Library / Laws / 113th / hr / H.R. 2 / Placed on Calendar (Senate)
II
Calendar No. 601
113th CONGRESS
2d Session
H. R. 2
IN THE SENATE OF THE UNITED STATES
November 12, 2014Received
November 13, 2014Read the first time
November 17, 2014Read the second time and placed on the calendar
AN ACT
To remove Federal Government obstacles to the production of more domestic energy; to ensure
transport of that energy reliably to businesses, consumers, and other end
users; to lower the cost of energy to consumers; to enable manufacturers
and other businesses to access domestically produced energy affordably and
reliably in order to create and sustain more secure and well-paying
American jobs; and for other purposes.
1.
Short title; table of contents
(a)
Short title
This Act may be cited as the American Energy Solutions for Lower Costs and More American Jobs Act.
(b)
Table of contents
The table of contents for this Act is as follows:
Sec. 1. Short title; table of contents.
Division A—Energy and Commerce
Title I—Modernizing Infrastructure
Subtitle A—Northern Route Approval
Sec. 101. Short title.
Sec. 102. Findings.
Sec. 103. Keystone XL permit approval.
Sec. 104. Judicial review.
Sec. 105. American burying beetle.
Sec. 106. Right-of-way and temporary use permit.
Sec. 107. Permits for activities in navigable waters.
Sec. 108. Migratory Bird Treaty Act permit.
Sec. 109. Oil spill response plan disclosure.
Subtitle B—Natural Gas Pipeline Permitting Reform
Sec. 121. Short title.
Sec. 122. Regulatory approval of natural gas pipeline projects.
Subtitle C—North American Energy Infrastructure
Sec. 131. Short title.
Sec. 132. Finding.
Sec. 133. Authorization of certain energy infrastructure projects at the national boundary of the
United States.
Sec. 134. Importation or exportation of natural gas to Canada and Mexico.
Sec. 135. Transmission of electric energy to Canada and Mexico.
Sec. 136. No Presidential permit required.
Sec. 137. Modifications to existing projects.
Sec. 138. Effective date; rulemaking deadlines.
Sec. 139. Definitions.
Title II—Maintaining Diverse Electricity Generation and Affordability
Subtitle A—Energy Consumers Relief
Sec. 201. Short title.
Sec. 202. Prohibition against finalizing certain energy-related rules that will cause significant
adverse effects to the economy.
Sec. 203. Reports and determinations prior to promulgating as final certain energy-related rules.
Sec. 204. Definitions.
Sec. 205. Prohibition on use of social cost of carbon in analysis.
Subtitle B—Electricity Security and Affordability
Sec. 211. Short title.
Sec. 212. Standards of performance for new fossil fuel-fired electric utility generating units.
Sec. 213. Congress To set effective date for standards of performance for existing, modified, and
reconstructed fossil fuel-fired electric utility generating units.
Sec. 214. Repeal of earlier rules and guidelines.
Sec. 215. Definitions.
Subtitle C—Report on Energy and Water Savings Potential From Thermal Insulation
Sec. 221. Report on energy and water savings potential from thermal insulation.
Title III—Unleashing Energy Diplomacy
Sec. 301. Short title.
Sec. 302. Action on applications.
Sec. 303. Public disclosure of export destinations.
Division B—Natural Resources Committee
Sec. 201. References.
Subdivision A—Lowering Gasoline Prices to Fuel an America That Works Act of 2014
Sec. 1. Short title.
Title I—Offshore Energy and Jobs
Subtitle A—Outer Continental Shelf Leasing Program Reforms
Sec. 10101. Outer Continental Shelf leasing program reforms.
Sec. 10102. Domestic oil and natural gas production goal.
Sec. 10103. Development and submittal of new 5-year oil and gas leasing program.
Sec. 10104. Rule of construction.
Sec. 10105. Addition of lease sales after finalization of 5-year plan.
Subtitle B—Directing the President To Conduct New OCS Sales
Sec. 10201. Requirement to conduct proposed oil and gas Lease Sale 220 on the Outer Continental
Shelf offshore Virginia.
Sec. 10202. South Carolina lease sale.
Sec. 10203. Southern California existing infrastructure lease sale.
Sec. 10204. Environmental impact statement requirement.
Sec. 10205. National defense.
Sec. 10206. Eastern Gulf of Mexico not included.
Subtitle C—Equitable Sharing of Outer Continental Shelf Revenues
Sec. 10301. Disposition of Outer Continental Shelf revenues to coastal States.
Subtitle D—Reorganization of Minerals Management Agencies of the Department of the Interior
Sec. 10401. Establishment of Under Secretary for Energy, Lands, and Minerals and Assistant
Secretary of Ocean Energy and Safety.
Sec. 10402. Bureau of Ocean Energy.
Sec. 10403. Ocean Energy Safety Service.
Sec. 10404. Office of Natural Resources revenue.
Sec. 10405. Ethics and drug testing.
Sec. 10406. Abolishment of Minerals Management Service.
Sec. 10407. Conforming amendments to Executive Schedule pay rates.
Sec. 10408. Outer Continental Shelf Energy Safety Advisory Board.
Sec. 10409. Outer Continental Shelf inspection fees.
Sec. 10410. Prohibition on action based on National Ocean Policy developed under Executive Order
No. 13547.
Subtitle E—United States Territories
Sec. 10501. Application of Outer Continental Shelf Lands Act with respect to territories of the
United States.
Subtitle F—Miscellaneous Provisions
Sec. 10601. Rules regarding distribution of revenues under Gulf of Mexico Energy Security Act of
2006.
Sec. 10602. Amount of distributed qualified outer Continental Shelf revenues.
Sec. 10603. South Atlantic Outer Continental Shelf Planning Area defined.
Sec. 10604. Enhancing geological and geophysical information for America’s energy future.
Subtitle G—Judicial Review
Sec. 10701. Time for filing complaint.
Sec. 10702. District court deadline.
Sec. 10703. Ability to seek appellate review.
Sec. 10704. Limitation on scope of review and relief.
Sec. 10705. Legal fees.
Sec. 10706. Exclusion.
Sec. 10707. Definitions.
Title II—Onshore Federal Lands and Energy Security
Subtitle A—Federal Lands Jobs and Energy Security
Sec. 21001. Short title.
Sec. 21002. Policies regarding buying, building, and working for America.
Chapter 1—Onshore oil and gas permit streamlining
Sec. 21101. Short title.
Subchapter A—Application for Permits to Drill Process Reform
Sec. 21111. Permit to drill application timeline.
Subchapter B—Administrative Protest Documentation Reform
Sec. 21121. Administrative protest documentation reform.
Subchapter C—Permit Streamlining
Sec. 21131. Making pilot offices permanent to improve energy permitting on Federal lands.
Sec. 21132. Administration of current law.
Subchapter D—Judicial Review
Sec. 21141. Definitions.
Sec. 21142. Exclusive venue for certain civil actions relating to covered energy projects.
Sec. 21143. Timely filing.
Sec. 21144. Expedition in hearing and determining the action.
Sec. 21145. Standard of review.
Sec. 21146. Limitation on injunction and prospective relief.
Sec. 21147. Limitation on attorneys’ fees.
Sec. 21148. Legal standing.
Subchapter E—Knowing America’s Oil and Gas Resources
Sec. 21151. Funding oil and gas resource assessments.
Chapter 2—Oil and gas leasing certainty
Sec. 21201. Short title.
Sec. 21202. Minimum acreage requirement for onshore lease sales.
Sec. 21203. Leasing certainty.
Sec. 21204. Leasing consistency.
Sec. 21205. Reduce redundant policies.
Sec. 21206. Streamlined congressional notification.
Chapter 3—Oil shale
Sec. 21301. Short title.
Sec. 21302. Effectiveness of oil shale regulations, amendments to resource management plans, and
record of decision.
Sec. 21303. Oil shale leasing.
Chapter 4—Miscellaneous provisions
Sec. 21401. Rule of construction.
Subtitle B—Planning for American Energy
Sec. 22001. Short title.
Sec. 22002. Onshore domestic energy production strategic plan.
Subtitle C—National Petroleum Reserve in Alaska access
Sec. 23001. Short title.
Sec. 23002. Sense of Congress and reaffirming national policy for the National Petroleum Reserve in
Alaska.
Sec. 23003. National Petroleum Reserve in Alaska: lease sales.
Sec. 23004. National Petroleum Reserve in Alaska: planning and permitting pipeline and road
construction.
Sec. 23005. Issuance of a new integrated activity plan and environmental impact statement.
Sec. 23006. Departmental accountability for development.
Sec. 23007. Deadlines under new proposed integrated activity plan.
Sec. 23008. Updated resource assessment.
Subtitle D—BLM Live Internet Auctions
Sec. 24001. Short title.
Sec. 24002. Internet-based onshore oil and gas lease sales.
Subtitle E—Native American Energy
Sec. 25001. Short title.
Sec. 25002. Appraisals.
Sec. 25003. Standardization.
Sec. 25004. Environmental reviews of major Federal actions on Indian lands.
Sec. 25005. Judicial review.
Sec. 25006. Tribal biomass demonstration project.
Sec. 25007. Tribal resource management plans.
Sec. 25008. Leases of restricted lands for the Navajo Nation.
Sec. 25009. Nonapplicability of certain rules.
Title III—Miscellaneous provisions
Sec. 30101. Establishment of Office of Energy Employment and Training.
Subdivision B—Bureau of Reclamation Conduit Hydropower Development Equity and Jobs Act
Sec. 1. Short title.
Sec. 2. Amendment.
Subdivision C—Central Oregon Jobs and Water Security Act
Sec. 1. Short title.
Sec. 2. Wild and Scenic River; Crooked, Oregon.
Sec. 3. City of Prineville Water Supply.
Sec. 4. First fill protection.
Sec. 5. Ochoco Irrigation District.
Subdivision D—State Authority For Hydraulic Fracturing Regulation; EPA Hydraulic Fracturing
Research
Title I—State Authority For Hydraulic Fracturing Regulation
Sec. 101. Short title.
Sec. 102. State authority for hydraulic fracturing regulation.
Sec. 103. Government Accountability Office study.
Sec. 104. Tribal authority on trust land.
Title II—EPA HYDRAULIC FRACTURING RESEARCH
Sec. 201. Short title.
Sec. 202. EPA hydraulic fracturing research.
Title III—Miscellaneous provisions
Sec. 301. Review of State activities.
Subdivision E—Preventing Government Waste and Protecting Coal Mining Jobs in America
Sec. 1. Short title.
Sec. 2. Incorporation of surface mining stream buffer zone rule into State programs.
Division C—Judiciary
Sec. 1. Short title.
Sec. 2. Coordination of agency administrative operations for efficient decisionmaking.
A
Energy and Commerce
I
Modernizing Infrastructure
A
Northern Route Approval
101.
Short title
This subtitle may be cited as the Northern Route Approval Act.
102.
Findings
The Congress finds the following:
(1) To maintain our Nation’s competitive edge and ensure an economy built to last, the United States
must have fast, reliable, resilient, and environmentally sound means of
moving energy. In a global economy, we will compete for the world’s
investments based in significant part on the quality of our
infrastructure. Investing in the Nation’s infrastructure provides
immediate and long-term economic benefits for local communities and the
Nation as a whole.
(2) The delivery of oil from Canada, a close ally not only in proximity but in shared values and
ideals, to domestic markets is in the national interest because of the
need to lessen dependence upon insecure foreign sources.
(3) The Keystone XL pipeline would provide both short-term and long-term employment opportunities and
related labor income benefits, such as government revenues associated with
taxes.
(4) The State of Nebraska has thoroughly reviewed and approved the proposed Keystone XL pipeline
reroute, concluding that the concerns of Nebraskans have had a major
influence on the pipeline reroute and that the reroute will have minimal
environmental impacts.
(5) The Keystone XL is in much the same position today as the Alaska Pipeline in 1973 prior to
congressional action. Once again, the Federal regulatory process remains
an insurmountable obstacle to a project that is likely to reduce oil
imports from insecure foreign sources.
103.
Keystone XL permit approval
Notwithstanding Executive Order No. 13337 (3 U.S.C. 301 note), Executive Order No. 11423 (3 U.S.C. 301 note), section 301 of title 3, United States Code, and any other Executive order or provision of law, no Presidential
permit shall be required for the pipeline described in the application
filed on May 4, 2012, by TransCanada Keystone Pipeline, L.P. to the
Department of State for the Keystone XL pipeline, as supplemented to
include the Nebraska reroute evaluated in the Final Evaluation Report
issued by the Nebraska Department of Environmental Quality in January 2013
and approved by the Nebraska governor. The final environmental impact
statement issued by the Secretary of State on January 31, 2014, coupled
with the Final Evaluation Report described in the previous sentence, shall
be considered to satisfy all requirements of the National Environmental
Policy Act of 1969 (42 U.S.C. 4321 et seq.) and of the National Historic Preservation Act (16 U.S.C. 470 et seq.).
104.
Judicial review
(a)
Exclusive jurisdiction
Except for review by the Supreme Court on writ of certiorari, the United States Court of Appeals
for the District of Columbia Circuit shall have original and exclusive
jurisdiction to determine—
(1) the validity of any final order or action (including a failure to act) of any Federal agency or
officer with respect to issuance of a permit relating to the construction
or maintenance of the Keystone XL pipeline, including any final order or
action deemed to be taken, made, granted, or issued;
(2) the constitutionality of any provision of this subtitle, or any decision or action taken, made,
granted, or issued, or deemed to be taken, made, granted, or issued under
this subtitle; or
(3) the adequacy of any environmental impact statement prepared under the National Environmental Policy
Act of 1969 (42 U.S.C. 4321 et seq.), or of any analysis under any other Act, with respect to any action taken, made, granted, or
issued, or deemed to be taken, made, granted, or issued under this
subtitle.
(b)
Deadline for filing claim
A claim arising under this subtitle may be brought not later than 60 days after the date of the
decision or action giving rise to the claim.
(c)
Expedited consideration
The United States Court of Appeals for the District of Columbia Circuit shall set any action
brought under subsection (a) for expedited consideration, taking into
account the national interest of enhancing national energy security by
providing access to the significant oil reserves in Canada that are needed
to meet the demand for oil.
105.
American burying beetle
(a)
Findings
The Congress finds that—
(1) environmental reviews performed for the Keystone XL pipeline project satisfy the requirements of
section 7 of the Endangered Species Act of 1973 (16 U.S.C. 1536(a)(2)) in its entirety; and
(2) for purposes of that Act, the Keystone XL pipeline project will not jeopardize the continued
existence of the American burying beetle or destroy or adversely modify
American burying beetle critical habitat.
(b)
Biological opinion
The Secretary of the Interior is deemed to have issued a written statement setting forth the
Secretary’s opinion containing such findings under section 7(b)(1)(A) of
the Endangered Species Act of 1973 (16 U.S.C. 1536(b)(1)(A)) and any taking of the American burying beetle that is incidental to the construction or operation
and maintenance of the Keystone XL pipeline as it may be ultimately
defined in its entirety, shall not be considered a prohibited taking of
such species under such Act.
106.
Right-of-way and temporary use permit
The Secretary of the Interior is deemed to have granted or issued a grant of right-of-way and
temporary use permit under section 28 of the Mineral Leasing Act (30 U.S.C. 185) and the Federal Land Policy and Management Act of 1976 (43 U.S.C. 1701 et seq.), as set forth in the application tendered to the Bureau of Land Management for the Keystone XL
pipeline.
107.
Permits for activities in navigable waters
(a)
Issuance of permits
The Secretary of the Army, not later than 90 days after receipt of an application therefor, shall
issue all permits under section 404 of the Federal Water Pollution Control
Act (33 U.S.C. 1344) and section 10 of the Act of March 3, 1899 (33 U.S.C. 403; commonly known as the Rivers and Harbors Appropriations Act of 1899), necessary for the
construction, operation, and maintenance of the pipeline described in the
May 4, 2012, application referred to in section 103, as supplemented by
the Nebraska reroute. The application shall be based on the administrative
record for the pipeline as of the date of enactment of this Act, which
shall be considered complete.
(b)
Waiver of procedural requirements
The Secretary may waive any procedural requirement of law or regulation that the Secretary
considers desirable to waive in order to accomplish the purposes of this
section.
(c)
Issuance in absence of action by the Secretary
If the Secretary has not issued a permit described in subsection (a) on or before the last day of
the 90-day period referred to in subsection (a), the permit shall be
deemed issued under section 404 of the Federal Water Pollution Control Act
(33 U.S.C. 1344) or section 10 of the Act of March 3, 1899 (33 U.S.C. 403), as appropriate, on the day following such last day.
(d)
Limitation
The Administrator of the Environmental Protection Agency may not prohibit or restrict an activity
or use of an area that is authorized under this section.
108.
Migratory Bird Treaty Act permit
The Secretary of the Interior is deemed to have issued a special purpose permit under the Migratory
Bird Treaty Act (16 U.S.C. 703 et seq.), as described in the application filed with the United States Fish and Wildlife Service for the
Keystone XL pipeline on January 11, 2013.
109.
Oil spill response plan disclosure
(a)
In general
Any pipeline owner or operator required under Federal law to develop an oil spill response plan for
the Keystone XL pipeline shall make such plan available to the Governor of
each State in which such pipeline operates to assist with emergency
response preparedness.
(b)
Updates
A pipeline owner or operator required to make available to a Governor a plan under subsection (a)
shall make available to such Governor any update of such plan not later
than 7 days after the date on which such update is made.
B
Natural Gas Pipeline Permitting Reform
121.
Short title
This subtitle may be cited as the Natural Gas Pipeline Permitting Reform Act.
122.
Regulatory approval of natural gas pipeline projects
Section 7 of the Natural Gas Act (15 U.S.C. 717f) is amended by adding at the end the following new subsection:
(i)
(1) The Commission shall approve or deny an application for a certificate of public convenience and
necessity for a prefiled project not later than 12 months after receiving
a complete application that is ready to be processed, as defined by the
Commission by regulation.
(2) The agency responsible for issuing any license, permit, or approval required under Federal law in
connection with a prefiled project for which a certificate of public
convenience and necessity is sought under this Act shall approve or deny
the issuance of the license, permit, or approval not later than 90 days
after the Commission issues its final environmental document relating to
the project.
(3) The Commission may extend the time period under paragraph (2) by 30 days if an agency demonstrates
that it cannot otherwise complete the process required to approve or deny
the license, permit, or approval, and therefor will be compelled to deny
the license, permit, or approval. In granting an extension under this
paragraph, the Commission may offer technical assistance to the agency as
necessary to address conditions preventing the completion of the review of
the application for the license, permit, or approval.
(4) If an agency described in paragraph (2) does not approve or deny the issuance of the license,
permit, or approval within the time period specified under paragraph (2)
or (3), as applicable, such license, permit, or approval shall take effect
upon the expiration of 30 days after the end of such period. The
Commission shall incorporate into the terms of such license, permit, or
approval any conditions proffered by the agency described in paragraph (2)
that the Commission does not find are inconsistent with the final
environmental document.
(5) For purposes of this subsection, the term prefiled project means a project for the siting, construction, expansion, or operation of a natural gas pipeline
with respect to which a prefiling docket number has been assigned by the
Commission pursuant to a prefiling process established by the Commission
for the purpose of facilitating the formal application process for
obtaining a certificate of public convenience and necessity.
.
C
North American Energy Infrastructure
131.
Short title
This subtitle may be cited as the North American Energy Infrastructure Act.
132.
Finding
Congress finds that the United States should establish a more uniform, transparent, and modern
process for the construction, connection, operation, and maintenance of
oil and natural gas pipelines and electric transmission facilities for the
import and export of oil and natural gas and the transmission of
electricity to and from Canada and Mexico, in pursuit of a more secure and
efficient North American energy market.
133.
Authorization of certain energy infrastructure projects at the national boundary of the United
States
(a)
Authorization
Except as provided in subsection (c) and section 137, no person may construct, connect, operate, or
maintain a cross-border segment of an oil pipeline or electric
transmission facility for the import or export of oil or the transmission
of electricity to or from Canada or Mexico without obtaining a certificate
of crossing for the construction, connection, operation, or maintenance of
the cross-border segment under this section.
(b)
Certificate of crossing
(1)
Requirement
Not later than 120 days after final action is taken under the National Environmental Policy Act of
1969 (42 U.S.C. 4321 et seq.) with respect to a cross-border segment for which a request is received under this section, the
relevant official identified under paragraph (2), in consultation with
appropriate Federal agencies, shall issue a certificate of crossing for
the cross-border segment unless the relevant official finds that the
construction, connection, operation, or maintenance of the cross-border
segment is not in the public interest of the United States.
(2)
Relevant official
The relevant official referred to in paragraph (1) is—
(A) the Secretary of State with respect to oil pipelines; and
(B) the Secretary of Energy with respect to electric transmission facilities.
(3)
Additional requirement for electric transmission facilities
In the case of a request for a certificate of crossing for the construction, connection, operation,
or maintenance of a cross-border segment of an electric transmission
facility, the Secretary of Energy shall require, as a condition of issuing
the certificate of crossing for the request under paragraph (1), that the
cross-border segment of the electric transmission facility be constructed,
connected, operated, or maintained consistent with all applicable policies
and standards of—
(A) the Electric Reliability Organization and the applicable regional entity; and
(B) any Regional Transmission Organization or Independent System Operator with operational or
functional control over the cross-border segment of the electric
transmission facility.
(c)
Exclusions
This section shall not apply to any construction, connection, operation, or maintenance of a
cross-border segment of an oil pipeline or electric transmission facility
for the import or export of oil or the transmission of electricity to or
from Canada or Mexico—
(1) if the cross-border segment is operating for such import, export, or transmission as of the date of
enactment of this Act;
(2) if a permit described in section 136 for such construction, connection, operation, or maintenance
has been issued;
(3) if a certificate of crossing for such construction, connection, operation, or maintenance has
previously been issued under this section; or
(4) if an application for a permit described in section 136 for such construction, connection,
operation, or maintenance is pending on the date of enactment of this Act,
until the earlier of—
(A) the date on which such application is denied; or
(B) July 1, 2016.
(d)
Effect of other laws
(1)
Application to projects
Nothing in this section or section 137 shall affect the application of any other Federal statute to
a project for which a certificate of crossing for the construction,
connection, operation, or maintenance of a cross-border segment is sought
under this section.
