development of capabilities
and technologies needed for the future of human exploration beyond low-Earth
orbit.
(2) The Administrator
shall, in consultation with the International Space Station partners—
(A) take all necessary
measures to support the operation and full utilization of the International
Space Station; and
(B) seek to minimize,
to the extent practicable, the operating costs of the International Space
Station.
(3) Reliance on
foreign carriers for crew transfer is unacceptable, and the Nation’s human
space flight program must acquire the capability to launch United States
astronauts on United States rockets from United States soil as soon as is safe
and practically possible, whether on Government-owned and operated space
transportation systems or privately owned systems that have been certified for
flight by the appropriate Federal agencies.
(b)
Reaffirmation of
policy
Congress reaffirms—
(1) its commitment to
the development of a commercially developed launch and delivery system to the
International Space Station for crew missions as expressed in the National
Aeronautics and Space Administration Authorization Act of 2005 (Public Law
109–155), the National Aeronautics and Space Administration Authorization Act
of 2008 (Public Law 110–422), and the National Aeronautics and Space
Administration Authorization Act of 2010 (Public Law 111–267);
(2) that the
Administration shall make use of United States commercially provided
International Space Station crew transfer and crew rescue services to the
maximum extent practicable; and
(3) the policy stated
in section 501(b) of the National Aeronautics and Space Administration
Authorization Act of 2010 (42 U.S.C. 18351(b)) that the Administration shall
pursue international, commercial, and intragovernmental means to maximize
International Space Station logistics supply, maintenance, and operational
capabilities, reduce risks to International Space Station systems
sustainability, and offset and minimize United States operations costs relating
to the International Space Station.
(c)
Assured access
to low-Earth orbit
Section 70501(a) of title 51, United States
Code, is amended to read as follows:
(a)
Policy
statement
It is the policy of
the United States to maintain an uninterrupted capability for human space
flight and operations in low-Earth orbit, and beyond, as an essential
instrument of national security and the capability to ensure continued United
States participation and leadership in the exploration and utilization of
space.
.
(d)
Repeals
(1)
Use of space
shuttle or alternatives
Chapter 701 of title 51, United States
Code, and the item relating to such chapter in the table of chapters for such
title, is repealed.
(2)
Shuttle pricing
policy for commercial and foreign users
Chapter 703 of title 51,
United States Code, and the item relating to such chapter in the table of
chapters for such title, is repealed.
(3)
Shuttle
privatization
Section 50133 of title 51, United States Code, and
the item relating to such section in the table of sections for chapter 501 of
such title, is repealed.
(e)
Extension
criteria report
Not later
than 1 year after the date of enactment of this Act, the Administrator shall
submit to the Committee on Science, Space, and Technology of the House of
Representatives and the Committee on Commerce, Science, and Transportation of
the Senate a report on the feasibility of extending the operation of the
International Space Station that includes—
(1) criteria for
defining the International Space Station as a research success;
(2) cost estimates for operating the
International Space Station to achieve the criteria in paragraph (1);
(3) cost estimates for extending operations to
2020, 2025, and 2030; and
(4) an assessment of
how the defined criteria under paragraph (1) respond to the National Academies
Decadal Survey on Biological and Physical Sciences in Space.
(f)
Strategic plan
for International Space Station research
(1)
In
general
The Director of the
Office of Science and Technology Policy, in consultation with the
Administrator, academia, other Federal agencies, the International Space
Station National Laboratory Advisory Committee, and other potential
stakeholders, shall develop and transmit to the Committee on Science, Space,
and Technology of the House of Representatives and the Committee on Commerce,
Science, and Transportation of the Senate a strategic plan for conducting
competitive, peer-reviewed research in physical and life sciences and related
technologies on the International Space Station through at least 2020.
(2)
Plan
requirements
The strategic plan shall—
(A) be consistent with the priorities and
recommendations established by the National Academies in its Decadal Survey on
Biological and Physical Sciences in Space;
(B) provide a research
timeline and identify resource requirements for its implementation, including
the facilities and instrumentation necessary for the conduct of such research;
and
(C) identify—
(i) criteria for the
proposed research, including—
(I) a
justification for the research to be carried out in the space microgravity
environment;
(II) the use of model
systems;
(III) the testing of
flight hardware to understand and ensure its functioning in the microgravity
environment;
(IV) the use of
controls to help distinguish among the direct and indirect effects of
microgravity, among other effects of the flight or space environment;
(V) approaches for
facilitating data collection, analysis, and interpretation;
(VI) procedures to
ensure repetition of experiments, as needed;
(VII) support for
timely presentation of the peer-reviewed results of the research; and
(VIII) defined metrics
for the success of each study;
(ii) instrumentation
required to support the measurements and analysis of the research to be carried
out under the strategic plan;
(iii) the capabilities
needed to support direct, real-time communications between astronauts working
on research experiments onboard the International Space Station and the
principal investigator on the ground;
(iv) a
process for involving the external user community in research planning,
including planning for relevant flight hardware and instrumentation, and for
utilization of the International Space Station, free flyers, or other research
platforms; and
(v) defined metrics
for success of the research plan.
(3)
Report
(A)
In
general
Not later than 1 year
after the date of enactment of this Act, the Comptroller General of the United
States shall transmit to the Committee on Science, Space, and Technology of the
House of Representatives and the Committee on Commerce, Science, and
Transportation of the Senate a report on the progress of the organization
chosen for the management of the International Space Station National
Laboratory as directed in section 504 of the National Aeronautics and Space
Administration Authorization Act of 2010 (42 U.S.C. 18354).
(B)
Specific
requirements
The report shall assess the management,
organization, and performance of such organization and shall include a review
of the status of each of the 7 required activities listed in section 504(c) of
such Act (42 U.S.C. 18354(c)).
213.
Commercial crew
report
(a)
In
general
The Administration
shall consider the ramifications of and create contingencies as the
sequestration adopted in the Budget Control Act of 2011 (Public Law 112–25)
continues to reduce the Administration’s overall budget.
(b)
Report
(1)
In
general
Not later than 60 days after the date of enactment of
this Act, the Administrator shall transmit to the Committee on Science, Space,
and Technology of the House of Representatives and the Committee on Commerce,
Science, and Transportation of the Senate a report containing 5 distinct
options for the final stages of the commercial crew program.
(2)
Requirements
These options shall include—
(A) a strategy that
assumes an appropriation of $500,000,000 over the next 3 fiscal years;
(B) a strategy that assumes an appropriation of
$600,000,000 over the next 3 fiscal years;
(C) a strategy that
assumes an appropriation of $700,000,000 over the next 3 fiscal years;
(D) a strategy that assumes an appropriation of
$800,000,000 over the next 3 fiscal years; and
(E) a strategy that
has yet to be considered previously in any budget submission but that the
Administration believes could ensure the flight readiness date of 2017 for at
least one provider or significantly decreases the overall program lifecycle
cost.
