Library / Laws / 113th / hr / H.R. 2218 / Placed on Calendar (Senate)
II
Calendar No. 153
113th CONGRESS
1st Session
H. R. 2218
IN THE SENATE OF THE UNITED
STATES
July 29, 2013
Received; read the first time
July 30, 2013
Read the second time and placed on the
calendar
AN ACT
To amend subtitle D of the Solid Waste
Disposal Act to encourage recovery and beneficial use of coal combustion
residuals and establish requirements for the proper management and disposal of
coal combustion residuals that are protective of human health and the
environment.
1.
Short title and table of
contents
(a)
Short
title
This Act may be cited
as the Coal Residuals Reuse and
Management Act of 2013.
(b)
Table of
contents
The table of
contents for this Act is as follows:
Sec. 1. Short title and table of contents.
Sec. 2. Management and disposal of coal combustion
residuals.
Sec. 3. 2000 regulatory determination.
Sec. 4. Technical assistance.
Sec. 5. Federal Power Act.
2.
Management and
disposal of coal combustion residuals
(a)
In
general
Subtitle D of the Solid Waste Disposal Act
(42 U.S.C. 6941 et
seq.) is amended by adding at the end the following:
4011.
Management and
disposal of coal combustion residuals
(a)
State permit
programs for coal combustion residuals
Each State may adopt, implement, and
enforce a coal combustion residuals permit program if such State provides the
notification required under subsection (b)(1), and the certification required
under subsection (b)(2).
(b)
State
actions
(1)
Notification
Not later than 6 months after the date of
enactment of this section (except as provided by the deadline identified under
subsection (d)(3)(B)), the Governor of each State shall notify the
Administrator, in writing, whether such State will adopt and implement a coal
combustion residuals permit program.
(2)
Certification
(A)
In
general
Not later than 36 months after the date of enactment of
this section (except as provided in subsection (f)(1)(A)), in the case of a
State that has notified the Administrator that it will implement a coal
combustion residuals permit program, the head of the lead State implementing
agency shall submit to the Administrator a certification that such coal
combustion residuals permit program meets the requirements described in
subsection (c).
(B)
Contents
A
certification submitted under this paragraph shall include—
(i) a letter
identifying the lead State implementing agency, signed by the head of such
agency;
(ii) identification of
any other State agencies involved with the implementation of the coal
combustion residuals permit program;
(iii) an explanation
of how the State coal combustion residuals permit program meets the
requirements of this section, including a description of the State’s—
(I) process to inspect
or otherwise determine compliance with such permit program;
(II) process to
enforce the requirements of such permit program;
(III) public
participation process for the promulgation, amendment, or repeal of regulations
for, and the issuance of permits under, such permit program;
(IV) statutes,
regulations, or policies pertaining to public access to information, such as
groundwater monitoring data; and
(V) statutes,
regulations, or policies pertaining to structural integrity or dam safety that
may be applied to structures through such permit program;
(iv) a certification
that the State has in effect, at the time of certification, statutes or
regulations necessary to implement a coal combustion residuals permit program
that meets the requirements described in subsection (c);
(v) copies of State
statutes and regulations described in clause (iv); and
(vi) an emergency action plan for State response
to a leak or spill at a structure that receives coal combustion
residuals.
(C)
Updates
A
State may update the certification as needed to reflect changes to the coal
combustion residuals permit program.
(3)
Maintenance of
4005(c) or
3006 program
In order to adopt or implement a coal
combustion residuals permit program under this section (including pursuant to
subsection (f)), the State implementing agency shall maintain an approved
permit program or other system of prior approval and conditions under section
4005(c) or an authorized program under section 3006.
(c)
Requirements for
a coal combustion residuals permit program
A coal combustion residuals permit program
shall consist of the following:
(1)
General
requirements
(A)
In
general
The implementing
agency shall—
(i) apply the subset
of the revised criteria described in paragraph (2) to owners or operators of
structures, including surface impoundments, that receive coal combustion
residuals on or after the date of enactment of this section;
(ii) with respect to
structures that are receiving coal combustion residuals as of the date of
enactment of this section, take the actions required under paragraph
(3);
(iii) impose requirements for surface
impoundments that do not meet certain criteria pursuant to paragraph (4);
and
(iv) require that
closure of structures occur in accordance with paragraph (5).
(B)
Structural
integrity
(i)
Engineering
certification
The implementing agency shall require that an
independent registered professional engineer certify that—
(I) the design of each structure that receives
coal combustion residuals on or after the date of enactment of this section is
in accordance with recognized and generally accepted good engineering practices
for containment of the maximum volume of coal combustion residuals and liquids
which can be impounded therein; and
(II) the construction
and maintenance of the structure will ensure structural stability.