(2)
Natural Gas Act
Nothing in this section or section 137 shall affect the requirement to obtain approval or
authorization under sections 3 and 7 of the Natural Gas Act for the
siting, construction, or operation of any facility to import or export
natural gas.
(3)
Energy Policy and Conservation Act
Nothing in this section or section 137 shall affect the authority of the President under section
103(a) of the Energy Policy and Conservation Act.
134.
Importation or exportation of natural gas to Canada and Mexico
Section 3(c) of the Natural Gas Act (15 U.S.C. 717b(c)) is amended by adding at the end the following: No order is required under subsection (a) to authorize the export or import of any natural gas to
or from Canada or Mexico..
135.
Transmission of electric energy to Canada and Mexico
(a)
Repeal of requirement To secure order
Section 202(e) of the Federal Power Act (16 U.S.C. 824a(e)) is repealed.
(b)
Conforming amendments
(1)
State regulations
Section 202(f) of the Federal Power Act (16 U.S.C. 824a(f)) is amended by striking insofar as such State regulation does not conflict with the exercise of the Commission’s powers
under or relating to subsection 202(e).
(2)
Seasonal diversity electricity exchange
Section 602(b) of the Public Utility Regulatory Policies Act of 1978 (16 U.S.C. 824a–4(b)) is amended by striking the Commission has conducted hearings and made the findings required under section 202(e) of the
Federal Power Act and all that follows through the period at the end and inserting the Secretary has conducted hearings and finds that the proposed transmission facilities would not
impair the sufficiency of electric supply within the United States or
would not impede or tend to impede the coordination in the public interest
of facilities subject to the jurisdiction of the Secretary..
136.
No Presidential permit required
No Presidential permit (or similar permit) required under Executive Order No. 13337 (3 U.S.C. 301 note), Executive Order No. 11423 (3 U.S.C. 301 note), section 301 of title 3, United States Code, Executive Order No. 12038, Executive Order No. 10485, or any other
Executive order shall be necessary for the construction, connection,
operation, or maintenance of an oil or natural gas pipeline or electric
transmission facility, or any cross-border segment thereof.
137.
Modifications to existing projects
No certificate of crossing under section 133, or permit described in section 136, shall be required
for a modification to the construction, connection, operation, or
maintenance of an oil or natural gas pipeline or electric transmission
facility—
(1) that is operating for the import or export of oil or natural gas or the transmission of electricity
to or from Canada or Mexico as of the date of enactment of the Act;
(2) for which a permit described in section 136 for such construction, connection, operation, or
maintenance has been issued; or
(3) for which a certificate of crossing for the cross-border segment of the pipeline or facility has
previously been issued under section 133.
138.
Effective date; rulemaking deadlines
(a)
Effective date
Sections 133 through 137, and the amendments made by such sections, shall take effect on July 1,
2015.
(b)
Rulemaking deadlines
Each relevant official described in section 133(b)(2) shall—
(1) not later than 180 days after the date of enactment of this Act, publish in the Federal Register
notice of a proposed rulemaking to carry out the applicable requirements
of section 133; and
(2) not later than 1 year after the date of enactment of this Act, publish in the Federal Register a
final rule to carry out the applicable requirements of section 133.
139.
Definitions
In this subtitle—
(1) the term cross-border segment means the portion of an oil or natural gas pipeline or electric transmission facility that is
located at the national boundary of the United States with either Canada
or Mexico;
(2) the term modification includes a reversal of flow direction, change in ownership, volume expansion, downstream or
upstream interconnection, or adjustment to maintain flow (such as a
reduction or increase in the number of pump or compressor stations);
(3) the term natural gas has the meaning given that term in section 2 of the Natural Gas Act (15 U.S.C. 717a);
(4) the term oil means petroleum or a petroleum product;
(5) the terms Electric Reliability Organization and regional entity have the meanings given those terms in section 215 of the Federal Power Act (16 U.S.C. 824o); and
(6) the terms Independent System Operator and Regional Transmission Organization have the meanings given those terms in section 3 of the Federal Power Act (16 U.S.C. 796).
II
Maintaining Diverse Electricity Generation and Affordability
A
Energy Consumers Relief
201.
Short title
This subtitle may be cited as the Energy Consumers Relief Act of 2014.
202.
Prohibition against finalizing certain energy-related rules that will cause significant adverse
effects to the economy
Notwithstanding any other provision of law, the Administrator of the Environmental Protection
Agency may not promulgate as final an energy-related rule that is
estimated to cost more than $1 billion if the Secretary of Energy
determines under section 203(3) that the rule will cause significant
adverse effects to the economy.
203.
Reports and determinations prior to promulgating as final certain energy-related rules
Before promulgating as final any energy-related rule that is estimated to cost more than $1
billion:
(1)
Report to Congress
The Administrator of the Environmental Protection Agency shall submit to Congress a report (and
transmit a copy to the Secretary of Energy) containing—
(A) a copy of the rule;
(B) a concise general statement relating to the rule;
(C) an estimate of the total costs of the rule, including the direct costs and indirect costs of the
rule;
(D)
(i) an estimate of the total benefits of the rule and when such benefits are expected to be realized;
(ii) a description of the modeling, the calculations, the assumptions, and the limitations due to
uncertainty, speculation, or lack of information associated with the
estimates under this subparagraph; and
(iii) a certification that all data and documents relied upon by the Agency in developing such estimates—
(I) have been preserved; and
(II) are available for review by the public on the Agency’s Web site, except to the extent to which
publication of such data and documents would constitute disclosure of
confidential information in violation of applicable Federal law;
(E) an estimate of the increases in energy prices, including potential increases in gasoline or
electricity prices for consumers, that may result from implementation or
enforcement of the rule; and
(F) a detailed description of the employment effects, including potential job losses and shifts in
employment, that may result from implementation or enforcement of the
rule.
(2)
Initial determination on increases and impacts
The Secretary of Energy, in consultation with the Federal Energy Regulatory Commission and the
Administrator of the Energy Information Administration, shall prepare an
independent analysis to determine whether the rule will cause—
(A) any increase in energy prices for consumers, including low-income households, small businesses, and
manufacturers;
(B) any impact on fuel diversity of the Nation’s electricity generation portfolio or on national,
regional, or local electric reliability;
(C) any adverse effect on energy supply, distribution, or use due to the economic or technical
infeasibility of implementing the rule; or
(D) any other adverse effect on energy supply, distribution, or use (including a shortfall in supply
and increased use of foreign supplies).
(3)
Subsequent determination on adverse effects to the economy
If the Secretary of Energy determines, under paragraph (2), that the rule will cause an increase,
impact, or effect described in such paragraph, then the Secretary, in
consultation with the Administrator of the Environmental Protection
Agency, the Secretary of Commerce, the Secretary of Labor, and the
Administrator of the Small Business Administration, shall—
(A) determine whether the rule will cause significant adverse effects to the economy, taking into
consideration—
(i) the costs and benefits of the rule and limitations in calculating such costs and benefits due to
uncertainty, speculation, or lack of information; and
(ii) the positive and negative impacts of the rule on economic indicators, including those related to
gross domestic product, unemployment, wages, consumer prices, and business
and manufacturing activity; and
(B) publish the results of such determination in the Federal Register.
204.
Definitions
In this subtitle:
(1) The terms direct costs and indirect costs have the meanings given such terms in chapter 8 of the Environmental Protection Agency’s Guidelines for Preparing Economic Analyses dated December 17, 2010.
(2) The term energy-related rule that is estimated to cost more than $1 billion means a rule of the Environmental Protection Agency that—
(A) regulates any aspect of the production, supply, distribution, or use of energy or provides for such
regulation by States or other governmental entities; and
(B) is estimated by the Administrator of the Environmental Protection Agency or the Director of the
Office of Management and Budget to impose direct costs and indirect costs,
in the aggregate, of more than $1,000,000,000.
(3) The term rule has the meaning given to such term in section 551 of title 5, United States Code.
205.
Prohibition on use of social cost of carbon in analysis
(a)
In general
Notwithstanding any other provision of law or any executive order, the Administrator of the
Environmental Protection Agency may not use the social cost of carbon in
order to incorporate social benefits of reducing carbon dioxide emissions,
or for any other reason, in any cost-benefit analysis relating to an
energy-related rule that is estimated to cost more than $1 billion unless
and until a Federal law is enacted authorizing such use.
(b)
Definition
In this section, the term social cost of carbon means the social cost of carbon as described in the technical support document entitled Technical Support Document: Technical Update of the Social Cost of Carbon for Regulatory Impact
Analysis Under Executive Order 12866, published by the Interagency Working Group on Social Cost of Carbon, United States Government, in
May 2013, or any successor or substantially related document, or any other
estimate of the monetized damages associated with an incremental increase
in carbon dioxide emissions in a given year.
B
Electricity Security and Affordability
211.
Short title
This subtitle may be cited as the Electricity Security and Affordability Act.
212.
Standards of performance for new fossil fuel-fired electric utility generating units
(a)
Limitation
The Administrator of the Environmental Protection Agency may not issue, implement, or enforce any
proposed or final rule under section 111 of the Clean Air Act (42 U.S.C. 7411) that establishes a standard of performance for emissions of any greenhouse gas from any new
source that is a fossil fuel-fired electric utility generating unit unless
such rule meets the requirements under subsections (b) and (c).
(b)
Requirements
In issuing any rule under section 111 of the Clean Air Act (42 U.S.C. 7411) establishing standards of performance for emissions of any greenhouse gas from new sources that
are fossil fuel-fired electric utility generating units, the Administrator
of the Environmental Protection Agency (for purposes of establishing such
standards)—
(1) shall separate sources fueled with coal and natural gas into separate categories; and
(2) shall not set a standard based on the best system of emission reduction for new sources within a
fossil-fuel category unless—
(A) such standard has been achieved on average for at least one continuous 12-month period (excluding
planned outages) by each of at least 6 units within such category—
(i) each of which is located at a different electric generating station in the United States;
(ii) which, collectively, are representative of the operating characteristics of electric generation at
different locations in the United States; and
(iii) each of which is operated for the entire 12-month period on a full commercial basis; and
(B) no results obtained from any demonstration project are used in setting such standard.
(c)
Coal having a heat content of 8300 or less British Thermal Units per pound
(1)
Separate subcategory
In carrying out subsection (b)(1), the Administrator of the Environmental Protection Agency shall
establish a separate subcategory for new sources that are fossil
fuel-fired electric utility generating units using coal with an average
heat content of 8300 or less British Thermal Units per pound.
(2)
Standard
Notwithstanding subsection (b)(2), in issuing any rule under section 111 of the Clean Air Act (42 U.S.C. 7411) establishing standards of performance for emissions of any greenhouse gas from new sources in
such subcategory, the Administrator of the Environmental Protection Agency
shall not set a standard based on the best system of emission reduction
unless—
(A) such standard has been achieved on average for at least one continuous 12-month period (excluding
planned outages) by each of at least 3 units within such subcategory—
(i) each of which is located at a different electric generating station in the United States;
(ii) which, collectively, are representative of the operating characteristics of electric generation at
different locations in the United States; and
(iii) each of which is operated for the entire 12-month period on a full commercial basis; and
(B) no results obtained from any demonstration project are used in setting such standard.
(d)
Technologies
Nothing in this section shall be construed to preclude the issuance, implementation, or enforcement
of a standard of performance that—
(1) is based on the use of one or more technologies that are developed in a foreign country, but has
been demonstrated to be achievable at fossil fuel-fired electric utility
generating units in the United States; and
(2) meets the requirements of subsection (b) and (c), as applicable.
213.
Congress To set effective date for standards of performance for existing, modified, and
reconstructed fossil fuel-fired electric utility generating units
(a)
Applicability
This section applies with respect to any rule or guidelines issued by the Administrator of the
Environmental Protection Agency under section 111 of the Clean Air Act (42 U.S.C. 7411) that—
(1) establish any standard of performance for emissions of any greenhouse gas from any modified or
reconstructed source that is a fossil fuel-fired electric utility
generating unit; or
(2) apply to the emissions of any greenhouse gas from an existing source that is a fossil fuel-fired
electric utility generating unit.
(b)
Congress To set effective date
A rule or guidelines described in subsection (a) shall not take effect unless a Federal law is
enacted specifying such rule’s or guidelines’ effective date.
(c)
Reporting
A rule or guidelines described in subsection (a) shall not take effect unless the Administrator of
the Environmental Protection Agency has submitted to Congress a report
containing each of the following:
(1) The text of such rule or guidelines.
(2) The economic impacts of such rule or guidelines, including the potential effects on—
(A) economic growth, competitiveness, and jobs in the United States;
(B) electricity ratepayers, including low-income ratepayers in affected States;
(C) required capital investments and projected costs for operation and maintenance of new equipment
required to be installed; and
(D) the global economic competitiveness of the United States.
(3) The amount of greenhouse gas emissions that such rule or guidelines are projected to reduce as
compared to overall global greenhouse gas emissions.
(d)
Consultation
In carrying out subsection (c), the Administrator of the Environmental Protection Agency shall
consult with the Administrator of the Energy Information Administration,
the Comptroller General of the United States, the Director of the National
Energy Technology Laboratory, and the Under Secretary of Commerce for
Standards and Technology.
214.
Repeal of earlier rules and guidelines
The following rules and guidelines shall be of no force or effect, and shall be treated as though
such rules and guidelines had never been issued:
(1) The proposed rule—
(A) entitled Standards of Performance for Greenhouse Gas Emissions for New Stationary Sources: Electric Utility
Generating Units, published at 77 Fed. Reg. 22392 (April 13, 2012); and
(B) withdrawn pursuant to the notice entitled Withdrawal of Proposed Standards of Performance for Greenhouse Gas Emissions From New Stationary
Sources: Electric Utility Generating Units, published at 79 Fed. Reg. 1352 (January 8, 2014).
(2) The proposed rule entitled Standards of Performance for Greenhouse Gas Emissions From New Stationary Sources: Electric Utility
Generating Units, published at 79 Fed. Reg. 1430 (January 8, 2014).
(3) With respect to the proposed rules described in paragraphs (1) and (2), any successor or
substantially similar proposed or final rule that—
(A) is issued prior to the date of the enactment of this Act;
(B) is applicable to any new source that is a fossil fuel-fired electric utility generating unit; and
(C) does not meet the requirements under subsections (b) and (c) of section 212.
(4) The proposed rule entitled Carbon Pollution Emission Guidelines for Existing Stationary Sources: Electric Utility Generating
Units, published at 79 Fed. Reg. 34830 (June 18, 2014).
(5) The proposed rule entitled Carbon Pollution Standards for Modified and Reconstructed Stationary Sources: Electric Utility
Generating Units, published at 79 Fed. Reg. 34960 (June 18, 2014).
(6) With respect to the proposed rules described in paragraphs (4) and (5), any successor or
substantially similar proposed or final rule that—
(A) is issued prior to the date of the enactment of this Act; and
(B) is applicable to any existing, modified, or reconstructed source that is a fossil fuel-fired
electric utility generating unit.
215.
Definitions
In this subtitle:
(1)
Demonstration project
The term demonstration project means a project to test or demonstrate the feasibility of carbon capture and storage technologies
that has received Federal Government funding or financial assistance.
(2)
Existing source
The term existing source has the meaning given such term in section 111(a) of the Clean Air Act (42 U.S.C. 7411(a)), except such term shall not include any modified source.
(3)
Greenhouse gas
The term greenhouse gas means any of the following:
(A) Carbon dioxide.
(B) Methane.
(C) Nitrous oxide.
(D) Sulfur hexafluoride.
(E) Hydrofluorocarbons.
(F) Perfluorocarbons.
(4)
Modification
The term modification has the meaning given such term in section 111(a) of the Clean Air Act (42 U.S.C. 7411(a)).
(5)
Modified source
The term modified source means any stationary source, the modification of which is commenced after the date of the
enactment of this Act.
(6)
New source
The term new source has the meaning given such term in section 111(a) of the Clean Air Act (42 U.S.C. 7411(a)), except that such term shall not include any modified source.
C
Report on Energy and Water Savings Potential From Thermal Insulation
221.
Report on energy and water savings potential from thermal insulation
(a)
Report
Not later than 1 year after the date of enactment of this Act, the Secretary of Energy, in
consultation with appropriate Federal agencies and relevant stakeholders,
shall submit to the Committee on Energy and Natural Resources of the
Senate and the Committee on Energy and Commerce of the House of
Representatives a report on the impact of thermal insulation on both
energy and water use systems for potable hot and chilled water in Federal
buildings, and the return on investment of installing such insulation.
(b)
Contents
The report shall include—
(1) an analysis based on the cost of municipal or regional water for delivered water and the avoided
cost of new water; and
(2) a summary of energy and water savings, including short term and long term (20 years) projections of
such savings.
III
Unleashing Energy Diplomacy
301.
Short title
This title may be cited as the Domestic Prosperity and Global Freedom Act.
302.
Action on applications
(a)
Decision deadline
For proposals that must also obtain authorization from the Federal Energy Regulatory Commission or
the United States Maritime Administration to site, construct, expand, or
operate LNG export facilities, the Department of Energy shall issue a
final decision on any application for the authorization to export natural
gas under section 3 of the Natural Gas Act (15 U.S.C. 717b) not later than 30 days after the later of—
(1) the conclusion of the review to site, construct, expand, or operate the LNG facilities required by
the National Environmental Policy Act of 1969 (42 U.S. C. 4321 et seq.);
or
(2) the date of enactment of this Act.
(b)
Conclusion of review
For purposes of subsection (a), review required by the National Environmental Policy Act of 1969
shall be considered concluded—
(1) for a project requiring an Environmental Impact Statement, 30 days after publication of a Final
Environmental Impact Statement;
(2) for a project for which an Environmental Assessment has been prepared, 30 days after publication by
the Department of Energy of a Finding of No Significant Impact; and
(3) upon a determination by the lead agency that an application is eligible for a categorical exclusion
pursuant National Environmental Policy Act of 1969 implementing
regulations.
(c)
Judicial action
(1) The United States Court of Appeals for the circuit in which the export facility will be located
pursuant to an application described in subsection (a) shall have original
and exclusive jurisdiction over any civil action for the review of—
(A) an order issued by the Department of Energy with respect to such application; or
(B) the Department of Energy’s failure to issue a final decision on such application.
(2) If the Court in a civil action described in paragraph (1) finds that the Department of Energy has
failed to issue a final decision on the application as required under
subsection (a), the Court shall order the Department of Energy to issue
such final decision not later than 30 days after the Court’s order.
(3) The Court shall set any civil action brought under this subsection for expedited consideration and
shall set the matter on the docket as soon as practical after the filing
date of the initial pleading.
303.
Public disclosure of export destinations
Section 3 of the Natural Gas Act (15 U.S.C. 717b) is amended by adding at the end the following:
(g)
Public Disclosure of LNG Export Destinations
As a condition for approval of any authorization to export LNG, the Secretary of Energy shall
require the applicant to publicly disclose the specific destination or
destinations of any such authorized LNG exports.
.
B
Natural Resources Committee
201.
References
Except as expressly provided otherwise, any reference to this Act in any subdivision of this division shall be treated as referring only to the provisions of that
subdivision.
A
Lowering Gasoline Prices to Fuel an America That Works Act of 2014
1.
Short title
This subdivision may be cited as the Lowering Gasoline Prices to Fuel an America That Works Act of 2014.
I
Offshore Energy and Jobs
A
Outer Continental Shelf Leasing Program Reforms
10101.
Outer Continental Shelf leasing program reforms
Section 18(a) of the Outer Continental Shelf Lands Act (43 U.S.C. 1344(a)) is amended by adding at the end the following:
(5)
(A) In each oil and gas leasing program under this section, the Secretary shall make available for
leasing and conduct lease sales including at least 50 percent of the
available unleased acreage within each outer Continental Shelf planning
area considered to have the largest undiscovered, technically recoverable
oil and gas resources (on a total btu basis) based upon the most recent
national geologic assessment of the outer Continental Shelf, with an
emphasis on offering the most geologically prospective parts of the
planning area.
(B) The Secretary shall include in each proposed oil and gas leasing program under this section any
State subdivision of an outer Continental Shelf planning area that the
Governor of the State that represents that subdivision requests be made
available for leasing. The Secretary may not remove such a subdivision
from the program until publication of the final program, and shall include
and consider all such subdivisions in any environmental review conducted
and statement prepared for such program under section 102(2) of the
National Environmental Policy Act of 1969 (42 U.S.C. 4332(2)).
(C) In this paragraph the term available unleased acreage means that portion of the outer Continental Shelf that is not under lease at the time of a
proposed lease sale, and that has not otherwise been made unavailable for
leasing by law.
(6)
(A) In the 5-year oil and gas leasing program, the Secretary shall make available for leasing any outer
Continental Shelf planning areas that—
(i) are estimated to contain more than 2,500,000,000 barrels of oil; or
(ii) are estimated to contain more than 7,500,000,000,000 cubic feet of natural gas.
(B) To determine the planning areas described in subparagraph (A), the Secretary shall use the document
entitled Minerals Management Service Assessment of Undiscovered Technically Recoverable Oil and Gas
Resources of the Nation’s Outer Continental Shelf, 2006.
.
10102.
Domestic oil and natural gas production goal
Section 18(b) of the Outer Continental Shelf Lands Act (43 U.S.C. 1344(b)) is amended to read as follows:
(b)
Domestic oil and natural gas production goal
–
(1)
In general
In developing a 5-year oil and gas leasing program, and subject to paragraph (2), the Secretary
shall determine a domestic strategic production goal for the development
of oil and natural gas as a result of that program. Such goal shall be—
(A) the best estimate of the possible increase in domestic production of oil and natural gas from the
outer Continental Shelf;
(B) focused on meeting domestic demand for oil and natural gas and reducing the dependence of the
United States on foreign energy; and
(C) focused on the production increases achieved by the leasing program at the end of the 15-year
period beginning on the effective date of the program.
(2)
Program goal
For purposes of the 5-year oil and gas leasing program, the production goal referred to in
paragraph (1) shall be an increase by 2032 of—
(A) no less than 3,000,000 barrels in the amount of oil produced per day; and
(B) no less than 10,000,000,000 cubic feet in the amount of natural gas produced per day.
