Library / Laws / 113th / hr / H.R. 2417 / Introduced in House
I
113th CONGRESS
1st Session
H. R. 2417
IN THE HOUSE OF REPRESENTATIVES
June 18, 2013
Mr. Franks of Arizona
(for himself, Mrs. Hartzler,
Mr. Posey,
Mr. Lamborn,
Mr. King of Iowa,
Mr. Broun of Georgia,
Mr. Pitts,
Mr. Pittenger,
Mr. LaMalfa,
Ms. Clarke,
Mr. Hunter,
Mr. Stewart,
Mr. Wilson of South Carolina,
Mr. Jordan,
Mr. Perry,
Mr. Gosar,
Mr. Duncan of South Carolina,
Mr. Royce,
Mr. Fortenberry, and
Mr. Kline) introduced the following
bill; which was referred to the Committee
on Energy and Commerce, and in addition to the Committee on
the Budget, for a period
to be subsequently determined by the Speaker, in each case for consideration of
such provisions as fall within the jurisdiction of the committee
concerned
A BILL
To amend the Federal Power Act to protect the bulk-power
system and electric infrastructure critical to the defense and well-being of
the United States against natural and manmade electromagnetic pulse
(EMP) threats and vulnerabilities.
1.
Short title
This Act may be cited as the
Secure High-voltage Infrastructure for
Electricity from Lethal Damage Act or the
SHIELD
Act.
2.
Findings
The Congress makes the following
findings:
(1) According to the
Report of the Commission to Assess the Threat to the United States from
Electromagnetic Pulse Attack (in this Act referred to as the EMP
Commission Report), the society and economy of the United States are
critically dependent upon the availability of
electricity..
(2) According to the
EMP Commission Report, continued electrical supply is necessary for
sustaining water supplies, production and distribution of food, fuel,
communications, and everything else that is part of our economy.
(3) According to the
EMP Commission Report, contemporary U.S. society is not structured, nor
does it have the means, to provide for the needs of nearly 300 million
Americans without electricity..
(4) According to the
EMP Commission Report, due to the existing electrical system operating at or
near its physical capacity, a relatively modest upset to the system can
cause functional collapse..
(5) According to the
EMP Commission Report, electromagnetic pulse (in this Act referred to as
EMP) is a threat to the overall electrical power system.
(6) According to the
EMP Commission Report, EMP occurs both naturally, such as geomagnetic storms,
and via manmade devices.
(7) According to the
EMP Commission Report, while the electric infrastructure has a degree of
durability against … the failure of one or a small number of [electric]
components, the current strategy for recovery leaves the United States
ill-prepared to respond effectively to an EMP attack that would potentially
result in damage to vast numbers of components nearly simultaneously over an
unprecedented geographic scale.
(8) According to the
EMP Commission Report, EMP may couple ultimately unmanageable currents
and voltages into an electrical system routinely operated with little margin
and cause the collapse of large portions of the electrical
system..
(9) According to the
EMP Commission Report, a collapse of large portions of the electrical system
will result in significant periods of power-outage and restoration from
collapse or loss of significant portions of the system [will be] exceedingly
difficult..
(10) According to the
EMP Commission Report, should the electrical power system be lost for
any substantial period of time … the consequences are likely to be catastrophic
to civilian society..
(11) According to the
EMP Commission Report, the Commission is deeply concerned that
[negative] impacts [on the electric infrastructure] are certain in an EMP event
unless practical steps are taken to provide protection for critical elements of
the electric system..
3.
Amendment to the
Federal Power Act
(a)
Critical
electric infrastructure security
Part II of the Federal Power Act
(16 U.S.C. 824 et seq.) is amended by adding after section 215 the following
new section:
215A.
Critical
electric infrastructure security
(a)
Definitions
For
purposes of this section:
(1)
Bulk-power
system; electric reliability organization; regional entity
The
terms bulk-power system, Electric Reliability
Organization, and regional entity have the meanings given
such terms in paragraphs (1), (2), and (7) of section 215(a),
respectively.
(2)
Defense critical
electric infrastructure
The term defense critical electric
infrastructure means any infrastructure located in the United States
(including the territories) used for the generation, transmission, or
distribution of electric energy that—
(A) is not part of the
bulk-power system; and
(B) serves a facility
designated by the President pursuant to subsection (d)(1), but is not owned or
operated by the owner or operator of such facility.
