Library / Laws / 113th / hr / H.R. 2641 / Introduced in House
I
113th CONGRESS
1st Session
H. R. 2641
IN THE HOUSE OF REPRESENTATIVES
July 10, 2013
Mr. Marino (for
himself, Mr. Bachus,
Mr. Coble,
Mr. Franks of Arizona,
Mr. Smith of Texas,
Mr. Amodei, and
Mr. Owens) introduced the following
bill; which was referred to the Committee
on the Judiciary, and in addition to the Committee on
Natural Resources, for a
period to be subsequently determined by the Speaker, in each case for
consideration of such provisions as fall within the jurisdiction of the
committee concerned
A BILL
To provide for improved coordination of agency actions in
the preparation and adoption of environmental documents for permitting
determinations, and for other purposes.
1.
Short title
This Act may be cited as the
Responsibly And Professionally
Invigorating Development Act of 2013 or as the
RAPID
Act.
2.
Coordination of
agency administrative operations for efficient decisionmaking
(a)
In
general
Part I of chapter 5
of title 5, United States Code, is amended by inserting after subchapter II the
following:
IIA
Interagency
Coordination Regarding Permitting
560.
Coordination of
agency administrative operations for efficient decisionmaking
(a)
Congressional
declaration of purpose
The purpose of this subchapter is to
establish a framework and procedures to streamline, increase the efficiency of,
and enhance coordination of agency administration of the regulatory review,
environmental decisionmaking, and permitting process for projects undertaken,
reviewed, or funded by Federal agencies. This subchapter will ensure that
agencies administer the regulatory process in a manner that is efficient so
that citizens are not burdened with regulatory excuses and time delays.
(b)
Definitions
For
purposes of this subchapter, the term—
(1) agency
means any agency, department, or other unit of Federal, State, local, or Indian
tribal government;
(2) category of
projects means 2 or more projects related by project type, potential
environmental impacts, geographic location, or another similar project feature
or characteristic;
(3) environmental
assessment means a concise public document for which a Federal agency
is responsible that serves to—
(A) briefly provide
sufficient evidence and analysis for determining whether to prepare an
environmental impact statement or a finding of no significant impact;
(B) aid an agency’s
compliance with NEPA when no environmental impact statement is necessary;
and
(C) facilitate
preparation of an environmental impact statement when one is necessary;
(4) environmental
impact statement means the detailed statement of significant
environmental impacts required to be prepared under NEPA;
(5) environmental
review means the Federal agency procedures for preparing an
environmental impact statement, environmental assessment, categorical
exclusion, or other document under NEPA;
(6) environmental
decisionmaking process means the Federal agency procedures for
undertaking and completion of any environmental permit, decision, approval,
review, or study under any Federal law other than NEPA for a project subject to
an environmental review;
(7) environmental
document means an environmental assessment or environmental impact
statement, and includes any supplemental document or document prepared pursuant
to a court order;
(8) finding of
no significant impact means a document by a Federal agency briefly
presenting the reasons why a project, not otherwise subject to a categorical
exclusion, will not have a significant effect on the human environment and for
which an environmental impact statement therefore will not be prepared;
(9) lead
agency means the Federal agency preparing or responsible for preparing
the environmental document;
(10) NEPA
means the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et
seq.);
(11) project
means major Federal actions that are construction activities undertaken with
Federal funds or that are construction activities that require approval by a
permit or regulatory decision issued by a Federal agency;
(12) project
sponsor means the agency or other entity, including any private or
public-private entity, that seeks approval for a project or is otherwise
responsible for undertaking a project; and
(13) record of
decision means a document prepared by a lead agency under NEPA
following an environmental impact statement that states the lead agency’s
decision, identifies the alternatives considered by the agency in reaching its
decision and states whether all practicable means to avoid or minimize
environmental harm from the alternative selected have been adopted, and if not,
why they were not adopted.
(c)
Preparation of
environmental documents
Upon the request of the lead agency, the
project sponsor shall be authorized to prepare any document for purposes of an
environmental review required in support of any project or approval by the lead
agency if the lead agency furnishes oversight in such preparation and
independently evaluates such document and the document is approved and adopted
by the lead agency prior to taking any action or making any approval based on
such document.