(3)
Inclusions
Each strategy shall include the contracting
instruments the Administration will employ to acquire the services in each
phase of development or acquisition, the number of commercial providers the
Administration will include in the program, and the estimated flight readiness
date in each scenario.
214.
Flight
readiness demonstration
(a)
In
general
The Administration shall carry out its flight readiness
demonstration, in which one or more commercial crew partner companies safely
transports United States astronauts to the International Space Station, by
December 31, 2017.
(b)
Report
Not later than 180 days after the date of
enactment of this Act and every 90 days thereafter until the Administration
carries out its flight readiness demonstration, the Administrator shall
transmit to the Committee on Science, Space, and Technology of the House of
Representatives and the Committee on Commerce, Science, and Transportation of
the Senate a report—
(1) describing the current status of the
Commercial Crew program, including all funding paid to any partner company
throughout the life of the program detailed by specific dollar amounts provided
for each milestone completed for each partner company;
(2) specifying the accomplishments and
milestones completed in the 90 days prior to the date of transmission of the
report under any phase of the program and all dollar amounts provided for each
of those milestones;
(3) identifying those accomplishments and
milestones that were expected to be completed in the 90 days prior to the date
of transmission of such report under any phase of the program but that were not
completed in that timeframe;
(4) setting forth the
accomplishments and milestones that are expected to be completed in the 90-day
period following the transmission of such report under any phase of the
program; and
(5) containing a
statement of flight readiness under subsection (c).
(c)
Statement of
Flight Readiness
The
statement of flight readiness required by subsection (b)(5) shall
include—
(1) either—
(A) a certification by
the Administrator that the Administration is on schedule to comply with
subsection (a); or
(B) an explanation as
to why the Administration is not on schedule to comply with subsection (a) and
why the Administration did not develop an acquisition strategy based on
existing budget authority; and
(2) a certification by the Administrator that
all deviations from the Aerospace Safety Advisory Panel recommendations have
been reported in accordance with section 215.
(d)
Authorization of
funds
Not later than 60 days
after the issuance of the explanation described in subsection (c)(2), the
Administrator shall provide, and begin implementation of, a new acquisition
strategy that ensures that at least 1 company will be prepared to provide crew
transport services by December 31, 2017.
215.
Certification
Products Contract phase two
(a)
In
general
Phase two and any
subsequent phase of the Certification Products Contract, and any further
acquisition or development actions taken by the Administration under the
Commercial Crew Program, shall be executed—
(1) under a cost-type
contract specified by Federal Acquisition Regulations; and
(2) except as provided
in subsection (b), in accordance with the 2012 Annual Report of the Aerospace
Safety Advisory Panel.
(b)
Deviations
(1)
Authority
The Administrator may deviate from any
findings and recommendations of the 2012 Annual Report of the Aerospace Safety
Advisory Panel if the Administrator has determined doing so is in the best
interest of the program.
(2)
Notice and
justification
If the
Administrator deviates from any findings and recommendations of the 2012 Annual
Report of the Aerospace Safety Advisory Panel under paragraph (1), the
Administrator shall transmit in writing to the Chair of the Aerospace Safety
Advisory Panel, the Committee on Science, Space, and Technology of the House of
Representatives, and the Committee on Commerce, Science, and Transportation of
the Senate notice of any planned deviations, along with a justification
therefor, as part of the statement required under section 214(c)(1).
(c)
Report
The
Aerospace Safety Advisory Panel shall review and report to the Committee on
Science, Space, and Technology of the House of Representatives and the
Committee on Commerce, Science, and Transportation of the Senate on any
deviation within 45 days of notification.
216.
Space
communications
(a)
Plan
The Administrator shall develop a plan, in
consultation with relevant Federal agencies, for updating the Administration’s
space communications architecture for both low-Earth orbital operations and
deep space exploration so that it is capable of meeting the Administration’s
needs over the next 20 years. The plan shall include lifecycle cost estimates,
milestones, estimated performance capabilities, and 5-year funding profiles.
The plan shall also include an estimate of the amounts of any reimbursements
the Administration is likely to receive from other Federal agencies during the
expected life of the upgrades described in the plan. At a minimum, the plan
shall include a description of the following:
(1) Projected Deep
Space Network requirements for the next 20 years, including those in support of
human space exploration missions.
(2) Upgrades needed to
support Deep Space Network requirements, including cost estimates and
schedules.
(3) Cost estimates for
the maintenance of existing Deep Space Network capabilities.
(4) Projected Tracking
and Data Relay Satellite System requirements for the next 20 years, including
those in support of other relevant Federal agencies.
(5) Cost and schedule
estimates to maintain and upgrade the Tracking and Data Relay Satellite System
to meet projected requirements.
(6) Steps the
Administration is taking to mitigate threats to electromagnetic spectrum
use.
(b)
Schedule
The
Administrator shall transmit the plan developed under this section to the
Committee on Science, Space, and Technology of the House of Representatives and
the Committee on Commerce, Science, and Transportation of the Senate not later
than 1 year after the date of enactment of this Act.
III
Science
A
General
301.
Science
portfolio
(a)
Balanced and
adequately funded activities
Section 803 of the National
Aeronautics and Space Administration Authorization Act of 2010 (124 Stat. 2832)
is amended to read as follows:
803.
Overall science
portfolio; Sense of Congress
Congress reaffirms its sense, expressed in
the National Aeronautics and Space Administration Authorization Act of 2010,
that a balanced and adequately funded set of activities, consisting of research
and analysis grants programs, technology development, small, medium, and large
space missions, and suborbital research activities, contributes to a robust and
productive science program and serves as a catalyst for innovation and
discovery.
.
(b)
Decadal
surveys
In proposing the funding of programs and activities for
the National Aeronautics and Space Administration for each fiscal year, the
Administrator shall, to the greatest extent practicable, follow guidance
provided in the current decadal surveys from the National Academies’ Space
Studies Board.
302.
Assessment of
science mission extensions
Section 30504 of title 51, United States
Code, is amended to read as follows:
30504.
Assessment of
science mission extensions
(a)
Assessment
The
Administrator shall carry out biennial reviews within each of the Science
divisions to assess the cost and benefits of extending the date of the
termination of data collection for those missions that exceed their planned
mission lifetime. The assessment shall take into consideration how extending
existing missions impacts the start of future missions.
(b)
Consultation and
Consideration of Potential Benefits of Instruments on
Missions
When deciding whether to extend a mission that has an
operational component, the Administrator shall consult with any affected
Federal agency and shall take into account the potential benefits of
instruments on missions that are beyond their planned mission lifetime.
(c)
Costs
If
a mission is extended based on consultation required under subsection (b), the
full costs of the extension shall be paid for by the operational agency or
agencies.
(d)
Report
The Administrator shall transmit to the
Committee on Science, Space, and Technology of the House of Representatives and
the Committee on Commerce, Science, and Transportation of the Senate, at the
same time as the submission to Congress of the President’s annual budget
request, a report detailing any assessment required by subsection (a) that was
carried out during the previous
year.