(ii)
Emergency
action plan
The implementing agency shall require that the owner
or operator of any structure that is a surface impoundment that receives coal
combustion residuals on or after the date of enactment of this section and that
is classified by the State as posing a high hazard potential pursuant to the
guidelines published by the Federal Emergency Management Agency entitled
Federal Guidelines for Dam Safety: Hazard Potential Classification
System for Dams (FEMA Publication Number 333) prepare and maintain an
emergency action plan that identifies responsible persons and actions to be
taken in the event of a dam safety emergency.
(iii)
Inspection
(I)
In
general
The implementing agency shall require that structures
that are surface impoundments that receive coal combustion residuals on or
after the date of enactment of this section be inspected not less than annually
by an independent registered professional engineer to assure that the design,
operation, and maintenance of the surface impoundment is in accordance with
recognized and generally accepted good engineering practices for containment of
the maximum volume of coal combustion residuals and liquids which can be
impounded therein, so as to ensure dam stability.
(II)
Potentially
hazardous conditions
The implementing agency shall require that
if an inspection under subclause (I), or a periodic evaluation under clause
(iv), reveals a potentially hazardous condition, the owner or operator of the
structure shall immediately take action to mitigate the potentially hazardous
condition and notify appropriate State and local first responders.
(iv)
Periodic
evaluation
The implementing agency shall require that structures
that are surface impoundments that receive coal combustion residuals on or
after the date of enactment of this section be periodically evaluated for
appearances of structural weakness.
(v)
Deficiency
(I)
In
general
If the head of the implementing agency determines that a
structure is deficient with respect to the requirements in clause (i), (iii),
or (iv), the head of the agency has the authority to require action to correct
the deficiency according to a schedule determined by the agency.
(II)
Uncorrected
deficiencies
If a deficiency is not corrected according to the
schedule, the head of the implementing agency has the authority to require that
the structure close in accordance with paragraph (5).
(III)
Dam safety
consultation
In the case of a structure that is a surface
impoundment, the head of the implementing agency shall, in making a
determination under subclause (I), consult with appropriate State dam safety
officials.
(C)
Location
The
implementing agency shall require that structures that first receive coal
combustion residuals on or after the date of enactment of this section shall be
constructed with a base located a minimum of 2 feet above the upper limit of
the water table, unless it is demonstrated to the satisfaction of the
implementing agency that—
(i) the hydrogeologic
characteristics of a structure and surrounding land would preclude such a
requirement; and
(ii) the function and
integrity of the liner system will not be adversely impacted by contact with
the water table.
(D)
Wind
dispersal
(i)
In
general
The implementing
agency shall require that owners or operators of structures that receive coal
combustion residuals on or after the date of enactment of this section address
wind dispersal of dust by requiring cover, or by wetting coal combustion
residuals with water to a moisture content that prevents wind dispersal,
facilitates compaction, and does not result in free liquids.
(ii)
Alternative
methods
Subject to the review
and approval by the implementing agency, owners or operators of structures that
receive coal combustion residuals on or after the date of enactment of this
section may propose alternative methods to address wind dispersal of dust that
will provide comparable or more effective control of dust.
(E)
Permits
The implementing agency shall require that
owners or operators of structures that receive coal combustion residuals on or
after the date of enactment of this section apply for and obtain permits
incorporating the requirements of the coal combustion residuals permit
program.
(F)
Public
availability of information
Except for information with respect
to which disclosure is prohibited under
section
1905 of title 18, United States Code, the implementing agency
shall ensure that—
(i) documents for
permit determinations are made available for public review and comment under
the public participation process described in subsection (b)(2)(B)(iii)(III) or
in subsection (e)(6), as applicable;
(ii) final determinations on permit applications
are made known to the public; and
(iii) groundwater
monitoring data collected under paragraph (2) is publicly available.
(G)
Agency
authority
(i)
In
general
The implementing agency has the authority to—
(I) obtain information
necessary to determine whether the owner or operator of a structure is in
compliance with the requirements of this subsection;
(II) conduct or
require monitoring and testing to ensure that structures are in compliance with
the requirements of this subsection; and
(III) enter, at
reasonable times, any site or premise subject to the coal combustion residuals
permit program for the purpose of inspecting structures and reviewing records
relevant to the design, operation, and maintenance of structures.
(ii)
Monitoring and
testing
If monitoring or testing is conducted under clause
(i)(II) by or for the implementing agency, the implementing agency shall, if
requested, provide to the owner or operator—
(I) a written
description of the monitoring or testing completed;
(II) at the time of
sampling, a portion of each sample equal in volume or weight to the portion
retained by or for the implementing agency; and
(III) a copy of the
results of any analysis of samples collected by or for the implementing
agency.
