Library / Laws / 113th / hr / H.R. 267 / Introduced in House
I
113th CONGRESS
1st Session
H. R. 267
IN THE HOUSE OF REPRESENTATIVES
January 15, 2013
Mrs. McMorris Rodgers
(for herself, Ms. DeGette,
Mr. Walden,
Mr. Terry,
Mr. Markey,
Mr. Latta,
Mr. Matheson,
Mr. Ben Ray Luján of New Mexico, and
Mr. Dingell) introduced the following
bill; which was referred to the Committee
on Energy and Commerce
A BILL
To improve hydropower, and for other
purposes.
1.
Short title; table of
contents
(a)
Short
title
This Act may be cited
as the Hydropower Regulatory
Efficiency Act of 2013.
(b)
Table of
contents
The table of contents of this Act is as follows:
Sec. 1. Short title; table of contents.
Sec. 2. Findings.
Sec. 3. Promoting small hydroelectric power
projects.
Sec. 4. Promoting conduit hydropower projects.
Sec. 5. FERC authority to extend preliminary permit
periods.
Sec. 6. Promoting hydropower development at nonpowered dams and
closed loop pumped storage projects.
Sec. 7. DOE study of pumped storage and potential hydropower
from conduits.
2.
Findings
Congress finds that—
(1) the hydropower industry currently employs
approximately 300,000 workers across the United States;
(2) hydropower is the
largest source of clean, renewable electricity in the United States;
(3) as of the date of enactment of this Act,
hydropower resources, including pumped storage facilities, provide—
(A) nearly 7 percent of the electricity
generated in the United States; and
(B) approximately 100,000 megawatts of electric
capacity in the United States;
(4) only 3 percent of
the 80,000 dams in the United States generate electricity, so there is
substantial potential for adding hydropower generation to nonpowered dams;
and
(5) according to one study, by utilizing
currently untapped resources, the United States could add approximately 60,000
megawatts of new hydropower capacity by 2025, which could create 700,000 new
jobs over the next 13 years.
3.
Promoting small
hydroelectric power projects
Subsection (d) of section 405 of the Public
Utility Regulatory Policies Act of 1978 (16 U.S.C. 2705) is amended by striking
5,000 and inserting 10,000.
4.
Promoting conduit
hydropower projects
(a)
Applicability
of, and exemption from, licensing requirements
Section 30 of the Federal Power Act (16
U.S.C. 823a) is amended—
(1) by striking
subsections (a) and (b) and inserting the following:
(a)
(1) A qualifying conduit
hydropower facility shall not be required to be licensed under this
part.
(2)
(A) Any person, State, or
municipality proposing to construct a qualifying conduit hydropower facility
shall file with the Commission a notice of intent to construct such facility.
The notice shall include sufficient information to demonstrate that the
facility meets the qualifying criteria.
(B) Not later than 15 days after receipt of a
notice of intent filed under subparagraph (A), the Commission shall—
(i) make an initial determination as to
whether the facility meets the qualifying criteria; and
(ii) if the Commission makes an initial
determination, pursuant to clause (i), that the facility meets the qualifying
criteria, publish public notice of the notice of intent filed under
subparagraph (A).
(C) If, not later than 45 days after the date
of publication of the public notice described in subparagraph (B)(ii)—
(i) an entity contests whether the
facility meets the qualifying criteria, the Commission shall promptly issue a
written determination as to whether the facility meets such criteria; or
(ii) no entity contests whether the
facility meets the qualifying criteria, the facility shall be deemed to meet
such criteria.
(3) For purposes of this section:
(A) The term conduit means
any tunnel, canal, pipeline, aqueduct, flume, ditch, or similar manmade water
conveyance that is operated for the distribution of water for agricultural,
municipal, or industrial consumption and not primarily for the generation of
electricity.
(B) The term qualifying conduit
hydropower facility means a facility (not including any dam or other
impoundment) that is determined or deemed under paragraph (2)(C) to meet the
qualifying criteria.
(C) The term qualifying
criteria means, with respect to a facility—
(i) the facility is constructed,
operated, or maintained for the generation of electric power and uses for such
generation only the hydroelectric potential of a non-federally owned
conduit;
(ii) the facility has an installed
capacity that does not exceed 5 megawatts; and
(iii) on or before the date of
enactment of the Hydropower Regulatory Efficiency Act of 2013, the facility is
not licensed under, or exempted from the license requirements contained in,
this part.
(b) Subject to
subsection (c), the Commission may grant an exemption in whole or in part from
the requirements of this part, including any license requirements contained in
this part, to any facility (not including any dam or other impoundment)
constructed, operated, or maintained for the generation of electric power which
the Commission determines, by rule or order—
(1) utilizes for such
generation only the hydroelectric potential of a conduit; and
(2) has an installed
capacity that does not exceed 40
megawatts.