(3)
Reporting
The Secretary shall report annually, beginning at the end of the 5-year period for which the
program applies, to the Committee on Natural Resources of the House of
Representatives and the Committee on Energy and Natural Resources of the
Senate on the progress of the program in meeting the production goal. The
Secretary shall identify in the report projections for production and any
problems with leasing, permitting, or production that will prevent meeting
the goal.
.
10103.
Development and submittal of new 5-year oil and gas leasing program
(a)
In general
The Secretary of the Interior shall—
(1) by not later than July 15, 2015, publish and submit to Congress a new proposed oil and gas leasing
program under section 18 of the Outer Continental Shelf Lands Act (43 U.S.C. 1344) for the 5-year period beginning on such date and ending July 15, 2021; and
(2) by not later than July 15, 2016, approve a final oil and gas leasing program under such section for
such period.
(b)
Consideration of all areas
In preparing such program the Secretary shall include consideration of areas of the Continental
Shelf off the coasts of all States (as such term is defined in section 2
of that Act, as amended by this title), that are subject to leasing under
this title.
(c)
Technical correction
Section 18(d)(3) of the Outer Continental Shelf Lands Act (43 U.S.C. 1344(d)(3)) is amended by striking or after eighteen months following the date of enactment of this section, whichever first occurs,.
10104.
Rule of construction
Nothing in this title shall be construed to authorize the issuance of a lease under the Outer
Continental Shelf Lands Act (43 U.S.C. 1331 et seq.) to any person designated for the imposition of sanctions pursuant to—
(1) the Iran Sanctions Act of 1996 (50 U.S.C. 1701 note), the Comprehensive Iran Sanctions, Accountability and Divestiture Act of 2010 (22 U.S.C. 8501 et seq.), the Iran Threat Reduction and Syria Human Rights Act of 2012 (22 U.S.C. 8701 et seq.), section 1245 of the National Defense Authorization Act for Fiscal Year 2012 (22 U.S.C. 8513a), or the Iran Freedom and Counter-Proliferation Act of 2012 (22 U.S.C. 8801 et seq.);
(2) Executive Order No. 13622 (July 30, 2012), Executive Order No. 13628 (October 9, 2012), or
Executive Order No. 13645 (June 3, 2013);
(3) Executive Order No. 13224 (September 23, 2001) or Executive Order No. 13338 (May 11, 2004); or
(4) the Syria Accountability and Lebanese Sovereignty Restoration Act of 2003 (22 U.S.C. 2151 note).
10105.
Addition of lease sales after finalization of 5-year plan
Section 18(d) of the Outer Continental Shelf Lands Act (43 U.S.C.1344(d)) is amended—
(1) in paragraph (3), by striking After and inserting Except as provided in paragraph (4), after; and
(2) by adding at the end the following:
(4) The Secretary may add to the areas included in an approved leasing program additional areas to be
made available for leasing under the program, if all review and documents
required under section 102 of the National Environmental Policy Act of
1969 (42 U.S.C. 4332) have been completed with respect to leasing of each such additional area within the 5-year period
preceding such addition.
.
B
Directing the President To Conduct New OCS Sales
10201.
Requirement to conduct proposed oil and gas Lease Sale 220 on the Outer Continental Shelf offshore
Virginia
(a)
In general
Notwithstanding the exclusion of Lease Sale 220 in the Final Outer Continental Shelf Oil & Gas Leasing Program 2012–2017, the Secretary of the Interior shall conduct offshore oil and gas
Lease Sale 220 under section 8 of the Outer Continental Shelf Lands Act (43 U.S.C. 1337) as soon as practicable, but not later than one year after the date of enactment of this Act.
(b)
Requirement To make replacement lease blocks available
For each lease block in a proposed lease sale under this section for which the Secretary of
Defense, in consultation with the Secretary of the Interior, under the
Memorandum of Agreement referred to in section 10205(b), issues a
statement proposing deferral from a lease offering due to defense-related
activities that are irreconcilable with mineral exploration and
development, the Secretary of the Interior, in consultation with the
Secretary of Defense, shall make available in the same lease sale one
other lease block in the Virginia lease sale planning area that is
acceptable for oil and gas exploration and production in order to mitigate
conflict.
(c)
Balancing military and energy production goals
In recognition that the Outer Continental Shelf oil and gas leasing program and the domestic energy
resources produced therefrom are integral to national security, the
Secretary of the Interior and the Secretary of Defense shall work jointly
in implementing this section in order to ensure achievement of the
following common goals:
(1) Preserving the ability of the Armed Forces of the United States to maintain an optimum state of
readiness through their continued use of the Outer Continental Shelf.
(2) Allowing effective exploration, development, and production of our Nation’s oil, gas, and renewable
energy resources.
(d)
Definitions
In this section:
(1)
Lease sale 220
The term Lease Sale 220 means such lease sale referred to in the Request for Comments on the Draft Proposed 5-Year Outer
Continental Shelf (OCS) Oil and Gas Leasing Program for 2010–2015 and
Notice of Intent To Prepare an Environmental Impact Statement (EIS) for
the Proposed 5-Year Program published January 21, 2009 (74 Fed. Reg.
3631).
(2)
Virginia lease sale planning area
The term Virginia lease sale planning area means the area of the outer Continental Shelf (as that term is defined in the Outer Continental
Shelf Lands Act (33 U.S.C. 1331 et seq.)) that is bounded by—
(A) a northern boundary consisting of a straight line extending from the northernmost point of
Virginia’s seaward boundary to the point on the seaward boundary of the
United States exclusive economic zone located at 37 degrees 17 minutes 1
second North latitude, 71 degrees 5 minutes 16 seconds West longitude; and
(B) a southern boundary consisting of a straight line extending from the southernmost point of
Virginia’s seaward boundary to the point on the seaward boundary of the
United States exclusive economic zone located at 36 degrees 31 minutes 58
seconds North latitude, 71 degrees 30 minutes 1 second West longitude.
10202.
South Carolina lease sale
Notwithstanding exclusion of the South Atlantic Outer Continental Shelf Planning Area from the
Final Outer Continental Shelf Oil & Gas Leasing Program 2012–2017, the Secretary of the Interior shall conduct a lease sale not later
than 2 years after the date of the enactment of this Act for areas off the
coast of South Carolina determined by the Secretary to have the most
geologically promising hydrocarbon resources and constituting not less
than 25 percent of the leasable area within the South Carolina offshore
administrative boundaries depicted in the notice entitled Federal Outer Continental Shelf (OCS) Administrative Boundaries Extending from the Submerged Lands
Act Boundary seaward to the Limit of the United States Outer Continental
Shelf, published January 3, 2006 (71 Fed. Reg. 127).
10203.
Southern California existing infrastructure lease sale
(a)
In general
The Secretary of the Interior shall offer for sale leases of tracts in the Santa Maria and Santa
Barbara/Ventura Basins of the Southern California OCS Planning Area as
soon as practicable, but not later than December 31, 2015.
(b)
Use of Existing Structures or Onshore-Based Drilling
The Secretary of the Interior shall include in leases offered for sale under this lease sale such
terms and conditions as are necessary to require that development and
production may occur only from offshore infrastructure in existence on the
date of the enactment of this Act or from onshore-based, extended-reach
drilling.
10204.
Environmental impact statement requirement
(a)
In General
For the purposes of this title, the Secretary of the Interior shall prepare a multisale
environmental impact statement under section 102 of the National
Environmental Policy Act of 1969 (42 U.S.C. 4332) for all lease sales required under this subtitle.
(b)
Actions To be considered
Notwithstanding section 102 of the National Environmental Policy Act of 1969 (42 U.S.C. 4332), in such statement—
(1) the Secretary is not required to identify nonleasing alternative courses of action or to analyze
the environmental effects of such alternative courses of action; and
(2) the Secretary shall only—
(A) identify a preferred action for leasing and not more than one alternative leasing proposal; and
(B) analyze the environmental effects and potential mitigation measures for such preferred action and
such alternative leasing proposal.
10205.
National defense
(a)
National Defense Areas
This title does not affect the existing authority of the Secretary of Defense, with the approval of
the President, to designate national defense areas on the Outer
Continental Shelf pursuant to section 12(d) of the Outer Continental Shelf
Lands Act (43 U.S.C. 1341(d)).
(b)
Prohibition on Conflicts With Military Operations
No person may engage in any exploration, development, or production of oil or natural gas on the
Outer Continental Shelf under a lease issued under this title that would
conflict with any military operation, as determined in accordance with the
Memorandum of Agreement between the Department of Defense and the
Department of the Interior on Mutual Concerns on the Outer Continental
Shelf signed July 20, 1983, and any revision or replacement for that
agreement that is agreed to by the Secretary of Defense and the Secretary
of the Interior after that date but before the date of issuance of the
lease under which such exploration, development, or production is
conducted.
10206.
Eastern Gulf of Mexico not included
Nothing in this title affects restrictions on oil and gas leasing under the Gulf of Mexico Energy
Security Act of 2006 (title I of division C of Public Law 109–432; 43 U.S.C. 1331 note).
C
Equitable Sharing of Outer Continental Shelf Revenues
10301.
Disposition of Outer Continental Shelf revenues to coastal States
(a)
In general
Section 9 of the Outer Continental Shelf Lands Act (43 U.S.C. 1338) is amended—
(1) in the existing text—
(A) in the first sentence, by striking All rentals, and inserting the following:
(c)
Disposition of revenue under old leases
All rentals,
; and
(B) in subsection (c) (as designated by the amendment made by subparagraph (A) of this paragraph), by
striking for the period from June 5, 1950, to date, and thereafter and inserting in the period beginning June 5, 1950, and ending on the date of enactment of the Lowering Gasoline Prices to Fuel an America That Works Act of 2014;
(2) by adding after subsection (c) (as so designated) the following:
(d)
Definitions
In this section:
(1)
Coastal State
The term coastal State includes a territory of the United States.
(2)
New leasing revenues
The term new leasing revenues—
(A) means amounts received by the United States as bonuses, rents, and royalties under leases for oil
and gas, wind, tidal, or other energy exploration, development, and
production on new areas of the outer Continental Shelf that are authorized
to be made available for leasing as a result of enactment of the Lowering Gasoline Prices to Fuel an America That Works Act of 2014 and leasing under that Act; and
(B) does not include amounts received by the United States under any lease of an area located in the
boundaries of the Central Gulf of Mexico and Western Gulf of Mexico Outer
Continental Shelf Planning Areas on the date of enactment of the Lowering Gasoline Prices to Fuel an America That Works Act of 2014, including a lease issued before, on, or after such date of enactment.
; and
(3) by inserting before subsection (c) (as so designated) the following:
(a)
Payment of new leasing revenues to coastal States
(1)
In general
Except as provided in paragraph (2), of the amount of new leasing revenues received by the United
States each fiscal year, 37.5 percent shall be allocated and paid in
accordance with subsection (b) to coastal States that are affected States
with respect to the leases under which those revenues are received by the
United States.
(2)
Phase-in
(A)
In general
Except as provided in subparagraph (B), paragraph (1) shall be applied—
(i) with respect to new leasing revenues under leases awarded under the first leasing program under
section 18(a) that takes effect after the date of enactment of the Lowering Gasoline Prices to Fuel an America That Works Act of 2014, by substituting 12.5 percent for 37.5 percent; and
(ii) with respect to new leasing revenues under leases awarded under the second leasing program under
section 18(a) that takes effect after the date of enactment of the Lowering Gasoline Prices to Fuel an America That Works Act of 2014, by substituting 25 percent for 37.5 percent.
(B)
Exempted lease sales
This paragraph shall not apply with respect to any lease issued under subtitle B of the Lowering Gasoline Prices to Fuel an America That Works Act of 2014.
(b)
Allocation of payments
(1)
In general
The amount of new leasing revenues received by the United States with respect to a leased tract
that are required to be paid to coastal States in accordance with this
subsection each fiscal year shall be allocated among and paid to coastal
States that are within 200 miles of the leased tract, in amounts that are
inversely proportional to the respective distances between the point on
the coastline of each such State that is closest to the geographic center
of the lease tract, as determined by the Secretary.
(2)
Minimum and maximum allocation
The amount allocated to a coastal State under paragraph (1) each fiscal year with respect to a
leased tract shall be—
(A) in the case of a coastal State that is the nearest State to the geographic center of the leased
tract, not less than 25 percent of the total amounts allocated with
respect to the leased tract;
(B) in the case of any other coastal State, not less than 10 percent, and not more than 15 percent, of
the total amounts allocated with respect to the leased tract; and
(C) in the case of a coastal State that is the only coastal State within 200 miles of a leased tract,
100 percent of the total amounts allocated with respect to the leased
tract.
(3)
Administration
Amounts allocated to a coastal State under this subsection—
(A) shall be available to the coastal State without further appropriation;
(B) shall remain available until expended;
(C) shall be in addition to any other amounts available to the coastal State under this Act; and
(D) shall be distributed in the fiscal year following receipt.
(4)
Use of funds
(A)
In general
Except as provided in subparagraph (B), a coastal State may use funds allocated and paid to it
under this subsection for any purpose as determined by the laws of that
State.
(B)
Restriction on use for matching
Funds allocated and paid to a coastal State under this subsection may not be used as matching funds
for any other Federal program.
.
(b)
Limitation on application
This section and the amendment made by this section shall not affect the application of section 105
of the Gulf of Mexico Energy Security Act of 2006 (title I of division C
of Public Law 109–432; (43 U.S.C. 1331 note)), as in effect before the enactment of this Act, with respect to revenues received by the
United States under oil and gas leases issued for tracts located in the
Western and Central Gulf of Mexico Outer Continental Shelf Planning Areas,
including such leases issued on or after the date of the enactment of this
Act.
D
Reorganization of Minerals Management Agencies of the Department of the Interior
10401.
Establishment of Under Secretary for Energy, Lands, and Minerals and Assistant Secretary of Ocean
Energy and Safety
There shall be in the Department of the Interior—
(1) an Under Secretary for Energy, Lands, and Minerals, who shall—
(A) be appointed by the President, by and with the advise and consent of the Senate;
(B) report to the Secretary of the Interior or, if directed by the Secretary, to the Deputy Secretary
of the Interior;
(C) be paid at the rate payable for level III of the Executive Schedule; and
(D) be responsible for—
(i) the safe and responsible development of our energy and mineral resources on Federal lands in
appropriate accordance with United States energy demands; and
(ii) ensuring multiple-use missions of the Department of the Interior that promote the safe and
sustained development of energy and minerals resources on public lands (as
that term is defined in the Federal Land Policy and Management Act of 1976
(43 U.S.C. 1701 et seq.));
(2) an Assistant Secretary of Ocean Energy and Safety, who shall—
(A) be appointed by the President, by and with the advise and consent of the Senate;
(B) report to the Under Secretary for Energy, Lands, and Minerals;
(C) be paid at the rate payable for level IV of the Executive Schedule; and
(D) be responsible for ensuring safe and efficient development of energy and minerals on the Outer
Continental Shelf of the United States; and
(3) an Assistant Secretary of Land and Minerals Management, who shall—
(A) be appointed by the President, by and with the advise and consent of the Senate;
(B) report to the Under Secretary for Energy, Lands, and Minerals;
(C) be paid at the rate payable for level IV of the Executive Schedule; and
(D) be responsible for ensuring safe and efficient development of energy and minerals on public lands
and other Federal onshore lands under the jurisdiction of the Department
of the Interior, including implementation of the Mineral Leasing Act (30 U.S.C. 181 et seq.) and the Surface Mining Control and Reclamation Act (30 U.S.C. 1201 et seq.) and administration of the Office of Surface Mining.
10402.
Bureau of Ocean Energy
(a)
Establishment
There is established in the Department of the Interior a Bureau of Ocean Energy (referred to in
this section as the Bureau), which shall—
(1) be headed by a Director of Ocean Energy (referred to in this section as the Director); and
(2) be administered under the direction of the Assistant Secretary of Ocean Energy and Safety.
(b)
Director
(1)
Appointment
The Director shall be appointed by the Secretary of the Interior.
(2)
Compensation
The Director shall be compensated at the rate provided for level V of the Executive Schedule under section 5316 of title 5, United States Code.
(c)
Duties
(1)
In general
The Secretary of the Interior shall carry out through the Bureau all functions, powers, and duties
vested in the Secretary relating to the administration of a comprehensive
program of offshore mineral and renewable energy resources management.
(2)
Specific authorities
The Director shall promulgate and implement regulations—
(A) for the proper issuance of leases for the exploration, development, and production of nonrenewable
and renewable energy and mineral resources on the Outer Continental Shelf;
(B) relating to resource identification, access, evaluation, and utilization;
(C) for development of leasing plans, lease sales, and issuance of leases for such resources; and
(D) regarding issuance of environmental impact statements related to leasing and post leasing
activities including exploration, development, and production, and the use
of third party contracting for necessary environmental analysis for the
development of such resources.
(3)
Limitation
The Secretary shall not carry out through the Bureau any function, power, or duty that is—
(A) required by section 10403 to be carried out through the Ocean Energy Safety Service; or
(B) required by section 10404 to be carried out through the Office of Natural Resources Revenue.
(d)
Responsibilities of land management agencies
Nothing in this section shall affect the authorities of the Bureau of Land Management under the
Federal Land Policy and Management Act of 1976 (43 U.S.C. 1701 et seq.) or of the Forest Service under the National Forest Management Act of 1976 (Public Law 94–588).
10403.
Ocean Energy Safety Service
(a)
Establishment
There is established in the Department of the Interior an Ocean Energy Safety Service (referred to
in this section as the Service), which shall—
(1) be headed by a Director of Energy Safety (referred to in this section as the Director); and
(2) be administered under the direction of the Assistant Secretary of Ocean Energy and Safety.
(b)
Director
(1)
Appointment
The Director shall be appointed by the Secretary of the Interior.
(2)
Compensation
The Director shall be compensated at the rate provided for level V of the Executive Schedule under section 5316 of title 5, United States Code.
(c)
Duties
(1)
In general
The Secretary of the Interior shall carry out through the Service all functions, powers, and duties
vested in the Secretary relating to the administration of safety and
environmental enforcement activities related to offshore mineral and
renewable energy resources on the Outer Continental Shelf pursuant to the
Outer Continental Shelf Lands Act (43 U.S.C. 1331 et seq.) including the authority to develop, promulgate, and enforce regulations to ensure the safe and
sound exploration, development, and production of mineral and renewable
energy resources on the Outer Continental Shelf in a timely fashion.
(2)
Specific authorities
The Director shall be responsible for all safety activities related to exploration and development
of renewable and mineral resources on the Outer Continental Shelf,
including—
(A) exploration, development, production, and ongoing inspections of infrastructure;
(B) the suspending or prohibiting, on a temporary basis, any operation or activity, including
production under leases held on the Outer Continental Shelf, in accordance
with section 5(a)(1) of the Outer Continental Shelf Lands Act (43 U.S.C. 1334(a)(1));
(C) cancelling any lease, permit, or right-of-way on the Outer Continental Shelf, in accordance with
section 5(a)(2) of the Outer Continental Shelf Lands Act (43 U.S.C. 1334(a)(2));
(D) compelling compliance with applicable Federal laws and regulations relating to worker safety and
other matters;
(E) requiring comprehensive safety and environmental management programs for persons engaged in
activities connected with the exploration, development, and production of
mineral or renewable energy resources;
(F) developing and implementing regulations for Federal employees to carry out any inspection or
investigation to ascertain compliance with applicable regulations,
including health, safety, or environmental regulations;
(G) implementing the Offshore Technology Research and Risk Assessment Program under section 21 of the
Outer Continental Shelf Lands Act (43 U.S.C. 1347);
(H) summoning witnesses and directing the production of evidence;
(I) levying fines and penalties and disqualifying operators;
(J) carrying out any safety, response, and removal preparedness functions; and
(K) the processing of permits, exploration plans, development plans.
(d)
Employees
(1)
In general
The Secretary shall ensure that the inspection force of the Bureau consists of qualified, trained
employees who meet qualification requirements and adhere to the highest
professional and ethical standards.
(2)
Qualifications
The qualification requirements referred to in paragraph (1)—
(A) shall be determined by the Secretary, subject to subparagraph (B); and
(B) shall include—
(i) 3 years of practical experience in oil and gas exploration, development, or production; or
(ii) a degree in an appropriate field of engineering from an accredited institution of higher learning.
(3)
Assignment
In assigning oil and gas inspectors to the inspection and investigation of individual operations,
the Secretary shall give due consideration to the extent possible to their
previous experience in the particular type of oil and gas operation in
which such inspections are to be made.
(4)
Background checks
The Director shall require that an individual to be hired as an inspection officer undergo an
employment investigation (including a criminal history record check).
(5)
Language requirements
Individuals hired as inspectors must be able to read, speak, and write English well enough to—
(A) carry out written and oral instructions regarding the proper performance of inspection duties; and
(B) write inspection reports and statements and log entries in the English language.
(6)
Veterans preference
The Director shall provide a preference for the hiring of an individual as a inspection officer if
the individual is a member or former member of the Armed Forces and is
entitled, under statute, to retired, retirement, or retainer pay on
account of service as a member of the Armed Forces.
(7)
Annual proficiency review
(A)
Annual proficiency review
The Director shall provide that an annual evaluation of each individual assigned inspection duties
is conducted and documented.
(B)
Continuation of employment
An individual employed as an inspector may not continue to be employed in that capacity unless the
evaluation demonstrates that the individual—
(i) continues to meet all qualifications and standards;
(ii) has a satisfactory record of performance and attention to duty based on the standards and
requirements in the inspection program; and
(iii) demonstrates the current knowledge and skills necessary to courteously, vigilantly, and effectively
perform inspection functions.
(8)
Limitation on right to strike
Any individual that conducts permitting or inspections under this section may not participate in a
strike, or assert the right to strike.
(9)
Personnel authority
Notwithstanding any other provision of law, the Director may employ, appoint, discipline and
terminate for cause, and fix the compensation, terms, and conditions of
employment of Federal service for individuals as the employees of the
Service in order to restore and maintain the trust of the people of the
United States in the accountability of the management of our Nation’s
energy safety program.
(10)
Training Academy
(A)
In general
The Secretary shall establish and maintain a National Offshore Energy Safety Academy (referred to
in this paragraph as the Academy) as an agency of the Ocean Energy Safety Service.