(2)
Revised
criteria
The subset of the revised criteria referred to in
paragraph (1)(A)(i) are as follows:
(A)
Design
requirements
For new
structures, and lateral expansions of existing structures, that first receive
coal combustion residuals on or after the date of enactment of this section,
the revised criteria regarding design requirements described in
section
258.40 of title 40, Code of Federal Regulations, except that
the leachate collection system requirements described in
section
258.40(a)(2) of title 40, Code of Federal Regulations, do not
apply to structures that are surface impoundments.
(B)
Groundwater
monitoring and corrective action
For all structures that receive
coal combustion residuals on or after the date of enactment of this section,
the revised criteria regarding groundwater monitoring and corrective action
requirements described in subpart E of part 258 of title 40, Code of Federal
Regulations, except that, for the purposes of this subparagraph, the revised
criteria shall also include—
(i) for the purposes
of detection monitoring, the constituents boron, chloride, conductivity,
fluoride, mercury, pH, sulfate, sulfide, and total dissolved solids; and
(ii) for the purposes
of assessment monitoring, establishing a groundwater protection standard, and
assessment of corrective measures, the constituents aluminum, boron, chloride,
fluoride, iron, manganese, molybdenum, pH, sulfate, and total dissolved
solids.
(C)
Closure
For
all structures that receive coal combustion residuals on or after the date of
enactment of this section, in a manner consistent with paragraph (5), the
revised criteria for closure described in subsections (a) through (c) and (h)
through (j) of
section
258.60 of title 40, Code of Federal Regulations.
(D)
Post-closure
For
all structures that receive coal combustion residuals on or after the date of
enactment of this section, the revised criteria for post-closure care described
in section
258.61 of title 40, Code of Federal Regulations, except for the
requirement described in subsection (a)(4) of that section.
(E)
Location
restrictions
The revised criteria for location restrictions
described in—
(i) for new
structures, and lateral expansions of existing structures, that first receive
coal combustion residuals on or after the date of enactment of this section,
sections 258.11 through 258.15 of title 40, Code of Federal Regulations;
and
(ii) for existing
structures that receive coal combustion residuals on or after the date of
enactment of this section, sections
258.11 and
258.15 of title 40, Code of Federal
Regulations.
(F)
Air
quality
For all structures that receive coal combustion residuals
on or after the date of enactment of this section, the revised criteria for air
quality described in
section
258.24 of title 40, Code of Federal Regulations.
(G)
Financial
assurance
For all structures that receive coal combustion
residuals on or after the date of enactment of this section, the revised
criteria for financial assurance described in subpart G of part 258 of title
40, Code of Federal Regulations.
(H)
Surface
water
For all structures that receive coal combustion residuals
on or after the date of enactment of this section, the revised criteria for
surface water described in
section
258.27 of title 40, Code of Federal Regulations.
(I)
Recordkeeping
For
all structures that receive coal combustion residuals on or after the date of
enactment of this section, the revised criteria for recordkeeping described in
section
258.29 of title 40, Code of Federal Regulations.
(J)
Run-on and
run-off control systems for land-based units
For all landfills
and other land-based units, other than surface impoundments, that receive coal
combustion residuals on or after the date of enactment of this section, the
revised criteria for run-on and run-off control systems described in
section
258.26 of title 40, Code of Federal Regulations.
(K)
Run-off control
systems for surface impoundments
For all surface impoundments
that receive coal combustion residuals on or after the date of enactment of
this section, the revised criteria for run-off control systems described in
section
258.26(a)(2) of title 40, Code of Federal Regulations.
(3)
Permit program
implementation for existing structures
(A)
Notification
Not later than the date on which a State
submits a certification under subsection (b)(2), not later than 30 months after
the Administrator receives notice under subsection (e)(1)(A), or not later than
36 months after the date of enactment of this section with respect to a coal
combustion residuals permit program that is being implemented by the
Administrator under subsection (e)(3), as applicable, the implementing agency
shall notify owners or operators of structures that are receiving coal
combustion residuals as of the date of enactment of this section within the
State of—
(i) the obligation to
apply for and obtain a permit under subparagraph (C); and
(ii) the requirements
referred to in subparagraph (B).
(B)
Compliance with
certain requirements
Not
later than 12 months after the date on which a State submits a certification
under subsection (b)(2), not later than 42 months after the Administrator
receives notice under subsection (e)(1)(A), or not later than 48 months after
the date of enactment of this section with respect to a coal combustion
residuals permit program that is being implemented by the Administrator under
subsection (e)(3), as applicable, the implementing agency shall require owners
or operators of structures that are receiving coal combustion residuals as of
the date of enactment of this section to comply with—
(i) the requirements
under paragraphs (1)(B)(ii) and (iii), (1)(D), (2)(B), (2)(F), (2)(H), (2)(J),
and (2)(K); and
(ii) the groundwater recordkeeping requirement
described in
section
258.29(a)(5) of title 40, Code of Federal Regulations.