(d)
Adoption and use
of documents
(1)
Documents
prepared under nepa
(A) Not more than 1
environmental impact statement and 1 environmental assessment shall be prepared
under NEPA for a project (except for supplemental environmental documents
prepared under NEPA or environmental documents prepared pursuant to a court
order), and, except as otherwise provided by law, the lead agency shall prepare
the environmental impact statement or environmental assessment. After the lead
agency issues a record of decision, no Federal agency responsible for making
any approval for that project may rely on a document other than the
environmental document prepared by the lead agency.
(B) Upon the request
of a project sponsor, a lead agency may adopt, use, or rely upon secondary and
cumulative impact analyses included in any environmental document prepared
under NEPA for projects in the same geographic area where the secondary and
cumulative impact analyses provide information and data that pertains to the
NEPA decision for the project under review.
(2)
State
environmental documents; supplemental documents
(A) Upon the request
of a project sponsor, a lead agency may adopt a document that has been prepared
for a project under State laws and procedures as the environmental impact
statement or environmental assessment for the project, provided that the State
laws and procedures under which the document was prepared provide environmental
protection and opportunities for public involvement that are substantially
equivalent to NEPA.
(B) An environmental
document adopted under subparagraph (A) is deemed to satisfy the lead agency’s
obligation under NEPA to prepare an environmental impact statement or
environmental assessment.
(C) In the case of a
document described in subparagraph (A), during the period after preparation of
the document but before its adoption by the lead agency, the lead agency shall
prepare and publish a supplement to that document if the lead agency determines
that—
(i) a
significant change has been made to the project that is relevant for purposes
of environmental review of the project; or
(ii) there have been
significant changes in circumstances or availability of information relevant to
the environmental review for the project.
(D) If the agency
prepares and publishes a supplemental document under subparagraph (C), the lead
agency may solicit comments from agencies and the public on the supplemental
document for a period of not more than 45 days beginning on the date of the
publication of the supplement.
(E) A lead agency
shall issue its record of decision or finding of no significant impact, as
appropriate, based upon the document adopted under subparagraph (A), and any
supplements thereto.
(3)
Contemporaneous
projects
If the lead agency determines that there is a reasonable
likelihood that the project will have similar environmental impacts as a
similar project in geographical proximity to the project, and that similar
project was subject to environmental review or similar State procedures within
the 5-year period immediately preceding the date that the lead agency makes
that determination, the lead agency may adopt the environmental document that
resulted from that environmental review or similar State procedure. The lead
agency may adopt such an environmental document, if it is prepared under State
laws and procedures only upon making a favorable determination on such
environmental document pursuant to paragraph (2)(A).
(e)
Participating
agencies
(1)
In
general
The lead agency shall be responsible for inviting and
designating participating agencies in accordance with this subsection. The lead
agency shall provide the invitation or notice of the designation in
writing.
(2)
Federal
participating agencies
Any Federal agency that is required to
adopt the environmental document of the lead agency for a project shall be
designated as a participating agency and shall collaborate on the preparation
of the environmental document, unless the Federal agency informs the lead
agency, in writing, by a time specified by the lead agency in the designation
of the Federal agency that the Federal agency—
(A) has no
jurisdiction or authority with respect to the project;
(B) has no expertise
or information relevant to the project; and
(C) does not intend to
submit comments on the project.
(3)
Invitation
The
lead agency shall identify, as early as practicable in the environmental review
for a project, any agencies other than an agency described in paragraph (2)
that may have an interest in the project, including, where appropriate,
Governors of affected States, and heads of appropriate tribal and local
(including county) governments, and shall invite such identified agencies and
officials to become participating agencies in the environmental review for the
project. The invitation shall set a deadline of 30 days for responses to be
submitted, which may only be extended by the lead agency for good cause shown.
Any agency that fails to respond prior to the deadline shall be deemed to have
declined the invitation.
(4)
Effect of
declining participating agency invitation
Any agency that
declines a designation or invitation by the lead agency to be a participating
agency shall be precluded from submitting comments on any document prepared
under NEPA for that project or taking any measures to oppose, based on the
environmental review, any permit, license, or approval related to that
project.
(5)
Effect of
designation
Designation as a participating agency under this
subsection does not imply that the participating agency—
(A) supports a
proposed project; or
(B) has any
jurisdiction over, or special expertise with respect to evaluation of, the
project.