(B)
Functions of Academy
The Secretary, through the Academy, shall be responsible for—
(i) the initial and continued training of both newly hired and experienced offshore oil and gas
inspectors in all aspects of health, safety, environmental, and
operational inspections;
(ii) the training of technical support personnel of the Bureau;
(iii) any other training programs for offshore oil and gas inspectors, Bureau personnel, Department
personnel, or other persons as the Secretary shall designate; and
(iv) certification of the successful completion of training programs for newly hired and experienced
offshore oil and gas inspectors.
(C)
Cooperative agreements
(i)
In general
In performing functions under this paragraph, and subject to clause (ii), the Secretary may enter
into cooperative educational and training agreements with educational
institutions, related Federal academies, other Federal agencies, State
governments, safety training firms, and oil and gas operators and related
industries.
(ii)
Training requirement
Such training shall be conducted by the Academy in accordance with curriculum needs and assignment
of instructional personnel established by the Secretary.
(11)
Use of Department personnel
In performing functions under this subsection, the Secretary shall use, to the extent practicable,
the facilities and personnel of the Department of the Interior. The
Secretary may appoint or assign to the Academy such officers and employees
as the Secretary considers necessary for the performance of the duties and
functions of the Academy.
(12)
Additional training programs
(A)
In general
The Secretary shall work with appropriate educational institutions, operators, and representatives
of oil and gas workers to develop and maintain adequate programs with
educational institutions and oil and gas operators that are designed—
(i) to enable persons to qualify for positions in the administration of this title; and
(ii) to provide for the continuing education of inspectors or other appropriate Department of the
Interior personnel.
(B)
Financial and technical assistance
The Secretary may provide financial and technical assistance to educational institutions in
carrying out this paragraph.
(e)
Limitation
The Secretary shall not carry out through the Service any function, power, or duty that is—
(1) required by section 10402 to be carried out through Bureau of Ocean Energy; or
(2) required by section 10404 to be carried out through the Office of Natural Resources Revenue.
10404.
Office of Natural Resources revenue
(a)
Establishment
There is established in the Department of the Interior an Office of Natural Resources Revenue
(referred to in this section as the Office) to be headed by a Director of Natural Resources Revenue (referred to in this section as the Director).
(b)
Appointment and compensation
(1)
In general
The Director shall be appointed by the Secretary of the Interior.
(2)
Compensation
The Director shall be compensated at the rate provided for Level V of the Executive Schedule under section 5316 of title 5, United States Code.
(c)
Duties
(1)
In general
The Secretary of the Interior shall carry out, through the Office, all functions, powers, and
duties vested in the Secretary and relating to the administration of
offshore royalty and revenue management functions.
(2)
Specific authorities
The Secretary shall carry out, through the Office, all functions, powers, and duties previously
assigned to the Minerals Management Service (including the authority to
develop, promulgate, and enforce regulations) regarding offshore royalty
and revenue collection; royalty and revenue distribution; auditing and
compliance; investigation and enforcement of royalty and revenue
regulations; and asset management for onshore and offshore activities.
(d)
Limitation
The Secretary shall not carry out through the Office any function, power, or duty that is—
(1) required by section 10402 to be carried out through Bureau of Ocean Energy; or
(2) required by section 10403 to be carried out through the Ocean Energy Safety Service.
10405.
Ethics and drug testing
(a)
Certification
The Secretary of the Interior shall certify annually that all Department of the Interior officers
and employees having regular, direct contact with lessees, contractors,
concessionaires, and other businesses interested before the Government as
a function of their official duties, or conducting investigations, issuing
permits, or responsible for oversight of energy programs, are in full
compliance with all Federal employee ethics laws and regulations under the
Ethics in Government Act of 1978 (5 U.S.C. App.) and part 2635 of title 5,
Code of Federal Regulations, and all guidance issued under subsection (c).
(b)
Drug Testing
The Secretary shall conduct a random drug testing program of all Department of the Interior
personnel referred to in subsection (a).
(c)
Guidance
Not later than 90 days after the date of enactment of this Act, the Secretary shall issue
supplementary ethics and drug testing guidance for the employees for which
certification is required under subsection (a). The Secretary shall update
the supplementary ethics guidance not less than once every 3 years
thereafter.
10406.
Abolishment of Minerals Management Service
(a)
Abolishment
The Minerals Management Service is abolished.
(b)
Completed administrative actions
(1)
In general
Completed administrative actions of the Minerals Management Service shall not be affected by the
enactment of this Act, but shall continue in effect according to their
terms until amended, modified, superseded, terminated, set aside, or
revoked in accordance with law by an officer of the United States or a
court of competent jurisdiction, or by operation of law.
(2)
Completed administrative action defined
For purposes of paragraph (1), the term completed administrative action includes orders, determinations, memoranda of understanding, memoranda of agreements, rules,
regulations, personnel actions, permits, agreements, grants, contracts,
certificates, licenses, registrations, and privileges.
(c)
Pending Proceedings
Subject to the authority of the Secretary of the Interior and the officers of the Department of the
Interior under this title—
(1) pending proceedings in the Minerals Management Service, including notices of proposed rulemaking,
and applications for licenses, permits, certificates, grants, and
financial assistance, shall continue, notwithstanding the enactment of
this Act or the vesting of functions of the Service in another agency,
unless discontinued or modified under the same terms and conditions and to
the same extent that such discontinuance or modification could have
occurred if this title had not been enacted; and
(2) orders issued in such proceedings, and appeals therefrom, and payments made pursuant to such
orders, shall issue in the same manner and on the same terms as if this
title had not been enacted, and any such orders shall continue in effect
until amended, modified, superseded, terminated, set aside, or revoked by
an officer of the United States or a court of competent jurisdiction, or
by operation of law.
(d)
Pending Civil Actions
Subject to the authority of the Secretary of the Interior or any officer of the Department of the
Interior under this title, pending civil actions shall continue
notwithstanding the enactment of this Act, and in such civil actions,
proceedings shall be had, appeals taken, and judgments rendered and
enforced in the same manner and with the same effect as if such enactment
had not occurred.
(e)
References
References relating to the Minerals Management Service in statutes, Executive orders, rules,
regulations, directives, or delegations of authority that precede the
effective date of this Act are deemed to refer, as appropriate, to the
Department, to its officers, employees, or agents, or to its corresponding
organizational units or functions. Statutory reporting requirements that
applied in relation to the Minerals Management Service immediately before
the effective date of this title shall continue to apply.
10407.
Conforming amendments to Executive Schedule pay rates
(a)
Under Secretary for Energy, Lands, and Minerals
Section 5314 of title 5, United States Code, is amended by inserting after the item relating to Under Secretaries of the Treasury (3). the following:
Under Secretary for Energy, Lands, and Minerals, Department of the Interior.
.
(b)
Assistant Secretaries
Section 5315 of title 5, United States Code, is amended by striking Assistant Secretaries of the Interior (6). and inserting the following:
Assistant Secretaries, Department of the Interior (7).
.
(c)
Directors
Section 5316 of title 5, United States Code, is amended by striking Director, Bureau of Mines, Department of the Interior. and inserting the following new items:
Director, Bureau of Ocean Energy, Department of the Interior.Director, Ocean Energy Safety Service, Department of the Interior.Director, Office of Natural Resources Revenue, Department of the Interior.
.
10408.
Outer Continental Shelf Energy Safety Advisory Board
(a)
Establishment
The Secretary of the Interior shall establish, under the Federal Advisory Committee Act, an Outer
Continental Shelf Energy Safety Advisory Board (referred to in this
section as the Board)—
(1) to provide the Secretary and the Directors established by this title with independent scientific
and technical advice on safe, responsible, and timely mineral and
renewable energy exploration, development, and production activities; and
(2) to review operations of the National Offshore Energy Health and Safety Academy established under
section 10403(d), including submitting to the Secretary recommendations of
curriculum to ensure training scientific and technical advancements.
(b)
Membership
(1)
Size
The Board shall consist of not more than 11 members, who—
(A) shall be appointed by the Secretary based on their expertise in oil and gas drilling, well design,
operations, well containment and oil spill response; and
(B) must have significant scientific, engineering, management, and other credentials and a history of
working in the field related to safe energy exploration, development, and
production activities.
(2)
Consultation and nominations
The Secretary shall consult with the National Academy of Sciences and the National Academy of
Engineering to identify potential candidates for the Board and shall take
nominations from the public.
(3)
Term
The Secretary shall appoint Board members to staggered terms of not more than 4 years, and shall
not appoint a member for more than 2 consecutive terms.
(4)
Balance
In appointing members to the Board, the Secretary shall ensure a balanced representation of
industry and research interests.
(c)
Chair
The Secretary shall appoint the Chair for the Board from among its members.
(d)
Meetings
The Board shall meet not less than 3 times per year and shall host, at least once per year, a
public forum to review and assess the overall energy safety performance of
Outer Continental Shelf mineral and renewable energy resource activities.
(e)
Offshore drilling safety assessments and recommendations
As part of its duties under this section, the Board shall, by not later than 180 days after the
date of enactment of this section and every 5 years thereafter, submit to
the Secretary a report that—
(1) assesses offshore oil and gas well control technologies, practices, voluntary standards, and
regulations in the United States and elsewhere; and
(2) as appropriate, recommends modifications to the regulations issued under this title to ensure
adequate protection of safety and the environment, including
recommendations on how to reduce regulations and administrative actions
that are duplicative or unnecessary.
(f)
Reports
Reports of the Board shall be submitted by the Board to the Committee on Natural Resources of the
House or Representatives and the Committee on Energy and Natural Resources
of the Senate and made available to the public in electronically
accessible form.
(g)
Travel expenses
Members of the Board, other than full-time employees of the Federal Government, while attending
meeting of the Board or while otherwise serving at the request of the
Secretary or the Director while serving away from their homes or regular
places of business, may be allowed travel expenses, including per diem in
lieu of subsistence, as authorized by section 5703 of title 5, United States Code, for individuals in the Government serving without pay.
10409.
Outer Continental Shelf inspection fees
Section 22 of the Outer Continental Shelf Lands Act (43 U.S.C. 1348) is amended by adding at the end of the section the following:
(g)
Inspection fees
(1)
Establishment
The Secretary of the Interior shall collect from the operators of facilities subject to inspection
under subsection (c) non-refundable fees for such inspections—
(A) at an aggregate level equal to the amount necessary to offset the annual expenses of inspections of
outer Continental Shelf facilities (including mobile offshore drilling
units) by the Department of the Interior; and
(B) using a schedule that reflects the differences in complexity among the classes of facilities to be
inspected.
(2)
Ocean energy safety fund
There is established in the Treasury a fund, to be known as the Ocean Energy Enforcement Fund (referred to in this subsection as the Fund), into which shall be deposited all amounts collected as fees under paragraph (1) and which shall
be available as provided under paragraph (3).
(3)
Availability of fees
(A)
In general
Notwithstanding section 3302 of title 31, United States Code, all amounts deposited in the Fund—
(i) shall be credited as offsetting collections;
(ii) shall be available for expenditure for purposes of carrying out inspections of outer Continental
Shelf facilities (including mobile offshore drilling units) and the
administration of the inspection program under this section;
(iii) shall be available only to the extent provided for in advance in an appropriations Act; and
(iv) shall remain available until expended.
(B)
Use for field offices
Not less than 75 percent of amounts in the Fund may be appropriated for use only for the respective
Department of the Interior field offices where the amounts were originally
assessed as fees.
(4)
Initial fees
Fees shall be established under this subsection for the fiscal year in which this subsection takes
effect and the subsequent 10 years, and shall not be raised without advise
and consent of the Congress, except as determined by the Secretary to be
appropriate as an adjustment equal to the percentage by which the Consumer
Price Index for the month of June of the calendar year preceding the
adjustment exceeds the Consumer Price Index for the month of June of the
calendar year in which the claim was determined or last adjusted.
(5)
Annual fees
Annual fees shall be collected under this subsection for facilities that are above the waterline,
excluding drilling rigs, and are in place at the start of the fiscal year.
Fees for fiscal year 2013 shall be—
(A) $10,500 for facilities with no wells, but with processing equipment or gathering lines;
(B) $17,000 for facilities with 1 to 10 wells, with any combination of active or inactive wells; and
(C) $31,500 for facilities with more than 10 wells, with any combination of active or inactive wells.
(6)
Fees for drilling rigs
Fees for drilling rigs shall be assessed under this subsection for all inspections completed in
fiscal years 2015 through 2024. Fees for fiscal year 2015 shall be—
(A) $30,500 per inspection for rigs operating in water depths of 1,000 feet or more; and
(B) $16,700 per inspection for rigs operating in water depths of less than 1,000 feet.
(7)
Billing
The Secretary shall bill designated operators under paragraph (5) within 60 days after the date of
the inspection, with payment required within 30 days of billing. The
Secretary shall bill designated operators under paragraph (6) within 30
days of the end of the month in which the inspection occurred, with
payment required within 30 days after billing.
(8)
Sunset
No fee may be collected under this subsection for any fiscal year after fiscal year 2024.
(9)
Annual reports
(A)
In general
Not later than 60 days after the end of each fiscal year beginning with fiscal year 2015, the
Secretary shall submit to the Committee on Energy and Natural Resources of
the Senate and the Committee on Natural Resources of the House of
Representatives a report on the operation of the Fund during the fiscal
year.
(B)
Contents
Each report shall include, for the fiscal year covered by the report, the following:
(i) A statement of the amounts deposited into the Fund.
(ii) A description of the expenditures made from the Fund for the fiscal year, including the purpose of
the expenditures and the additional hiring of personnel.
(iii) A statement of the balance remaining in the Fund at the end of the fiscal year.
(iv) An accounting of pace of permit approvals.
(v) If fee increases are proposed after the initial 10-year period referred to in paragraph (5), a
proper accounting of the potential adverse economic impacts such fee
increases will have on offshore economic activity and overall production,
conducted by the Secretary.
(vi) Recommendations to increase the efficacy and efficiency of offshore inspections.
(vii) Any corrective actions levied upon offshore inspectors as a result of any form of misconduct.
.
10410.
Prohibition on action based on National Ocean Policy developed under Executive Order No. 13547
(a)
Prohibition
The Bureau of Ocean Energy and the Ocean Energy Safety Service may not develop, propose, finalize,
administer, or implement, any limitation on activities under their
jurisdiction as a result of the coastal and marine spatial planning
component of the National Ocean Policy developed under Executive Order No.
13547.
(b)
Report on expenditures
Not later than 60 days after the date of enactment of this Act, the President shall submit a report
to the Committee on Natural Resources of the House of Representatives and
the Committee on Energy and Natural Resources of the Senate identifying
all Federal expenditures in fiscal years 2011, 2012, 2013, and 2014 by the
Bureau of Ocean Energy and the Ocean Energy Safety Service and their
predecessor agencies, by agency, account, and any pertinent subaccounts,
for the development, administration, or implementation of the coastal and
marine spatial planning component of the National Ocean Policy developed
under Executive Order No. 13547, including staff time, travel, and other
related expenses.
E
United States Territories
10501.
Application of Outer Continental Shelf Lands Act with respect to territories of the United States
Section 2 of the Outer Continental Shelf Lands Act (43 U.S.C. 1331) is amended—
(1) in paragraph (a), by inserting after control the following: or lying within the United States exclusive economic zone and the Continental Shelf adjacent to any
territory of the United States;
(2) in paragraph (p), by striking and after the semicolon at the end;
(3) in paragraph (q), by striking the period at the end and inserting ; and; and
(4) by adding at the end the following:
(r) The term State includes each territory of the United States.
.
F
Miscellaneous Provisions
10601.
Rules regarding distribution of revenues under Gulf of Mexico Energy Security Act of 2006
(a)
In general
Not later than 60 days after the date of enactment of this Act, the Secretary of the Interior shall
issue rules to provide more clarity, certainty, and stability to the
revenue streams contemplated by the Gulf of Mexico Energy Security Act of
2006 (43 U.S.C. 1331 note).
(b)
Contents
The rules shall include clarification of the timing and methods of disbursements of funds under
section 105(b)(2) of such Act.
10602.
Amount of distributed qualified outer Continental Shelf revenues
Section 105(f)(1) of the Gulf of Mexico Energy Security Act of 2006 (title I of division C of Public Law 109–432; 43 U.S.C. 1331 note) shall be applied by substituting 2024, and shall not exceed $999,999,999 for each of fiscal years 2025 through 2055 for 2055.
10603.
South Atlantic Outer Continental Shelf Planning Area defined
For the purposes of this Act, the Outer Continental Shelf Lands Act (43 U.S.C. 1331 et seq.), and any regulations or 5-year plan issued under that Act, the term South Atlantic Outer Continental Shelf Planning Area means the area of the outer Continental Shelf (as defined in section 2 of that Act (43 U.S.C. 1331)) that is located between the northern lateral seaward administrative boundary of the State of
Virginia and the southernmost lateral seaward administrative boundary of
the State of Georgia.
10604.
Enhancing geological and geophysical information for America’s energy future
Section 11 of the Outer Continental Shelf lands Act (43 U.S.C. 1340) is amended by adding at the end the following:
(i)
Enhancing Geological and Geophysical Information for America’s Energy Future
(1) The Secretary, acting through the Director of the Bureau of Ocean Energy Management, shall
facilitate and support the practical study of geology and geophysics to
better understand the oil, gas, and other hydrocarbon potential in the
South Atlantic Outer Continental Shelf Planning Area by entering into
partnerships to conduct geological and geophysical activities on the outer
Continental Shelf.
(2)
(A) No later than 180 days after the date of enactment of the Lowering Gasoline Prices to Fuel an
America That Works Act of 2014, the Governors of the States of Georgia,
South Carolina, North Carolina, and Virginia may each nominate for
participation in the partnerships—
(i) one institution of higher education located within the Governor’s State; and
(ii) one institution of higher education within the Governor’s State that is a historically black
college or university, as defined in section 631(a) of the Higher
Education Act of 1965 (20 U.S.C. 1132(a)).
(B) In making nominations, the Governors shall give preference to those institutions of higher
education that demonstrate a vigorous rate of admission of veterans of the
Armed Forces of the United States.
(3) The Secretary shall only select as a partner a nominee that the Secretary determines demonstrates
excellence in geophysical sciences curriculum, engineering curriculum, or
information technology or other technical studies relating to seismic
research (including data processing).
(4) Notwithstanding subsection (d), nominees selected as partners by the Secretary may conduct
geological and geophysical activities under this section after filing a
notice with the Secretary 30-days prior to commencement of the activity
without any further authorization by the Secretary except those activities
that use solid or liquid explosives shall require a permit. The Secretary
may not charge any fee for the provision of data or other information
collected under this authority, other than the cost of duplicating any
data or information provided. Nominees selected as partners under this
section shall provide to the Secretary any data or other information
collected under this subsection within 60 days after completion of an
initial analysis of the data or other information collected, if so
requested by the Secretary.
(5) Data or other information produced as a result of activities conducted by nominees selected as
partners under this subsection shall not be used or shared for commercial
purposes by the nominee, may not be produced for proprietary use or sale,
and shall be made available by the Secretary to the public.
(6) The Secretary shall submit to the Committee on Natural Resources of the House of Representatives
and the Committee on Energy and Natural Resources of the Senate reports on
the data or other information produced under the partnerships under this
section. Such reports shall be made no less frequently than every 180 days
following the conduct of the first geological and geophysical activities
under this section.
(7) In this subsection the term geological and geophysical activities means any oil- or gas-related investigation conducted on the outer Continental Shelf, including
geophysical surveys where magnetic, gravity, seismic, or other systems are
used to detect or imply the presence of oil or gas.
.
G
Judicial Review
10701.
Time for filing complaint
(a)
In general
Any cause of action that arises from a covered energy decision must be filed not later than the end
of the 60-day period beginning on the date of the covered energy decision.
Any cause of action not filed within this time period shall be barred.
(b)
Exception
Subsection (a) shall not apply to a cause of action brought by a party to a covered energy lease.
10702.
District court deadline
(a)
In general
All proceedings that are subject to section 10701—
(1) shall be brought in the United States district court for the district in which the Federal property
for which a covered energy lease is issued is located or the United States
District Court of the District of Columbia;
(2) shall be resolved as expeditiously as possible, and in any event not more than 180 days after such
cause or claim is filed; and
(3) shall take precedence over all other pending matters before the district court.
(b)
Failure To comply with deadline
If an interlocutory or final judgment, decree, or order has not been issued by the district court
by the deadline described under this section, the cause or claim shall be
dismissed with prejudice and all rights relating to such cause or claim
shall be terminated.
10703.
Ability to seek appellate review
An interlocutory or final judgment, decree, or order of the district court in a proceeding that is
subject to section 10701 may be reviewed by the U.S. Court of Appeals for
the District of Columbia Circuit. The D.C. Circuit shall resolve any such
appeal as expeditiously as possible and, in any event, not more than 180
days after such interlocutory or final judgment, decree, or order of the
district court was issued.
10704.
Limitation on scope of review and relief
(a)
Administrative findings and conclusions
In any judicial review of any Federal action under this subtitle, any administrative findings and
conclusions relating to the challenged Federal action shall be presumed to
be correct unless shown otherwise by clear and convincing evidence
contained in the administrative record.
(b)
Limitation on prospective relief
In any judicial review of any action, or failure to act, under this subtitle, the Court shall not
grant or approve any prospective relief unless the Court finds that such
relief is narrowly drawn, extends no further than necessary to correct the
violation of a Federal law requirement, and is the least intrusive means
necessary to correct the violation concerned.
10705.
Legal fees
Any person filing a petition seeking judicial review of any action, or failure to act, under this
subtitle who is not a prevailing party shall pay to the prevailing parties
(including intervening parties), other than the United States, fees and
other expenses incurred by that party in connection with the judicial
review, unless the Court finds that the position of the person was
substantially justified or that special circumstances make an award
unjust.
10706.
Exclusion
This subtitle shall not apply with respect to disputes between the parties to a lease issued
pursuant to an authorizing leasing statute regarding the obligations of
such lease or the alleged breach thereof.
10707.
Definitions
In this subtitle, the following definitions apply:
(1)
Covered energy decision
The term covered energy decision means any action or decision by a Federal official regarding the issuance of a covered energy
lease.
(2)
Covered energy lease
The term covered energy lease means any lease under this title or under an oil and gas leasing program under this title.
II
Onshore Federal Lands and Energy Security
A
Federal Lands Jobs and Energy Security
21001.