(C)
Permits
(i)
Permit
deadline
Not later than 48
months after the date on which a State submits a certification under subsection
(b)(2), not later than 78 months after the Administrator receives notice under
subsection (e)(1)(A), or not later than 84 months after the date of enactment
of this section with respect to a coal combustion residuals permit program that
is being implemented by the Administrator under subsection (e)(3), as
applicable, the implementing agency shall issue, with respect to a structure
that is receiving coal combustion residuals as of the date of enactment of this
section, a final permit incorporating the requirements of the coal combustion
residuals permit program, or a final denial for an application submitted
requesting such a permit.
(ii)
Application
deadline
The implementing
agency shall identify, in collaboration with the owner or operator of a
structure described in clause (i), a reasonable deadline by which the owner or
operator shall submit a permit application under such clause.
(D)
Interim
operation
(i)
Prior to
deadlines
With respect to any period of time on or after the date
of enactment of this section but prior to the applicable deadline in
subparagraph (B), the owner or operator of a structure that is receiving coal
combustion residuals as of the date of enactment of this section may continue
to operate such structure until such applicable deadline under the applicable
authority in effect.
(ii)
Prior to
permit
Unless the implementing agency determines that the
structure should close pursuant to paragraph (5), if the owner or operator of a
structure that is receiving coal combustion residuals as of the date of
enactment of this section meets the requirements referred to in subparagraph
(B) by the applicable deadline in such subparagraph, the owner or operator may
operate the structure until such time as the implementing agency issues, under
subparagraph (C), a final permit incorporating the requirements of the coal
combustion residuals permit program, or a final denial for an application
submitted requesting such a permit.
(4)
Requirements for
surface impoundments that do not meet certain criteria
(A)
Surface
impoundments that require assessment of corrective measures within 10 years of
the date of enactment
(i)
In
general
In addition to the groundwater monitoring and corrective
action requirements described in paragraph (2)(B), the implementing agency
shall require a surface impoundment that receives coal combustion residuals on
or after the date of enactment of this section to comply with the requirements
in clause (ii) of this subparagraph and clauses (i) and (ii) of subparagraph
(D) if the surface impoundment—
(I) does not—
(aa) have a liner
system described in
section
258.40(b) of title 40, Code of Federal Regulations; and
(bb) meet the design
criteria described in
section
258.40(a)(1) of title 40, Code of Federal Regulations;
and
(II) within 10 years after the date of enactment
of this section, is required under
section
258.56(a) of title 40, Code of Federal Regulations, to undergo
an assessment of corrective measures for any constituent covered under subpart
E of part 258 of title 40, Code of Federal Regulations, or otherwise identified
in paragraph (2)(B)(ii) of this subsection, for which assessment groundwater
monitoring is required.
(ii)
Deadline to
meet groundwater protection standard
Except as provided in
subparagraph (C), the implementing agency shall require that the groundwater
protection standard, for surface impoundments identified in clause (i) of this
subparagraph, established by the implementing agency under section
258.55(h) or
258.55(i) of title 40, Code of
Federal Regulations, for any constituent for which corrective measures are
required shall be met—
(I) as soon as
practicable at the relevant point of compliance, as described in
section
258.40(d) of title 40, Code of Federal Regulations; and
(II) not later than 10
years after the date of enactment of this section.
(B)
Surface
impoundments subject to a state corrective action requirement as of the date of
enactment
(i)
In
general
In addition to the
groundwater monitoring and corrective action requirements described in
paragraph (2)(B), the implementing agency shall require a surface impoundment
that receives coal combustion residuals on or after the date of enactment of
this section to comply with the requirements in clause (ii) of this
subparagraph and clauses (i) and (ii) of subparagraph (D) if the surface
impoundment—
(I) does not—
(aa) have a liner
system described in
section
258.40(b) of title 40, Code of Federal Regulations; and
(bb) meet the design
criteria described in
section
258.40(a)(1) of title 40, Code of Federal Regulations;
and
(II) as of the date of
enactment of this section, is subject to a State corrective action
requirement.
(ii)
Deadline to
meet groundwater protection standard
Except as provided in
subparagraph (C), the implementing agency shall require that the groundwater
protection standard, for surface impoundments identified in clause (i) of this
subparagraph, established by the implementing agency under section
258.55(h) or
258.55(i) of title 40, Code of
Federal Regulations, for any constituent for which corrective measures are
required shall be met—
(I) as soon as
practicable at the relevant point of compliance, as described in
section
258.40(d) of title 40, Code of Federal Regulations; and
(II) not later than 8
years after the date of enactment of this section.
