,,contributions ,,from ,,the ,,museum ,,of ,,history ,,and ,,technology3 ,,paper #ai ,,elevator ,,systems ,,of ,,the ,,eiffel ,,tower1 #ahhi ,robert ,m4 ,vogel ,,preparatory ,,work ,,for ,,the ,,tower #d ,,the ,,tower',s ,,structural ,,rationale #e ,,elevator ,,development ,,before ,,the ,,tower #f ,,the ,,tower',s ,,elevators #bj ,,epilogue #cg ,,elevator ,,systems of the ,,eiffel ,,tower1 #ahhi ,by ,robert ,m4 ,vogel ,this article traces the evolution of the powered passenger elevator from its initial development in the mid-#aith century to the installation of the three separate elevator systems in the ,eiffel ,tower in #ahhi4 ,the design of the ,tower's elevators involved problems of capacity1 length of rise1 and safety far greater than any previously encountered in the field2 and the equipment that resulted was the first capable of meeting the conditions of vertical transportation found in the just emerging skyscraper4 ,,the ,,author3 ,robert ,m4 ,vogel is associate curator of mechanical and civil engineering1 ,united ,states ,national ,museum1 ,smithsonian ,institution4 ,the #a1jjj-;foot tower that formed the focal point and central feature of the ,universal ,exposition of #ahhi at ,paris has become one of the best known of man's works4 ,it was among the most outstanding technological achievements of an age which was itself remarkable for such achievements4 ,second to the interest shown in the tower's structural aspects was the interest in its mechanical organs4 ,of these1 the most exceptional were the three separate elevator systems by which the upper levels were made accessible to the ,exposition visitors4 ,the design of these systems involved problems far greater than had been encountered in previous elevator work anywhere in the world4 ,the basis of these difficulties was the amplification of the two conditions that were the normal determinants in elevator design--passenger capacity and height of rise4 ,in addition1 there was the problem1 totally new1 of fitting elevator shafts to the curvature of the ,tower's legs4 ,the study of the various solutions to these problems presents a concise view of the capabilities of the elevator art just prior to the beginning of the most recent phase of its development1 marked by the entry of electricity into the field4 ,the great confidence of the ,tower's builder in his own engineering ability can be fully appreciated1 however1 only when notice is taken of one exceptional way in which the project differed from works of earlier periods as well as from contemporary ones4 ,in almost every case1 these other works had evolved1 in a natural and progressive way1 from a fundamental concept firmly based upon precedent4 ,this was true of such notable structures of the time as the ,brooklyn ,bridge and1 to a lesser extent1 the ,forth ,bridge4 ,for the design of his tower1 there was virtually no experience in structural history from which ,eiffel could draw other than a series of high piers that his own firm had designed earlier for railway bridges4 ,it was these designs that led ,eiffel to consider the practicality of iron structures of extreme height4 ,illustration3 ,figure #a4--,the ,eiffel ,tower at the time of the ,universal ,exposition of #ahhi at ,paris4 7,from ,la ,nature1 ,june #bi1 #ahhi1 vol4 #ag1 p4 #gc47 ,illustration3 ,figure #b4--;,gustave ,eiffel 7#ahcb-aibc74 7,from ,gustave ,eiffel1 ,la ,tour de ,trois ,cents ,mtres1 ,paris1 #aijj1 frontispiece47 ,there was1 it is true1 some inspiration to be found in the paper projects of several earlier designers--themselves inspired by that compulsion which throughout history seems to have driven men to attempt the erection of magnificently high structures4 ,one such inspiration was a proposal made in #ahcb by the celebrated but eccentric ,welsh engineer ,richard ,trevithick to erect a #a1jjj-;foot1 conical1 cast-iron tower 7fig4 #c7 to celebrate the passing of the ,reform ,bill4 ,of particular interest in light of the present discussion was ,trevithick's plan to raise visitors to the summit on a piston1 driven upward within the structure's hollow central tube by compressed air4 ,it probably is fortunate for ,trevithick's reputation that his plan died shortly after this and the project was forgotten4 ,one project of genuine promise was a tower proposed by the eminent ,american engineering firm of ,clarke1 ,reeves ,company to be erected at the ,centennial ,exhibition at ,philadelphia in #ahgf4 ,at the time1 this firm was perhaps the leading designer and erector of iron