.
303.
Radioisotope
thermoelectric generators
(a)
Analysis of
Requirements and Risks
The Administrator, in consultation with
other Federal agencies, shall conduct an analysis of—
(1) the requirements
of the Administration for radioisotope power system material that is needed to
carry out planned, high priority robotic missions in the solar system and other
surface exploration activities beyond low-Earth orbit; and
(2) the risks to
missions of the Administration in meeting those requirements, or any additional
requirements, due to a lack of adequate radioisotope power system
material.
(b)
Contents of
analysis
The analysis conducted under subsection (a)
shall—
(1) detail the Administration’s current
projected mission requirements and associated timeframes for radioisotope power
system material;
(2) explain the assumptions used to determine
the Administration’s requirements for the material, including—
(A) the planned use of
Advanced Stirling Radioisotope Generator technology;
(B) the status of and
timeline for completing development and demonstration of the Advanced Stirling
Radioisotope Generator technology, including the development of flight
readiness requirements; and
(C) the risks and implications of, and
contingencies for, any delays or unanticipated technical challenges affecting
or related to the Administration’s mission plans for the anticipated use of
Advanced Stirling Radioisotope Generator technology;
(3) assess the risk to the Administration’s
programs of any potential delays in achieving the schedule and milestones for
planned domestic production of radioisotope power system material;
(4) outline a process
for meeting any additional Administration requirements for the material;
(5) estimate the
incremental costs required to increase the amount of material produced each
year, if such an increase is needed to support additional Administration
requirements for the material;
(6) detail how the Administration and other
Federal agencies will manage, operate, and fund production facilities and the
design and development of all radioisotope power systems used by the
Administration and other Federal agencies as necessary;
(7) specify the steps the Administration will
take, in consultation with the Department of Energy, to preserve the
infrastructure and workforce necessary for production of radioisotope power
systems; and
(8) detail how the
Administration has implemented or rejected the recommendations from the
National Research Council’s 2009 report titled Radioisotope Power
Systems: An Imperative for Maintaining U.S. Leadership in Space
Exploration.
(c)
Transmittal
Not later than 180 days after the date of
enactment of this Act, the Administrator shall transmit the results of the
analysis to the Committee on Science, Space, and Technology of the House of
Representatives and the Committee on Commerce, Science, and Transportation of
the Senate.
304.
Congressional
declaration of policy and purpose
Section 20102(d) of title 51, United States
Code, is amended by adding at the end the following new paragraph:
(10) The direction of the unique competence of
the Administration to the search for life’s origin, evolution, distribution,
and future in the Universe. In carrying out this objective, the Administration
may use any practicable ground-based, airborne, or space-based technical means
and spectra of electromagnetic
radiation.
.
B
Astrophysics
311.
Decadal
cadence
In carrying out
section 301(b), the Administrator shall ensure a steady cadence of large,
medium, and small astrophysics missions.
312.
Extrasolar
planet exploration strategy
(a)
Strategy
The Administrator shall enter into an
arrangement with the National Academies to develop a science strategy for the
study and exploration of extrasolar planets, including the use of TESS, the
James Webb Space Telescope, WFIRST, or any other telescope, spacecraft, or
instrument as appropriate. Such strategy shall—
(1) outline key
scientific questions;
(2) identify the most
promising research in the field;
(3) indicate the
extent to which the mission priorities in existing decadal surveys address key
extrasolar planet research goals; and
(4) make recommendations with respect to
optimal coordination with international partners.
(b)
Use of
strategy
The Administrator shall use the strategy to—
(1) inform roadmaps,
strategic plans, and other activities of the Administration as they relate to
extrasolar planet research and exploration; and
(2) provide a
foundation for future activities and initiatives.
(c)
Report to
Congress
Not later than 18
months after the date of enactment of this Act, the National Academies shall
transmit a report to the Administrator, and to the Committee on Science, Space,
and Technology of the House of Representatives and the Committee on Commerce,
Science, and Transportation of the Senate, containing the strategy developed
under subsection (a).
313.
James Webb
Space Telescope
It is the
sense of Congress that the James Webb Space Telescope program is significant to
our understanding of the history of the universe, including galaxies, stars,
and planetary systems, and should continue to receive priority of funding in
accord with the recommendation of the most recent decadal survey for Astronomy
and Astrophysics of the National Academies’ Space Studies Board.
314.
Wide-Field
Infrared Survey Telescope
The
Administrator shall ensure that the development of the Wide-Field Infrared
Survey Telescope continues while the James Webb Space Telescope is
completed.
315.
National
Reconnaissance Office telescope donation
Not later than 90 days after the date of
enactment of this Act, the Administrator shall transmit a report to the
Committee on Science, Space, and Technology of the House of Representatives and
the Committee on Commerce, Science, and Transportation of the Senate outlining
the cost of the Administration’s potential plan for developing the Wide-Field
Infrared Survey Telescope as described in the most recent astronomy and
astrophysics decadal survey, including an alternative plan for the Wide-Field
Infrared Survey Telescope 2.4, which includes the donated 2.4-meter aperture
National Reconnaissance Office telescope. Due to the budget constraints on the
Administration’s science programs, this report shall include—
(1) an assessment of
affordable approaches to develop the Wide-Field Infrared Survey
Telescope;
(2) a
comparison to the development of mission concepts that exclude the utilization
of the donated asset;
(3) an assessment of
how the Administration’s existing science missions will be affected by the
utilization of the donated asset described in this section; and
(4) a
description of the cost associated with storing and maintaining the donated
asset.
C
Planetary
Science
321.
Decadal
cadence
In carrying out
section 301(b), the Administrator shall ensure, to the greatest extent
practicable, that the Administration carries out a balanced set of planetary
science programs in accordance with the priorities established in the most
recent decadal survey for planetary science. Such programs shall include, at a
minimum—
(1) a
Discovery-class mission at least once every 24 months;
(2) a
New Frontiers-class mission at least once every 60 months; and
(3) at least one Flagship-class mission per
decadal survey period, starting with a Europa mission with a goal of launching
by 2021.
322.
Near-Earth
objects
(a)
Findings
Congress
makes the following findings:
(1) Near-Earth objects
pose a serious and credible threat to humankind, as many scientists believe
that a major asteroid or comet was responsible for the mass extinction of the
majority of the Earth’s species, including the dinosaurs, nearly 65,000,000
years ago.
(2) Similar objects
have struck the Earth or passed through the Earth’s atmosphere several times in
the Earth’s history and pose a similar threat in the future.
(3) Several such
near-Earth objects have only been discovered within days of the objects’
closest approach to Earth, and recent discoveries of such large objects
indicate that many large near-Earth objects remain to be discovered.
