AN ACT
To provide for improved coordination of agency actions in the preparation and adoption of
environmental documents for permitting determinations, and for other
purposes.
1.
Short title
This Act may be cited as the Responsibly And Professionally Invigorating Development Act of 2014 or as the RAPID Act.
2.
Coordination of agency administrative operations for efficient decisionmaking
(a)
In general
Chapter 5 of part 1 of title 5, United States Code, is amended by inserting after subchapter II the
following:
IIA
Interagency Coordination Regarding Permitting
560.
Coordination of agency administrative operations for efficient decisionmaking
(a)
Congressional declaration of purpose
The purpose of this subchapter is to establish a framework and procedures to streamline, increase
the efficiency of, and enhance coordination of agency administration of
the regulatory review, environmental decisionmaking, and permitting
process for projects undertaken, reviewed, or funded by Federal agencies.
This subchapter will ensure that agencies administer the regulatory
process in a manner that is efficient so that citizens are not burdened
with regulatory excuses and time delays.
(b)
Definitions
For purposes of this subchapter, the term—
(1) agency means any agency, department, or other unit of Federal, State, local, or Indian tribal government;
(2) category of projects means 2 or more projects related by project type, potential environmental impacts, geographic
location, or another similar project feature or characteristic;
(3) environmental assessment means a concise public document for which a Federal agency is responsible that serves to—
(A) briefly provide sufficient evidence and analysis for determining whether to prepare an
environmental impact statement or a finding of no significant impact;
(B) aid an agency’s compliance with NEPA when no environmental impact statement is necessary; and
(C) facilitate preparation of an environmental impact statement when one is necessary;
(4) environmental impact statement means the detailed statement of significant environmental impacts required to be prepared under
NEPA;
(5) environmental review means the Federal agency procedures for preparing an environmental impact statement, environmental
assessment, categorical exclusion, or other document under NEPA;
(6) environmental decisionmaking process means the Federal agency procedures for undertaking and completion of any environmental permit,
decision, approval, review, or study under any Federal law other than NEPA
for a project subject to an environmental review;
(7) environmental document means an environmental assessment or environmental impact statement, and includes any supplemental
document or document prepared pursuant to a court order;
(8) finding of no significant impact means a document by a Federal agency briefly presenting the reasons why a project, not otherwise
subject to a categorical exclusion, will not have a significant effect on
the human environment and for which an environmental impact statement
therefore will not be prepared;
(9) lead agency means the Federal agency preparing or responsible for preparing the environmental document;
(10) NEPA means the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.);
(11) project means major Federal actions that are construction activities undertaken with Federal funds or that
are construction activities that require approval by a permit or
regulatory decision issued by a Federal agency;
(12) project sponsor means the agency or other entity, including any private or public-private entity, that seeks
approval for a project or is otherwise responsible for undertaking a
project; and
(13) record of decision means a document prepared by a lead agency under NEPA following an environmental impact statement
that states the lead agency’s decision, identifies the alternatives
considered by the agency in reaching its decision and states whether all
practicable means to avoid or minimize environmental harm from the
alternative selected have been adopted, and if not, why they were not
adopted.
(c)
Preparation of environmental documents
Upon the request of the lead agency, the project sponsor shall be authorized to prepare any
document for purposes of an environmental review required in support of
any project or approval by the lead agency if the lead agency furnishes
oversight in such preparation and independently evaluates such document
and the document is approved and adopted by the lead agency prior to
taking any action or making any approval based on such document.
(d)
Adoption and use of documents
(1)
Documents prepared under nepa
(A) Not more than 1 environmental impact statement and 1 environmental assessment shall be prepared
under NEPA for a project (except for supplemental environmental documents
prepared under NEPA or environmental documents prepared pursuant to a
court order), and, except as otherwise provided by law, the lead agency
shall prepare the environmental impact statement or environmental
assessment. After the lead agency issues a record of decision, no Federal
agency responsible for making any approval for that project may rely on a
document other than the environmental document prepared by the lead
agency.
(B) Upon the request of a project sponsor, a lead agency may adopt, use, or rely upon secondary and
cumulative impact analyses included in any environmental document prepared
under NEPA for projects in the same geographic area where the secondary
and cumulative impact analyses provide information and data that pertains
to the NEPA decision for the project under review.