Short title
This subtitle may be cited as the Federal Lands Jobs and Energy Security Act.
21002.
Policies regarding buying, building, and working for America
(a)
Congressional intent
It is the intent of the Congress that—
(1) this subtitle will support a healthy and growing United States domestic energy sector that, in
turn, helps to reinvigorate American manufacturing, transportation, and
service sectors by employing the vast talents of United States workers to
assist in the development of energy from domestic sources;
(2) to ensure a robust onshore energy production industry and ensure that the benefits of development
support local communities, under this subtitle, the Secretary shall make
every effort to promote the development of onshore American energy, and
shall take into consideration the socioeconomic impacts, infrastructure
requirements, and fiscal stability for local communities located within
areas containing onshore energy resources; and
(3) the Congress will monitor the deployment of personnel and material onshore to encourage the
development of American manufacturing to enable United States workers to
benefit from this subtitle through good jobs and careers, as well as the
establishment of important industrial facilities to support expanded
access to American resources.
(b)
Requirement
The Secretary of the Interior shall when possible, and practicable, encourage the use of United
States workers and equipment manufactured in the United States in all
construction related to mineral resource development under this subtitle.
1
Onshore oil and gas permit streamlining
21101.
Short title
This chapter may be cited as the Streamlining Permitting of American Energy Act of 2014.
A
Application for Permits to Drill Process Reform
21111.
Permit to drill application timeline
Section 17(p)(2) of the Mineral Leasing Act (30 U.S.C. 226(p)(2)) is amended to read as follows:
(2)
Applications for permits to drill reform and process
(A)
Timeline
The Secretary shall decide whether to issue a permit to drill within 30 days after receiving an
application for the permit. The Secretary may extend such period for up to
2 periods of 15 days each, if the Secretary has given written notice of
the delay to the applicant. The notice shall be in the form of a letter
from the Secretary or a designee of the Secretary, and shall include the
names and titles of the persons processing the application, the specific
reasons for the delay, and a specific date a final decision on the
application is expected.
(B)
Notice of reasons for denial
If the application is denied, the Secretary shall provide the applicant—
(i) in writing, clear and comprehensive reasons why the application was not accepted and detailed
information concerning any deficiencies; and
(ii) an opportunity to remedy any deficiencies.
(C)
Application deemed approved
If the Secretary has not made a decision on the application by the end of the 60-day period
beginning on the date the application is received by the Secretary, the
application is deemed approved, except in cases in which existing reviews
under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) or Endangered Species Act of 1973 (16 U.S.C. 1531 et seq.) are incomplete.
(D)
Denial of permit
If the Secretary decides not to issue a permit to drill in accordance with subparagraph (A), the
Secretary shall—
(i) provide to the applicant a description of the reasons for the denial of the permit;
(ii) allow the applicant to resubmit an application for a permit to drill during the 10-day period
beginning on the date the applicant receives the description of the denial
from the Secretary; and
(iii) issue or deny any resubmitted application not later than 10 days after the date the application is
submitted to the Secretary.
(E)
Fee
(i)
In general
Notwithstanding any other law, the Secretary shall collect a single $6,500 permit processing fee
per application from each applicant at the time the final decision is made
whether to issue a permit under subparagraph (A). This fee shall not apply
to any resubmitted application.
(ii)
Treatment of permit processing fee
Of all fees collected under this paragraph, 50 percent shall be transferred to the field office
where they are collected and used to process protests, leases, and permits
under this Act subject to appropriation.
.
B
Administrative Protest Documentation Reform
21121.
Administrative protest documentation reform
Section 17(p) of the Mineral Leasing Act (30 U.S.C. 226(p)) is further amended by adding at the end the following:
(4)
Protest fee
(A)
In general
The Secretary shall collect a $5,000 documentation fee to accompany each protest for a lease, right
of way, or application for permit to drill.
(B)
Treatment of fees
Of all fees collected under this paragraph, 50 percent shall remain in the field office where they
are collected and used to process protests subject to appropriation.
.
C
Permit Streamlining
21131.
Making pilot offices permanent to improve energy permitting on Federal lands
(a)
Establishment
The Secretary of the Interior (referred to in this section as the Secretary) shall establish a Federal Permit Streamlining Project (referred to in this section as the Project) in every Bureau of Land Management field office with responsibility for permitting energy
projects on Federal land.
(b)
Memorandum of understanding
(1)
In general
Not later than 90 days after the date of enactment of this Act, the Secretary shall enter into a
memorandum of understanding for purposes of this section with—
(A) the Secretary of Agriculture;
(B) the Administrator of the Environmental Protection Agency; and
(C) the Chief of the Army Corps of Engineers.
(2)
State participation
The Secretary may request that the Governor of any State with energy projects on Federal lands to
be a signatory to the memorandum of understanding.
(c)
Designation of qualified staff
(1)
In general
Not later than 30 days after the date of the signing of the memorandum of understanding under
subsection (b), all Federal signatory parties shall, if appropriate,
assign to each of the Bureau of Land Management field offices an employee
who has expertise in the regulatory issues relating to the office in which
the employee is employed, including, as applicable, particular expertise
in—
(A) the consultations and the preparation of biological opinions under section 7 of the Endangered
Species Act of 1973 (16 U.S.C. 1536);
(B) permits under section 404 of Federal Water Pollution Control Act (33 U.S.C. 1344);
(C) regulatory matters under the Clean Air Act (42 U.S.C. 7401 et seq.);
(D) planning under the National Forest Management Act of 1976 (16 U.S.C. 472a et seq.); and
(E) the preparation of analyses under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.).
(2)
Duties
Each employee assigned under paragraph (1) shall—
(A) not later than 90 days after the date of assignment, report to the Bureau of Land Management Field
Managers in the office to which the employee is assigned;
(B) be responsible for all issues relating to the energy projects that arise under the authorities of
the employee’s home agency; and
(C) participate as part of the team of personnel working on proposed energy projects, planning, and
environmental analyses on Federal lands.
(d)
Additional personnel
The Secretary shall assign to each Bureau of Land Management field office identified in subsection
(a) any additional personnel that are necessary to ensure the effective
approval and implementation of energy projects administered by the Bureau
of Land Management field offices, including inspection and enforcement
relating to energy development on Federal land, in accordance with the
multiple use mandate of the Federal Land Policy and Management Act of 1976
(43 U.S.C. 1701 et seq.).
(e)
Funding
Funding for the additional personnel shall come from the Department of the Interior reforms
identified in sections 21111 and 21121.
(f)
Savings provision
Nothing in this section affects—
(1) the operation of any Federal or State law; or
(2) any delegation of authority made by the head of a Federal agency whose employees are participating
in the Project.
(g)
Definition
For purposes of this section the term energy projects includes oil, natural gas, and other energy projects as defined by the Secretary.
21132.
Administration of current law
Notwithstanding any other law, the Secretary of the Interior shall not require a finding of
extraordinary circumstances in administering section 390 of the Energy
Policy Act of 2005 (42 U.S.C. 15942).
D
Judicial Review
21141.
Definitions
In this subchapter—
(1) the term covered civil action means a civil action containing a claim under section 702 of title 5, United States Code, regarding agency action (as defined for the purposes of that
section) affecting a covered energy project on Federal lands of the United
States; and
(2) the term covered energy project means the leasing of Federal lands of the United States for the exploration, development,
production, processing, or transmission of oil, natural gas, or any other
source of energy, and any action under such a lease, except that the term
does not include any disputes between the parties to a lease regarding the
obligations under such lease, including regarding any alleged breach of
the lease.
21142.
Exclusive venue for certain civil actions relating to covered energy projects
Venue for any covered civil action shall lie in the district court where the project or leases
exist or are proposed.
21143.
Timely filing
To ensure timely redress by the courts, a covered civil action must be filed no later than the end
of the 90-day period beginning on the date of the final Federal agency
action to which it relates.
21144.
Expedition in hearing and determining the action
The court shall endeavor to hear and determine any covered civil action as expeditiously as
possible.
21145.
Standard of review
In any judicial review of a covered civil action, administrative findings and conclusions relating
to the challenged Federal action or decision shall be presumed to be
correct, and the presumption may be rebutted only by the preponderance of
the evidence contained in the administrative record.
21146.
Limitation on injunction and prospective relief
In a covered civil action, the court shall not grant or approve any prospective relief unless the
court finds that such relief is narrowly drawn, extends no further than
necessary to correct the violation of a legal requirement, and is the
least intrusive means necessary to correct that violation. In addition,
courts shall limit the duration of preliminary injunctions to halt covered
energy projects to no more than 60 days, unless the court finds clear
reasons to extend the injunction. In such cases of extensions, such
extensions shall only be in 30-day increments and shall require action by
the court to renew the injunction.
21147.
Limitation on attorneys’ fees
Sections 504 of title 5, United States Code, and 2412 of title 28, United States Code, (together
commonly called the Equal Access to Justice Act) do not apply to a covered
civil action, nor shall any party in such a covered civil action receive
payment from the Federal Government for their attorneys’ fees, expenses,
and other court costs.
21148.
Legal standing
Challengers filing appeals with the Department of the Interior Board of Land Appeals shall meet the
same standing requirements as challengers before a United States district
court.
E
Knowing America’s Oil and Gas Resources
21151.
Funding oil and gas resource assessments
(a)
In general
The Secretary of the Interior shall provide matching funding for joint projects with States to
conduct oil and gas resource assessments on Federal lands with significant
oil and gas potential.
(b)
Cost sharing
The Federal share of the cost of activities under this section shall not exceed 50 percent.
(c)
Resource assessment
Any resource assessment under this section shall be conducted by a State, in consultation with the
United States Geological Survey.
(d)
Authorization of appropriations
There is authorized to be appropriated to the Secretary to carry out this section a total of
$50,000,000 for fiscal years 2015 through 2018.
2
Oil and gas leasing certainty
21201.
Short title
This chapter may be cited as the Providing Leasing Certainty for American Energy Act of 2014.
21202.
Minimum acreage requirement for onshore lease sales
In conducting lease sales as required by section 17(a) of the Mineral Leasing Act (30 U.S.C. 226(a)), each year the Secretary of the Interior shall perform the following:
(1) The Secretary shall offer for sale no less than 25 percent of the annual nominated acreage not
previously made available for lease. Acreage offered for lease pursuant to
this paragraph shall not be subject to protest and shall be eligible for
categorical exclusions under section 390 of the Energy Policy Act of 2005
(42 U.S.C. 15942), except that it shall not be subject to the test of extraordinary circumstances.
(2) In administering this section, the Secretary shall only consider leasing of Federal lands that are
available for leasing at the time the lease sale occurs.
21203.
Leasing certainty
Section 17(a) of the Mineral Leasing Act (30 U.S.C. 226(a)) is amended by inserting (1) before All lands, and by adding at the end the following:
(2)
(A) The Secretary shall not withdraw any covered energy project issued under this Act without finding a
violation of the terms of the lease by the lessee.
(B) The Secretary shall not infringe upon lease rights under leases issued under this Act by
indefinitely delaying issuance of project approvals, drilling and seismic
permits, and rights of way for activities under such a lease.
(C) No later than 18 months after an area is designated as open under the current land use plan the
Secretary shall make available nominated areas for lease under the
criteria in section 2.
(D) Notwithstanding any other law, the Secretary shall issue all leases sold no later than 60 days
after the last payment is made.
(E) The Secretary shall not cancel or withdraw any lease parcel after a competitive lease sale has
occurred and a winning bidder has submitted the last payment for the
parcel.
(F) After the conclusion of the public comment period for a planned competitive lease sale, the
Secretary shall not cancel, defer, or withdraw any lease parcel announced
to be auctioned in the lease sale.
(G) Not later than 60 days after a lease sale held under this Act, the Secretary shall adjudicate any
lease protests filed following a lease sale. If after 60 days any protest
is left unsettled, said protest is automatically denied and appeal rights
of the protestor begin.
(H) No additional lease stipulations may be added after the parcel is sold without consultation and
agreement of the lessee, unless the Secretary deems such stipulations as
emergency actions to conserve the resources of the United States.
.
21204.
Leasing consistency
Federal land managers must follow existing resource management plans and continue to actively lease
in areas designated as open when resource management plans are being
amended or revised, until such time as a new record of decision is signed.
21205.
Reduce redundant policies
Bureau of Land Management Instruction Memorandum 2010–117 shall have no force or effect.
21206.
Streamlined congressional notification
Section 31(e) of the Mineral Leasing Act (30 U.S.C. 188(e)) is amended in the matter following paragraph (4) by striking at least thirty days in advance of the reinstatement and inserting in an annual report.
3
Oil shale
21301.
Short title
This chapter may be cited as the Protecting Investment in Oil Shale the Next Generation of Environmental, Energy, and Resource
Security Act or the PIONEERS Act.
21302.
Effectiveness of oil shale regulations, amendments to resource management plans, and record of
decision
(a)
Regulations
Notwithstanding any other law or regulation to the contrary, the final regulations regarding oil
shale management published by the Bureau of Land Management on November
18, 2008 (73 Fed. Reg. 69,414) are deemed to satisfy all legal and
procedural requirements under any law, including the Federal Land Policy
and Management Act of 1976 (43 U.S.C. 1701 et seq.), the Endangered Species Act of 1973 (16 U.S.C. 1531 et seq.), and the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.), and the Secretary of the Interior shall implement those regulations, including the oil shale
leasing program authorized by the regulations, without any other
administrative action necessary.
(b)
Amendments to resource management plans and record of decision
Notwithstanding any other law or regulation to the contrary, the November 17, 2008 U.S. Bureau of
Land Management Approved Resource Management Plan Amendments/Record of
Decision for Oil Shale and Tar Sands Resources to Address Land Use
Allocations in Colorado, Utah, and Wyoming and Final Programmatic
Environmental Impact Statement are deemed to satisfy all legal and
procedural requirements under any law, including the Federal Land Policy
and Management Act of 1976 (43 U.S.C. 1701 et seq.), the Endangered Species Act of 1973 (16 U.S.C. 1531 et seq.), and the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.), and the Secretary of the Interior shall implement the oil shale leasing program authorized by
the regulations referred to in subsection (a) in those areas covered by
the resource management plans amended by such amendments, and covered by
such record of decision, without any other administrative action
necessary.
21303.
Oil shale leasing
(a)
Additional research and development lease sales
The Secretary of the Interior shall hold a lease sale within 180 days after the date of enactment
of this Act offering an additional 10 parcels for lease for research,
development, and demonstration of oil shale resources, under the terms
offered in the solicitation of bids for such leases published on January
15, 2009 (74 Fed. Reg. 10).
(b)
Commercial lease sales
No later than January 1, 2016, the Secretary of the Interior shall hold no less than 5 separate
commercial lease sales in areas considered to have the most potential for
oil shale development, as determined by the Secretary, in areas nominated
through public comment. Each lease sale shall be for an area of not less
than 25,000 acres, and in multiple lease blocs.
4
Miscellaneous provisions
21401.
Rule of construction
Nothing in this subtitle shall be construed to authorize the issuance of a lease under the Mineral
Leasing Act (30 U.S.C. 181 et seq.) to any person designated for the imposition of sanctions pursuant to—
(1) the Iran Sanctions Act of 1996 (50 U.S.C. 1701 note), the Comprehensive Iran Sanctions, Accountability and Divestiture Act of 2010 (22 U.S.C. 8501 et seq.), the Iran Threat Reduction and Syria Human Rights Act of 2012 (22 U.S.C. 8701 et seq.), section 1245 of the National Defense Authorization Act for Fiscal Year 2012 (22 U.S.C. 8513a), or the Iran Freedom and Counter-Proliferation Act of 2012 (22 U.S.C. 8801 et seq.);
(2) Executive Order No. 13622 (July 30, 2012), Executive Order No. 13628 (October 9, 2012), or
Executive Order No. 13645 (June 3, 2013);
(3) Executive Order No. 13224 (September 23, 2001) or Executive Order No. 13338 (May 11, 2004); or
(4) the Syria Accountability and Lebanese Sovereignty Restoration Act of 2003 (22 U.S.C. 2151 note).
B
Planning for American Energy
22001.
Short title
This subtitle may be cited as the Planning for American Energy Act of 2014.
22002.
Onshore domestic energy production strategic plan
(a)
In general
The Mineral Leasing Act (30 U.S.C. 181 et seq.) is amended by redesignating section 44 as section 45, and by inserting after section 43 the
following:
44.
Quadrennial Strategic Federal Onshore Energy Production Strategy
(a)
In general
(1) The Secretary of the Interior (hereafter in this section referred to as Secretary), in consultation with the Secretary of Agriculture with regard to lands administered by the
Forest Service, shall develop and publish every 4 years a Quadrennial
Federal Onshore Energy Production Strategy. This Strategy shall direct
Federal land energy development and department resource allocation in
order to promote the energy and national security of the United States in
accordance with Bureau of Land Management’s mission of promoting the
multiple use of Federal lands as set forth in the Federal Land Policy and
Management Act of 1976 (43 U.S.C. 1701 et seq.).
(2) In developing this Strategy, the Secretary shall consult with the Administrator of the Energy
Information Administration on the projected energy demands of the United
States for the next 30-year period, and how energy derived from Federal
onshore lands can put the United States on a trajectory to meet that
demand during the next 4-year period. The Secretary shall consider how
Federal lands will contribute to ensuring national energy security, with a
goal for increasing energy independence and production, during the next
4-year period.
(3) The Secretary shall determine a domestic strategic production objective for the development of
energy resources from Federal onshore lands. Such objective shall be—
(A) the best estimate, based upon commercial and scientific data, of the expected increase in domestic
production of oil and natural gas from the Federal onshore mineral estate,
with a focus on lands held by the Bureau of Land Management and the Forest
Service;
(B) the best estimate, based upon commercial and scientific data, of the expected increase in domestic
coal production from Federal lands;
(C) the best estimate, based upon commercial and scientific data, of the expected increase in domestic
production of strategic and critical energy minerals from the Federal
onshore mineral estate;
(D) the best estimate, based upon commercial and scientific data, of the expected increase in megawatts
for electricity production from each of the following sources: wind,
solar, biomass, hydropower, and geothermal energy produced on Federal
lands administered by the Bureau of Land Management and the Forest
Service;
(E) the best estimate, based upon commercial and scientific data, of the expected increase in
unconventional energy production, such as oil shale;
(F) the best estimate, based upon commercial and scientific data, of the expected increase in domestic
production of oil, natural gas, coal, and other renewable sources from
tribal lands for any federally recognized Indian tribe that elects to
participate in facilitating energy production on its lands;
(G) the best estimate, based upon commercial and scientific data, of the expected increase in
production of helium on Federal lands administered by the Bureau of Land
Management and the Forest Service; and
(H) the best estimate, based upon commercial and scientific data, of the expected increase in domestic
production of geothermal, solar, wind, or other renewable energy sources
from available lands (as such term is defined in section 203 of the Hawaiian Homes Commission Act, 1920 (42 Stat. 108
et seq.), and including any other lands deemed by the Territory or State
of Hawaii, as the case may be, to be included within that definition) that
the agency or department of the government of the State of Hawaii that is
responsible for the administration of such lands selects to be used for
such energy production.
(4) The Secretary shall consult with the Administrator of the Energy Information Administration
regarding the methodology used to arrive at its estimates for purposes of
this section.
(5) The Secretary has the authority to expand the energy development plan to include other energy
production technology sources or advancements in energy on Federal lands.
(6) The Secretary shall include in the Strategy a plan for addressing new demands for transmission
lines and pipelines for distribution of oil and gas across Federal lands
to ensure that energy produced can be distributed to areas of need.
(b)
Tribal objectives
It is the sense of Congress that federally recognized Indian tribes may elect to set their own
production objectives as part of the Strategy under this section. The
Secretary shall work in cooperation with any federally recognized Indian
tribe that elects to participate in achieving its own strategic energy
objectives designated under this subsection.
(c)
Execution of the Strategy
The relevant Secretary shall have all necessary authority to make determinations regarding which
additional lands will be made available in order to meet the production
objectives established by strategies under this section. The Secretary
shall also take all necessary actions to achieve these production
objectives unless the President determines that it is not in the national
security and economic interests of the United States to increase Federal
domestic energy production and to further decrease dependence upon foreign
sources of energy. In administering this section, the relevant Secretary
shall only consider leasing Federal lands available for leasing at the
time the lease sale occurs.
(d)
State, federally recognized Indian tribes, local government, and public input
In developing each strategy, the Secretary shall solicit the input of affected States, federally
recognized Indian tribes, local governments, and the public.
(e)
Reporting
The Secretary shall report annually to the Committee on Natural Resources of the House of
Representatives and the Committee on Energy and Natural Resources of the
Senate on the progress of meeting the production goals set forth in the
strategy. The Secretary shall identify in the report projections for
production and capacity installations and any problems with leasing,
permitting, siting, or production that will prevent meeting the goal. In
addition, the Secretary shall make suggestions to help meet any shortfalls
in meeting the production goals.
(f)
Programmatic environmental impact statement
Not later than 12 months after the date of enactment of this section, in accordance with section
102(2)(C) of the National Environmental Policy Act of 1969 (42 U.S.C. 4332(2)(C)), the Secretary shall complete a programmatic environmental impact statement. This programmatic
environmental impact statement will be deemed sufficient to comply with
all requirements under that Act for all necessary resource management and
land use plans associated with the implementation of the strategy.
(g)
Congressional review
At least 60 days prior to publishing a proposed strategy under this section, the Secretary shall
submit it to the President and the Congress, together with any comments
received from States, federally recognized Indian tribes, and local
governments. Such submission shall indicate why any specific
recommendation of a State, federally recognized Indian tribe, or local
government was not accepted.
(h)
Strategic and critical energy minerals defined
For purposes of this section, the term strategic and critical energy minerals means those that are necessary for the Nation’s energy infrastructure including pipelines,
refining capacity, electrical power generation and transmission, and
renewable energy production and those that are necessary to support
domestic manufacturing, including but not limited to, materials used in
energy generation, production, and transportation.
.
(b)
First Quadrennial Strategy
Not later than 18 months after the date of enactment of this Act, the Secretary of the Interior
shall submit to Congress the first Quadrennial Federal Onshore Energy
Production Strategy under the amendment made by subsection (a).
C
National Petroleum Reserve in Alaska access
23001.
Short title
This subtitle may be cited as the National Petroleum Reserve Alaska Access Act.