structures in the ,united ,states1 having executed such works as the ,girard ,avenue ,bridge over the ,schuylkill at ,fairmount ,park1 and most of ,new ,york's early elevated railway system4 ,the company's proposal 7fig4 #d7 for a #a1jjj-;foot shaft of wrought-iron columns braced by a continuous web of diagonals was based upon sound theoretical knowledge and practical experience4 ,nevertheless1 the natural hesitation that the fair's sponsors apparently felt in the face of so heroic a scheme could not be overcome1 and this project also remained a vision4 ,preparatory ,work for the ,tower ,in the year #ahhe1 the ,eiffel firm1 which also had an extensive background of experience in structural engineering1 undertook a series of investigations of tall metallic piers based upon its recent experiences with several lofty railway viaducts and bridges4 ,the most spectacular of these was the famous ,garabit ,viaduct 7#ahhj-ahhd71 which carries a railroad some #djj feet above the valley of the ,truyere in southern ,france4 ,while the #bjj-;foot height of the viaduct's two greatest piers was not startling even at that period1 the studies proved that piers of far greater height were entirely feasible in iron construction4 ,this led to the design of a #cie-;foot pier1 which1 although never incorporated into a bridge1 may be said to have been the direct basis for the ,eiffel ,tower4 ,preliminary studies for a #cjj-meter tower were made with the #ahhi fair immediately in mind4 ,with an assurance born of positive knowledge1 ,eiffel in ,june of #ahhf approached the ,exposition commissioners with the project4 ,there can be no doubt that only the singular respect with which ,eiffel was regarded not only by his profession but by the entire nation motivated the ,commission to approve a plan which1 in the hands of a figure of less stature1 would have been considered grossly impractical4 ,between this time and commencement of the ,tower's construction at the end of ,january #ahhg1 there arose one of the most persistently annoying of the numerous difficulties1 both structural and social1 which confronted ,eiffel as the project advanced4 ,in the wake of the initial enthusiasm--on the part of the fair's ,commission inspired by the desire to create a monument to ,french technological achievement1 and on the part of the majority of ,frenchmen by the stirring of their imagination at the magnitude of the structure--there grew a rising movement of disfavor4 ,the nucleus was1 not surprisingly1 formed mainly of the intelligentsia1 but objections were made by prominent ,frenchmen in all walks of life4 ,the most interesting point to be noted in a retrospection of this often violent opposition was that1 although the ,tower's every aspect was attacked1 there was remarkably little criticism of its structural feasibility1 either by the engineering profession or1 as seems traditionally to be the case with bold and unprecedented undertakings1 by large numbers of the technically uninformed laity4 ,true1 there was an undercurrent of what might be characterized as unease by many property owners in the structure's shadow1 but the most obstinate element of resistance was that which deplored the ,tower as a mechanistic intrusion upon the architectural and natural beauties of ,paris4 ,this resistance voiced its fury in a flood of special newspaper editions1 petitions1 and manifestos signed by such lights of the fine and literary arts as ,de ,maupassant1 ,gounod1 ,dumas fils1 and others4 ,the eloquence of one article1 which appeared in several ,paris papers in ,february #ahhg1 was typical3 ,we protest in the name of ,french taste and the national art culture against the erection of a staggering ,tower1 like a gigantic kitchen chimney dominating ,paris1 eclipsing by its barbarous mass ,notre ,dame1 the ,sainte-,chapelle1 the tower of ,st4 ,jacques1 the ,dme des ,invalides1 the ,arc de ,triomphe1 humiliating these monuments by an act of madness4#a ,further1 a prediction was made that the entire city would become dishonored by the odious shadow of the odious column of bolted sheet iron4 ,it is impossible to determine what influence these outcries might have had on the project had they been organized sooner4 ,but inasmuch as the ,commission had1 in ,november #ahhf1 provided #a1ejj1jjj francs for its commencement1 the work had been fairly launched by the time the protestations became loud enough to threaten and they were ineffectual4 ,upon completion1 many of the most vigorous protestants became as vigorous in their