(3)
Defense critical
electric infrastructure vulnerability
The term defense critical electric
infrastructure vulnerability means a weakness in defense critical
electric infrastructure that, in the event of a malicious act using an
electromagnetic pulse, would pose a substantial risk of disruption of those
electrical or electronic devices or communications networks, including
hardware, software, and data, that are essential to the reliability of defense
critical electric infrastructure.
(4)
Electromagnetic
pulse
The term electromagnetic pulse means 1 or more
pulses of electromagnetic energy generated or emitted by a device capable of
disabling, disrupting, or destroying electronic equipment by means of such a
pulse.
(5)
Geomagnetic
storm
The term geomagnetic storm means a temporary
disturbance of the Earth’s magnetic field resulting from solar activity.
(6)
Grid security
threat
The term grid security threat means a
substantial likelihood of—
(A) a malicious act
using an electromagnetic pulse, or a geomagnetic storm event, that could
disrupt the operation of those electrical or electronic devices or
communications networks, including hardware, software, and data, that are
essential to the reliability of the bulk-power system or of defense critical
electric infrastructure; and
(B) disruption of the
operation of such devices or networks, with significant adverse effects on the
reliability of the bulk-power system or of defense critical electric
infrastructure, as a result of such act or event.
(7)
Grid security
vulnerability
The term
grid security vulnerability means a weakness that, in the event of
a malicious act using an electromagnetic pulse, would pose a substantial risk
of disruption to the operation of those electrical or electronic devices or
communications networks, including hardware, software, and data, that are
essential to the reliability of the bulk-power system.
(8)
Large
transformer
The term large transformer means an
electric transformer that is part of the bulk-power system.
(9)
Protected
information
The term protected information means
information, other than classified national security information, designated as
protected information by the Commission under subsection (e)(2)—
(A) that was developed
or submitted in connection with the implementation of this section;
(B) that specifically
discusses grid security threats, grid security vulnerabilities, defense
critical electric infrastructure vulnerabilities, or plans, procedures, or
measures to address such threats or vulnerabilities; and
(C) the unauthorized
disclosure of which could be used in a malicious manner to impair the
reliability of the bulk-power system or of defense critical electric
infrastructure.
(10)
Secretary
The
term Secretary means the Secretary of Energy.
(11)
Security
The
definition of security in section 3(16) shall not apply to the
provisions in this section.
(b)
Emergency
response measures
(1)
Authority to
address grid security threats
Whenever the President issues and
provides to the Commission (either directly or through the Secretary) a written
directive or determination identifying an imminent grid security threat, the
Commission may, with or without notice, hearing, or report, issue such orders
for emergency measures as are necessary in its judgment to protect the
reliability of the bulk-power system or of defense critical electric
infrastructure against such threat. As soon as practicable, but not later than
180 days after the date of enactment of this section, the Commission shall,
after notice and opportunity for comment, establish rules of procedure that
ensure that such authority can be exercised expeditiously.
(2)
Notification of
Congress
Whenever the President issues and provides to the
Commission (either directly or through the Secretary) a written directive or
determination under paragraph (1), the President (or the Secretary, as the case
may be) shall promptly notify congressional committees of relevant
jurisdiction, including the Committee on Energy and Commerce of the House of
Representatives and the Committee on Energy and Natural Resources of the
Senate, of the contents of, and justification for, such directive or
determination.
(3)
Consultation
Before issuing an order for emergency
measures under paragraph (1), the Commission shall, to the extent practicable
in light of the nature of the grid security threat and the urgency of the need
for such emergency measures, consult with the Secretary, other appropriate
Federal agencies, appropriate governmental authorities in Canada and Mexico,
the Electric Reliability Organization, and entities described in paragraph
(4).
(4)
Application
An
order for emergency measures under this subsection may apply to—
(A) a regional entity;
or
(B) any owner, user,
or operator of the bulk-power system or of defense critical electric
infrastructure within the United States.
(5)
Discontinuance
The
Commission shall issue an order discontinuing any emergency measures ordered
under this subsection, effective not later than 30 days after the earliest of
the following:
(A) The date upon
which the President issues and provides to the Commission (either directly or
through the Secretary) a written directive or determination that the grid
security threat identified under paragraph (1) no longer exists.