23002.
Sense of Congress and reaffirming national policy for the National Petroleum Reserve in Alaska
It is the sense of Congress that—
(1) the National Petroleum Reserve in Alaska remains explicitly designated, both in name and legal
status, for purposes of providing oil and natural gas resources to the
United States; and
(2) accordingly, the national policy is to actively advance oil and gas development within the Reserve
by facilitating the expeditious exploration, production, and
transportation of oil and natural gas from and through the Reserve.
23003.
National Petroleum Reserve in Alaska: lease sales
Section 107(a) of the Naval Petroleum Reserves Production Act of 1976 (42 U.S.C. 6506a(a)) is amended to read as follows:
(a)
In General
The Secretary shall conduct an expeditious program of competitive leasing of oil and gas in the
reserve in accordance with this Act. Such program shall include at least
one lease sale annually in those areas of the reserve most likely to
produce commercial quantities of oil and natural gas each year in the
period 2014 through 2024.
.
23004.
National Petroleum Reserve in Alaska: planning and permitting pipeline and road construction
(a)
In general
Notwithstanding any other provision of law, the Secretary of the Interior, in consultation with
other appropriate Federal agencies, shall facilitate and ensure permits,
in a timely and environmentally responsible manner, for all surface
development activities, including for the construction of pipelines and
roads, necessary to—
(1) develop and bring into production any areas within the National Petroleum Reserve in Alaska that
are subject to oil and gas leases; and
(2) transport oil and gas from and through the National Petroleum Reserve in Alaska in the most direct
manner possible to existing transportation or processing infrastructure on
the North Slope of Alaska.
(b)
Timeline
The Secretary shall ensure that any Federal permitting agency shall issue permits in accordance
with the following timeline:
(1) Permits for such construction for transportation of oil and natural gas produced under existing
Federal oil and gas leases with respect to which the Secretary has issued
a permit to drill shall be approved within 60 days after the date of
enactment of this Act.
(2) Permits for such construction for transportation of oil and natural gas produced under Federal oil
and gas leases shall be approved within 6 months after the submission to
the Secretary of a request for a permit to drill.
(c)
Plan
To ensure timely future development of the Reserve, within 270 days after the date of the enactment
of this Act, the Secretary of the Interior shall submit to Congress a plan
for approved rights-of-way for a plan for pipeline, road, and any other
surface infrastructure that may be necessary infrastructure that will
ensure that all leasable tracts in the Reserve are within 25 miles of an
approved road and pipeline right-of-way that can serve future development
of the Reserve.
23005.
Issuance of a new integrated activity plan and environmental impact statement
(a)
Issuance of new integrated activity plan
The Secretary of the Interior shall, within 180 days after the date of enactment of this Act,
issue—
(1) a new proposed integrated activity plan from among the non-adopted alternatives in the National
Petroleum Reserve Alaska Integrated Activity Plan Record of Decision
issued by the Secretary of the Interior and dated February 21, 2013; and
(2) an environmental impact statement under section 102(2)(C) of the National Environmental Policy Act
of 1969 (42 U.S.C. 4332(2)(C)) for issuance of oil and gas leases in the National Petroleum Reserve-Alaska to promote efficient
and maximum development of oil and natural gas resources of such reserve.
(b)
Nullification of existing record of decision, IAP, and EIS
Except as provided in subsection (a), the National Petroleum Reserve-Alaska Integrated Activity
Plan Record of Decision issued by the Secretary of the Interior and dated
February 21, 2013, including the integrated activity plan and
environmental impact statement referred to in that record of decision,
shall have no force or effect.
23006.
Departmental accountability for development
The Secretary of the Interior shall issue regulations not later than 180 days after the date of
enactment of this Act that establish clear requirements to ensure that the
Department of the Interior is supporting development of oil and gas leases
in the National Petroleum Reserve-Alaska.
23007.
Deadlines under new proposed integrated activity plan
At a minimum, the new proposed integrated activity plan issued under section 23005(a)(1) shall—
(1) require the Department of the Interior to respond within 5 business days to a person who submits an
application for a permit for development of oil and natural gas leases in
the National Petroleum Reserve-Alaska acknowledging receipt of such
application; and
(2) establish a timeline for the processing of each such application, that—
(A) specifies deadlines for decisions and actions on permit applications; and
(B) provide that the period for issuing each permit after submission of such an application shall not
exceed 60 days without the concurrence of the applicant.
23008.
Updated resource assessment
(a)
In general
The Secretary of the Interior shall complete a comprehensive assessment of all technically
recoverable fossil fuel resources within the National Petroleum Reserve in
Alaska, including all conventional and unconventional oil and natural gas.
(b)
Cooperation and consultation
The resource assessment required by subsection (a) shall be carried out by the United States
Geological Survey in cooperation and consultation with the State of Alaska
and the American Association of Petroleum Geologists.
(c)
Timing
The resource assessment required by subsection (a) shall be completed within 24 months of the date
of the enactment of this Act.
(d)
Funding
The United States Geological Survey may, in carrying out the duties under this section,
cooperatively use resources and funds provided by the State of Alaska.
D
BLM Live Internet Auctions
24001.
Short title
This subtitle may be cited as the BLM Live Internet Auctions Act.
24002.
Internet-based onshore oil and gas lease sales
(a)
Authorization
Section 17(b)(1) of the Mineral Leasing Act (30 U.S.C. 226(b)(1)) is amended—
(1) in subparagraph (A), in the third sentence, by inserting , except as provided in subparagraph (C) after by oral bidding; and
(2) by adding at the end the following:
(C) In order to diversify and expand the Nation’s onshore leasing program to ensure the best return to
the Federal taxpayer, reduce fraud, and secure the leasing process, the
Secretary may conduct onshore lease sales through Internet-based bidding
methods. Each individual Internet-based lease sale shall conclude within 7
days.
.
(b)
Report
Not later than 90 days after the tenth Internet-based lease sale conducted under the amendment made
by subsection (a), the Secretary of the Interior shall analyze the first
10 such lease sales and report to Congress the findings of the analysis.
The report shall include—
(1) estimates on increases or decreases in such lease sales, compared to sales conducted by oral
bidding, in—
(A) the number of bidders;
(B) the average amount of bid;
(C) the highest amount bid; and
(D) the lowest bid;
(2) an estimate on the total cost or savings to the Department of the Interior as a result of such
sales, compared to sales conducted by oral bidding; and
(3) an evaluation of the demonstrated or expected effectiveness of different structures for lease sales
which may provide an opportunity to better maximize bidder participation,
ensure the highest return to the Federal taxpayers, minimize opportunities
for fraud or collusion, and ensure the security and integrity of the
leasing process.
E
Native American Energy
25001.
Short title
This subtitle may be cited as the Native American Energy Act.
25002.
Appraisals
(a)
Amendment
Title XXVI of the Energy Policy Act of 1992 (25 U.S.C. 3501 et seq.) is amended by adding at the end the following:
2607.
Appraisal reforms
(a)
Options to Indian Tribes
With respect to a transaction involving Indian land or the trust assets of an Indian tribe that
requires the approval of the Secretary, any appraisal relating to fair
market value required to be conducted under applicable law, regulation, or
policy may be completed by—
(1) the Secretary;
(2) the affected Indian tribe; or
(3) a certified, third-party appraiser pursuant to a contract with the Indian tribe.
(b)
Time Limit on Secretarial Review and Action
Not later than 30 days after the date on which the Secretary receives an appraisal conducted by or
for an Indian tribe pursuant to paragraphs (2) or (3) of subsection (a),
the Secretary shall—
(1) review the appraisal; and
(2) provide to the Indian tribe a written notice of approval or disapproval of the appraisal.
(c)
Failure of Secretary To Approve or Disapprove
If, after 60 days, the Secretary has failed to approve or disapprove any appraisal received, the
appraisal shall be deemed approved.
(d)
Option to Indian Tribes To Waive Appraisal
(1) An Indian tribe wishing to waive the requirements of subsection (a), may do so after it has
satisfied the requirements of subsections (2) and (3) below.
(2) An Indian tribe wishing to forego the necessity of a waiver pursuant to this section must provide
to the Secretary a written resolution, statement, or other unambiguous
indication of tribal intent, duly approved by the governing body of the
Indian tribe.
(3) The unambiguous indication of intent provided by the Indian tribe to the Secretary under paragraph
(2) must include an express waiver by the Indian tribe of any claims for
damages it might have against the United States as a result of the lack of
an appraisal undertaken.
(e)
Definition
For purposes of this subsection, the term appraisal includes appraisals and other estimates of value.
(f)
Regulations
The Secretary shall develop regulations for implementing this section, including standards the
Secretary shall use for approving or disapproving an appraisal.
.
(b)
Conforming amendment
The table of contents of the Energy Policy Act of 1992 (42 U.S.C. 13201 note) is amended by adding at the end of the items relating to title XXVI the following:
Sec. 2607. Appraisal reforms.
.
25003.
Standardization
As soon as practicable after the date of the enactment of this Act, the Secretary of the Interior
shall implement procedures to ensure that each agency within the
Department of the Interior that is involved in the review, approval, and
oversight of oil and gas activities on Indian lands shall use a uniform
system of reference numbers and tracking systems for oil and gas wells.
25004.
Environmental reviews of major Federal actions on Indian lands
Section 102 of the National Environmental Policy Act of 1969 (42 U.S.C. 4332) is amended by inserting (a) In general.— before the first sentence, and by adding at the end the following:
(b)
Review of major Federal actions on Indian lands
(1)
In general
For any major Federal action on Indian lands of an Indian tribe requiring the preparation of a
statement under subsection (a)(2)(C), the statement shall only be
available for review and comment by the members of the Indian tribe and by
any other individual residing within the affected area.
(2)
Regulations
The Chairman of the Council on Environmental Quality shall develop regulations to implement this
section, including descriptions of affected areas for specific major
Federal actions, in consultation with Indian tribes.
(3)
Definitions
In this subsection, each of the terms Indian land and Indian tribe has the meaning given that term in section 2601 of the Energy Policy Act of 1992 (25 U.S.C. 3501).
(4)
Clarification of authority
Nothing in the Native American Energy Act, except section 25006 of that Act, shall give the
Secretary any additional authority over energy projects on Alaska Native
Claims Settlement Act lands.
.
25005.
Judicial review
(a)
Time for filing complaint
Any energy related action must be filed not later than the end of the 60-day period beginning on
the date of the final agency action. Any energy related action not filed
within this time period shall be barred.
(b)
District court venue and deadline
All energy related actions—
(1) shall be brought in the United States District Court for the District of Columbia; and
(2) shall be resolved as expeditiously as possible, and in any event not more than 180 days after such
cause of action is filed.
(c)
Appellate review
An interlocutory order or final judgment, decree or order of the district court in an energy
related action may be reviewed by the U.S. Court of Appeals for the
District of Columbia Circuit. The D.C. Circuit Court of Appeals shall
resolve such appeal as expeditiously as possible, and in any event not
more than 180 days after such interlocutory order or final judgment,
decree or order of the district court was issued.
(d)
Limitation on certain payments
Notwithstanding section 1304 of title 31, United States Code, no award may be made under section 504 of title 5, United States Code, or under section 2412 of title 28, United States Code, and no amounts may be obligated or expended from the Claims and
Judgment Fund of the United States Treasury to pay any fees or other
expenses under such sections, to any person or party in an energy related
action.
(e)
Legal fees
In any energy related action in which the plaintiff does not ultimately prevail, the court shall
award to the defendant (including any intervenor-defendants), other than
the United States, fees and other expenses incurred by that party in
connection with the energy related action, unless the court finds that the
position of the plaintiff was substantially justified or that special
circumstances make an award unjust. Whether or not the position of the
plaintiff was substantially justified shall be determined on the basis of
the administrative record, as a whole, which is made in the energy related
action for which fees and other expenses are sought.
(f)
Definitions
For the purposes of this section, the following definitions apply:
(1)
Agency action
The term agency action has the same meaning given such term in section 551 of title 5, United States Code.
(2)
Indian land
The term Indian Land has the same meaning given such term in section 203(c)(3) of the Energy Policy Act of 2005 (Public Law 109–58; 25 U.S.C. 3501), including lands owned by Native Corporations under the Alaska Native Claims Settlement Act (Public Law 92–203; 43 U.S.C. 1601).
(3)
Energy related action
The term energy related action means a cause of action that—
(A) is filed on or after the effective date of this Act; and
(B) seeks judicial review of a final agency action to issue a permit, license, or other form of agency
permission allowing:
(i) any person or entity to conduct activities on Indian Land, which activities involve the
exploration, development, production or transportation of oil, gas, coal,
shale gas, oil shale, geothermal resources, wind or solar resources,
underground coal gasification, biomass, or the generation of electricity;
or
(ii) any Indian Tribe, or any organization of two or more entities, at least one of which is an Indian
tribe, to conduct activities involving the exploration, development,
production or transportation of oil, gas, coal, shale gas, oil shale,
geothermal resources, wind or solar resources, underground coal
gasification, biomass, or the generation of electricity, regardless of
where such activities are undertaken.
(4)
Ultimately prevail
The phrase ultimately prevail means, in a final enforceable judgment, the court rules in the party’s favor on at least one cause
of action which is an underlying rationale for the preliminary injunction,
administrative stay, or other relief requested by the party, and does not
include circumstances where the final agency action is modified or amended
by the issuing agency unless such modification or amendment is required
pursuant to a final enforceable judgment of the court or a court-ordered
consent decree.
25006.
Tribal biomass demonstration project
The Tribal Forest Protection Act of 2004 is amended by inserting after section 2 (25 U.S.C. 3115a) the following:
3.
Tribal biomass demonstration project
(a)
In general
For each of fiscal years 2014 through 2018, the Secretary shall enter into stewardship contracts or
other agreements, other than agreements that are exclusively direct
service contracts, with Indian tribes to carry out demonstration projects
to promote biomass energy production (including biofuel, heat, and
electricity generation) on Indian forest land and in nearby communities by
providing reliable supplies of woody biomass from Federal land.
(b)
Definitions
The definitions in section 2 shall apply to this section.
(c)
Demonstration projects
In each fiscal year for which projects are authorized, the Secretary shall enter into contracts or
other agreements described in subsection (a) to carry out at least 4 new
demonstration projects that meet the eligibility criteria described in
subsection (d).
(d)
Eligibility criteria
To be eligible to enter into a contract or other agreement under this subsection, an Indian tribe
shall submit to the Secretary an application—
(1) containing such information as the Secretary may require; and
(2) that includes a description of—
(A) the Indian forest land or rangeland under the jurisdiction of the Indian tribe; and
(B) the demonstration project proposed to be carried out by the Indian tribe.
(e)
Selection
In evaluating the applications submitted under subsection (c), the Secretary—
(1) shall take into consideration the factors set forth in paragraphs (1) and (2) of section 2(e) of Public Law 108–278; and whether a proposed demonstration project would—
(A) increase the availability or reliability of local or regional energy;
(B) enhance the economic development of the Indian tribe;
(C) improve the connection of electric power transmission facilities serving the Indian tribe with
other electric transmission facilities;
(D) improve the forest health or watersheds of Federal land or Indian forest land or rangeland; or
(E) otherwise promote the use of woody biomass; and
(2) shall exclude from consideration any merchantable logs that have been identified by the Secretary
for commercial sale.
(f)
Implementation
The Secretary shall—
(1) ensure that the criteria described in subsection (c) are publicly available by not later than 120
days after the date of enactment of this section; and
(2) to the maximum extent practicable, consult with Indian tribes and appropriate intertribal
organizations likely to be affected in developing the application and
otherwise carrying out this section.
(g)
Report
Not later than September 20, 2015, the Secretary shall submit to Congress a report that describes,
with respect to the reporting period—
(1) each individual tribal application received under this section; and
(2) each contract and agreement entered into pursuant to this section.
(h)
Incorporation of management plans
In carrying out a contract or agreement under this section, on receipt of a request from an Indian
tribe, the Secretary shall incorporate into the contract or agreement, to
the extent practicable, management plans (including forest management and
integrated resource management plans) in effect on the Indian forest land
or rangeland of the respective Indian tribe.
(i)
Term
A stewardship contract or other agreement entered into under this section—
(1) shall be for a term of not more than 20 years; and
(2) may be renewed in accordance with this section for not more than an additional 10 years.
.
25007.
Tribal resource management plans
Unless otherwise explicitly exempted by Federal law enacted after the date of the enactment of this
Act, any activity conducted or resources harvested or produced pursuant to
a tribal resource management plan or an integrated resource management
plan approved by the Secretary of the Interior under the National Indian
Forest Resources Management Act (25 U.S.C. 3101 et seq.) or the American Indian Agricultural Resource Management Act (25 U.S.C. 3701 et seq.), shall be considered a sustainable management practice for purposes of any Federal standard,
benefit, or requirement that requires a demonstration of such
sustainability.
25008.
Leases of restricted lands for the Navajo Nation
Subsection (e)(1) of the first section of the Act of August 9, 1955 (25 U.S.C. 415(e)(1); commonly referred to as the Long-Term Leasing Act), is amended—
(1) by striking , except a lease for and inserting , including leases for;
(2) in subparagraph (A), by striking 25 the first place it appears and all that follows and inserting 99 years;;
(3) in subparagraph (B), by striking the period and inserting ; and; and
(4) by adding at the end the following:
(C) in the case of a lease for the exploration, development, or extraction of mineral resources,
including geothermal resources, 25 years, except that any such lease may
include an option to renew for one additional term not to exceed 25 years.
.
25009.
Nonapplicability of certain rules
No rule promulgated by the Department of the Interior regarding hydraulic fracturing used in the
development or production of oil or gas resources shall have any effect on
any land held in trust or restricted status for the benefit of Indians
except with the express consent of the beneficiary on whose behalf such
land is held in trust or restricted status.
III
Miscellaneous provisions
30101.
Establishment of Office of Energy Employment and Training
(a)
Establishment
The Secretary of the Interior shall establish an Office of Energy Employment and Training, which
shall oversee the hiring and training efforts of the Department of the
Interior’s energy planning, permitting, and regulatory agencies.
(b)
Director
(1)
In general
The Office shall be under the direction of a Deputy Assistant Secretary for Energy Employment and
Training, who shall report directly to the Assistant Secretary for Energy,
Lands and Minerals Management, and shall be fully employed to carry out
the functions of the Office.
(2)
Duties
The Deputy Assistant Secretary for Energy Employment and Training shall perform the following
functions:
(A) Develop and implement systems to track the Department’s hiring of trained skilled workers in the
energy permitting and inspection agencies.
(B) Design and recommend to the Secretary programs and policies aimed at expanding the Department’s
hiring of women, minorities, and veterans into the Department’s workforce
dealing with energy permitting and inspection programs. Such programs and
policies shall include—
(i) recruiting at historically black colleges and universities, Hispanic-serving institutions, women’s
colleges, and colleges that typically serve majority minority populations;
(ii) sponsoring and recruiting at job fairs in urban communities;
(iii) placing employment advertisements in newspapers and magazines oriented toward minorities, veterans,
and women;
(iv) partnering with organizations that are focused on developing opportunities for minorities,
veterans, and women to be placed in Departmental internships, summer
employment, and full-time positions relating to energy;
(v) where feasible, partnering with inner-city high schools, girls’ high schools, and high schools with
majority minority populations to demonstrate career opportunities and the
path to those opportunities available at the Department;
(vi) coordinating with the Department of Veterans Affairs and the Department of Defense in the hiring of
veterans; and
(vii) any other mass media communications that the Deputy Assistant Secretary determines necessary to
advertise, promote, or educate about opportunities at the Department.
(C) Develop standards for—
(i) equal employment opportunity and the racial, ethnic, and gender diversity of the workforce and
senior management of the Department; and
(ii) increased participation of minority-owned, veteran-owned, and women-owned businesses in the
programs and contracts with the Department.
(D) Review and propose for adoption the best practices of entities regulated by the Department with
regards to hiring and diversity policies, and publish those best practices
for public review.
(c)
Reports
The Secretary shall submit to Congress an annual report regarding the actions taken by the
Department of the Interior agency and the Office pursuant to this section,
which shall include—
(1) a statement of the total amounts paid by the Department to minority contractors;
(2) the successes achieved and challenges faced by the Department in operating minority, veteran or
service-disabled veteran, and women outreach programs;
(3) the challenges the Department may face in hiring minority, veteran, and women employees and
contracting with veteran or service-disabled veteran, minority-owned, and
women-owned businesses; and
(4) any other information, findings, conclusions, and recommendations for legislative or Department
action, as the Director determines appropriate.
(d)
Definitions
For purposes of this section, the following definitions shall apply:
(1)
Minority
The term minority means United States citizens who are Asian Indian American, Asian Pacific American, Black
American, Hispanic American, or Native American.
(2)
Minority-owned business
The term minority-owned business means a for-profit enterprise, regardless of size, physically located in the United States or its
trust territories, that is owned, operated, and controlled by minority
group members. Minority group members are United States citizens who are Asian Indian American, Asian Pacific American, Black American,
Hispanic American, or Native American (terminology in NMSDC categories).
Ownership by minority individuals means the business is at least 51
percent owned by such individuals or, in the case of a publicly owned
business, at least 51 percent of the stock is owned by one or more such
individuals. Further, the management and daily operations are controlled
by those minority group members. For purposes of NMSDC’s program, a
minority group member is an individual who is a United States citizen with
at least 1/4 or 25 percent minimum (documentation to support claim of 25 percent required from applicant) of
one or more of the following:
(A) Asian Indian American, which is a United States citizen whose origins are from India, Pakistan, or
Bangladesh.
(B) Asian Pacific American, which is a United States citizen whose origins are from Japan, China,
Indonesia, Malaysia, Taiwan, Korea, Vietnam, Laos, Cambodia, the
Philippines, Thailand, Samoa, Guam, the United States Trust Territories of
the Pacific, or the Northern Marianas.
(C) Black American, which is a United States citizen having origins in any of the Black racial groups
of Africa.
(D) Hispanic American, which is a United States citizen of true-born Hispanic heritage, from any of the
Spanish-speaking areas of the following regions: Mexico, Central America,
South America, and the Caribbean Basin only.
(E) Native American, which means a United States citizen enrolled to a federally recognized tribe, or a
Native as defined under the Alaska Native Claims Settlement Act.
(3)
NMSDC
The term NMSDC means the National Minority Supplier Development Council.