praise of the ,tower1 but a hard core of critics continued for several years to circulate petitions advocating its demolition by the government4 ,one of these critics1 it was said--probably apocryphally--took an office on the first platform1 that being the only place in ,paris from which the ,tower could not be seen4 ,illustration3 ,figure #c4--,trevithick's proposed cast-iron tower 7#ahcb7 would have been #a1jjj feet high1 #ajj feet in diameter at the base1 #ab feet at the top1 and surmounted by a colossal statue4 7,from ,f4 ,dye1 ,popular ,engineering1 ,london1 #ahie1 p4 #bje47 ,the ,tower's ,structural ,rationale ,during the previously mentioned studies of high piers undertaken by the ,eiffel firm1 it was established that as the base width of these piers increased in proportion to their height1 the diagonal bracing connecting the vertical members1 necessary for rigidity1 became so long as to be subject to high flexural stresses from wind and columnar loading4 ,to resist these stresses1 the bracing required extremely large sections which greatly increased the surface of the structure exposed to the wind1 and was1 moreover1 decidedly uneconomical4 ,to overcome this difficulty1 the principle which became the basic design concept of the ,tower was developed4 ,the material which would otherwise have been used for the continuous lattice of diagonal bracing was concentrated in the four corner columns of the ,tower1 and these verticals were connected only at two widely separated points by the deep bands of trussing which formed the first and second platforms4 ,a slight curvature inward was given to the main piers to further widen the base and increase the stability of the structure4 ,at a point slightly above the second platform1 the four members converged to the extent that conventional bracing became more economical1 and they were joined4 ,illustration3 ,figure #d4--,the proposed #a1jjj-;foot iron tower designed by ,clarke1 ,reeves ,co4 for the ,centennial ,exhibition of #ahgf at ,philadelphia4 7,from ,scientific ,american1 ,jan4 #bd1 #ahgd1 vol4 #cj1 p4 #dg47 ,that this theory was successful not only practically1 but visually1 is evident from the resulting work4 ,the curve of the legs and the openings beneath the two lower platforms are primarily responsible for the ,tower's graceful beauty as well as for its structural soundness4 ,the design of the ,tower was not actually the work of ,eiffel himself but of two of his chief engineers1 ,emile ,nouguier 7#ahdj-87 and ,maurice ,koechlin 7#ahef-aidf7--the men who had conducted the high pier studies--and the architect ,stphen ,sauvestre 7#ahdg-874 ,in the planning of the foundations1 extreme care was used to ensure adequate footing1 but in spite of the ,tower's light weight in proportion to its bulk1 and the low earth pressure it exerted1 uneven pier settlement with resultant leaning of the ,tower was considered a dangerous possibility4#b ,to compensate for this eventuality1 a device was used whose ingenious directness justifies a brief description4 ,in the base of each of the #af columns forming the four main legs was incorporated an opening into which an #hjj-ton hydraulic press could be placed1 capable of raising the member slightly4 ,a thin steel shim could then be inserted to make the necessary correction 7fig4 #e74 ,the system was used only during construction to overcome minor erection discrepancies4 ,in order to appreciate fully the problem which confronted the ,tower's designers and sponsors when they turned to the problem of making its observation areas accessible to the fair's visitors1 it is first necessary to investigate briefly the contemporary state of elevator art4 ,elevator ,development before the ,tower ,while power-driven hoists and elevators in many forms had been used since the early years of the #aith century1 the ever-present possibility of breakage of the hoisting rope restricted their use almost entirely to the handling of goods in mills and warehouses4#c ,not until the invention of a device which would positively prevent this was there much basis for work on other elements of the system4 ,the first workable mechanism to prevent the car from dropping to the bottom of the hoistway in event of rope failure was the product of ,elisha ,g4 ,otis 7#ahaa-ahfa71 a mechanic of ,yonkers1 ,new ,york4 ,the invention was made more or less as a matter of course along with the other machinery for a new mattress factory of which ,otis was master mechanic4 ,illustration3 ,figure #e4--;,correcting erection