(B) The date upon
which the Commission issues a written determination that the emergency measures
are no longer needed to address the grid security threat identified under
paragraph (1), including by means of Commission approval of a reliability
standard under section 215 that the Commission determines adequately addresses
such threat.
(C) The date that is 1
year after the issuance of an order under paragraph (1).
(6)
Cost
recovery
If the Commission determines that owners, operators, or
users of the bulk-power system or of defense critical electric infrastructure
have incurred substantial costs to comply with an order under this subsection
or subsection (c) and that such costs were prudently incurred and cannot
reasonably be recovered through regulated rates or market prices for the
electric energy or services sold by such owners, operators, or users, the
Commission shall, after notice and an opportunity for comment, establish a
mechanism that permits such owners, operators, or users to recover such
costs.
(c)
Measures To
address grid security vulnerabilities
(1)
Commission
authority
(A)
Reliability
standards
If the Commission,
in consultation with appropriate Federal agencies, identifies a grid security
vulnerability that the Commission determines has not adequately been addressed
through a reliability standard developed and approved under section 215, the
Commission shall, after notice and opportunity for comment and after
consultation with the Secretary, other appropriate Federal agencies, and
appropriate governmental authorities in Canada and Mexico, issue an order
directing the Electric Reliability Organization to submit to the Commission for
approval under section 215, not later than 30 days after the issuance of such
order, a reliability standard requiring implementation, by any owner, operator,
or user of the bulk-power system in the United States, of measures to protect
the bulk-power system against such vulnerability. Any such standard shall
include a protection plan, including automated hardware-based solutions. The
Commission shall approve a reliability standard submitted pursuant to this
subparagraph, unless the Commission determines that such reliability standard
does not adequately protect against such vulnerability or otherwise does not
satisfy the requirements of section 215.
(B)
Measures to
address grid security vulnerabilities
If the Commission, after
notice and opportunity for comment and after consultation with the Secretary,
other appropriate Federal agencies, and appropriate governmental authorities in
Canada and Mexico, determines that the reliability standard submitted by the
Electric Reliability Organization to address a grid security vulnerability
identified under subparagraph (A) does not adequately protect the bulk-power
system against such vulnerability, the Commission shall promulgate a rule or
issue an order requiring implementation, by any owner, operator, or user of the
bulk-power system in the United States, of measures to protect the bulk-power
system against such vulnerability. Any such rule or order shall include a
protection plan, including automated hardware-based solutions. Before
promulgating a rule or issuing an order under this subparagraph, the Commission
shall, to the extent practicable in light of the urgency of the need for action
to address the grid security vulnerability, request and consider
recommendations from the Electric Reliability Organization regarding such rule
or order. The Commission may establish an appropriate deadline for the
submission of such recommendations.
(2)
Rescission
The
Commission shall approve a reliability standard developed under section 215
that addresses a grid security vulnerability that is the subject of a rule or
order under paragraph (1)(B), unless the Commission determines that such
reliability standard does not adequately protect against such vulnerability or
otherwise does not satisfy the requirements of section 215. Upon such approval,
the Commission shall rescind the rule promulgated or order issued under
paragraph (1)(B) addressing such vulnerability, effective upon the effective
date of the newly approved reliability standard.
(3)
Geomagnetic
storms and electromagnetic pulse
Not later than 6 months after
the date of enactment of this section, the Commission shall, after notice and
an opportunity for comment and after consultation with the Secretary and other
appropriate Federal agencies, issue an order directing the Electric Reliability
Organization to submit to the Commission for approval under section 215, not
later than 6 months after the issuance of such order, reliability standards
adequate to protect the bulk-power system from any reasonably foreseeable
geomagnetic storm or electromagnetic pulse event. The Commission’s order shall
specify the nature and magnitude of the reasonably foreseeable events against
which such standards must protect. Such standards shall appropriately balance
the risks to the bulk-power system associated with such events, including any
regional variation in such risks, the costs of mitigating such risks, and the
priorities and timing associated with implementation. If the Commission
determines that the reliability standards submitted by the Electric Reliability
Organization pursuant to this paragraph are inadequate, the Commission shall
promulgate a rule or issue an order adequate to protect the bulk-power system
from geomagnetic storms or electromagnetic pulse as required under paragraph
(1)(B).