(6)
Cooperating
agency
A participating agency may also be designated by a lead
agency as a cooperating agency under the regulations contained
in part 1500 of title 40, Code of Federal Regulations, as in effect on January
1, 2011. Designation as a cooperating agency shall have no effect on
designation as participating agency. No agency that is not a participating
agency may be designated as a cooperating agency.
(7)
Concurrent
reviews
Each Federal agency shall—
(A) carry out
obligations of the Federal agency under other applicable law concurrently and
in conjunction with the review required under NEPA; and
(B) in accordance with
the rules made by the Council on Environmental Quality pursuant to subsection
(n)(1), make and carry out such rules, policies, and procedures as may be
reasonably necessary to enable the agency to ensure completion of the
environmental review and environmental decisionmaking process in a timely,
coordinated, and environmentally responsible manner.
(8)
Comments
Each
participating agency shall limit its comments on a project to areas that are
within the authority and expertise of such participating agency. Each
participating agency shall identify in such comments the statutory authority of
the participating agency pertaining to the subject matter of its comments. The
lead agency shall not act upon, respond to or include in any document prepared
under NEPA, any comment submitted by a participating agency that concerns
matters that are outside of the authority and expertise of the commenting
participating agency.
(f)
Project
initiation request
(1)
Notice
A
project sponsor shall provide the Federal agency responsible for undertaking a
project with notice of the initiation of the project by providing a description
of the proposed project, the general location of the proposed project, and a
statement of any Federal approvals anticipated to be necessary for the proposed
project, for the purpose of informing the Federal agency that the environmental
review should be initiated.
(2)
Lead agency
initiation
The agency receiving a project initiation notice under
paragraph (1) shall promptly identify the lead agency for the project, and the
lead agency shall initiate the environmental review within a period of 45 days
after receiving the notice required by paragraph (1) by inviting or designating
agencies to become participating agencies, or, where the lead agency determines
that no participating agencies are required for the project, by taking such
other actions that are reasonable and necessary to initiate the environmental
review.
(g)
Alternatives
analysis
(1)
Participation
As
early as practicable during the environmental review, but no later than during
scoping for a project requiring the preparation of an environmental impact
statement, the lead agency shall provide an opportunity for involvement by
cooperating agencies in determining the range of alternatives to be considered
for a project.
(2)
Range of
alternatives
Following participation under paragraph (1), the
lead agency shall determine the range of alternatives for consideration in any
document which the lead agency is responsible for preparing for the project,
subject to the following limitations:
(A)
No evaluation of
certain alternatives
No Federal agency shall evaluate any
alternative that was identified but not carried forward for detailed evaluation
in an environmental document or evaluated and not selected in any environmental
document prepared under NEPA for the same project.
(B)
Only feasible
alternatives evaluated
Where a project is being constructed,
managed, funded, or undertaken by a project sponsor that is not a Federal
agency, Federal agencies shall only be required to evaluate alternatives that
the project sponsor could feasibly undertake, consistent with the purpose of
and the need for the project, including alternatives that can be undertaken by
the project sponsor and that are technically and economically feasible.
(3)
Methodologies
(A)
In
general
The lead agency shall determine, in collaboration with
cooperating agencies at appropriate times during the environmental review, the
methodologies to be used and the level of detail required in the analysis of
each alternative for a project. The lead agency shall include in the
environmental document a description of the methodologies used and how the
methodologies were selected.
(B)
No evaluation of
inappropriate alternatives
When a lead agency determines that an
alternative does not meet the purpose and need for a project, that alternative
is not required to be evaluated in detail in an environmental document.
(4)
Preferred
alternative
At the discretion of the lead agency, the preferred
alternative for a project, after being identified, may be developed to a higher
level of detail than other alternatives in order to facilitate the development
of mitigation measures or concurrent compliance with other applicable laws if
the lead agency determines that the development of such higher level of detail
will not prevent the lead agency from making an impartial decision as to
whether to accept another alternative which is being considered in the
environmental review.
(5)
Employment
analysis
The evaluation of each alternative in an environmental
impact statement or an environmental assessment shall identify the potential
effects of the alternative on employment, including potential short-term and
long-term employment increases and reductions and shifts in employment.