discrepancies by raising pier member--with hydraulic press and hand pump--and inserting shims4 7,from ,la ,nature1 ,feb4 #ah1 #ahhh1 vol4 #af1 p4 #ahd47 ,illustration3 ,figure #f4--,the promenade beneath the ,eiffel ,tower1 #ahhi4 7,from ,la ,nature1 ,nov4 #cj1 #ahhi1 vol4 #ag1 p4 #dbe47 ,illustration3 ,figure #g4--,teagle elevator in an ,english mill about #ahde4 ,power was taken from the line shafting4 7,from ,pictorial ,gallery of ,arts1 ,volume of ,useful ,arts1 ,london1 n4d4 ca4 #ahde47 ,the importance of this invention soon became evident to ,otis1 and he introduced his device to the public three years later during the second season of the ,new ,york ,crystal ,palace ,exhibition1 in #ahed4 ,here he would demonstrate dramatically the perfect safety of his elevator by cutting the hoisting rope of a suspended platform on which he himself stood1 uttering the immortal words which have come to be inseparably associated with the history of the elevator--,all safe1 gentlemen6#d ,the invention achieved popularity slowly1 but did find increasing favor in manufactories throughout the eastern ,united ,states4 ,the significance of ,otis' early work in this field lay strictly in the safety features of his elevators rather than in the hoisting equipment4 ,his earliest systems were operated by machinery similar to that of the teagle elevator in which the hoisting drum was driven from the mill shafting by simple fast and loose pulleys with crossed and straight belts to raise1 lower1 and stop4 ,this scheme1 already common at the time1 was itself a direct improvement on the ancient hand-powered drum hoist4 ,the first complete elevator machine in the ,united ,states1 constructed in #ahee1 was a complex and inefficient contrivance built around an oscillating-cylinder steam engine4 ,the advantages of an elevator system independent of the mill drive quickly became apparent1 and by #ahfj improved steam elevator machines were being produced in some quantity1 but almost exclusively for freight service4 ,it is not clear when the first elevator was installed explicitly for passenger service1 but it was probably in #aheg1 when ,otis placed one in a store on ,broadway at ,broome ,street in ,new ,york4 ,in the decade following the ,civil ,war1 tall buildings had just begun to emerge2 and1 although the skylines of the world's great cities were still dominated by church spires1 there was increasing activity in the development of elevator apparatus adapted to the transportation of people as well as of merchandise4 ,operators of hotels and stores gradually became aware of the commercial advantages to be gained by elevating their patrons even one or two floors above the ground1 by machinery4 ,the steam engine formed the foundation of the early elevator industry1 but as building heights increased it was gradually replaced by hydraulic1 and ultimately by electrical1 systems4 ,,the ,,steam ,,elevator ,the progression from an elevator machine powered by the line shafting of a mill to one in which the power source was independent would appear a simple and direct one4 ,nevertheless1 it was about #dj years after the introduction of the powered elevator before it became common to couple elevator machines directly to separate engines4 ,the multiple belt and pulley transmission system was at first retained1 but it soon became evident that a more satisfactory service resulted from stopping and reversing the engine itself1 using a single fixed belt to connect the engine and winding mechanism4 ,interestingly1 the same pattern was followed #dj years later when the first attempts were made to apply the electric motor to elevator drive4 ,illustration3 ,figure #h4--;,in the typical steam elevator machine two vertical cylinders were situated either above or below the crankshaft1 and a small pulley was keyed to the crankshaft4 ,in a light-duty machine1 the power was transmitted by flatbelt from the small pulley to a larger one mounted directly on the drum4 ,in heavy-duty machines1 spur gearing was interposed between the large secondary pulley and the winding drum4 7,photo courtesy of ,otis ,elevator ,company47 ,illustration3 ,figure #i4--,several manufacturers built steam machines in which a gear on the drum shaft meshed directly with a worm on the crankshaft4 ,this arrangement eliminated the belt1 and1 since the drum could not drive the engine through the worm gearing1 no brake was necessary for holding the load4 7,courtesy of ,otis ,elevator ,company47 ,by #ahgj the steam elevator machine had attained its ultimate