(4) The efforts taken
to date by the Administration for detecting and characterizing the hazards of
near-Earth objects must continue to fully determine the threat posed by such
objects to cause widespread destruction and loss of life.
(b)
Definition
For
purposes of this section, the term near-Earth object means an
asteroid or comet with a perihelion distance of less than 1.3 Astronomical
Units from the Sun.
(c)
Near-Earth
object survey
The Administrator shall continue to discover,
track, catalogue, and characterize the physical characteristics of near-Earth
objects equal to or greater than 140 meters in diameter in order to assess the
threat of such near-Earth objects to the Earth, pursuant to the George E.
Brown, Jr. Near-Earth Object Survey Act (42 U.S.C. 16691). It shall be the goal
of the Survey program to achieve 90 percent completion of its near-Earth object
catalogue (based on statistically predicted populations of near-Earth objects)
by 2020.
(d)
Warning and
mitigation of potential hazards of near-Earth objects
Congress
reaffirms the policy set forth in section 20102(g) of title 51, United States
Code (relating to detecting, tracking, cataloguing, and characterizing
asteroids and comets).
(e)
Program
Report
The Administrator
shall transmit to the Committee on Science, Space, and Technology of the House
of Representatives and the Committee on Commerce, Science, and Transportation
of the Senate, not later than 1 year after the date of enactment of this Act,
an initial report that provides—
(1) recommendations
for carrying out the Survey program and an associated proposed budget;
(2) analysis of
possible options that the Administration could employ to divert an object on a
likely collision course with Earth; and
(3) a
description of the status of efforts to coordinate and cooperate with other
countries to discover hazardous asteroids and comets, plan a mitigation
strategy, and implement that strategy in the event of the discovery of an
object on a likely collision course with Earth.
(f)
Annual
reports
The Administrator
shall annually transmit to the Committee on Science, Space, and Technology of
the House of Representatives and the Committee on Commerce, Science, and
Transportation of the Senate a report that provides—
(1) a
summary of all activities carried out pursuant to subsection (c) since the date
of enactment of this Act; and
(2) a
summary of expenditures for all activities carried out pursuant to subsection
(c) since the date of enactment of this Act.
323.
Astrobiology
strategy
(a)
Strategy
The Administrator shall enter into an
arrangement with the National Academies to develop a science strategy for
astrobiology that would outline key scientific questions, identify the most
promising research in the field, and indicate the extent to which the mission
priorities in existing decadal surveys address the search for life’s origin,
evolution, distribution, and future in the Universe.
(b)
Use of
strategy
The Administrator
shall use the strategy developed under subsection (a) in planning and funding
research and other activities and initiatives in the field of astrobiology. The
strategy shall include recommendations for coordination with international
partners.
(c)
Report to
Congress
Not later than 18
months after the date of enactment of this Act, the National Academies shall
transmit a report to the Administrator, and to the Committee on Science, Space,
and Technology of the House of Representatives and the Committee on Commerce,
Science, and Transportation of the Senate, containing the strategy developed
under subsection (a).
324.
Public-private
partnerships
Not later than
180 days after the date of enactment of this Act, the Administrator shall
transmit to the Committee on Science, Space, and Technology of the House of
Representatives and the Committee on Commerce, Science, and Transportation of
the Senate a report describing how the Administration can expand collaborative
public-private partnerships to study life’s origin, evolution, distribution,
and future in the Universe.
D
Heliophysics
331.
Decadal
cadence
In carrying out
section 301(b), the Administrator shall ensure a steady cadence of large,
medium, and small heliophysics missions.
332.
Review of space
weather
(a)
Review
The Director of the Office of Science and
Technology Policy, in consultation with the Administrator, the Administrator of
the National Oceanic and Atmospheric Administration, the Director of the
National Science Foundation, the Secretary of Defense, the Secretary of Energy,
and the Secretary of Homeland Security, shall enter into an arrangement with
the National Academies to provide a comprehensive study that reviews current
and planned space weather monitoring requirements and capabilities. The study
shall inform the process of identifying national needs for future space weather
monitoring and mitigation. The National Academies shall give consideration to
international and private sector efforts and collaboration. The study shall
also review the current state of research capabilities in observing, modeling,
and prediction and provide recommendations to ensure future advancement of
predictive capability.
(b)
Report to
Congress
Not later than 1
year after the date of enactment of this Act, the National Academies shall
transmit a report to the Administrator, and to the Committee on Science, Space,
and Technology of the House of Representatives and the Committee on Commerce,
Science, and Transportation of the Senate, containing the results of the study
provided under subsection (a).
333.
Deep Space
Climate Observatory
(a)
Integrating
sensors
The Administrator may
not integrate or fund the development of any sensor on the Deep Space Climate
Observatory (DSCOVR) that is not aligned with the spacecraft’s original space
weather mission requirements.
(b)
Algorithms
The Administration may not develop or
implement algorithms, or any other applications or products, that—
(1) are not aligned
with the Deep Space Climate Observatory mission’s intended space weather
requirements; or
(2) enable
Earth at noon images from the spacecraft.
E
Earth
Science
341.
Goal
(a)
In
general
Recognizing the
contributions that Earth science and remote sensing have made to society over
the last 50 years, the Administration shall continue to develop first-of-a-kind
instruments that, once proved, can be transitioned to other agencies for
operations.
(b)
Amendment
Section 60501 of title 51, United States
Code, is amended by inserting In order to accomplish this goal, the
Administrator shall conduct research and development on new sensors and
instruments that will mitigate the risks associated with the development of
operational systems and long-term data continuity requirements by other
agencies. The Administration shall not be responsible for the development of
operational Earth science systems, including satellite, sensor, or instrument
development, acquisition, and operations, as well as product development and
data analysis, unless such work is conducted on a reimbursable basis that
accounts for the full cost of the work. The Administrator shall use the Joint
Agency Satellite Division structure, or a direct successor thereto, to manage
this process on a fully reimbursable basis. after Earth
observations-based research program..
342.
Decadal
cadence
In carrying out
section 301(b), the Administrator shall ensure a steady cadence of large,
medium, and small Earth science missions.
343.
Research to
operations
Section 60502(a) of
title 51, United States Code, is amended by inserting Operational
responsibility for Earth science or space weather missions or sensors may not
be transferred from any other Federal agency to the Administration, except as
specifically authorized by law. after execute the
transitions..
344.