(4)
Women-owned business
The term women-owned business means a business that can verify through evidence documentation that 51 percent or more is
women-owned, managed, and controlled. The business must be open for at
least 6 months. The business owner must be a United States citizen or
legal resident alien. Evidence must indicate that—
(A) the contribution of capital or expertise by the woman business owner is real and substantial and in
proportion to the interest owned;
(B) the woman business owner directs or causes the direction of management, policy, fiscal, and
operational matters; and
(C) the woman business owner has the ability to perform in the area of specialty or expertise without
reliance on either the finances or resources of a firm that is not owned
by a woman.
(5)
Service disabled veteran
The term Service Disabled Veteran must have a service-connected disability that has been determined by the Department of Veterans
Affairs or Department of Defense. The SDVOSBC must be small under the
North American Industry Classification System (NAICS) code assigned to the
procurement; the SDV must unconditionally own 51 percent of the SDVOSBC;
the SDVO must control the management and daily operations of the SDVOSBC;
and the SDV must hold the highest officer position in the SDVOSBC.
(6)
Veteran-owned business
The term veteran-owned business means a business that can verify through evidence documentation that 51 percent or more is
veteran-owned, managed, and controlled. The business must be open for at
least 6 months. The business owner must be a United States citizen or
legal resident alien and honorably or service-connected disability
discharged from service.
B
Bureau of Reclamation Conduit Hydropower Development Equity and Jobs Act
1.
Short title
This subdivision may be cited as the Bureau of Reclamation Conduit Hydropower Development Equity and Jobs Act.
2.
Amendment
Section 9 of the Act entitled An Act authorizing construction of water conservation and utilization projects in the Great Plains
and arid semiarid areas of the United States, approved August 11, 1939 (16 U.S.C. 590z–7; commonly known as the Water Conservation and Utilization Act), is amended—
(1) by striking In connection with and inserting (a) In connection with; and
(2) by adding at the end the following:
(b) Notwithstanding subsection (a), the Secretary is authorized to enter into leases of power
privileges for electric power generation in connection with any project
constructed under this Act, and shall have authority in addition to and
alternative to any authority in existing laws relating to particular
projects, including small conduit hydropower development.
(c) When entering into leases of power privileges under subsection (b), the Secretary shall use the
processes applicable to such leases under section 9(c) of the Reclamation
Project Act of 1939 (43 U.S.C. 485h(c)).
(d) Lease of power privilege contracts shall be at such rates as, in the Secretary’s judgment, will
produce revenues at least sufficient to cover the appropriate share of the
annual operation and maintenance cost of the project and such fixed
charges, including interest, as the Secretary deems proper. Lease of power
privilege contracts shall be for periods not to exceed 40 years.
(e) No findings under section 3 shall be required for a lease under subsection (b).
(f) All right, title, and interest to installed power facilities constructed by non-Federal entities
pursuant to a lease of power privilege, and direct revenues derived
therefrom, shall remain with the lessee unless otherwise required under
subsection (g).
(g) Notwithstanding section 8, lease revenues and fixed charges, if any, shall be covered into the
Reclamation Fund to be credited to the project from which those revenues
or charges were derived.
(h) When carrying out this section, the Secretary shall first offer the lease of power privilege to an
irrigation district or water users association operating the applicable
transferred conduit, or to the irrigation district or water users
association receiving water from the applicable reserved conduit. The
Secretary shall determine a reasonable timeframe for the irrigation
district or water users association to accept or reject a lease of power
privilege offer. If the irrigation district or water users association
elects not to accept a lease of power privilege offer under subsection
(b), the Secretary shall offer the lease of power privilege to other
parties using the processes applicable to such leases under section 9(c)
of the Reclamation Project Act of 1939 (43 U.S.C. 485h(c)).
(i) The Bureau of Reclamation shall apply its categorical exclusion process under the National
Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) to small conduit hydropower development under this section, excluding siting of associated
transmission facilities on Federal lands.
(j) Nothing in this section shall obligate the Western Area Power Administration or the Bonneville
Power Administration to purchase or market any of the power produced by
the facilities covered under this section and none of the costs associated
with production or delivery of such power shall be assigned to project
purposes for inclusion in project rates.
(k) Nothing in this section shall alter or impede the delivery and management of water by Bureau of
Reclamation facilities, as water used for conduit hydropower generation
shall be deemed incidental to use of water for the original project
purposes. Lease of power privilege shall be made only when, in the
judgment of the Secretary, the exercise of the lease will not be
incompatible with the purposes of the project or division involved and
shall not create any unmitigated financial or physical impacts to the
project or division involved. The Secretary shall notify and consult with
the irrigation district or legally organized water users association
operating the transferred conduit in advance of offering the lease of
power privilege and shall prescribe such terms and conditions necessary to
adequately protect the planning, design, construction, operation,
maintenance, and other interests of the United States and the project or
division involved.
(l) Nothing in this section shall alter or affect any agreements in effect on the date of the enactment
of the Bureau of Reclamation Conduit Hydropower Development Equity and
Jobs Act for the development of conduit hydropower projects or disposition
of revenues.
(m) In this section:
(1) The term conduit means any Bureau of Reclamation tunnel, canal, pipeline, aqueduct, flume, ditch, or similar
manmade water conveyance that is operated for the distribution of water
for agricultural, municipal, or industrial consumption and not primarily
for the generation of electricity.
(2) The term irrigation district means any irrigation, water conservation or conservancy, multi-county water conservation or
conservancy district, or any separate public entity composed of two or
more such districts and jointly exercising powers of its member districts.
(3) The term reserved conduit means any conduit that is included in project works the care, operation, and maintenance of which
has been reserved by the Secretary, through the Commissioner of the Bureau
of Reclamation.
(4) The term transferred conduit means any conduit that is included in project works the care, operation, and maintenance of which
has been transferred to a legally organized water users association or
irrigation district.
(5) The term small conduit hydropower means a facility capable of producing 5 megawatts or less of electric capacity.
.
C
Central Oregon Jobs and Water Security Act
1.
Short title
This subdivision may be cited as the Central Oregon Jobs and Water Security Act.
2.
Wild and Scenic River; Crooked, Oregon
Section 3(a)(72) of the Wild and Scenic Rivers Act (16 U.S.C. 1274(a)(72)) is amended as follows:
(1) By striking 15-mile and inserting 14.75-mile.
(2) In subparagraph (B)—
(A) by striking 8-mile and all that follows through Bowman Dam and inserting 7.75-mile segment from a point one-quarter mile downstream from the toe of Bowman Dam; and
(B) by adding at the end the following: The developer for any hydropower development, including turbines and appurtenant facilities, at
Bowman Dam, in consultation with the Bureau of Land Management, shall
analyze any impacts to the Outstandingly Remarkable Values of the Wild and
Scenic River that may be caused by such development, including the future
need to undertake routine and emergency repairs, and shall propose
mitigation for any impacts as part of any license application submitted to
the Federal Energy Regulatory Commission..
3.
City of Prineville Water Supply
Section 4 of the Act of August 6, 1956 (70 Stat. 1058), (as amended by the Acts of September 14,
1959 (73 Stat. 554), and September 18, 1964 (78 Stat. 954)) is further
amended as follows:
(1) By striking ten cubic feet the first place it appears and inserting 17 cubic feet.
(2) By striking during those months when there is no other discharge therefrom, but this release may be reduced for
brief temporary periods by the Secretary whenever he may find that release
of the full ten cubic feet per second is harmful to the primary purpose of
the project.
(3) By adding at the end the following: Without further action by the Secretary, and as determined necessary for any given year by the City
of Prineville, up to seven of the 17 cubic feet per second minimum release
shall also serve as mitigation for City of Prineville groundwater pumping,
pursuant to and in a manner consistent with Oregon State law, including
any shaping of the release of the up to seven cubic feet per second to
coincide with City of Prineville groundwater pumping as may be required by
the State of Oregon. As such, the Secretary is authorized to make
applications to the State of Oregon in conjunction with the City to
protect these supplies instream. The City shall make payment to the
Secretary for that portion of the minimum release that actually serves as
mitigation pursuant to Oregon State law for the City in any given year,
with the payment for any given year equal to the amount of mitigation in
acre feet required to offset actual City groundwater pumping for that year
in accordance with Reclamation Water and Related Contract and Repayment Principles and Requirements, Reclamation Manual Directives and Standards PEC 05–01, dated 09/12/2006, and guided by Economic and Environmental Principles and Guidelines for Water and Related Land Resources
Implementation Studies, dated March 10, 1983. The Secretary is authorized to contract exclusively with the City for
additional amounts in the future at the request of the City..
4.
First fill protection
The Act of August 6, 1956 (70 Stat. 1058), as amended by the Acts of September 14, 1959 (73 Stat.
554), and September 18, 1964 (78 Stat. 954), is further amended by adding
at the end the following:
6. Other than the 17 cubic feet per second release provided for in section 4, and subject to
compliance with the Army Corps of Engineers’ flood curve requirements, the
Secretary shall, on a first fill priority basis, store in and release from Prineville Reservoir, whether from carryover, infill, or
a combination thereof, the following:
(1) 68,273 acre feet of water annually to fulfill all 16 Bureau of Reclamation contracts existing as of
January 1, 2011, and up to 2,740 acre feet of water annually to supply the
McKay Creek lands as provided for in section 5 of this Act.
(2) Not more than 10,000 acre feet of water annually, to be made available to the North Unit Irrigation
District pursuant to a Temporary Water Service Contract, upon the request
of the North Unit Irrigation District, consistent with the same terms and
conditions as prior such contracts between the District and the Bureau of
Reclamation.
7. Except as otherwise provided in this Act, nothing in this Act—
(1) modifies contractual rights that may exist between contractors and the United States under
Reclamation contracts;
(2) amends or reopens contracts referred to in paragraph (1); or
(3) modifies any rights, obligations, or requirements that may be provided or governed by Oregon State
law.
.
5.
Ochoco Irrigation District
(a)
Early repayment
Notwithstanding section 213 of the Reclamation Reform Act of 1982 (43 U.S.C. 390mm), any landowner within Ochoco Irrigation District in Oregon, may repay, at any time, the
construction costs of the project facilities allocated to that landowner’s
lands within the district. Upon discharge, in full, of the obligation for
repayment of the construction costs allocated to all lands the landowner
owns in the district, those lands shall not be subject to the ownership
and full-cost pricing limitations of the Act of June 17, 1902 (43 U.S.C. 371 et seq.), and Acts supplemental to and amendatory of that Act, including the Reclamation Reform Act of
1982 (43 U.S.C. 390aa et seq.).
(b)
Certification
Upon the request of a landowner who has repaid, in full, the construction costs of the project
facilities allocated to that landowner’s lands owned within the district,
the Secretary of the Interior shall provide the certification provided for
in subsection (b)(1) of section 213 of the Reclamation Reform Act of 1982
(43 U.S.C. 390mm(b)(1)).
(c)
Contract amendment
On approval of the district directors and notwithstanding project authorizing legislation to the
contrary, the district’s reclamation contracts are modified, without
further action by the Secretary of the Interior, to—
(1) authorize the use of water for instream purposes, including fish or wildlife purposes, in order for
the district to engage in, or take advantage of, conserved water projects
and temporary instream leasing as authorized by Oregon State law;
(2) include within the district boundary approximately 2,742 acres in the vicinity of McKay Creek,
resulting in a total of approximately 44,937 acres within the district
boundary;
(3) classify as irrigable approximately 685 acres within the approximately 2,742 acres of included
lands in the vicinity of McKay Creek, where the approximately 685 acres
are authorized to receive irrigation water pursuant to water rights issued
by the State of Oregon and have in the past received water pursuant to
such State water rights; and
(4) provide the district with stored water from Prineville Reservoir for purposes of supplying up to
the approximately 685 acres of lands added within the district boundary
and classified as irrigable under paragraphs (2) and (3), with such stored
water to be supplied on an acre-per-acre basis contingent on the transfer
of existing appurtenant McKay Creek water rights to instream use and the
State’s issuance of water rights for the use of stored water.
(d)
Limitation
Except as otherwise provided in subsections (a) and (c), nothing in this section shall be construed
to—
(1) modify contractual rights that may exist between the district and the United States under the
district’s Reclamation contracts;
(2) amend or reopen the contracts referred to in paragraph (1); or
(3) modify any rights, obligations or relationships that may exist between the district and its
landowners as may be provided or governed by Oregon State law.
D
State Authority For Hydraulic Fracturing Regulation; EPA Hydraulic Fracturing Research
I
State Authority For Hydraulic Fracturing Regulation
101.
Short title
This title may be cited as the Protecting States’ Rights to Promote American Energy Security Act.
102.
State authority for hydraulic fracturing regulation
The Mineral Leasing Act (30 U.S.C. 181 et seq.) is amended by redesignating section 44 as section 45, and by inserting after section 43 the
following:
44.
State authority for hydraulic fracturing regulation
(a)
In general
The Department of the Interior shall not enforce any Federal regulation, guidance, or permit
requirement regarding hydraulic fracturing, or any component of that
process, relating to oil, gas, or geothermal production activities on or
under any land in any State that has regulations, guidance, or permit
requirements for that activity.
(b)
State authority
The Department of the Interior shall recognize and defer to State regulations, permitting, and
guidance, for all activities related to hydraulic fracturing, or any
component of that process, relating to oil, gas, or geothermal production
activities on Federal land.
(c)
Transparency of State regulations
(1)
In general
Each State shall submit to the Bureau of Land Management a copy of its regulations that apply to
hydraulic fracturing operations on Federal land.
(2)
Availability
The Secretary of the Interior shall make available to the public State regulations submitted under
this subsection.
(d)
Transparency of State disclosure requirements
(1)
In general
Each State shall submit to the Bureau of Land Management a copy of any regulations of the State
that require disclosure of chemicals used in hydraulic fracturing
operations on Federal land.
(2)
Availability
The Secretary of the Interior shall make available to the public State regulations submitted under
this subsection.
(e)
Hydraulic fracturing defined
In this section the term hydraulic fracturing means the process by which fracturing fluids (or a fracturing fluid system) are pumped into an
underground geologic formation at a calculated, predetermined rate and
pressure to generate fractures or cracks in the target formation and
thereby increase the permeability of the rock near the wellbore and
improve production of natural gas or oil.
.
103.
Government Accountability Office study
(a)
Study
The Comptroller General of the United States shall conduct a study examining the economic benefits
of domestic shale oil and gas production resulting from the process of
hydraulic fracturing. This study will include identification of—
(1) State and Federal revenue generated as a result of shale gas production;
(2) jobs created both directly and indirectly as a result of shale oil and gas production; and
(3) an estimate of potential energy prices without domestic shale oil and gas production.
(b)
Report
The Comptroller General shall submit a report on the findings of such study to the Committee on
Natural Resources of the House of Representatives within 30 days after
completion of the study.
104.
Tribal authority on trust land
The Department of the Interior shall not enforce any Federal regulation, guidance, or permit
requirement regarding the process of hydraulic fracturing (as that term is
defined in section 44 of the Mineral Leasing Act, as amended by section
102 of this Act), or any component of that process, relating to oil, gas,
or geothermal production activities on any land held in trust or
restricted status for the benefit of Indians except with the express
consent of the beneficiary on whose behalf such land is held in trust or
restricted status.
II
EPA HYDRAULIC FRACTURING RESEARCH
201.
Short title
This title may be cited as the EPA Hydraulic Fracturing Study Improvement Act.
202.
Epa hydraulic fracturing research
In conducting its study of the potential impacts of hydraulic fracturing on drinking water
resources, with respect to which a request for information was issued
under Federal Register Vol. 77, No. 218, the Administrator of the
Environmental Protection Agency shall adhere to the following
requirements:
(1)
Peer review and information quality
Prior to issuance and dissemination of any final report or any interim report summarizing the
Environmental Protection Agency’s research on the relationship between
hydraulic fracturing and drinking water, the Administrator shall—
(A) consider such reports to be Highly Influential Scientific Assessments and require peer review of
such reports in accordance with guidelines governing such assessments, as
described in—
(i) the Environmental Protection Agency’s Peer Review Handbook 3rd Edition;
(ii) the Environmental Protection Agency’s Scientific Integrity Policy, as in effect on the date of
enactment of this Act; and
(iii) the Office of Management and Budget’s Peer Review Bulletin, as in effect on the date of enactment
of this Act; and
(B) require such reports to meet the standards and procedures for the dissemination of influential
scientific, financial, or statistical information set forth in the
Environmental Protection Agency’s Guidelines for Ensuring and Maximizing
the Quality, Objectivity, Utility, and Integrity of Information
Disseminated by the Environmental Protection Agency, developed in response
to guidelines issued by the Office of Management and Budget under section
515(a) of the Treasury and General Government Appropriations Act for
Fiscal Year 2001 (Public Law 106–554).
(2)
Probability, uncertainty, and consequence
In order to maximize the quality and utility of information developed through the study, the
Administrator shall ensure that identification of the possible impacts of
hydraulic fracturing on drinking water resources included in such reports
be accompanied by objective estimates of the probability, uncertainty, and
consequence of each identified impact, taking into account the risk
management practices of States and industry. Estimates or descriptions of
probability, uncertainty, and consequence shall be as quantitative as
possible given the validity, accuracy, precision, and other quality
attributes of the underlying data and analyses, but no more quantitative
than the data and analyses can support.
(3)
Release of final report
The final report shall be publicly released by September 30, 2016.
III
Miscellaneous provisions
301.
Review of State activities
The Secretary of the Interior shall annually review and report to Congress on all State activities
relating to hydraulic fracturing.
E
Preventing Government Waste and Protecting Coal Mining Jobs in America
1.
Short title
This subdivision may be cited as the Preventing Government Waste and Protecting Coal Mining Jobs in America.
2.
Incorporation of surface mining stream buffer zone rule into State programs
(a)
In general
Section 503 of the Surface Mining Control and Reclamation Act of 1977 (30 U.S.C. 1253) is amended by adding at the end the following:
(e)
Stream buffer zone management
(1)
In general
In addition to the requirements under subsection (a), each State program shall incorporate the
necessary rule regarding excess spoil, coal mine waste, and buffers for
perennial and intermittent streams published by the Office of Surface
Mining Reclamation and Enforcement on December 12, 2008 (73 Fed. Reg.
75813 et seq.) which complies with the Endangered Species Act of 1973 (16 U.S.C. 1531 et seq.) in view of the 2006 discussions between the Director of the Office of Surface Mining and the
Director of the United States Fish and Wildlife Service, and the Office of
Surface Mining Reclamation and Enforcement’s consideration and review of
comments submitted by the United States Fish and Wildlife Service during
the rulemaking process in 2007.
(2)
Study of implementation
The Secretary shall—
(A) at such time as the Secretary determines all States referred to in subsection (a) have fully
incorporated the necessary rule referred to in paragraph (1) of this
subsection into their State programs, publish notice of such
determination;
(B) during the 5-year period beginning on the date of such publication, assess the effectiveness of
implementation of such rule by such States;
(C) carry out all required consultation on the benefits and other impacts of the implementation of the
rule to any threatened species or endangered species, with the
participation of the United States Fish and Wildlife Service and the
United States Geological Survey; and
(D) upon the conclusion of such period, submit a comprehensive report on the impacts of such rule to
the Committee on Natural Resources of the House of Representatives and the
Committee on Energy and Natural Resources of the Senate, including—
(i) an evaluation of the effectiveness of such rule;
(ii) an evaluation of any ways in which the existing rule inhibits energy production; and
(iii) a description in detail of any proposed changes that should be made to the rule, the justification
for such changes, all comments on such changes received by the Secretary
from such States, and the projected costs and benefits of such changes.
(3)
Limitation on new regulations
The Secretary may not issue any regulations under this Act relating to stream buffer zones or
stream protection before the date of the publication of the report under
paragraph (2), other than a rule necessary to implement paragraph (1).
.
(b)
Deadline for State implementation
Not later than 2 years after the date of the enactment of this Act, a State with a State program
approved under section 503 of the Surface Mining Control and Reclamation
Act of 1977 (30 U.S.C. 1253) shall submit to the Secretary of the Interior amendments to such program pursuant to part 732 of
title 30, Code of Federal Regulations, incorporating the necessary rule
referred to in subsection (e)(1) of such section, as amended by this
section.
C
Judiciary
1.
Short title
This division may be cited as the Responsibly And Professionally Invigorating Development Act of 2014 or as the RAPID Act.
2.
Coordination of agency administrative operations for efficient decisionmaking
(a)
In general
Chapter 5 of part 1 of title 5, United States Code, is amended by inserting after subchapter II the
following:
IIA
Interagency Coordination Regarding Permitting
560.
Coordination of agency administrative operations for efficient decisionmaking
(a)
Congressional declaration of purpose
The purpose of this subchapter is to establish a framework and procedures to streamline, increase
the efficiency of, and enhance coordination of agency administration of
the regulatory review, environmental decisionmaking, and permitting
process for projects undertaken, reviewed, or funded by Federal agencies.
This subchapter will ensure that agencies administer the regulatory
process in a manner that is efficient so that citizens are not burdened
with regulatory excuses and time delays.
(b)
Definitions
For purposes of this subchapter, the term—
(1) agency means any agency, department, or other unit of Federal, State, local, or Indian tribal government;
(2) category of projects means 2 or more projects related by project type, potential environmental impacts, geographic
location, or another similar project feature or characteristic;
(3) environmental assessment means a concise public document for which a Federal agency is responsible that serves to—
(A) briefly provide sufficient evidence and analysis for determining whether to prepare an
environmental impact statement or a finding of no significant impact;
(B) aid an agency’s compliance with NEPA when no environmental impact statement is necessary; and
(C) facilitate preparation of an environmental impact statement when one is necessary;
(4) environmental impact statement means the detailed statement of significant environmental impacts required to be prepared under
NEPA;
(5) environmental review means the Federal agency procedures for preparing an environmental impact statement, environmental
assessment, categorical exclusion, or other document under NEPA;
(6) environmental decisionmaking process means the Federal agency procedures for undertaking and completion of any environmental permit,
decision, approval, review, or study under any Federal law other than NEPA
for a project subject to an environmental review;
(7) environmental document means an environmental assessment or environmental impact statement, and includes any supplemental
document or document prepared pursuant to a court order;
(8) finding of no significant impact means a document by a Federal agency briefly presenting the reasons why a project, not otherwise
subject to a categorical exclusion, will not have a significant effect on
the human environment and for which an environmental impact statement
therefore will not be prepared;
(9) lead agency means the Federal agency preparing or responsible for preparing the environmental document;
(10) NEPA means the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.);
(11) project means major Federal actions that are construction activities undertaken with Federal funds or that
are construction activities that require approval by a permit or
regulatory decision issued by a Federal agency;
(12) project sponsor means the agency or other entity, including any private or public-private entity, that seeks
approval for a project or is otherwise responsible for undertaking a
project; and
(13) record of decision means a document prepared by a lead agency under NEPA following an environmental impact statement
that states the lead agency’s decision, identifies the alternatives
considered by the agency in reaching its decision and states whether all
practicable means to avoid or minimize environmental harm from the
alternative selected have been adopted, and if not, why they were not
adopted.