form1 which1 except for a number of minor refinements1 was to remain unchanged until the type became completely obsolete toward the end of the century4 ,by the last quarter of the century1 a continuous series of improvements in the valving1 control systems1 and safety features of the steam machine had made possible an elevator able to compete with the subsequently appearing hydraulic systems for freight and low-rise passenger service insofar as smoothness1 control1 and lifting power were concerned4 ,however1 steam machinery began to fail in this competition as the increasing height of buildings rapidly extended the demands of speed and length of rise4 ,the limitation in rise constituted the most serious shortcoming of the steam elevator 7figs4 #h-aj71 an inherent defect that did not exist in the various hydraulic systems4 ,illustration3 ,figure #aj4--;,components of the steam passenger elevator at the time of its peak development and use 7#ahgf74 7,from ,the ,first ,one ,hundred ,years1 ,otis ,elevator ,company1 #aiec47 ,since the only practical way in which the power of a steam engine could be applied to the haulage of elevator cables was through a rotational system1 the cables invariably were wound on a drum4 ,the travel or rise of the car was therefore limited by the cable capacity of the winding drum4 ,as building heights increased1 drums became necessarily longer and larger until they grew so cumbersome as to impose a serious limitation upon further upward growth4 ,a drum machine rarely could be used for a lift of more than #aej feet4#e ,another organic difficulty existing in drum machines was the dangerous possibility of the car--or the counterweight1 whose cables often wound on the drum--being drawn past the normal top limit and into the upper supporting works4 ,only safety stops could prevent such an occurrence if the operator failed to stop the car at the top or bottom of the shaft1 and even these were not always effective4 ,hydraulic machines were not susceptible to this danger1 the piston or plunger being arrested by the ends of the cylinder at the extremes of travel4 ,,the ,,hydraulic ,,elevator ,the rope-geared hydraulic elevator1 which was eventually to become known as the standard of the industry1 is generally thought to have evolved directly from an invention of the ,english engineer ,sir ,william ,armstrong 7#ahaj-aijj7 of ordnance fame4 ,in #ahdf he developed a water-powered crane1 utilizing the hydraulic head available from a reservoir on a hill #bjj feet above4 ,the system was not basically different from the simple hydraulic press so well known at the time4 ,water1 admitted to a horizontal cylinder1 displaced a piston and rod to which a sheave was attached4 ,around the sheave passed a loop of chain1 one end of which was fixed1 the other running over guide sheaves and terminating at the crane arm with a lifting hook4 ,as the piston was pressed into the cylinder1 the free end of the chain was drawn up at triple the piston speed1 raising the load4 ,the effect was simply that of a #c-to-#a tackle1 with the effort and load elements reversed4 ,simple valves controlled admission and exhaust of the water4 7,see fig4 #aa47 ,illustration3 ,figure #aa4--;,armstrong's hydraulic crane4 ,the main cylinder was inclined1 permitting gravity to assist in overhauling the hook4 ,the small cylinder rotated the crane4 7,from ,john ,h4 ,jallings1 ,elevators1 ,chicago1 #aiaf1 p4 #hb47 ,the success of this system initiated a sizable industry in ,england1 and the hydraulic crane1 with many modifications1 was in common use there for many years4 ,such cranes were introduced in the ,united ,states in about #ahfg but never became popular2 they did1 however1 have a profound influence on the elevator art1 forming the basis of the third generic type to achieve widespread use in this country4 ,the ease of translation from the ,armstrong crane to an elevator system could hardly have been more evident1 only two alterations of consequence being necessary in the passage4 ,a guided platform or car was substituted for the hook2 and the control valves were connected to a stationary endless rope that was accessible to an operator on the car4 ,the rope-geared hydraulic system 7fig4 #ac7 appeared in mature form in about #ahgf4 ,however1 before it had become the standard elevator through a process of refinement1 another system was introduced which merits notice if for no other reason than that its popularity for some years seems remarkable in view of its preposterously unsafe