(2)
State environmental documents; supplemental documents
(A) Upon the request of a project sponsor, a lead agency may adopt a document that has been prepared
for a project under State laws and procedures as the environmental impact
statement or environmental assessment for the project, provided that the
State laws and procedures under which the document was prepared provide
environmental protection and opportunities for public involvement that are
substantially equivalent to NEPA.
(B) An environmental document adopted under subparagraph (A) is deemed to satisfy the lead agency’s
obligation under NEPA to prepare an environmental impact statement or
environmental assessment.
(C) In the case of a document described in subparagraph (A), during the period after preparation of the
document but before its adoption by the lead agency, the lead agency shall
prepare and publish a supplement to that document if the lead agency
determines that—
(i) a significant change has been made to the project that is relevant for purposes of environmental
review of the project; or
(ii) there have been significant changes in circumstances or availability of information relevant to the
environmental review for the project.
(D) If the agency prepares and publishes a supplemental document under subparagraph (C), the lead
agency may solicit comments from agencies and the public on the
supplemental document for a period of not more than 45 days beginning on
the date of the publication of the supplement.
(E) A lead agency shall issue its record of decision or finding of no significant impact, as
appropriate, based upon the document adopted under subparagraph (A), and
any supplements thereto.
(3)
Contemporaneous projects
If the lead agency determines that there is a reasonable likelihood that the project will have
similar environmental impacts as a similar project in geographical
proximity to the project, and that similar project was subject to
environmental review or similar State procedures within the 5-year period
immediately preceding the date that the lead agency makes that
determination, the lead agency may adopt the environmental document that
resulted from that environmental review or similar State procedure. The
lead agency may adopt such an environmental document, if it is prepared
under State laws and procedures only upon making a favorable determination
on such environmental document pursuant to paragraph (2)(A).
(e)
Participating agencies
(1)
In general
The lead agency shall be responsible for inviting and designating participating agencies in
accordance with this subsection. The lead agency shall provide the
invitation or notice of the designation in writing.
(2)
Federal participating agencies
Any Federal agency that is required to adopt the environmental document of the lead agency for a
project shall be designated as a participating agency and shall
collaborate on the preparation of the environmental document, unless the
Federal agency informs the lead agency, in writing, by a time specified by
the lead agency in the designation of the Federal agency that the Federal
agency—
(A) has no jurisdiction or authority with respect to the project;
(B) has no expertise or information relevant to the project; and
(C) does not intend to submit comments on the project.
(3)
Invitation
The lead agency shall identify, as early as practicable in the environmental review for a project,
any agencies other than an agency described in paragraph (2) that may have
an interest in the project, including, where appropriate, Governors of
affected States, and heads of appropriate tribal and local (including
county) governments, and shall invite such identified agencies and
officials to become participating agencies in the environmental review for
the project. The invitation shall set a deadline of 30 days for responses
to be submitted, which may only be extended by the lead agency for good
cause shown. Any agency that fails to respond prior to the deadline shall
be deemed to have declined the invitation.
(4)
Effect of declining participating agency invitation
Any agency that declines a designation or invitation by the lead agency to be a participating
agency shall be precluded from submitting comments on any document
prepared under NEPA for that project or taking any measures to oppose,
based on the environmental review, any permit, license, or approval
related to that project.
(5)
Effect of designation
Designation as a participating agency under this subsection does not imply that the participating
agency—
(A) supports a proposed project; or
(B) has any jurisdiction over, or special expertise with respect to evaluation of, the project.
(6)
Cooperating agency
A participating agency may also be designated by a lead agency as a cooperating agency under the regulations contained in part 1500 of title 40, Code of Federal Regulations, as in
effect on January 1, 2011. Designation as a cooperating agency shall have
no effect on designation as participating agency. No agency that is not a
participating agency may be designated as a cooperating agency.
(7)
Concurrent reviews
Each Federal agency shall—
(A) carry out obligations of the Federal agency under other applicable law concurrently and in
conjunction with the review required under NEPA; and
(B) in accordance with the rules made by the Council on Environmental Quality pursuant to subsection
(n)(1), make and carry out such rules, policies, and procedures as may be
reasonably necessary to enable the agency to ensure completion of the
environmental review and environmental decisionmaking process in a timely,
coordinated, and environmentally responsible manner.