(C)
Extension of
deadline
(i)
In
general
Except as provided in clause (ii) of this subparagraph,
the deadline for meeting a groundwater protection standard under subparagraph
(A)(ii) or (B)(ii) may be extended by the implementing agency, after
opportunity for public notice and comment under the public participation
process described in subsection (b)(2)(B)(iii)(III), or in subsection (e)(6)
based on—
(I) the effectiveness
of any interim measures implemented by the owner or operator of the facility
under section 258.58(a)(3) of title 40,
Code of Federal Regulations;
(II) the level of
progress demonstrated in meeting the groundwater protection standard;
(III) the potential
for other adverse human health or environmental exposures attributable to the
contamination from the surface impoundment undergoing corrective action;
and
(IV) the lack of
available alternative management capacity for the coal combustion residuals and
related materials managed in the impoundment at the facility at which the
impoundment is located if the owner or operator has used best efforts, as
necessary, to design, obtain any necessary permits, finance, construct, and
render operational the alternative management capacity during the time period
for meeting a groundwater protection standard in subparagraph (A)(ii) or
(B)(ii).
(ii)
Exception
The
deadline under subparagraph (A)(ii) or (B)(ii) shall not be extended if there
has been contamination of public or private drinking water systems attributable
to a surface impoundment undergoing corrective action, unless the contamination
has been addressed by providing a permanent replacement water system.
(D)
Additional
requirements
(i)
Closure
If
the deadline under subparagraph (A)(ii), (B)(ii), or (C) is not satisfied, the
surface impoundment shall cease receiving coal combustion residuals and
initiate closure under paragraph (5).
(ii)
Interim
measures
(I)
In
general
Except as provided in subclause (II), not later than 90
days after the date on which the assessment of corrective measures is
initiated, the owner or operator of a surface impoundment described in
subparagraph (A) or (B) shall implement interim measures, as necessary, under
the factors in
section
258.58(a)(3) of title 40, Code of Federal Regulations.
(II)
Impoundments
subject to state corrective action requirement as of the date of
enactment
Subclause (I) shall only apply to surface impoundments
subject to a State corrective action requirement as of the date of enactment of
this section if the owner or operator has not implemented interim measures, as
necessary, under the factors in
section
258.58(a)(3) of title 40, Code of Federal Regulations.
(E)
Surface
impoundments that require assessment of corrective measures more than 10 years
after date of enactment
(i)
In
general
In addition to the
groundwater monitoring and corrective action requirements described in
paragraph (2)(B), the implementing agency shall require a surface impoundment
that receives coal combustion residuals on or after the date of enactment of
this section to comply with the requirements in clause (ii) if the surface
impoundment—
(I) does not—
(aa) have a liner
system described in
section
258.40(b) of title 40, Code of Federal Regulations; and
(bb) meet the design
criteria described in
section
258.40(a)(1) of title 40, Code of Federal Regulations;
and
(II) more than 10 years after the date of
enactment of this section, is required under section 258.56(a) title 40, Code
of Federal Regulations, to undergo an assessment of corrective measures for any
constituent covered under subpart E of part 258 of title 40, Code of Federal
Regulations, or otherwise identified in paragraph (2)(B)(ii) of this
subsection, for which assessment groundwater monitoring is required.
(ii)
Requirements
(I)
Closure
The
surface impoundments identified in clause (i) shall cease receiving coal
combustion residuals and initiate closure in accordance with paragraph (5)
after alternative management capacity at the facility is available for the coal
combustion residuals and related materials managed in the impoundment.
(II)
Best
efforts
The alternative management capacity shall be developed as
soon as practicable with the owner or operator using best efforts to design,
obtain necessary permits for, finance, construct, and render operational the
alternative management capacity.
(III)
Alternative
capacity management plan
The owner or operator shall, in
collaboration with the implementing agency, prepare a written plan that
describes the steps necessary to develop the alternative management capacity
and includes a schedule for completion.
(IV)
Public
participation
The plan described in subclause (III) shall be
subject to public notice and comment under the public participation process
described in subsection (b)(2)(B)(iii)(III) or in subsection (e)(6), as
applicable.
(5)
Closure
(A)
In
general
If it is determined
by the implementing agency that a structure should close because the
requirements of a coal combustion residuals permit program are not being
satisfied with respect to such structure, or if it is determined by the owner
or operator that a structure should close, the time period and method for the
closure of such structure shall be set forth in a closure plan that establishes
a deadline for completion of closure as soon as practicable and that takes into
account the nature and the site-specific characteristics of the structure to be
closed.