design4 ,patented by ,cyrus ,w4 ,baldwin of ,boston in ,january #ahgj1 this system was termed the ,hydro-,atmospheric ,elevator1 but more commonly known as the water-balance elevator 7fig4 #ab74 ,it employed water not under pressure but simply as mass under the influence of gravity4 ,the elevator car's supporting cables ran over sheaves at the top of the shaft to a large iron bucket1 which traveled in a closed tube or well adjacent to and the same length as the shaft4 ,to raise the car1 the operator caused a valve to open1 filling the bucket with water from a roof tank4 ,when the weight of water was sufficient to overbalance the loaded car1 the bucket descended1 raising the car4 ,on its ascent the car was stopped at intermediate floors by a strong brake that gripped the guides4 ,upon reaching the top1 the operator was able to open a valve in the bucket1 now at the bottom of its travel1 and discharge its contents into a basement tank1 to be pumped back to the roof4 ,no longer counterbalanced1 the car could descend1 its speed controlled solely by the brake4 ,the great popularity of this novel system apparently was due to its smooth operation1 high speed1 simplicity1 and economy of operation4 ,managed by a skillful operator1 it was capable of speeds far greater than other systems could then achieve--up to a frightening #a1hjj feet per minute4#f ,illustration3 ,figure #ab4--;,final development of the ,baldwin-,hale water balance elevator1 #ahgc4 ,the brake1 kept applied by powerful springs1 was released only by steady pressure on a lever4 ,there were two additional controls--the continuous rope that opened the cistern valve to fill the bucket1 and a second lever to open the valve of the bucket to empty it4 7,from ,united ,states ,railroad and ,mining ,register1 ,apr4 #ab1 #ahgc1 vol4 #ag1 p4 #c47 ,in addition to the element of potential danger from careless operation or failure of the brake1 the ,baldwin system was extremely expensive to install as a result of the second shaft1 which of course was required to be more or less watertight4 ,much of the water-balance elevator's development and refinement was done by ,william ,e4 ,hale of ,chicago1 who also made most of the installations4 ,the system has1 therefore1 come to bear his name more commonly than ,baldwin's4 ,the popularity of the water-balance system waned after only a few years1 being eclipsed by more rational systems4 ,hale eventually abandoned it and became the western agent for ,otis--by this time prominent in the field--and subsequently was influential in development of the hydraulic elevator4 ,the rope-geared system of hydraulic elevator operation was so basically simple that by #ahhj it had been embraced by virtually all manufacturers4 ,however1 for years most builders continued to maintain a line of steam and belt driven machines for freight service4 ,inspired by the rapid increase of taller and taller buildings1 there was a concentrated effort1 heightened by severe competition1 to refine the basic system4 ,illustration3 ,figure #ac4--,vertical cylinder1 rope-geared hydraulic elevator with #b3a gear ratio and rope control 7about #ahhj74 ,for higher rises and speeds1 ratios of up to #aj3a were used1 and the endless rope was replaced by a lever4 7,courtesy of ,otis ,elevator ,company47 ,by the late #ahhj's a vast number of improvements in detail had appeared1 and this form of elevator was considered to be almost without defect4 ,it was safe4 ,absence of a drum enabled the car to be carried by a number of cables rather than by one or two1 and rendered overtravel impossible4 ,it was fast4 ,control devices had received probably the most attention by engineers and were as perfect and sensitive as was possible with mechanical means4 ,cars with lever control could be run at the high speeds required for high buildings1 yet they could be stopped with a smoothness and precision unattainable earlier with systems in which the valves were controlled by an endless rope1 worked by the operator4 ,it was almost completely silent1 and when the cylinder was placed vertically in a well near the shaft1 practically no valuable floor space was occupied4 ,but most important1 the length of rise was unlimited because no drum was used4 ,as greater rises were required1 the multiplication of the ropes and sheaves was simply increased1 raising the piston-car travel ratio and permitting the cylinder to remain of manageable length4 ,the ratio was often as high as #aj or #ab to #a1 the car moving #aj or #ab feet to the piston's #a4 ,in