(8)
Comments
Each participating agency shall limit its comments on a project to areas that are within the
authority and expertise of such participating agency. Each participating
agency shall identify in such comments the statutory authority of the
participating agency pertaining to the subject matter of its comments. The
lead agency shall not act upon, respond to or include in any document
prepared under NEPA, any comment submitted by a participating agency that
concerns matters that are outside of the authority and expertise of the
commenting participating agency.
(f)
Project initiation request
(1)
Notice
A project sponsor shall provide the Federal agency responsible for undertaking a project with
notice of the initiation of the project by providing a description of the
proposed project, the general location of the proposed project, and a
statement of any Federal approvals anticipated to be necessary for the
proposed project, for the purpose of informing the Federal agency that the
environmental review should be initiated.
(2)
Lead agency initiation
The agency receiving a project initiation notice under paragraph (1) shall promptly identify the
lead agency for the project, and the lead agency shall initiate the
environmental review within a period of 45 days after receiving the notice
required by paragraph (1) by inviting or designating agencies to become
participating agencies, or, where the lead agency determines that no
participating agencies are required for the project, by taking such other
actions that are reasonable and necessary to initiate the environmental
review.
(g)
Alternatives analysis
(1)
Participation
As early as practicable during the environmental review, but no later than during scoping for a
project requiring the preparation of an environmental impact statement,
the lead agency shall provide an opportunity for involvement by
cooperating agencies in determining the range of alternatives to be
considered for a project.
(2)
Range of alternatives
Following participation under paragraph (1), the lead agency shall determine the range of
alternatives for consideration in any document which the lead agency is
responsible for preparing for the project, subject to the following
limitations:
(A)
No evaluation of certain alternatives
No Federal agency shall evaluate any alternative that was identified but not carried forward for
detailed evaluation in an environmental document or evaluated and not
selected in any environmental document prepared under NEPA for the same
project.
(B)
Only feasible alternatives evaluated
Where a project is being constructed, managed, funded, or undertaken by a project sponsor that is
not a Federal agency, Federal agencies shall only be required to evaluate
alternatives that the project sponsor could feasibly undertake, consistent
with the purpose of and the need for the project, including alternatives
that can be undertaken by the project sponsor and that are technically and
economically feasible.
(3)
Methodologies
(A)
In general
The lead agency shall determine, in collaboration with cooperating agencies at appropriate times
during the environmental review, the methodologies to be used and the
level of detail required in the analysis of each alternative for a
project. The lead agency shall include in the environmental document a
description of the methodologies used and how the methodologies were
selected.
(B)
No evaluation of inappropriate alternatives
When a lead agency determines that an alternative does not meet the purpose and need for a project,
that alternative is not required to be evaluated in detail in an
environmental document.
(4)
Preferred alternative
At the discretion of the lead agency, the preferred alternative for a project, after being
identified, may be developed to a higher level of detail than other
alternatives in order to facilitate the development of mitigation measures
or concurrent compliance with other applicable laws if the lead agency
determines that the development of such higher level of detail will not
prevent the lead agency from making an impartial decision as to whether to
accept another alternative which is being considered in the environmental
review.
(5)
Employment analysis
The evaluation of each alternative in an environmental impact statement or an environmental
assessment shall identify the potential effects of the alternative on
employment, including potential short-term and long-term employment
increases and reductions and shifts in employment.
(h)
Coordination and scheduling
(1)
Coordination plan
(A)
In general
The lead agency shall establish and implement a plan for coordinating public and agency
participation in and comment on the environmental review for a project or
category of projects to facilitate the expeditious resolution of the
environmental review.
(B)
Schedule
(i)
In general
The lead agency shall establish as part of the coordination plan for a project, after consultation
with each participating agency and, where applicable, the project sponsor,
a schedule for completion of the environmental review. The schedule shall
include deadlines, consistent with subsection (i), for decisions under any
other Federal laws (including the issuance or denial of a permit or
license) relating to the project that is covered by the schedule.