(B)
Surface
impoundment
In the case of a surface impoundment, the closure
plan under subparagraph (A) shall require, at a minimum, the removal of liquid
and the stabilization of remaining waste, as necessary to support the final
cover.
(d)
Federal review
of State permit programs
(1)
In
general
The Administrator shall provide to a State written notice
and an opportunity to remedy deficiencies in accordance with paragraph (3) if
at any time the State—
(A) does not satisfy the notification
requirement under subsection (b)(1);
(B) has not submitted a certification required
under subsection (b)(2);
(C) does not satisfy the maintenance
requirement under subsection (b)(3);
(D) is not implementing a coal combustion
residuals permit program, with respect to which the State has submitted a
certification under subsection (b)(2), that meets the requirements described in
subsection (c);
(E) is not implementing a coal combustion
residuals permit program, with respect to which the State has submitted a
certification under subsection (b)(2)—
(i) that is consistent
with such certification; and
(ii) for which the
State continues to have in effect statutes or regulations necessary to
implement such program; or
(F) does not make available to the
Administrator, within 90 days of a written request, specific information
necessary for the Administrator to ascertain whether the State has satisfied
the requirements described in subparagraphs (A) through (E).
(2)
Request
If
a request described in paragraph (1)(F) is proposed pursuant to a petition to
the Administrator, the Administrator shall only make the request if the
Administrator does not possess the information necessary to ascertain whether
the State has satisfied the requirements described in subparagraphs (A) through
(E) of such paragraph.
(3)
Contents of
notice; deadline for response
A notice provided under paragraph
(1) shall—
(A) include findings
of the Administrator detailing any applicable deficiencies described in
subparagraphs (A) through (F) of paragraph (1); and
(B) identify, in
collaboration with the State, a reasonable deadline by which the State shall
remedy such applicable deficiencies, which shall be—
(i) in the case of a
deficiency described in subparagraphs (A) through (E) of paragraph (1), not
earlier than 180 days after the date on which the State receives the notice;
and
(ii) in the case of a
deficiency described in paragraph (1)(F), not later than 90 days after the date
on which the State receives the notice.
(4)
Criteria for
determining deficiency of State permit program
In making a
determination whether a State has failed to satisfy the requirements described
in subparagraphs (A) through (E) of paragraph (1), or a determination under
subsection (e)(1)(B), the Administrator shall consider, as appropriate—
(A) whether the
State’s statutes or regulations to implement a coal combustion residuals permit
program are not sufficient to meet the requirements described in subsection (c)
because of—
(i) failure of the
State to promulgate or enact new statutes or regulations when necessary;
or
(ii) action by a State
legislature or court striking down or limiting such State statutes or
regulations;
(B) whether the
operation of the State coal combustion residuals permit program fails to comply
with the requirements of subsection (c) because of—
(i) failure of the
State to issue permits as required in subsection (c)(1)(E);
(ii) repeated issuance
of permits by the State which do not meet the requirements of subsection
(c);
(iii) failure of the
State to comply with the public participation requirements of this section;
or
(iv) failure of the
State to implement corrective action requirements as described in subsection
(c)(2)(B); and
(C) whether the
enforcement of a State coal combustion residuals permit program fails to comply
with the requirements of this section because of—
(i) failure to act on
violations of permits, as identified by the State; or
(ii) repeated failure
by the State to inspect or otherwise determine compliance pursuant to the
process identified in subsection (b)(2)(B)(iii)(I).
(e)
Implementation
by Administrator
(1)
Federal backstop
authority
The Administrator shall implement a coal combustion
residuals permit program for a State only if—
(A) the Governor of
the State notifies the Administrator under subsection (b)(1) that the State
will not adopt and implement a permit program;
(B) the State has
received a notice under subsection (d) and the Administrator determines, after
providing a 30-day period for notice and public comment, that the State has
failed, by the deadline identified in the notice under subsection (d)(3)(B), to
remedy the deficiencies detailed in the notice under subsection (d)(3)(A);
or
(C) the State informs
the Administrator, in writing, that such State will no longer implement such a
permit program.
(2)
Review
A
State may obtain a review of a determination by the Administrator under this
subsection as if the determination was a final regulation for purposes of
section 7006.
(3)
Other
structures
For structures
that receive coal combustion residuals on or after the date of enactment of
this section located on property within the exterior boundaries of a State that
the State does not have authority or jurisdiction to regulate, the
Administrator shall implement a coal combustion residuals permit program only
for those structures.
(4)
Requirements
If
the Administrator implements a coal combustion residuals permit program for a
State under paragraph (1) or (3), the permit program shall consist of the
requirements described in subsection (c).