(h)
Coordination and
scheduling
(1)
Coordination
plan
(A)
In
general
The lead agency shall establish and implement a plan for
coordinating public and agency participation in and comment on the
environmental review for a project or category of projects to facilitate the
expeditious resolution of the environmental review.
(B)
Schedule
(i)
In
general
The lead agency shall establish as part of the
coordination plan for a project, after consultation with each participating
agency and, where applicable, the project sponsor, a schedule for completion of
the environmental review. The schedule shall include deadlines, consistent with
subsection (i), for decisions under any other Federal laws (including the
issuance or denial of a permit or license) relating to the project that is
covered by the schedule.
(ii)
Factors for
consideration
In establishing the schedule, the lead agency shall
consider factors such as—
(I) the
responsibilities of participating agencies under applicable laws;
(II) resources
available to the participating agencies;
(III) overall size and
complexity of the project;
(IV) overall schedule
for and cost of the project;
(V) the sensitivity of
the natural and historic resources that could be affected by the project;
and
(VI) the extent to
which similar projects in geographic proximity were recently subject to
environmental review or similar State procedures.
(iii)
Compliance
with the schedule
(I) All participating
agencies shall comply with the time periods established in the schedule or with
any modified time periods, where the lead agency modifies the schedule pursuant
to subparagraph (D).
(II) The lead agency
shall disregard and shall not respond to or include in any document prepared
under NEPA, any comment or information submitted or any finding made by a
participating agency that is outside of the time period established in the
schedule or modification pursuant to subparagraph (D) for that agency’s
comment, submission or finding.
(III) If a
participating agency fails to object in writing to a lead agency decision,
finding or request for concurrence within the time period established under law
or by the lead agency, the agency shall be deemed to have concurred in the
decision, finding or request.
(C)
Consistency with
other time periods
A schedule under subparagraph (B) shall be
consistent with any other relevant time periods established under Federal
law.
(D)
Modification
The
lead agency may—
(i) lengthen a
schedule established under subparagraph (B) for good cause; and
(ii) shorten a
schedule only with the concurrence of the cooperating agencies.
(E)
Dissemination
A
copy of a schedule under subparagraph (B), and of any modifications to the
schedule, shall be—
(i) provided within 15
days of completion or modification of such schedule to all participating
agencies and to the project sponsor; and
(ii) made available to
the public.
(F)
Roles and
responsibility of lead agency
With respect to the environmental
review for any project, the lead agency shall have authority and responsibility
to take such actions as are necessary and proper, within the authority of the
lead agency, to facilitate the expeditious resolution of the environmental
review for the project.
(i)
Deadlines
The
following deadlines shall apply to any project subject to review under NEPA and
any decision under any Federal law relating to such project (including the
issuance or denial of a permit or license or any required finding):
(1)
Environmental
review deadlines
The lead agency shall complete the environmental
review within the following deadlines:
(A)
Environmental
impact statement projects
For projects requiring preparation of
an environmental impact statement—
(i) the lead agency
shall issue an environmental impact statement within 2 years after the earlier
of the date the lead agency receives the project initiation request or a Notice
of Intent to Prepare an Environmental Impact Statement is published in the
Federal Register; and
(ii) in circumstances
where the lead agency has prepared an environmental assessment and determined
that an environmental impact statement will be required, the lead agency shall
issue the environmental impact statement within 2 years after the date of
publication of the Notice of Intent to Prepare an Environmental Impact
Statement in the Federal Register.
(B)
Environmental
assessment projects
For projects requiring preparation of an
environmental assessment, the lead agency shall issue a finding of no
significant impact or publish a Notice of Intent to Prepare an Environmental
Impact Statement in the Federal Register within 1 year after the earlier of the
date the lead agency receives the project initiation request, makes a decision
to prepare an environmental assessment, or sends out participating agency
invitations.
(2)
Extensions
(A)
Requirements
The
environmental review deadlines may be extended only if—
(i) a
different deadline is established by agreement of the lead agency, the project
sponsor, and all participating agencies; or
(ii) the deadline is
extended by the lead agency for good cause.
(B)
Limitation
The
environmental review shall not be extended by more than 1 year for a project
requiring preparation of an environmental impact statement or by more than 180
days for a project requiring preparation of an environmental assessment.