(ii)
Factors for consideration
In establishing the schedule, the lead agency shall consider factors such as—
(I) the responsibilities of participating agencies under applicable laws;
(II) resources available to the participating agencies;
(III) overall size and complexity of the project;
(IV) overall schedule for and cost of the project;
(V) the sensitivity of the natural and historic resources that could be affected by the project; and
(VI) the extent to which similar projects in geographic proximity were recently subject to environmental
review or similar State procedures.
(iii)
Compliance with the schedule
(I) All participating agencies shall comply with the time periods established in the schedule or with
any modified time periods, where the lead agency modifies the schedule
pursuant to subparagraph (D).
(II) The lead agency shall disregard and shall not respond to or include in any document prepared under
NEPA, any comment or information submitted or any finding made by a
participating agency that is outside of the time period established in the
schedule or modification pursuant to subparagraph (D) for that agency’s
comment, submission or finding.
(III) If a participating agency fails to object in writing to a lead agency decision, finding or request
for concurrence within the time period established under law or by the
lead agency, the agency shall be deemed to have concurred in the decision,
finding or request.
(C)
Consistency with other time periods
A schedule under subparagraph (B) shall be consistent with any other relevant time periods
established under Federal law.
(D)
Modification
The lead agency may—
(i) lengthen a schedule established under subparagraph (B) for good cause; and
(ii) shorten a schedule only with the concurrence of the cooperating agencies.
(E)
Dissemination
A copy of a schedule under subparagraph (B), and of any modifications to the schedule, shall be—
(i) provided within 15 days of completion or modification of such schedule to all participating
agencies and to the project sponsor; and
(ii) made available to the public.
(F)
Roles and responsibility of lead agency
With respect to the environmental review for any project, the lead agency shall have authority and
responsibility to take such actions as are necessary and proper, within
the authority of the lead agency, to facilitate the expeditious resolution
of the environmental review for the project.
(i)
Deadlines
The following deadlines shall apply to any project subject to review under NEPA and any decision
under any Federal law relating to such project (including the issuance or
denial of a permit or license or any required finding):
(1)
Environmental review deadlines
The lead agency shall complete the environmental review within the following deadlines:
(A)
Environmental impact statement projects
For projects requiring preparation of an environmental impact statement—
(i) the lead agency shall issue an environmental impact statement within 2 years after the earlier of
the date the lead agency receives the project initiation request or a
Notice of Intent to Prepare an Environmental Impact Statement is published
in the Federal Register; and
(ii) in circumstances where the lead agency has prepared an environmental assessment and determined that
an environmental impact statement will be required, the lead agency shall
issue the environmental impact statement within 2 years after the date of
publication of the Notice of Intent to Prepare an Environmental Impact
Statement in the Federal Register.
(B)
Environmental assessment projects
For projects requiring preparation of an environmental assessment, the lead agency shall issue a
finding of no significant impact or publish a Notice of Intent to Prepare
an Environmental Impact Statement in the Federal Register within 1 year
after the earlier of the date the lead agency receives the project
initiation request, makes a decision to prepare an environmental
assessment, or sends out participating agency invitations.
(2)
Extensions
(A)
Requirements
The environmental review deadlines may be extended only if—
(i) a different deadline is established by agreement of the lead agency, the project sponsor, and all
participating agencies; or
(ii) the deadline is extended by the lead agency for good cause.
(B)
Limitation
The environmental review shall not be extended by more than 1 year for a project requiring
preparation of an environmental impact statement or by more than 180 days
for a project requiring preparation of an environmental assessment.
(3)
Environmental review comments
(A)
Comments on draft environmental impact statement
For comments by agencies and the public on a draft environmental impact statement, the lead agency
shall establish a comment period of not more than 60 days after
publication in the Federal Register of notice of the date of public
availability of such document, unless—
(i) a different deadline is established by agreement of the lead agency, the project sponsor, and all
participating agencies; or
(ii) the deadline is extended by the lead agency for good cause.
(B)
Other comments
For all other comment periods for agency or public comments in the environmental review process,
the lead agency shall establish a comment period of no more than 30 days
from availability of the materials on which comment is requested, unless—
(i) a different deadline is established by agreement of the lead agency, the project sponsor, and all
participating agencies; or
(ii) the deadline is extended by the lead agency for good cause.