Interagency
coordination
Section 60505 of
title 51, United States Code, is amended—
(1) in the section
heading, by inserting and
other Federal agencies after Atmospheric
Administration;
(2) in subsection
(a)—
(A) by striking
and the Administrator of the National Oceanic and Atmospheric
Administration and inserting , the Administrator of the National
Oceanic and Atmospheric Administration, and the heads of other relevant Federal
agencies; and
(B) by striking
the two agencies and inserting each of those
agencies;
(3) in subsection (b)—
(A) by striking
and the Administrator of the National Oceanic and Atmospheric
Administration and inserting , the Administrator of the National
Oceanic and Atmospheric Administration, and the heads of other relevant Federal
agencies;
(B) by striking
Committee on Science and Technology and inserting
Committee on Science, Space, and Technology; and
(C) by striking
and the National Oceanic and Atmospheric Administration and
inserting , the National Oceanic and Atmospheric Administration, and
other relevant Federal agencies; and
(4) in subsection (d),
by striking Administration Earth science mission and all that
follows through the period and inserting Earth science mission or Earth
observing system to or from the National Oceanic and Atmospheric
Administration, any other Federal agency, or the Administration, or to or from
other stakeholders, until the plans required under subsection (c) have been
approved by the Administrator, the Administrator of the National Oceanic and
Atmospheric Administration, and the heads of other relevant Federal agencies,
and until financial resources have been identified to support the transition or
transfer in the President’s annual budget request for the National Oceanic and
Atmospheric Administration, the Administration, or other relevant agencies.
Operational responsibility for Earth science programs may not be transferred
from any other Federal agency to the Administration, except as specifically
authorized by law..
345.
Joint Polar
Satellite System climate sensors
The Administration shall not be responsible
for the development of Joint Polar Satellite System climate sensors, including
the Total Solar Irradiance Sensor (TSIS–2), the Ozone Mapping and Profiler
Suite–Limb (OMPS–L), or the Clouds and Earth Radiant Energy System (CERES–C).
Any effort by the Administration related to this work shall be conducted on a
fully reimbursable basis and executed by the Administration’s Joint Agency
Satellite Division or a direct successor thereto.
346.
Land
imaging
(a)
Reaffirmation of
Policy
Congress reaffirms the finding in section 2(1) of the Land
Remote Sensing Policy Act of 1992 (15 U.S.C. 5601(1)), which states that
The continuous collection and utilization of land remote sensing data
from space are of major benefit in studying and understanding human impacts on
the global environment, in managing the Earth’s natural resources, in carrying
out national security functions, and in planning and conducting many other
activities of scientific, economic, and social importance..
(b)
Continuous Land
Remote Sensing Data Collection
The Director of the Office of
Science and Technology Policy shall take steps in consultation with other
relevant Federal agencies to ensure, to the maximum extent practicable, the
continuous collection of space-based, medium-resolution observations of the
Earth’s land cover, and to ensure that the data are made available in such ways
as to facilitate the widest possible use.
(c)
Definition of
land imaging capabilities
The
Administrator may not initiate the definition of requirements for land imaging
capabilities unless such work is conducted on a fully reimbursable basis and
executed by the Administration’s Joint Agency Satellite Division or a direct
successor thereto.
347.
Sources of
Earth science data
(a)
Acquisition
The
Administrator shall, to the extent possible and while satisfying the scientific
or educational requirements of the Administration and, where appropriate, of
other Federal agencies and scientific researchers, acquire, where cost
effective, space-based and airborne Earth remote sensing data, services,
distribution, and applications from non-Federal providers.
(b)
Treatment as
Commercial Item Under Acquisition Laws
Acquisitions by the
Administrator of the data, services, distribution, and applications referred to
in subsection (a) shall be carried out in accordance with applicable
acquisition laws and regulations (including chapters 137 and 140 of title 10,
United States Code). For purposes of such laws and regulations, such data,
services, distribution, and applications shall be considered to be commercial
items. Nothing in this subsection shall be construed to preclude the United
States from acquiring, through contracts with commercial providers, sufficient
rights in data to meet the needs of the scientific and educational community or
the needs of other government activities.
(c)
Safety
Standards
Nothing in this section shall be construed to prohibit
the Federal Government from requiring compliance with applicable safety
standards.
(d)
Report
Not later than 180 days after the date of
enactment of the Act, the Administrator shall submit a report to the Committee
on Science, Space, and Technology of the House of Representatives and the
Committee on Commerce, Science, and Transportation of the Senate on the
Administration’s efforts to carry out this section.
IV
Aeronautics
401.
Sense of
Congress
It is the sense of
Congress that—
(1) a
robust aeronautics research portfolio will help maintain the United States
status as a leader in aviation;
(2) aeronautics
research is essential to the Administration’s mission; and
(3) the Administrator
should coordinate and consult with relevant Federal agencies and the private
sector to minimize duplication and leverage resources.
402.
Unmanned aerial
systems research and development
(a)
In
general
The Administrator, in consultation with the Administrator
of the Federal Aviation Administration and other Federal agencies, shall direct
research and technological development to facilitate the safe integration of
unmanned aerial systems into the National Airspace System, including—
(1) positioning and
navigation systems;
(2) sense and avoid
capabilities;
(3) secure data and
communication links;
(4) flight recovery
systems; and
(5) human systems
integration.
(b)
Roadmap
The
Administrator shall update a roadmap for unmanned aerial systems research and
development and transmit this roadmap to the Committee on Science, Space, and
Technology of the House of Representatives and the Committee on Commerce,
Science, and Transportation of the Senate not later than 90 days after the date
of enactment of this Act.
(c)
Cooperative
unmanned aerial vehicle activities
Section 31504 of title 51,
United States Code, is amended by inserting Operational flight data
derived from these cooperative agreements shall be made available, in
appropriate and usable formats, to the Administration and the Federal Aviation
Administration for the development of regulatory standards. after
in remote areas..
403.
Research
program on composite materials used in aeronautics
(a)
Consultation
The
Administrator, in overseeing the Administration’s Integrated Systems Research
Program’s work on composite materials, shall consult with relevant Federal
agencies and partners in industry to accelerate safe development and
certification processes for new composite materials and design methods while
maintaining rigorous inspection of new composite materials.
(b)
Report
Not later than 1 year after the date of
enactment of this Act, the Administrator shall transmit a report to the
Committee on Science, Space, and Technology of the House of Representatives and
the Committee on Commerce, Science, and Transportation of the Senate detailing
the Administration’s work on new composite materials and the coordination
efforts among Federal agencies.
404.
Hypersonic
research
Not later than 1 year
after the date of enactment of this Act, the Administrator, in consultation
with other Federal agencies, shall develop and transmit to the Committee on
Science, Space, and Technology of the House of Representatives and the
Committee on Commerce, Science, and Transportation of the Senate a research and
development roadmap for hypersonic aircraft research with the objective of
exploring hypersonic science and technology using air-breathing propulsion
concepts, through a mix of theoretical work, basic and applied research, and
development of flight research demonstration vehicles. The roadmap shall
prescribe appropriate agency contributions, coordination efforts, and
technology milestones.
405.