(4)
Large
transformer availability
Not later than 1 year after the date of
enactment of this section, the Commission shall, after notice and an
opportunity for comment and after consultation with the Secretary and other
appropriate Federal agencies, issue an order directing the Electric Reliability
Organization to submit to the Commission for approval under section 215, not
later than 1 year after the issuance of such order, reliability standards
addressing availability of large transformers. Such standards shall require
entities that own or operate large transformers to ensure, individually or
jointly, adequate availability of large transformers to promptly restore the
reliable operation of the bulk-power system in the event that any such
transformer is destroyed or disabled as a result of a geomagnetic storm event
or electromagnetic pulse event. The Commission’s order shall specify the nature
and magnitude of the reasonably foreseeable events that shall provide the basis
for such standards. Such standards shall—
(A) provide entities
subject to the standards with the option of meeting such standards individually
or jointly; and
(B) appropriately
balance the risks associated with a reasonably foreseeable event, including any
regional variation in such risks, and the costs of ensuring adequate
availability of spare transformers.
(d)
Critical defense
facilities
(1)
Designation
Not
later than 180 days after the date of enactment of this section, the President
shall designate, in a written directive or determination provided to the
Commission, facilities located in the United States (including the territories)
that are—
(A) critical to the
defense of the United States; and
(B) vulnerable to a
disruption of the supply of electric energy provided to such facility by an
external provider.
The number of facilities designated
by such directive or determination shall not exceed 100. The President may
periodically revise the list of designated facilities through a subsequent
written directive or determination provided to the Commission, provided that
the total number of designated facilities at any time shall not exceed
100.
(2)
Commission
authority
If the Commission identifies a defense critical
electric infrastructure vulnerability that the Commission, in consultation with
owners and operators of any facility or facilities designated by the President
pursuant to paragraph (1), determines has not adequately been addressed through
measures undertaken by owners or operators of defense critical electric
infrastructure, the Commission shall, after notice and an opportunity for
comment and after consultation with the Secretary and other appropriate Federal
agencies, promulgate a rule or issue an order requiring implementation, by any
owner or operator of defense critical electric infrastructure, of measures to
protect the defense critical electric infrastructure against such
vulnerability. The Commission shall exempt from any such rule or order any
specific defense critical electric infrastructure that the Commission
determines already has been adequately protected against the identified
vulnerability. The Commission shall make any such determination in consultation
with the owner or operator of the facility designated by the President pursuant
to paragraph (1) that relies upon such defense critical electric
infrastructure.
(3)
Cost
recovery
An owner or operator of defense critical electric
infrastructure shall be required to take measures under paragraph (2) only to
the extent that the owners or operators of a facility or facilities designated
by the President pursuant to paragraph (1) that rely upon such infrastructure
agree to bear the full incremental costs of compliance with a rule promulgated
or order issued under paragraph (2).
(e)
Protection of
Information
(1)
Prohibition of
public disclosure of protected information
Protected information
shall—
(A) be exempt from
disclosure under section 552(b)(3) of title 5, United States Code; and
(B) not be made
available pursuant to any State, local, or tribal law requiring disclosure of
information or records.
(2)
Information
sharing
(A)
In
general
Consistent with the Controlled Unclassified Information
framework established by the President, the Commission shall promulgate such
regulations and issue such orders as necessary to designate protected
information and to prohibit the unauthorized disclosure of such protected
information.
(B)
Sharing of
protected information
The regulations promulgated and orders
issued pursuant to subparagraph (A) shall provide standards for and facilitate
the appropriate sharing of protected information with, between, and by Federal,
State, local, and tribal authorities, the Electric Reliability Organization,
regional entities, and owners, operators, and users of the bulk-power system in
the United States and of defense critical electric infrastructure. In
promulgating such regulations and issuing such orders, the Commission shall
take account of the role of State commissions in reviewing the prudence and
cost of investments within their respective jurisdictions. The Commission shall
consult with appropriate Canadian and Mexican authorities to develop protocols
for the sharing of protected information with, between, and by appropriate
Canadian and Mexican authorities and owners, operators, and users of the
bulk-power system outside the United States.
