Library / Laws / 113th / hr / H.R. 1363 / Introduced in House
I
113th CONGRESS
1st Session
H. R. 1363
IN THE HOUSE OF REPRESENTATIVES
March 21, 2013
Mr. Labrador
introduced the following bill; which was referred to the
Committee on Natural
Resources
A BILL
To promote timely exploration for geothermal resources
under existing geothermal leases, and for other purposes.
1.
Short title
This Act may be cited as the
Exploring for Geothermal Energy on
Federal Lands Act.
2.
Geothermal
exploration notice and exclusion
(a)
Definition of
geothermal exploration test project
In this section the term geothermal
exploration test project means the drilling of a well to test or explore
for geothermal resources on lands leased by the Department of the Interior for
the development and production of geothermal resources, that—
(1) is carried out by
the holder of the lease;
(2) causes—
(A) less than 5 acres
of soil or vegetation disruption at the location of each geothermal exploration
well; and
(B) not more than an
additional 5 acres of soil or vegetation disruption during access or egress to
the test site;
(3) is
developed—
(A) no deeper than
2,500 feet;
(B) less than 8 inches
in diameter;
(C) in a manner that
does not require off-road motorized access other than to and from the well site
along an identified off-road route for which notice is provided to the
Secretary of the Interior under subsection (c);
(D) without
construction of new roads other than upgrading of existing drainage crossings
for safety purposes; and
(E) with the use of
rubber-tired digging or drilling equipment vehicles;
(4) is completed in
less than 45 days, including the removal of any surface infrastructure from the
site; and
(5) requires the
restoration of the project site within 3 years to approximately the condition
that existed at the time the project began, unless the site is subsequently
used as part of energy development on the lease.
(b)
NEPA
exclusion
Section 102(2)(C)
of the National Environmental Policy Act of 1969 (42 U.S.C. 4332(2)(C)) shall
not apply with respect to a project that the Secretary of the Interior
determines under subsection (c) is a geothermal exploration test
project.
(c)
Notice of
intent; review and determination
(1)
Requirement to
provide notice
A leaseholder intending to carry out a geothermal
exploration test project shall provide notice to the Secretary of the Interior
not later than 30 days prior to the start of drilling under the project.
(2)
Review of
project
The Secretary shall by not later than 10 days after
receipt of a notice of intent under paragraph (1) from a leaseholder—
(A) review the project
described in the notice and determine whether it is a geothermal exploration
test project under subsection (a); and
(B) notify the
leaseholder—
(i) that under subsection (b) of this section,
section 102(2)(C) of the National Environmental Policy Act of 1969 (42 U.S.C.
4332(2)(C)) does not apply to the project; or
(ii) that section 102(2)(C) of the National
Environmental Policy Act of 1969 (42 U.S.C. 4332(2)(C)) applies to the project,
including clear and detailed findings on any deficiencies in the project that
preclude the application of subsection (b) of this section to the
project.
(3)
Opportunity to
remedy
If the Secretary
provides notice under paragraph (2)(B)(ii) that section 102(2)(C) of the
National Environmental Policy Act of 1969 (42 U.S.C. 4332(2)(C)) applies to the
project, the Secretary shall provide the leaseholder an opportunity to remedy
the deficiencies described in the notice prior to the date the leaseholder
intended to start drilling under the project.