Supersonic
research
Not later than 1 year
after the date of enactment of this Act, the Administrator shall develop and
transmit to the Committee on Science, Space, and Technology of the House of
Representatives and the Committee on Commerce, Science, and Transportation of
the Senate a roadmap that allows for flexible funding profiles, for supersonic
aeronautics research and development with the objective of developing and
demonstrating, in a relevant environment, airframe and propulsion technologies
to minimize the environmental impact, including noise, of supersonic overland
flight in an efficient and economical manner. The roadmap shall include—
(1) a
status report on the Administration’s existing research on supersonic
flight;
(2) a
list of specific technological, environmental, and other challenges that must
be overcome to minimize the environmental impact, including noise, of
supersonic overland flight;
(3) a
research plan to address such challenges, as well as a project timeline for
accomplishing relevant research goals; and
(4) a
plan for coordination with stakeholders, including relevant government agencies
and industry.
406.
Research on
NextGen airspace management concepts and tools
(a)
In
general
The Administrator
shall, in consultation with the Director of the Joint Planning and Development
Office of the Federal Aviation Administration, review at least annually the
alignment and timing of the Administration’s research and development
activities in support of the NextGen airspace management modernization
initiative, and shall make any necessary adjustments by reprioritizing or
retargeting the Administration’s research and development activities in support
of the NextGen initiative.
(b)
Annual
reports
The Administrator
shall report to the Committee on Science, Space, and Technology of the House of
Representatives and the Committee on Commerce, Science, and Transportation of
the Senate annually regarding the progress of the Administration’s research and
development activities in support of the NextGen airspace management
modernization initiative, including details of consultation with the Federal
Aviation Administration and any adjustments made to research activities.
407.
Rotorcraft
research
Not later than 1 year
after the date of enactment of this Act, the Administrator, in consultation
with other Federal agencies, shall prepare and transmit to the Committee on
Science, Space, and Technology of the House of Representatives and the
Committee on Commerce, Science, and Transportation of the Senate a plan for
research relating to rotorcraft and other runway-independent air vehicles, with
the objective of developing and demonstrating improved safety, noise, and
environmental impact in a relevant environment. The plan shall include specific
goals for the research, a timeline for implementation, metrics for success, and
guidelines for collaboration and coordination with industry and other Federal
agencies.
V
Space
Technology
501.
Space
technology
(a)
Findings
Congress finds the following:
(1) The Space
Technology Mission Directorate created by the Administration is lacking an
organic statutory authorization and in need of congressional direction.
(2) In order to appropriately prioritize the
Administration’s resources to accomplish its goals and purposes, the Space
Technology Mission Directorate needs to be reorganized as provided in the
amendments made by this section.
(3) Projects, programs, and activities
currently within the Exploration Research and Development program should
continue as planned as part of the Human Exploration and Operations Mission
Directorate.
(b)
Space technology
program
(1)
Amendment
Section 70507 of title 51, United States
Code, is amended to read as follows:
70507.
Space
Technology Program authorized
(a)
Program
authorized
The Administrator
shall establish, within the office of the Administrator, a Space Technology
Program to pursue the development of technologies that enable exploration of
the solar system or advanced space science throughout the various elements of
the Administration.
(b)
Small business
programs
The Administrator shall organize and manage the
Administration’s Small Business Innovation Research program and Small Business
Technology Transfer program within the Space Technology Program.
(c)
Nonduplication
certification
The
Administrator shall include in the budget for each fiscal year, as transmitted
to Congress under section 1105(a) of title 31, a certification that no project,
program, or mission undertaken by the Space Technology Program is independently
under development by any other office or directorate of the
Administration.
.
(2)
Table of
sections amendment
The item relating to section 70507 in the
table of sections for chapter 705 of title 51, United States Code, is amended
to read as follows:
70507. Space Technology Program
authorized.
.
VI
Education
601.
Education
(a)
In
general
The Administration
shall continue its education and outreach efforts to—
(1) increase student
interest and participation in Science, Technology, Engineering, and Mathematics
(STEM) education;
(2) improve public
literacy in STEM;
(3) employ proven
strategies for improving student learning and teaching;
(4) provide curriculum
support materials; and
(5) create and support
opportunities for professional development for STEM teachers.
(b)
Organization
In
order to ensure the inspiration and engagement of children and the general
public, the Administration shall continue its STEM education and outreach
activities within the Science, Aeronautics Research, Space Operations, and
Exploration Mission Directorates. Funds devoted to education and public
outreach shall be maintained in the Directorates, and the consolidation of
these activities into the Education Directorate is prohibited.
(c)
Prohibition
The Administration may not implement any
proposed STEM education and outreach-related changes proposed in the budget for
fiscal year 2014 transmitted to Congress under section 1105(a) of title 31,
United States Code.
VII
Policy
Provisions
701.
Asteroid
Retrieval Mission
(a)
In
General
Consistent with the
policy stated in section 201(b), the Administrator may not fund the development
of an asteroid retrieval mission to send a robotic spacecraft to a near-Earth
asteroid for rendezvous, retrieval, and redirection of that asteroid to lunar
orbit for exploration by astronauts.
(b)
Asteroid
survey
The Administration may not pursue a program to search for
asteroids of 20 meters or less in diameter unless the survey program described
in section 322(c) is at least 90 percent complete.
(c)
Report
Not later than 180 days after the date of
enactment of this Act, the Administrator shall provide to the Committee on
Science, Space, and Technology of the House of Representatives and the
Committee on Commerce, Science, and Transportation of the Senate a report on
the proposed Asteroid Retrieval Mission. Such report shall include—
(1) a
detailed budget profile, including cost estimates for the development of all
necessary technologies and spacecraft required for the mission;
(2) a
detailed technical plan that includes milestones and a specific
schedule;
(3) a
description of the technologies and capabilities anticipated to be gained from
the proposed mission that will enable future human missions to Mars which could
not be gained by lunar missions; and
(4) a
complete review by the Small Bodies Assessment Group and the NASA Advisory
Council that includes a recommendation to Congress on the feasibility of the
mission as proposed by the Administration.
702.
Termination
liability
(a)
Findings
Congress
makes the following findings:
(1) The International Space Station, the Space
Launch System, and the Orion crew capsule will enable the Nation to continue
operations in low-Earth orbit and to send its astronauts to deep space. As a
result of their unique capabilities and their critical contribution to the
future of space exploration, these systems have been designated by Congress and
the Administration as priority investments.
(2) While the Space Launch System and the Orion
programs, currently under development, have made significant progress, they
have not been funded at levels authorized, and as a result congressionally
authorized milestones will be delayed by several years.
(3) In addition,
contractors are currently holding program funding, estimated to be in the
hundreds of millions of dollars, to cover the potential termination liability
should the Government choose to terminate a program for convenience. As a
result, hundreds of millions of taxpayer dollars are unavailable for meaningful
work on these programs.
(4) According to the Government Accountability
Office, the Administration procures most of its goods and services through
contracts, and it terminates very few of them. In fiscal year 2010, the
Administration terminated 28 of 16,343 active contracts and orders—a
termination rate of about 0.17 percent.
(5) Providing
processes requiring congressional action on termination of these high-priority
programs would enable contractors to apply taxpayer dollars to making maximum
progress in meeting the established technical goals and schedule milestones of
these programs.