(3)
Submission of
information to Congress
Nothing in this section shall permit or
authorize the withholding of information from Congress, any committee or
subcommittee thereof, or the Comptroller General.
(4)
Disclosure of
nonprotected information
In implementing this section, the
Commission shall protect from disclosure only the minimum amount of information
necessary to protect the reliability of the bulk-power system and of defense
critical electric infrastructure. The Commission shall segregate protected
information within documents and electronic communications, wherever feasible,
to facilitate disclosure of information that is not designated as protected
information.
(5)
Duration of
designation
Information may not be designated as protected
information for longer than 5 years, unless specifically redesignated by the
Commission.
(6)
Removal of
designation
The Commission may remove the designation of
protected information, in whole or in part, from a document or electronic
communication if the unauthorized disclosure of such information could no
longer be used to impair the reliability of the bulk-power system or of defense
critical electric infrastructure.
(7)
Judicial review
of designations
Notwithstanding subsection (f) of this section or
section 313, a person or entity may seek judicial review of a determination by
the Commission concerning the designation of protected information under this
subsection exclusively in the district court of the United States in the
district in which the complainant resides, or has his principal place of
business, or in the District of Columbia. In such a case the court shall
determine the matter de novo, and may examine the contents of documents or
electronic communications designated as protected information in camera to
determine whether such documents or any part thereof were improperly designated
as protected information. The burden is on the Commission to sustain its
designation.
(f)
Judicial
review
The Commission shall act expeditiously to resolve all
applications for rehearing of orders issued pursuant to this section that are
filed under section 313(a). Any party seeking judicial review pursuant to
section 313 of an order issued under this section may obtain such review only
in the United States Court of Appeals for the District of Columbia
Circuit.
(g)
Provision of
assistance to industry in meeting grid security protection needs
(1)
Expertise and
resources
The Secretary shall establish a program, in
consultation with other appropriate Federal agencies, to develop technical
expertise in the protection of systems for the generation, transmission, and
distribution of electric energy against geomagnetic storms or malicious acts
using electromagnetic pulse that would pose a substantial risk of disruption to
the operation of those electronic devices or communications networks, including
hardware, software, and data, that are essential to the reliability of such
systems. Such program shall include the identification and development of
appropriate technical and electronic resources, including hardware, software,
and system equipment.
(2)
Sharing
expertise
As appropriate, the Secretary shall offer to share
technical expertise developed under the program under paragraph (1), through
consultation and assistance, with owners, operators, or users of systems for
the generation, transmission, or distribution of electric energy located in the
United States and with State commissions. In offering such support, the
Secretary shall assign higher priority to systems serving facilities designated
by the President pursuant to subsection (d)(1) and other
critical-infrastructure facilities, which the Secretary shall identify in
consultation with the Commission and other appropriate Federal agencies.
(3)
Security
clearances and communication
The Secretary shall facilitate and,
to the extent practicable, expedite the acquisition of adequate security
clearances by key personnel of any entity subject to the requirements of this
section to enable optimum communication with Federal agencies regarding grid
security threats, grid security vulnerabilities, and defense critical electric
infrastructure vulnerabilities. The Secretary, the Commission, and other
appropriate Federal agencies shall, to the extent practicable and consistent
with their obligations to protect classified and protected information, share
timely actionable information regarding grid security threats, grid security
vulnerabilities, and defense critical electric infrastructure vulnerabilities
with appropriate key personnel of owners, operators, and users of the
bulk-power system and of defense critical electric
infrastructure.
.
(b)
Conforming
amendments
(1)
Jurisdiction
Section
201(b)(2) of the Federal Power Act (16 U.S.C. 824(b)(2)) is amended by
inserting 215A, after 215, each place it
appears.
(2)
Public
utility
Section 201(e) of the Federal Power Act (16 U.S.C.
824(e)) is amended by inserting 215A, after
215,.
4.
Budgetary
compliance
The budgetary
effects of this Act, for the purpose of complying with the Statutory
Pay-As-You-Go Act of 2010, shall be determined by reference to the latest
statement titled Budgetary Effects of PAYGO Legislation for this
Act, submitted for printing in the Congressional Record by the Chairman of the
House Budget Committee, provided that such statement has been submitted prior
to the vote on passage.