(5)
Enforcement
(A)
In
general
If the Administrator implements a coal combustion
residuals permit program for a State under paragraph (1)—
(i) the authorities
referred to in section 4005(c)(2)(A) shall apply with respect to coal
combustion residuals and structures for which the Administrator is implementing
the coal combustion residuals permit program; and
(ii) the Administrator
may use those authorities to inspect, gather information, and enforce the
requirements of this section in the State.
(B)
Other
structures
If the Administrator implements a coal combustion
residuals permit program under paragraph (3)—
(i) the authorities
referred to in section 4005(c)(2)(A) shall apply with respect to coal
combustion residuals and structures for which the Administrator is implementing
the coal combustion residuals permit program; and
(ii) the Administrator
may use those authorities to inspect, gather information, and enforce the
requirements of this section for the structures for which the Administrator is
implementing the coal combustion residuals permit program.
(6)
Public
participation process
If the Administrator implements a coal
combustion residuals permit program for a State under this subsection, the
Administrator shall provide a 30-day period for the public participation
process required in paragraphs (1)(F)(i), (4)(C)(i), and (4)(E)(ii)(IV) of
subsection (c).
(f)
State control
after implementation by Administrator
(1)
State
control
(A)
New adoption, or
resumption of, and implementation by State
For a State for which
the Administrator is implementing a coal combustion residuals permit program
under subsection (e)(1)(A), or subsection (e)(1)(C), the State may adopt and
implement such a permit program by—
(i) notifying the
Administrator that the State will adopt and implement such a permit
program;
(ii) not later than 6
months after the date of such notification, submitting to the Administrator a
certification under subsection (b)(2); and
(iii) receiving from
the Administrator—
(I) a determination,
after providing a 30-day period for notice and public comment, that the State
coal combustion residuals permit program meets the requirements described in
subsection (c); and
(II) a timeline for
transition of control of the coal combustion residuals permit program.
(B)
Remedying
deficient permit program
For a State for which the Administrator
is implementing a coal combustion residuals permit program under subsection
(e)(1)(B), the State may adopt and implement such a permit program by—
(i) remedying only the
deficiencies detailed in the notice pursuant to subsection (d)(3)(A);
and
(ii) receiving from
the Administrator—
(I) a determination,
after providing a 30-day period for notice and public comment, that the
deficiencies detailed in such notice have been remedied; and
(II) a timeline for
transition of control of the coal combustion residuals permit program.
(2)
Review of
determination
(A)
Determination
required
The Administrator shall make a determination under
paragraph (1) not later than 90 days after the date on which the State submits
a certification under paragraph (1)(A)(ii), or notifies the Administrator that
the deficiencies have been remedied pursuant to paragraph (1)(B)(i), as
applicable.
(B)
Review
A
State may obtain a review of a determination by the Administrator under
paragraph (1) as if such determination was a final regulation for purposes of
section 7006.
(3)
Implementation
during transition
(A)
Effect on
actions and orders
Program requirements of, and actions taken or
orders issued pursuant to, a coal combustion residuals permit program shall
remain in effect if—
(i) a
State takes control of its coal combustion residuals permit program from the
Administrator under paragraph (1); or
(ii) the Administrator
takes control of a coal combustion residuals permit program from a State under
subsection (e).
(B)
Change in
requirements
Subparagraph (A) shall apply to such program
requirements, actions, and orders until such time as—
(i) the implementing
agency changes the requirements of the coal combustion residuals permit program
with respect to the basis for the action or order; or
(ii) the State or the
Administrator, whichever took the action or issued the order, certifies the
completion of a corrective action that is the subject of the action or
order.
(4)
Single permit
program
If a State adopts and implements a coal combustion
residuals permit program under this subsection, the Administrator shall cease
to implement the permit program implemented under subsection (e)(1) for such
State.
(g)
Effect on
determination under 4005(c) or
3006
The Administrator shall not consider the implementation of a
coal combustion residuals permit program by the Administrator under subsection
(e) in making a determination of approval for a permit program or other system
of prior approval and conditions under section 4005(c) or of authorization for
a program under section 3006.
(h)
Authority
(1)
State
authority
Nothing in this
section shall preclude or deny any right of any State to adopt or enforce any
regulation or requirement respecting coal combustion residuals that is more
stringent or broader in scope than a regulation or requirement under this
section.
(2)
Authority of the
administrator
(A)
In
general
Except as provided in
subsections (d) and (e) and section 6005, the Administrator shall, with respect
to the regulation of coal combustion residuals, defer to the States pursuant to
this section.
(B)
Imminent
hazard
Nothing in this section shall be construed as affecting
the authority of the Administrator under section 7003 with respect to coal
combustion residuals.
(C)
Enforcement
assistance only upon request
Upon request from the head of a lead
State agency that is implementing a coal combustion residuals permit program,
the Administrator may provide to such State agency only the enforcement
assistance requested.