(b)
NASA termination
liability
(1)
General
rule
Termination liability costs for a covered program shall be
provided only pursuant to this subsection.
(2)
Prohibition on
reserving funds
The
Administrator may not reserve funds from amounts appropriated for a covered
program, and shall direct prime contractors not to reserve funds, for potential
termination liability costs with respect to a covered program.
(3)
Intent of
Congress
It is the intent of
Congress that funds authorized to be appropriated for covered programs be
applied in meeting established technical goals and schedule milestones.
(4)
Void contractual
provisions
Any provision in a prime contract entered into before
the date of enactment of this Act that provides for the payment of termination
liability costs through any means other than as provided in this subsection is
hereby declared to be void and unenforceable.
(5)
Congressional
action; notice
(A)
Termination for
convenience
The Administrator
may not initiate termination for the convenience of the Government of a prime
contract on a covered program unless such program termination is authorized or
required by a law enacted after the date of enactment of this Act.
(B)
Termination for
cause
The Administrator shall
notify the Committee on Science, Space, and Technology of the House of
Representatives and the Committee on Commerce, Science, and Transportation of
the Senate before initiating termination for cause of a prime contract on a
covered program.
(6)
Supplemental
appropriation request
(A)
Request
If the Administrator decides to terminate a
prime contract on a covered program, and sufficient unobligated appropriations
are not available to cover termination liability costs in the appropriations
account that is funding the prime contract being terminated, the Administrator
shall provide to Congress a notification that an authorization of
appropriations is necessary not later than 120 days in advance of the proposed
contract settlement for the covered program.
(B)
Intent of
Congress
It is the intent of Congress to provide additional
authorization for appropriations as may be necessary to pay termination
liability costs on prime contracts for covered programs if Congress deems it
appropriate that the Administration terminate such prime contracts.
(7)
Definitions
For
purposes of this section:
(A)
Covered
program
The term covered program means the
International Space Station, the Space Launch System, and the Orion crew
capsule.
(B)
Prime
contractor
The term
prime contractor means a person or entity contracting directly
with the Federal Government on a covered program.
(C)
Termination
liability costs
The term termination liability
costs means any costs incurred by a prime contractor, or by any
subcontractor of a prime contractor, for which the Federal Government is liable
as a result of termination of a prime contract by the Administrator.
(c)
Reporting
Not
later than 6 months after the date of enactment of this Act, and every 6 months
thereafter for the duration of the prime contracts on covered programs, the
Administrator shall transmit to the Committee on Science, Space, and Technology
of the House of Representatives and the Committee on Commerce, Science, and
Transportation of the Senate a report that provides—
(1) the estimated
termination liability costs for each of the prime contracts; and
(2) the basis for how
such estimate was determined.
703.
Indemnification
extension
Section 50915(f) of
title 51, United States Code, is amended by striking December 31,
2013 and inserting December 31, 2018.
704.
Baseline and
cost controls
Section 30104 of
title 51, United States Code, is amended—
(1) in subsection (a),
by striking Procedural Requirements 7120.5c, dated March 22,
2005 and inserting Procedural Requirements 7120.5E, dated August
14, 2012; and
(2) in subsection (f),
by striking beginning 18 months after the date the Administrator
transmits a report under subsection (e)(1)(A) and inserting
beginning 18 months after the Administrator makes such
determination.
705.
Project and
program reserves
To ensure
that the establishment, maintenance, and allotment of project and program
reserves contribute to prudent management, not later than 180 days after the
date of enactment of this Act, the Administrator shall transmit to the
Committee on Science, Space, and Technology of the House of Representatives and
the Committee on Commerce, Science, and Transportation of the Senate a report
describing the Administration’s criteria for establishing the amount of
reserves at the project and program levels and how such criteria complement the
Administration’s policy of budgeting at a 70-percent confidence level.
706.
Independent
reviews
Not later than 270
days after the date of enactment of this Act, the Administrator shall transmit
to the Committee on Science, Space, and Technology of the House of
Representatives and the Committee on Commerce, Science, and Transportation of
the Senate a report describing the Administration’s procedures for conducting
independent reviews of projects and programs at lifecycle milestones and how
the Administration ensures the independence of the individuals who conduct
those reviews prior to their assignment.
707.
Space Act
Agreements
(a)
Cost
Sharing
To the extent that the Administrator determines
practicable, the funds provided by the Government under a funded Space Act
Agreement shall not exceed the total amount provided by other parties to the
Space Act Agreement.
(b)
Need
A
Space Act Agreement may be used only when the use of a standard contract,
grant, or cooperative agreement is not feasible or appropriate, as determined
by the Associate Administrator for Procurement.
(c)
Public Notice
and Comment
The Administrator
shall make available for public notice and comment each proposed Space Act
Agreement at least 30 days before entering into such agreement, with
appropriate redactions for proprietary, sensitive, or classified
information.
(d)
Transparency
The
Administrator shall publicly disclose on the Administration’s website and make
available in a searchable format all Space Act Agreements, with appropriate
redactions for proprietary, sensitive, or classified information, not later
than 60 days after such agreement is signed.
(e)
Authorization
The
Administrator may not enter into a funded Space Act Agreement for an amount in
excess of $50,000,000 unless such agreement has been specifically authorized by
law.
(f)
Annual
report
(1)
Requirement
Not later than 90 days after the end of
each fiscal year, the Administrator shall submit to the Committee on Science,
Space, and Technology of the House of Representatives and the Committee on
Commerce, Science, and Transportation of the Senate a report on the use of
Space Act Agreement authority by the Administration during the previous fiscal
year.
(2)
Contents
The
report shall include for each Space Act Agreement in effect at the time of the
report—
(A) an indication of
whether the agreement is a reimbursable, nonreimbursable, or funded Space Act
Agreement;
(B) a description
of—
(i) the
subject and terms;
(ii) the
parties;
(iii) the
responsible—
(I) mission
directorate;
(II) center; or
(III) headquarters
element;
(iv) the
value;
(v) the
extent of the cost sharing among Federal Government and non-Federal
sources;
(vi) the
time period or schedule; and
(vii) all milestones;
and
(C) an indication of
whether the agreement was renewed during the previous fiscal year.
(3)
Anticipated
agreements
The report shall also include a list of all
anticipated reimbursable, nonreimbursable, and funded Space Act Agreements for
the upcoming fiscal year.
(4)
Cumulative
program benefits
The report shall also include, with respect to
the Space Act Agreements covered by the report, a summary of—
(A) the technology
areas in which research projects were conducted under such agreements;
(B) the extent to
which the use of the Space Act Agreements—
(i) has
contributed to a broadening of the technology and industrial base available for
meeting Administration needs; and
(ii) has
fostered within the technology and industrial base new relationships and
practices that support the United States; and
(C) the total amount
of value received by the Federal Government during the fiscal year pursuant to
such Space Act Agreements.