(c)
Preparation of environmental documents
Upon the request of the lead agency, the project sponsor shall be authorized to prepare any
document for purposes of an environmental review required in support of
any project or approval by the lead agency if the lead agency furnishes
oversight in such preparation and independently evaluates such document
and the document is approved and adopted by the lead agency prior to
taking any action or making any approval based on such document.
(d)
Adoption and use of documents
(1)
Documents prepared under nepa
(A) Not more than 1 environmental impact statement and 1 environmental assessment shall be prepared
under NEPA for a project (except for supplemental environmental documents
prepared under NEPA or environmental documents prepared pursuant to a
court order), and, except as otherwise provided by law, the lead agency
shall prepare the environmental impact statement or environmental
assessment. After the lead agency issues a record of decision, no Federal
agency responsible for making any approval for that project may rely on a
document other than the environmental document prepared by the lead
agency.
(B) Upon the request of a project sponsor, a lead agency may adopt, use, or rely upon secondary and
cumulative impact analyses included in any environmental document prepared
under NEPA for projects in the same geographic area where the secondary
and cumulative impact analyses provide information and data that pertains
to the NEPA decision for the project under review.
(2)
State environmental documents; supplemental documents
(A) Upon the request of a project sponsor, a lead agency may adopt a document that has been prepared
for a project under State laws and procedures as the environmental impact
statement or environmental assessment for the project, provided that the
State laws and procedures under which the document was prepared provide
environmental protection and opportunities for public involvement that are
substantially equivalent to NEPA.
(B) An environmental document adopted under subparagraph (A) is deemed to satisfy the lead agency’s
obligation under NEPA to prepare an environmental impact statement or
environmental assessment.
(C) In the case of a document described in subparagraph (A), during the period after preparation of the
document but before its adoption by the lead agency, the lead agency shall
prepare and publish a supplement to that document if the lead agency
determines that—
(i) a significant change has been made to the project that is relevant for purposes of environmental
review of the project; or
(ii) there have been significant changes in circumstances or availability of information relevant to the
environmental review for the project.
(D) If the agency prepares and publishes a supplemental document under subparagraph (C), the lead
agency may solicit comments from agencies and the public on the
supplemental document for a period of not more than 45 days beginning on
the date of the publication of the supplement.
(E) A lead agency shall issue its record of decision or finding of no significant impact, as
appropriate, based upon the document adopted under subparagraph (A), and
any supplements thereto.
(3)
Contemporaneous projects
If the lead agency determines that there is a reasonable likelihood that the project will have
similar environmental impacts as a similar project in geographical
proximity to the project, and that similar project was subject to
environmental review or similar State procedures within the 5-year period
immediately preceding the date that the lead agency makes that
determination, the lead agency may adopt the environmental document that
resulted from that environmental review or similar State procedure. The
lead agency may adopt such an environmental document, if it is prepared
under State laws and procedures only upon making a favorable determination
on such environmental document pursuant to paragraph (2)(A).
(e)
Participating agencies
(1)
In general
The lead agency shall be responsible for inviting and designating participating agencies in
accordance with this subsection. The lead agency shall provide the
invitation or notice of the designation in writing.
(2)
Federal participating agencies
Any Federal agency that is required to adopt the environmental document of the lead agency for a
project shall be designated as a participating agency and shall
collaborate on the preparation of the environmental document, unless the
Federal agency informs the lead agency, in writing, by a time specified by
the lead agency in the designation of the Federal agency that the Federal
agency—
(A) has no jurisdiction or authority with respect to the project;
(B) has no expertise or information relevant to the project; and
(C) does not intend to submit comments on the project.
(3)
Invitation
The lead agency shall identify, as early as practicable in the environmental review for a project,
any agencies other than an agency described in paragraph (2) that may have
an interest in the project, including, where appropriate, Governors of
affected States, and heads of appropriate tribal and local (including
county) governments, and shall invite such identified agencies and
officials to become participating agencies in the environmental review for
the project. The invitation shall set a deadline of 30 days for responses
to be submitted, which may only be extended by the lead agency for good
cause shown. Any agency that fails to respond prior to the deadline shall
be deemed to have declined the invitation.
(4)
Effect of declining participating agency invitation
Any agency that declines a designation or invitation by the lead agency to be a participating
agency shall be precluded from submitting comments on any document
prepared under NEPA for that project or taking any measures to oppose,
based on the environmental review, any permit, license, or approval
related to that project.
(5)
Effect of designation
Designation as a participating agency under this subsection does not imply that the participating
agency—
(A) supports a proposed project; or
(B) has any jurisdiction over, or special expertise with respect to evaluation of, the project.
(6)
Cooperating agency
A participating agency may also be designated by a lead agency as a cooperating agency under the regulations contained in part 1500 of title 40, Code of Federal Regulations, as in
effect on January 1, 2011. Designation as a cooperating agency shall have
no effect on designation as participating agency. No agency that is not a
participating agency may be designated as a cooperating agency.
(7)
Concurrent reviews
Each Federal agency shall—
(A) carry out obligations of the Federal agency under other applicable law concurrently and in
conjunction with the review required under NEPA; and
(B) in accordance with the rules made by the Council on Environmental Quality pursuant to subsection
(n)(1), make and carry out such rules, policies, and procedures as may be
reasonably necessary to enable the agency to ensure completion of the
environmental review and environmental decisionmaking process in a timely,
coordinated, and environmentally responsible manner.
(8)
Comments
Each participating agency shall limit its comments on a project to areas that are within the
authority and expertise of such participating agency. Each participating
agency shall identify in such comments the statutory authority of the
participating agency pertaining to the subject matter of its comments. The
lead agency shall not act upon, respond to or include in any document
prepared under NEPA, any comment submitted by a participating agency that
concerns matters that are outside of the authority and expertise of the
commenting participating agency.
(f)
Project initiation request
(1)
Notice
A project sponsor shall provide the Federal agency responsible for undertaking a project with
notice of the initiation of the project by providing a description of the
proposed project, the general location of the proposed project, and a
statement of any Federal approvals anticipated to be necessary for the
proposed project, for the purpose of informing the Federal agency that the
environmental review should be initiated.
(2)
Lead agency initiation
The agency receiving a project initiation notice under paragraph (1) shall promptly identify the
lead agency for the project, and the lead agency shall initiate the
environmental review within a period of 45 days after receiving the notice
required by paragraph (1) by inviting or designating agencies to become
participating agencies, or, where the lead agency determines that no
participating agencies are required for the project, by taking such other
actions that are reasonable and necessary to initiate the environmental
review.
(g)
Alternatives analysis
(1)
Participation
As early as practicable during the environmental review, but no later than during scoping for a
project requiring the preparation of an environmental impact statement,
the lead agency shall provide an opportunity for involvement by
cooperating agencies in determining the range of alternatives to be
considered for a project.
(2)
Range of alternatives
Following participation under paragraph (1), the lead agency shall determine the range of
alternatives for consideration in any document which the lead agency is
responsible for preparing for the project, subject to the following
limitations:
(A)
No evaluation of certain alternatives
No Federal agency shall evaluate any alternative that was identified but not carried forward for
detailed evaluation in an environmental document or evaluated and not
selected in any environmental document prepared under NEPA for the same
project.
(B)
Only feasible alternatives evaluated
Where a project is being constructed, managed, funded, or undertaken by a project sponsor that is
not a Federal agency, Federal agencies shall only be required to evaluate
alternatives that the project sponsor could feasibly undertake, consistent
with the purpose of and the need for the project, including alternatives
that can be undertaken by the project sponsor and that are technically and
economically feasible.
(3)
Methodologies
(A)
In general
The lead agency shall determine, in collaboration with cooperating agencies at appropriate times
during the environmental review, the methodologies to be used and the
level of detail required in the analysis of each alternative for a
project. The lead agency shall include in the environmental document a
description of the methodologies used and how the methodologies were
selected.
(B)
No evaluation of inappropriate alternatives
When a lead agency determines that an alternative does not meet the purpose and need for a project,
that alternative is not required to be evaluated in detail in an
environmental document.
(4)
Preferred alternative
At the discretion of the lead agency, the preferred alternative for a project, after being
identified, may be developed to a higher level of detail than other
alternatives in order to facilitate the development of mitigation measures
or concurrent compliance with other applicable laws if the lead agency
determines that the development of such higher level of detail will not
prevent the lead agency from making an impartial decision as to whether to
accept another alternative which is being considered in the environmental
review.
(5)
Employment analysis
The evaluation of each alternative in an environmental impact statement or an environmental
assessment shall identify the potential effects of the alternative on
employment, including potential short-term and long-term employment
increases and reductions and shifts in employment.
(h)
Coordination and scheduling
(1)
Coordination plan
(A)
In general
The lead agency shall establish and implement a plan for coordinating public and agency
participation in and comment on the environmental review for a project or
category of projects to facilitate the expeditious resolution of the
environmental review.
(B)
Schedule
(i)
In general
The lead agency shall establish as part of the coordination plan for a project, after consultation
with each participating agency and, where applicable, the project sponsor,
a schedule for completion of the environmental review. The schedule shall
include deadlines, consistent with subsection (i), for decisions under any
other Federal laws (including the issuance or denial of a permit or
license) relating to the project that is covered by the schedule.
(ii)
Factors for consideration
In establishing the schedule, the lead agency shall consider factors such as—
(I) the responsibilities of participating agencies under applicable laws;
(II) resources available to the participating agencies;
(III) overall size and complexity of the project;
(IV) overall schedule for and cost of the project;
(V) the sensitivity of the natural and historic resources that could be affected by the project; and
(VI) the extent to which similar projects in geographic proximity were recently subject to environmental
review or similar State procedures.
(iii)
Compliance with the schedule
(I) All participating agencies shall comply with the time periods established in the schedule or with
any modified time periods, where the lead agency modifies the schedule
pursuant to subparagraph (D).
(II) The lead agency shall disregard and shall not respond to or include in any document prepared under
NEPA, any comment or information submitted or any finding made by a
participating agency that is outside of the time period established in the
schedule or modification pursuant to subparagraph (D) for that agency’s
comment, submission or finding.
(III) If a participating agency fails to object in writing to a lead agency decision, finding or request
for concurrence within the time period established under law or by the
lead agency, the agency shall be deemed to have concurred in the decision,
finding or request.
(C)
Consistency with other time periods
A schedule under subparagraph (B) shall be consistent with any other relevant time periods
established under Federal law.
(D)
Modification
The lead agency may—
(i) lengthen a schedule established under subparagraph (B) for good cause; and
(ii) shorten a schedule only with the concurrence of the cooperating agencies.
(E)
Dissemination
A copy of a schedule under subparagraph (B), and of any modifications to the schedule, shall be—
(i) provided within 15 days of completion or modification of such schedule to all participating
agencies and to the project sponsor; and
(ii) made available to the public.
(F)
Roles and responsibility of lead agency
With respect to the environmental review for any project, the lead agency shall have authority and
responsibility to take such actions as are necessary and proper, within
the authority of the lead agency, to facilitate the expeditious resolution
of the environmental review for the project.
(i)
Deadlines
The following deadlines shall apply to any project subject to review under NEPA and any decision
under any Federal law relating to such project (including the issuance or
denial of a permit or license or any required finding):
(1)
Environmental review deadlines
The lead agency shall complete the environmental review within the following deadlines:
(A)
Environmental impact statement projects
For projects requiring preparation of an environmental impact statement—
(i) the lead agency shall issue an environmental impact statement within 2 years after the earlier of
the date the lead agency receives the project initiation request or a
Notice of Intent to Prepare an Environmental Impact Statement is published
in the Federal Register; and
(ii) in circumstances where the lead agency has prepared an environmental assessment and determined that
an environmental impact statement will be required, the lead agency shall
issue the environmental impact statement within 2 years after the date of
publication of the Notice of Intent to Prepare an Environmental Impact
Statement in the Federal Register.
(B)
Environmental assessment projects
For projects requiring preparation of an environmental assessment, the lead agency shall issue a
finding of no significant impact or publish a Notice of Intent to Prepare
an Environmental Impact Statement in the Federal Register within 1 year
after the earlier of the date the lead agency receives the project
initiation request, makes a decision to prepare an environmental
assessment, or sends out participating agency invitations.
(2)
Extensions
(A)
Requirements
The environmental review deadlines may be extended only if—
(i) a different deadline is established by agreement of the lead agency, the project sponsor, and all
participating agencies; or
(ii) the deadline is extended by the lead agency for good cause.
(B)
Limitation
The environmental review shall not be extended by more than 1 year for a project requiring
preparation of an environmental impact statement or by more than 180 days
for a project requiring preparation of an environmental assessment.
(3)
Environmental review comments
(A)
Comments on draft environmental impact statement
For comments by agencies and the public on a draft environmental impact statement, the lead agency
shall establish a comment period of not more than 60 days after
publication in the Federal Register of notice of the date of public
availability of such document, unless—
(i) a different deadline is established by agreement of the lead agency, the project sponsor, and all
participating agencies; or
(ii) the deadline is extended by the lead agency for good cause.
(B)
Other comments
For all other comment periods for agency or public comments in the environmental review process,
the lead agency shall establish a comment period of no more than 30 days
from availability of the materials on which comment is requested, unless—
(i) a different deadline is established by agreement of the lead agency, the project sponsor, and all
participating agencies; or
(ii) the deadline is extended by the lead agency for good cause.
(4)
Deadlines for decisions under other laws
Notwithstanding any other provision of law, in any case in which a decision under any other Federal
law relating to the undertaking of a project being reviewed under NEPA
(including the issuance or denial of a permit or license) is required to
be made, the following deadlines shall apply:
(A)
Decisions prior to record of decision or finding of no significant impact
If a Federal agency is required to approve, or otherwise to act upon, a permit, license, or other
similar application for approval related to a project prior to the record
of decision or finding of no significant impact, such Federal agency shall
approve or otherwise act not later than the end of a 90-day period
beginning—
(i) after all other relevant agency review related to the project is complete; and
(ii) after the lead agency publishes a notice of the availability of the final environmental impact
statement or issuance of other final environmental documents, or no later
than such other date that is otherwise required by law, whichever event
occurs first.
(B)
Other decisions
With regard to any approval or other action related to a project by a Federal agency that is not
subject to subparagraph (A), each Federal agency shall approve or
otherwise act not later than the end of a period of 180 days beginning—
(i) after all other relevant agency review related to the project is complete; and
(ii) after the lead agency issues the record of decision or finding of no significant impact, unless a
different deadline is established by agreement of the Federal agency, lead
agency, and the project sponsor, where applicable, or the deadline is
extended by the Federal agency for good cause, provided that such
extension shall not extend beyond a period that is 1 year after the lead
agency issues the record of decision or finding of no significant impact.
(C)
Failure to act
In the event that any Federal agency fails to approve, or otherwise to act upon, a permit, license,
or other similar application for approval related to a project within the
applicable deadline described in subparagraph (A) or (B), the permit,
license, or other similar application shall be deemed approved by such
agency and the agency shall take action in accordance with such approval
within 30 days of the applicable deadline described in subparagraph (A) or
(B).
(D)
Final agency action
Any approval under subparagraph (C) is deemed to be final agency action, and may not be reversed by
any agency. In any action under chapter 7 seeking review of such a final
agency action, the court may not set aside such agency action by reason of
that agency action having occurred under this paragraph.
(j)
Issue identification and resolution
(1)
Cooperation
The lead agency and the participating agencies shall work cooperatively in accordance with this
section to identify and resolve issues that could delay completion of the
environmental review or could result in denial of any approvals required
for the project under applicable laws.
(2)
Lead agency responsibilities
The lead agency shall make information available to the participating agencies as early as
practicable in the environmental review regarding the environmental,
historic, and socioeconomic resources located within the project area and
the general locations of the alternatives under consideration. Such
information may be based on existing data sources, including geographic
information systems mapping.
(3)
Participating agency responsibilities
Based on information received from the lead agency, participating agencies shall identify, as early
as practicable, any issues of concern regarding the project’s potential
environmental, historic, or socioeconomic impacts. In this paragraph,
issues of concern include any issues that could substantially delay or
prevent an agency from granting a permit or other approval that is needed
for the project.
(4)
Issue resolution
(A)
Meeting of participating agencies
At any time upon request of a project sponsor, the lead agency shall promptly convene a meeting
with the relevant participating agencies and the project sponsor, to
resolve issues that could delay completion of the environmental review or
could result in denial of any approvals required for the project under
applicable laws.
(B)
Notice that resolution cannot be achieved
If a resolution cannot be achieved within 30 days following such a meeting and a determination by
the lead agency that all information necessary to resolve the issue has
been obtained, the lead agency shall notify the heads of all participating
agencies, the project sponsor, and the Council on Environmental Quality
for further proceedings in accordance with section 204 of NEPA, and shall
publish such notification in the Federal Register.
(k)
Limitation on use of social cost of carbon
(1)
In general
In the case of any environmental review or environmental decisionmaking process, a lead agency may
not use the social cost of carbon.
(2)
Definition
In this subsection, the term social cost of carbon means the social cost of carbon as described in the technical support document entitled Technical Support Document: Technical Update of the Social Cost of Carbon for Regulatory Impact
Analysis Under Executive Order No. 12866, published by the Interagency Working Group on Social Cost of Carbon, United States Government, in
May 2013, revised in November 2013, or any successor thereto or
substantially related document, or any other estimate of the monetized
damages associated with an incremental increase in carbon dioxide
emissions in a given year.
(l)
Report to congress
The head of each Federal agency shall report annually to Congress—
(1) the projects for which the agency initiated preparation of an environmental impact statement or
environmental assessment;
(2) the projects for which the agency issued a record of decision or finding of no significant impact
and the length of time it took the agency to complete the environmental
review for each such project;
(3) the filing of any lawsuits against the agency seeking judicial review of a permit, license, or
approval issued by the agency for an action subject to NEPA, including the
date the complaint was filed, the court in which the complaint was filed,
and a summary of the claims for which judicial review was sought; and
(4) the resolution of any lawsuits against the agency that sought judicial review of a permit, license,
or approval issued by the agency for an action subject to NEPA.
(m)
Limitations on claims
(1)
In general
Notwithstanding any other provision of law, a claim arising under Federal law seeking judicial
review of a permit, license, or approval issued by a Federal agency for an
action subject to NEPA shall be barred unless—
(A) in the case of a claim pertaining to a project for which an environmental review was conducted and
an opportunity for comment was provided, the claim is filed by a party
that submitted a comment during the environmental review on the issue on
which the party seeks judicial review, and such comment was sufficiently
detailed to put the lead agency on notice of the issue upon which the
party seeks judicial review; and
(B) filed within 180 days after publication of a notice in the Federal Register announcing that the
permit, license, or approval is final pursuant to the law under which the
agency action is taken, unless a shorter time is specified in the Federal
law pursuant to which judicial review is allowed.
(2)
New information
The preparation of a supplemental environmental impact statement, when required, is deemed a
separate final agency action and the deadline for filing a claim for
judicial review of such action shall be 180 days after the date of
publication of a notice in the Federal Register announcing the record of
decision for such action. Any claim challenging agency action on the basis
of information in a supplemental environmental impact statement shall be
limited to challenges on the basis of that information.
(3)
Rule of construction
Nothing in this subsection shall be construed to create a right to judicial review or place any
limit on filing a claim that a person has violated the terms of a permit,
license, or approval.
(n)
Categories of projects
The authorities granted under this subchapter may be exercised for an individual project or a
category of projects.
(o)
Effective date
The requirements of this subchapter shall apply only to environmental reviews and environmental
decisionmaking processes initiated after the date of enactment of this
subchapter. In the case of a project for which an environmental review or
environmental decisionmaking process was initiated prior to the date of
enactment of this subchapter, the provisions of subsection (i) shall
apply, except that, notwithstanding any other provision of this section,
in determining a deadline under such subsection, any applicable period of
time shall be calculated as beginning from the date of enactment of this
subchapter.
(p)
Applicability
Except as provided in subsection (p), this subchapter applies, according to the provisions thereof,
to all projects for which a Federal agency is required to undertake an
environmental review or make a decision under an environmental law for a
project for which a Federal agency is undertaking an environmental review.
(q)
Savings clause
Nothing in this section shall be construed to supersede, amend, or modify sections 134, 135, 139,
325, 326, and 327 of title 23, sections 5303 and 5304 of title 49, or subtitle C of title I of division A of the Moving Ahead for Progress in the 21st
Century Act and the amendments made by such subtitle (Public Law 112–141).
.
(b)
Technical amendment
The table of sections for chapter 5 of title 5, United States Code, is amended by inserting after the items relating to subchapter II
the following:
Subchapter IIA—Interagency Coordination Regarding Permitting
560. Coordination of agency administrative operations for efficient decisionmaking.
.
(c)
Regulations
(1)
Council on environmental quality
Not later than 180 days after the date of enactment of this division, the Council on Environmental
Quality shall amend the regulations contained in part 1500 of title 40,
Code of Federal Regulations, to implement the provisions of this division
and the amendments made by this division, and shall by rule designate
States with laws and procedures that satisfy the criteria under section 560(d)(2)(A) of title 5, United States Code.
(2)
Federal agencies
Not later than 120 days after the date that the Council on Environmental Quality amends the
regulations contained in part 1500 of title 40, Code of Federal
Regulations, to implement the provisions of this division and the
amendments made by this division, each Federal agency with regulations
implementing the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) shall amend such regulations to implement the provisions of this division.
Passed the House of Representatives September 18, 2014.Karen L. Haas,Clerk