(3)
Environmental
review comments
(A)
Comments on
draft environmental impact statement
For comments by agencies and
the public on a draft environmental impact statement, the lead agency shall
establish a comment period of not more than 60 days after publication in the
Federal Register of notice of the date of public availability of such document,
unless—
(i) a
different deadline is established by agreement of the lead agency, the project
sponsor, and all participating agencies; or
(ii) the deadline is
extended by the lead agency for good cause.
(B)
Other
comments
For all other comment periods for agency or public
comments in the environmental review process, the lead agency shall establish a
comment period of no more than 30 days from availability of the materials on
which comment is requested, unless—
(i) a
different deadline is established by agreement of the lead agency, the project
sponsor, and all participating agencies; or
(ii) the deadline is
extended by the lead agency for good cause.
(4)
Deadlines for
decisions under other laws
Notwithstanding any other provision of
law, in any case in which a decision under any other Federal law relating to
the undertaking of a project being reviewed under NEPA (including the issuance
or denial of a permit or license) is required to be made, the following
deadlines shall apply:
(A)
Decisions prior
to record of decision or finding of no significant impact
If a
Federal agency is required to approve, or otherwise to act upon, a permit,
license, or other similar application for approval related to a project prior
to the record of decision or finding of no significant impact, such Federal
agency shall approve or otherwise act not later than the end of a 90-day period
beginning—
(i) after all other
relevant agency review related to the project is complete; and
(ii) after the lead
agency publishes a notice of the availability of the final environmental impact
statement or issuance of other final environmental documents, or no later than
such other date that is otherwise required by law, whichever event occurs
first.
(B)
Other
decisions
With regard to any approval or other action related to
a project by a Federal agency that is not subject to subparagraph (A), each
Federal agency shall approve or otherwise act not later than the end of a
period of 180 days beginning—
(i) after all other
relevant agency review related to the project is complete; and
(ii) after the lead
agency issues the record of decision or finding of no significant impact,
unless a different deadline is established by agreement of the Federal agency,
lead agency, and the project sponsor, where applicable, or the deadline is
extended by the Federal agency for good cause, provided that such extension
shall not extend beyond a period that is 1 year after the lead agency issues
the record of decision or finding of no significant impact.
(C)
Failure to
act
In the event that any Federal agency fails to approve, or
otherwise to act upon, a permit, license, or other similar application for
approval related to a project within the applicable deadline described in
subparagraph (A) or (B), the permit, license, or other similar application
shall be deemed approved by such agency and the agency shall take action in
accordance with such approval within 30 days of the applicable deadline
described in subparagraph (A) or (B).
(D)
Final agency
action
Any approval under subparagraph (C) is deemed to be final
agency action, and may not be reversed by any agency. In any action under
chapter 7 seeking review of such a final agency action, the court may not set
aside such agency action by reason of that agency action having occurred under
this paragraph.
(j)
Issue
identification and resolution
(1)
Cooperation
The
lead agency and the participating agencies shall work cooperatively in
accordance with this section to identify and resolve issues that could delay
completion of the environmental review or could result in denial of any
approvals required for the project under applicable laws.
(2)
Lead agency
responsibilities
The lead agency shall make information available
to the participating agencies as early as practicable in the environmental
review regarding the environmental, historic, and socioeconomic resources
located within the project area and the general locations of the alternatives
under consideration. Such information may be based on existing data sources,
including geographic information systems mapping.
(3)
Participating
agency responsibilities
Based on information received from the
lead agency, participating agencies shall identify, as early as practicable,
any issues of concern regarding the project’s potential environmental,
historic, or socioeconomic impacts. In this paragraph, issues of concern
include any issues that could substantially delay or prevent an agency from
granting a permit or other approval that is needed for the project.
(4)
Issue
resolution
(A)
Meeting of
participating agencies
At any time upon request of a project
sponsor, the lead agency shall promptly convene a meeting with the relevant
participating agencies and the project sponsor, to resolve issues that could
delay completion of the environmental review or could result in denial of any
approvals required for the project under applicable laws.