(4)
Deadlines for decisions under other laws
Notwithstanding any other provision of law, in any case in which a decision under any other Federal
law relating to the undertaking of a project being reviewed under NEPA
(including the issuance or denial of a permit or license) is required to
be made, the following deadlines shall apply:
(A)
Decisions prior to record of decision or finding of no significant impact
If a Federal agency is required to approve, or otherwise to act upon, a permit, license, or other
similar application for approval related to a project prior to the record
of decision or finding of no significant impact, such Federal agency shall
approve or otherwise act not later than the end of a 90-day period
beginning—
(i) after all other relevant agency review related to the project is complete; and
(ii) after the lead agency publishes a notice of the availability of the final environmental impact
statement or issuance of other final environmental documents, or no later
than such other date that is otherwise required by law, whichever event
occurs first.
(B)
Other decisions
With regard to any approval or other action related to a project by a Federal agency that is not
subject to subparagraph (A), each Federal agency shall approve or
otherwise act not later than the end of a period of 180 days beginning—
(i) after all other relevant agency review related to the project is complete; and
(ii) after the lead agency issues the record of decision or finding of no significant impact, unless a
different deadline is established by agreement of the Federal agency, lead
agency, and the project sponsor, where applicable, or the deadline is
extended by the Federal agency for good cause, provided that such
extension shall not extend beyond a period that is 1 year after the lead
agency issues the record of decision or finding of no significant impact.
(C)
Failure to act
In the event that any Federal agency fails to approve, or otherwise to act upon, a permit, license,
or other similar application for approval related to a project within the
applicable deadline described in subparagraph (A) or (B), the permit,
license, or other similar application shall be deemed approved by such
agency and the agency shall take action in accordance with such approval
within 30 days of the applicable deadline described in subparagraph (A) or
(B).
(D)
Final agency action
Any approval under subparagraph (C) is deemed to be final agency action, and may not be reversed by
any agency. In any action under chapter 7 seeking review of such a final
agency action, the court may not set aside such agency action by reason of
that agency action having occurred under this paragraph.
(j)
Issue identification and resolution
(1)
Cooperation
The lead agency and the participating agencies shall work cooperatively in accordance with this
section to identify and resolve issues that could delay completion of the
environmental review or could result in denial of any approvals required
for the project under applicable laws.
(2)
Lead agency responsibilities
The lead agency shall make information available to the participating agencies as early as
practicable in the environmental review regarding the environmental,
historic, and socioeconomic resources located within the project area and
the general locations of the alternatives under consideration. Such
information may be based on existing data sources, including geographic
information systems mapping.
(3)
Participating agency responsibilities
Based on information received from the lead agency, participating agencies shall identify, as early
as practicable, any issues of concern regarding the project’s potential
environmental, historic, or socioeconomic impacts. In this paragraph,
issues of concern include any issues that could substantially delay or
prevent an agency from granting a permit or other approval that is needed
for the project.
(4)
Issue resolution
(A)
Meeting of participating agencies
At any time upon request of a project sponsor, the lead agency shall promptly convene a meeting
with the relevant participating agencies and the project sponsor, to
resolve issues that could delay completion of the environmental review or
could result in denial of any approvals required for the project under
applicable laws.
(B)
Notice that resolution cannot be achieved
If a resolution cannot be achieved within 30 days following such a meeting and a determination by
the lead agency that all information necessary to resolve the issue has
been obtained, the lead agency shall notify the heads of all participating
agencies, the project sponsor, and the Council on Environmental Quality
for further proceedings in accordance with section 204 of NEPA, and shall
publish such notification in the Federal Register.
(k)
Limitation on use of social cost of carbon
(1)
In general
In the case of any environmental review or environmental decisionmaking process, a lead agency may
not use the social cost of carbon.
(2)
Definition
In this subsection, the term social cost of carbon means the social cost of carbon as described in the technical support document entitled Technical Support Document: Technical Update of the Social Cost of Carbon for Regulatory Impact
Analysis Under Executive Order No. 12866, published by the Interagency Working Group on Social Cost of Carbon, United States Government, in
May 2013, revised in November 2013, or any successor thereto or
substantially related document, or any other estimate of the monetized
damages associated with an incremental increase in carbon dioxide
emissions in a given year.
