Library / Laws / 113th / hr / H.R. 1375 / Introduced in House
I
113th CONGRESS
1st Session
H. R. 1375
IN THE HOUSE OF REPRESENTATIVES
March 21, 2013
Mr. Mullin introduced
the following bill; which was referred to the
Committee on Natural
Resources, and in addition to the Committee on
Agriculture, for a period
to be subsequently determined by the Speaker, in each case for consideration of
such provisions as fall within the jurisdiction of the committee
concerned
A BILL
To facilitate the development of wind energy resources on
Federal lands.
1.
Short title
This Act may be cited at the
Reducing Regulatory Obstacles to Wind
Energy Production Act.
2.
Onshore
meteorological site testing and monitoring project
(a)
Definition of
meteorological site testing and monitoring project
In this
section, the term meteorological site testing and monitoring
project means a project carried out on land administered by the Bureau
of Land Management or the Forest Service to test or monitor weather (including
wind and solar energy) using towers or other devices, that—
(1) causes—
(A) less than 1 acre
of soil or vegetation disruption at the location of each meteorological tower
or other device; and
(B) not more than 5
acres of soil or disruption within the proposed right-of-way for the
project;
(2) is
installed—
(A) to the maximum
extent practicable, using existing access roads;
(B) in a manner that
does not require off-road motorized access other than 1 installation activity
and 1 decommissioning activity along an identified off-road route approved by
the Director of the Bureau of Land Management or Chief of the Forest
Service;
(C) without
construction of new roads other than upgrading of existing minor drainage
crossings for safety purposes; and
(D) without the use of
digging or drilling equipment vehicles other than rubber-tired vehicles with
gross weight ratings under 8,500 pounds;
(3) is decommissioned
not more than 5 years after the date of commencement of the project,
including—
(A) removal of any
towers, devices, or other surface infrastructure from the site; and
(B) restoration of the
site to approximately the condition that existed at the time the project began;
and
(4) provides
meteorological information obtained by the permitted project to the Bureau of
Land Management and the Forest Service.
(b)
NEPA
exclusion
Section 102(2)(C)
of the National Environmental Policy Act of 1969 (42 U.S.C. 4332(2)(C)) shall
not apply with respect to a meteorological site testing and monitoring
project.
(c)
Permit timeline
and conditions
(1)
In
general
The Director of the Bureau of Land Management or Chief of
the Forest Service, as applicable, shall decide whether to issue a permit for a
project that is a meteorological site testing and monitoring project within 30
days after receiving an application for the permit.
(2)
Public comment
and consultation
During the period referred to in paragraph (1),
the Director of the Bureau of Land Management or the Chief of the Forest
Service, as applicable, shall—
(A) provide an
opportunity for submission of comments by the public; and
(B) consult with the
heads of other Federal, State, and local agencies that would be affected by the
issuance of the permit.
(3)
Denial of
Application
If the application is denied, the Director or Chief,
respectively, shall provide the applicant—
(A) in writing, clear
and comprehensive reasons why the application was not approved and detailed
information concerning any deficiencies, and
(B) an opportunity to
remedy any deficiencies.
(d)
Protection of
information
The information provided to the Bureau of Land
Management and the Forest Service pursuant to subsection (a)(4) shall be
treated by such agency as proprietary information and protected against
disclosure.