;
(2) in subsection (c),
by striking subsection (a) and inserting subsection
(b); and
(3) in subsection (d),
by striking subsection (a) and inserting subsection
(b).
(b)
Conforming
amendment
Subsection (d) of section 405 of the Public Utility
Regulatory Policies Act of 1978 (16 U.S.C. 2705), as amended, is further
amended by striking subsection (a) of such section 30 and
inserting subsection (b) of such section 30.
5.
FERC authority to
extend preliminary permit periods
Section 5 of the Federal Power Act (16
U.S.C. 798) is amended—
(1) by designating the first, second, and third
sentences as subsections (a), (c), and (d), respectively; and
(2) by inserting after subsection (a) (as so
designated) the following:
(b) The Commission may
extend the period of a preliminary permit once for not more than 2 additional
years beyond the 3 years permitted by subsection (a) if the Commission finds
that the permittee has carried out activities under such permit in good faith
and with reasonable
diligence.
.
6.
Promoting
hydropower development at nonpowered dams and closed loop pumped storage
projects
(a)
In
general
To improve the regulatory process and reduce delays and
costs for hydropower development at nonpowered dams and closed loop pumped
storage projects, the Federal Energy Regulatory Commission (referred to in this
section as the Commission) shall investigate the feasibility of
the issuance of a license for hydropower development at nonpowered dams and
closed loop pumped storage projects in a 2-year period (referred to in this
section as a 2-year process). Such a 2-year process shall include
any prefiling licensing process of the Commission.
(b)
Workshops and
pilots
The Commission shall—
(1) not later than 60
days after the date of enactment of this Act, hold an initial workshop to
solicit public comment and recommendations on how to implement a 2-year
process;
(2) develop criteria
for identifying projects featuring hydropower development at nonpowered dams
and closed loop pumped storage projects that may be appropriate for licensing
within a 2-year process;
(3) not later than 180
days after the date of enactment of this Act, develop and implement pilot
projects to test a 2-year process, if practicable; and
(4) not later than 3
years after the date of implementation of the final pilot project testing a
2-year process, hold a final workshop to solicit public comment on the
effectiveness of each tested 2-year process.
(c)
Memorandum of
understanding
The Commission shall, to the extent practicable,
enter into a memorandum of understanding with any applicable Federal or State
agency to implement a pilot project described in subsection (b).
(d)
Reports
(1)
Pilot projects
not implemented
If the Commission determines that no pilot
project described in subsection (b) is practicable because no 2-year process is
practicable, not later than 240 days after the date of enactment of this Act,
the Commission shall submit to the Committee on Energy and Commerce of the
House of Representatives and the Committee on Energy and Natural Resources of
the Senate a report that—
(A) describes the
public comments received as part of the initial workshop held under subsection
(b)(1); and
(B) identifies the
process, legal, environmental, economic, and other issues that justify the
determination of the Commission that no 2-year process is practicable, with
recommendations on how Congress may address or remedy the identified
issues.
(2)
Pilot projects
implemented
If the Commission develops and implements pilot
projects involving a 2-year process, not later than 60 days after the date of
completion of the final workshop held under subsection (b)(4), the Commission
shall submit to the Committee on Energy and Commerce of the House of
Representatives and the Committee on Energy and Natural Resources of the Senate
a report that—
(A) describes the
outcomes of the pilot projects;
(B) describes the
public comments from the final workshop on the effectiveness of each tested
2-year process; and
(C)
(i) outlines how the
Commission will adopt policies under existing law (including regulations) that
result in a 2-year process for appropriate projects;
(ii) outlines how the Commission will
issue new regulations to adopt a 2-year process for appropriate projects;
or
(iii) identifies the process, legal,
environmental, economic, and other issues that justify a determination of the
Commission that no 2-year process is practicable, with recommendations on how
Congress may address or remedy the identified issues.
7.
DOE study of
pumped storage and potential hydropower from conduits
(a)
In
general
The Secretary of Energy shall conduct a study—
(1)
(A) of the technical
flexibility that existing pumped storage facilities can provide to support
intermittent renewable electric energy generation, including the potential for
such existing facilities to be upgraded or retrofitted with advanced
commercially available technology; and
(B) of the technical potential of existing
pumped storage facilities and new advanced pumped storage facilities, to
provide grid reliability benefits; and
(2)
(A) to identify the range of
opportunities for hydropower that may be obtained from conduits (as defined by
the Secretary) in the United States; and
(B) through case studies, to assess
amounts of potential energy generation from such conduit hydropower
projects.
(b)
Report
Not
later than 1 year after the date of enactment of this Act, the Secretary of
Energy shall submit to the Committee on Energy and Commerce of the House of
Representatives and the Committee on Energy and Natural Resources of the Senate
a report that describes the results of the study conducted under subsection
(a), including any recommendations.