(B)
Notice that
resolution cannot be achieved
If a resolution cannot be achieved
within 30 days following such a meeting and a determination by the lead agency
that all information necessary to resolve the issue has been obtained, the lead
agency shall notify the heads of all participating agencies, the project
sponsor, and the Council on Environmental Quality for further proceedings in
accordance with section 204 of NEPA, and shall publish such notification in the
Federal Register.
(k)
Report to
congress
The head of each Federal agency shall report annually to
Congress—
(1) the projects for
which the agency initiated preparation of an environmental impact statement or
environmental assessment;
(2) the projects for
which the agency issued a record of decision or finding of no significant
impact and the length of time it took the agency to complete the environmental
review for each such project;
(3) the filing of any
lawsuits against the agency seeking judicial review of a permit, license, or
approval issued by the agency for an action subject to NEPA, including the date
the complaint was filed, the court in which the complaint was filed, and a
summary of the claims for which judicial review was sought; and
(4) the resolution of
any lawsuits against the agency that sought judicial review of a permit,
license, or approval issued by the agency for an action subject to NEPA.
(l)
Limitations on
claims
(1)
In
general
Notwithstanding any other provision of law, a claim
arising under Federal law seeking judicial review of a permit, license, or
approval issued by a Federal agency for an action subject to NEPA shall be
barred unless—
(A) in the case of a
claim pertaining to a project for which an environmental review was conducted
and an opportunity for comment was provided, the claim is filed by a party that
submitted a comment during the environmental review on the issue on which the
party seeks judicial review, and such comment was sufficiently detailed to put
the lead agency on notice of the issue upon which the party seeks judicial
review; and
(B) filed within 180
days after publication of a notice in the Federal Register announcing that the
permit, license, or approval is final pursuant to the law under which the
agency action is taken, unless a shorter time is specified in the Federal law
pursuant to which judicial review is allowed.
(2)
New
information
The preparation of a supplemental environmental
impact statement, when required, is deemed a separate final agency action and
the deadline for filing a claim for judicial review of such action shall be 180
days after the date of publication of a notice in the Federal Register
announcing the record of decision for such action. Any claim challenging agency
action on the basis of information in a supplemental environmental impact
statement shall be limited to challenges on the basis of that
information.
(3)
Rule of
construction
Nothing in this subsection shall be construed to
create a right to judicial review or place any limit on filing a claim that a
person has violated the terms of a permit, license, or approval.
(m)
Categories of
projects
The authorities granted under this subchapter may be
exercised for an individual project or a category of projects.
(n)
Effective
date
The requirements of this subchapter shall apply only to
environmental reviews and environmental decisionmaking processes initiated
after the date of enactment of this subchapter.
(o)
Applicability
Except
as provided in subsection (p), this subchapter applies, according to the
provisions thereof, to all projects for which a Federal agency is required to
undertake an environmental review or make a decision under an environmental law
for a project for which a Federal agency is undertaking an environmental
review.
(p)
Savings
clause
Nothing in this section shall be construed to supersede,
amend, or modify sections 134, 135, 139, 325, 326, and 327 of title 23, United
States Code, sections 5303 and 5304 of title 49, United States Code, or
subtitle C of title I of division A of the Moving Ahead for Progress in the
21st Century Act and the amendments made by such subtitle (Public Law
112–141).
.
(b)
Technical
amendment
The table of sections for chapter 5 of title 5, United
States Code, is amended by inserting after the item relating to subchapter II
the following:
Subchapter IIA—Interagency Coordination
Regarding Permitting
560. Coordination of agency administrative
operations for efficient
decisionmaking.
.
(c)
Regulations
(1)
Council on
environmental quality
Not later than 180 days after the date of
enactment of this title, the Council on Environmental Quality shall amend the
regulations contained in part 1500 of title 40, Code of Federal Regulations, to
implement the provisions of this title and the amendments made by this title,
and shall by rule designate States with laws and procedures that satisfy the
criteria under section 560(d)(2)(A) of title 5, United States Code.
(2)
Federal
agencies
Not later than 120 days after the date that the Council
on Environmental Quality amends the regulations contained in part 1500 of title
40, Code of Federal Regulations, to implement the provisions of this title and
the amendments made by this title, each Federal agency with regulations
implementing the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et
seq.) shall amend such regulations to implement the provisions of this
subchapter.