(D)
Concurrent
enforcement
Except as
provided in subparagraph (C), the Administrator shall not have concurrent
enforcement authority when a State is implementing a coal combustion residuals
permit program, including during any period of interim operation described in
subsection (c)(3)(D).
(E)
Other
authority
The Administrator shall not have authority to finalize
the proposed rule published at pages 35128 through 35264 of volume 75 of the
Federal Register (June 21, 2010).
(F)
Other response
authority
Nothing in this
section shall be construed as affecting the authority of the Administrator
under the Comprehensive Environmental Response, Compensation, and Liability Act
of 1980 (42 U.S.C.
9601 et seq.) with respect to coal combustion residuals.
(3)
Citizen
suits
Nothing in this section shall be construed to affect the
authority of a person to commence a civil action in accordance with section
7002.
(i)
Mine reclamation
activities
A coal combustion residuals permit program implemented
by the Administrator under subsection (e) shall not apply to the utilization,
placement, and storage of coal combustion residuals at surface mining and
reclamation operations.
(j)
Definitions
In
this section:
(1)
Coal combustion
residuals
The term coal combustion residuals
means—
(A) the solid wastes
listed in section 3001(b)(3)(A)(i), including recoverable materials from such
wastes;
(B) coal combustion
wastes that are co-managed with wastes produced in conjunction with the
combustion of coal, provided that such wastes are not segregated and disposed
of separately from the coal combustion wastes and comprise a relatively small
proportion of the total wastes being disposed in the structure;
(C) fluidized bed
combustion wastes;
(D) wastes from the
co-burning of coal with non-hazardous secondary materials, provided that coal
makes up at least 50 percent of the total fuel burned; and
(E) wastes from the
co-burning of coal with materials described in subparagraph (A) that are
recovered from monofills.
(2)
Coal combustion
residuals permit program
The term coal combustion residuals
permit program means all of the authorities, activities, and procedures
that comprise the system of prior approval and conditions implemented by or for
a State to regulate the management and disposal of coal combustion
residuals.
(3)
Code of Federal
regulations
The term Code of Federal Regulations
means the Code of Federal Regulations (as in effect on the date of enactment of
this section) or any successor regulations.
(4)
Implementing
agency
The term implementing agency means the agency
responsible for implementing a coal combustion residuals permit program for a
State, which shall either be the lead State implementing agency identified
under subsection (b)(2)(B)(i) or the Administrator pursuant to subsection
(e).
(5)
Permit; prior
approval and conditions
Except as provided in subsections (b)(3)
and (g), the terms permit and prior approval and
conditions mean any authorization, license, or equivalent control
document that incorporates the requirements of subsection (c).
(6)
Revised
criteria
The term revised criteria means the
criteria promulgated for municipal solid waste landfill units under section
4004(a) and under section 1008(a)(3), as revised under section 4010(c).
(7)
Structure
(A)
In
general
Except as provided in
subparagraph (B), the term structure means a landfill, surface
impoundment, or other land-based unit which receives, or is intended to
receive, coal combustion residuals.
(B)
De minimis
receipt
The term structure does not include any
land-based unit that receives only de minimis quantities of coal combustion
residuals if the presence of coal combustion residuals is incidental to the
material managed in the
unit.
.
(b)
Conforming
amendment
The table of contents contained in section 1001 of the
Solid Waste Disposal Act is amended by inserting after the item relating to
section 4010 the following:
Sec. 4011. Management and disposal of coal
combustion
residuals.
.
3.
2000 regulatory
determination
Nothing in this
Act, or the amendments made by this Act, shall be construed to alter in any
manner the Environmental Protection Agency’s regulatory determination entitled
Notice of Regulatory Determination on Wastes From the Combustion of
Fossil Fuels, published at 65 Fed. Reg. 32214 (May 22, 2000), that the
fossil fuel combustion wastes addressed in that determination do not warrant
regulation under subtitle C of the Solid Waste Disposal Act (42 U.S.C. 6921 et
seq.).
4.
Technical
assistance
Nothing in this
Act, or the amendments made by this Act, shall be construed to affect the
authority of a State to request, or the Administrator of the Environmental
Protection Agency to provide, technical assistance under the Solid Waste
Disposal Act (42
U.S.C. 6901 et seq.).
5.
Federal Power
Act
Nothing in this Act, or
the amendments made by this Act, shall be construed to affect the obligations
of an owner or operator of a structure (as defined in section 4011 of the Solid
Waste Disposal Act, as added by this Act) under section 215(b)(1) of the
Federal Power Act (16 U.S.C. 824o(b)(1)).
Passed the House of
Representatives July 25, 2013.
Karen L. Haas,
Clerk
July 30, 2013
Read the second time and placed on the
calendar