708.
Human
spaceflight accident investigations
Section 70702(a) of title 51, United States
Code, is amended by striking paragraph (3) and inserting the following:
(3) any other space vehicle carrying humans
that is owned by the Federal Government or that is being used pursuant to a
contract or Space Act Agreement, as defined in section 2 of the with the
Federal Government;
or
.
709.
Commercial
technology transfer program
Section 50116(a) of title 51, United States
Code, is amended by inserting , while protecting national
security after research community.
710.
Orbital
debris
(a)
Finding
Congress
finds that orbital debris poses serious risks to the operational space
capabilities of the United States and that an international consensus and
strategic plan is needed to mitigate the growth of orbital debris wherever
possible.
(b)
Reports
(1)
Coordination
Not later than 90 days after the date of
enactment of this Act, the Administrator shall provide the Committee on
Science, Space, and Technology of the House of Representatives and the
Committee on Commerce, Science, and Transportation of the Senate with a report
on the status of efforts to coordinate with countries within the Inter-Agency
Space Debris Coordination Committee to mitigate the effects and growth of
orbital debris as required by section 1202(b)(1) of the National Aeronautics
and Space Administration Authorization Act of 2010 (42 U.S.C.
18441(b)(1)).
(2)
Mitigation
strategy
Not later than 90
days after the date of enactment of this Act, the Director of the Office of
Science and Technology Policy shall provide the Committee on Science, Space,
and Technology of the House of Representatives and the Committee on Commerce,
Science, and Transportation of the Senate with a report on the status of the
orbital debris mitigation strategy required under section 1202(b)(2) of the
National Aeronautics and Space Administration Authorization Act of 2010 (42
U.S.C. 18441(b)(2)).
711.
NASA
leadership
Section 20111 of
title 51, United States Code, is amended—
(1) in subsection (a),
by inserting The Administrator shall serve for a term of 6 years, and
may be reappointed for additional terms. after and activities
thereof.; and
(2) in subsection
(b)—
(A) by inserting
The Deputy Administrator may not act for, and exercise the powers of,
the Administrator for a period in excess of 45 days. After 45 days, the
Associate Administrator shall exercise the powers of the Administrator until a
new Administrator is appointed and confirmed by the Senate. after
absence or disability.; and
(B) by striking
from civilian life.
712.
NASA Advisory
Council
(a)
Establishment
Subchapter
II of chapter 201 of title 51, United States Code, is amended by adding at the
end the following new section:
20118.
NASA Advisory
Council
(a)
Establishment
There
shall be established a NASA Advisory Council (in this section referred to as
the Council) for the Administration in accordance with this
section, not later than 9 months after the date of enactment of this
section.
(b)
Membership and
appointment
The Council shall consist of 11 members to be
appointed as follows:
(1) 5 members shall be
appointed by the President.
(2) 2 members shall be
appointed by the President pro tempore of the Senate.
(3) 1 member shall be
appointed by the minority leader of the Senate.
(4) 2 members shall be
appointed by the Speaker of the House of Representatives.
(5) 1 member shall be
appointed by the minority leader of the House of Representatives.
In
addition to the members appointed under paragraphs (1) through (5), the
Administrator shall be an ex officio, nonvoting member of the Council. Members
of the Council shall comply with the Federal Advisory Committee Act (5 U.S.C.
App.) and the Ethics in Government Act of 1978 (5 U.S.C. App.).
(c)
Qualifications
The
persons appointed as members of the Council shall be—
(1) former astronauts
or scientists or engineers eminent in the fields of human spaceflight,
planetary science, space science, Earth science, aeronautics, or disciplines
related to space exploration and aeronautics, including other scientific,
engineering, or business disciplines;
(2) selected on the
basis of established records of distinguished service; and
(3) so selected as to
provide representation of the views of engineering, science, and aerospace
leaders in all areas of the Nation.
(d)
Terms
The
term of office of each member of the Council shall be 6 years.
(e)
Meetings
The
Council shall meet two times annually at minimum and at such other times as the
Chairman may determine, but the Chairman shall also call a meeting whenever
one-third of the members so request in writing. The Council shall adopt
procedures governing the conduct of its meetings, including delivery of notice
and a definition of a quorum, which in no case shall be less than one-half plus
one of the members of the Council.
(f)
Chairman and
vice chairman
The Chairman and Vice Chairman of the Council shall
be elected by a majority vote of the Council for a two-year term. A member may
serve as Chairman and Vice Chairman for up to three terms. The Vice Chairman
shall perform the duties of the Chairman in his absence. If a vacancy occurs in
the chairmanship or vice chairmanship, the Council shall elect a member to fill
such vacancy.
(g)
Staff
The
Administrator shall support the Council with professional staff to provide for
the performance of such duties as may be prescribed by the Council.
(h)
Committees
The
Council is authorized to appoint from among its members such committees as it
deems necessary and to assign to committees so appointed such survey and
advisory functions as the Council deems appropriate to assist it in exercising
its powers and functions.
(i)
Functions
(1)
Budget
proposal
(A)
Review of
proposal
Not later than
October 15 of each year, the Council shall have reviewed the Administration’s
proposed budget for the next fiscal year and shall provide to the President
their advice based on the best professional judgment of a majority of members.
Portions of Council meetings in which the Council considers the budget proposal
for the next fiscal year may be closed to the public until the Council submits
the proposal to the President and Congress.
(B)
Advice to
congressional committees
Not
later than 14 days following the President’s budget submittal to Congress for
the next fiscal year, the Council shall provide to the Committee on Science,
Space, and Technology of the House of Representatives and the Committee on
Commerce, Science, and Transportation of the Senate their advice based on the
best professional judgment of a majority of members.
(2)
Advice to the
President and Congress
The Council shall report their findings,
advice, and recommendations to the President and Congress on matters of
particular policy interest on space exploration and aeronautics based on the
best professional judgment of a majority of
members.
.
(b)
Table of
sections
The table of sections for chapter 201 of title 51,
United States Code, is amended by adding at the end of the items for subchapter
II the following new item:
20118. NASA Advisory
Council.
.
(c)
Consultation and
advice
Section 20113(g) of title 51, United States Code, is
amended by inserting and Congress after advice to the
Administration.
713.
Cost
estimation
(a)
Report
Not later than 90 days after the date of
enactment of this Act, the Administrator shall transmit to the Committee on
Science, Space, and Technology of the House of Representatives and the
Committee on Commerce, Science, and Transportation of the Senate a report on
current and continuing efforts to implement more effective cost-estimation
practices.
(b)
Elements
The
report required under subsection (a) shall include—
(1) a
list of steps the Administration is undertaking to advance consistent
implementation of the joint cost and schedule level (JCL) process; and
(2) a
description of mechanisms the Administration is using and will continue to use
to ensure that adequate resources are dedicated to cost estimation.