(l)
Report to congress
The head of each Federal agency shall report annually to Congress—
(1) the projects for which the agency initiated preparation of an environmental impact statement or
environmental assessment;
(2) the projects for which the agency issued a record of decision or finding of no significant impact
and the length of time it took the agency to complete the environmental
review for each such project;
(3) the filing of any lawsuits against the agency seeking judicial review of a permit, license, or
approval issued by the agency for an action subject to NEPA, including the
date the complaint was filed, the court in which the complaint was filed,
and a summary of the claims for which judicial review was sought; and
(4) the resolution of any lawsuits against the agency that sought judicial review of a permit, license,
or approval issued by the agency for an action subject to NEPA.
(m)
Limitations on claims
(1)
In general
Notwithstanding any other provision of law, a claim arising under Federal law seeking judicial
review of a permit, license, or approval issued by a Federal agency for an
action subject to NEPA shall be barred unless—
(A) in the case of a claim pertaining to a project for which an environmental review was conducted and
an opportunity for comment was provided, the claim is filed by a party
that submitted a comment during the environmental review on the issue on
which the party seeks judicial review, and such comment was sufficiently
detailed to put the lead agency on notice of the issue upon which the
party seeks judicial review; and
(B) filed within 180 days after publication of a notice in the Federal Register announcing that the
permit, license, or approval is final pursuant to the law under which the
agency action is taken, unless a shorter time is specified in the Federal
law pursuant to which judicial review is allowed.
(2)
New information
The preparation of a supplemental environmental impact statement, when required, is deemed a
separate final agency action and the deadline for filing a claim for
judicial review of such action shall be 180 days after the date of
publication of a notice in the Federal Register announcing the record of
decision for such action. Any claim challenging agency action on the basis
of information in a supplemental environmental impact statement shall be
limited to challenges on the basis of that information.
(3)
Rule of construction
Nothing in this subsection shall be construed to create a right to judicial review or place any
limit on filing a claim that a person has violated the terms of a permit,
license, or approval.
(n)
Categories of projects
The authorities granted under this subchapter may be exercised for an individual project or a
category of projects.
(o)
Effective date
The requirements of this subchapter shall apply only to environmental reviews and environmental
decisionmaking processes initiated after the date of enactment of this
subchapter. In the case of a project for which an environmental review or
environmental decisionmaking process was initiated prior to the date of
enactment of this subchapter, the provisions of subsection (i) shall
apply, except that, notwithstanding any other provision of this section,
in determining a deadline under such subsection, any applicable period of
time shall be calculated as beginning from the date of enactment of this
subchapter.
(p)
Applicability
Except as provided in subsection (p), this subchapter applies, according to the provisions thereof,
to all projects for which a Federal agency is required to undertake an
environmental review or make a decision under an environmental law for a
project for which a Federal agency is undertaking an environmental review.
(q)
Savings clause
Nothing in this section shall be construed to supersede, amend, or modify sections 134, 135, 139,
325, 326, and 327 of title 23, sections 5303 and 5304 of title 49, or subtitle C of title I of division A of the Moving Ahead for Progress in the 21st
Century Act and the amendments made by such subtitle (Public Law 112–141).
.
(b)
Technical amendment
The table of sections for chapter 5 of title 5, United States Code, is amended by inserting after the items relating to subchapter II
the following:
Subchapter IIA—Interagency Coordination Regarding Permitting
560. Coordination of agency administrative operations for efficient decisionmaking.
.
(c)
Regulations
(1)
Council on environmental quality
Not later than 180 days after the date of enactment of this title, the Council on Environmental
Quality shall amend the regulations contained in part 1500 of title 40,
Code of Federal Regulations, to implement the provisions of this title and
the amendments made by this title, and shall by rule designate States with
laws and procedures that satisfy the criteria under section 560(d)(2)(A) of title 5, United States Code.
(2)
Federal agencies
Not later than 120 days after the date that the Council on Environmental Quality amends the
regulations contained in part 1500 of title 40, Code of Federal
Regulations, to implement the provisions of this title and the amendments
made by this title, each Federal agency with regulations implementing the
National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) shall amend such regulations to implement the provisions of this subchapter.
Passed the House of Representatives March 6, 2014.Karen L. Haas,Clerk