addition to its principal advantages1 the hydraulic elevator could be operated directly from municipal water mains in the many cities where there was sufficient pressure1 thus eliminating a large investment in tanks1 pumps and boilers 7fig4 #ad74 ,by far the greatest development in this specialized branch of mechanical engineering occurred in the ,united ,states4 ,the comparative position of ,american practice1 which will be demonstrated farther on1 is indicated by the fact that ,otis ,brothers and other large elevator concerns in the ,united ,states were able to establish offices in many of the major cities of ,europe and compete very successfully with local firms in spite of the higher costs due to shipment4 ,this also demonstrates the extent of error in the oft-heard statement that the skyscraper was the direct result of the elevator's invention4 ,there is no question that continued elevator improvement was an essential factor in the rapid increase of building heights4 ,however1 consideration of the situation in ,european cities1 where buildings of over #aj stories were 7and still are7 rare in spite of the availability of similar elevator techniques1 points to the fundamental matter of tradition4 ,the ,european city simply did not develop with the lack of judicial restraint which characterized metropolitan growth in the ,united ,states4 ,the ,american tendency to confine mercantile activity to the smallest possible area resulted in excessive land values1 which drove buildings skyward4 ,the elevator followed1 or1 at most1 kept pace with1 the development of higher buildings4 ,illustration3 ,figure #ad4--;,in the various hydraulic systems1 a pump was required if pressure from water mains was insufficient to operate the elevator directly4 ,there was either a gravity tank on the roof or a pressure tank in the basement4 7,from ,thomas ,e4 ,brown1 ,jr41 ,the ,american ,passenger ,elevator1 ,engineering ,magazine 7,new ,york71 ,june #ahic1 vol4 #e1 p4 #cdj47 ,european elevator development--notwithstanding the number of ,american rope-geared hydraulic machines sold in ,europe in the #aj years or so preceding the ,paris fair of #ahhi--was confined mainly to variations on the direct plunger type1 which was first used in ,english factories in the #ahcj's4 ,the plunger elevator 7fig4 #af71 an even closer derivative of the hydraulic press than ,armstrong's crane1 was nothing more than a platform on the upper end of a vertical plunger that rose from a cylinder as water was forced in4 ,there were two reasons for this ,european practice4 ,the first and most apparent was the rarity of tall buildings4 ,the drilling of a well to receive the cylinder was thus a matter of little difficulty4 ,this well had to be equivalent in depth to the elevator rise4 ,the second reason was an innate ,european distrust of cable-hung elevator systems in any form1 an attitude that will be discussed more fully farther on4 ,,the ,,electric ,,elevator ,at the time the ,eiffel ,tower elevators were under consideration1 water under pressure was1 from a practical standpoint1 the only agent capable of fulfilling the power and control requirements of this particularly severe service4 ,steam1 as previously mentioned1 had already been found wanting in several respects4 ,electricity1 on the other hand1 seemed to hold promise for almost every field of human endeavor4 ,by #ahhh the electric motor had behind it a #aj- or #ae-year history of active development4 ,frank ,j4 ,sprague had already placed in successful operation a sizable electric trolley-car system1 and was manufacturing motors of up to #bj horsepower in commercial quantity4 ,lighting generators were being produced in sizes far greater4 ,there were1 nevertheless1 many obstacles preventing the translation of this progress into machinery capable of hauling large groups of people a vertical distance of #a1jjj feet with unquestionable dependability4 ,the first application of electricity to elevator propulsion was an experiment of the distinguished ,german electrician ,werner von ,siemens1 who1 in #ahhj1 constructed a car that successfully climbed a rack by means of a motor and worm gearing beneath its deck 7figs4 #ag1 #ah7--;again1 the characteristic ,european distrust of cable suspension4 ,however1 the effect of this success on subsequent development was negligible4 ,significant use of electricity in this field occurred somewhat later1 and in a manner parallel to that by which steam was first applied to the elevator--the driving of mechanical 7belt driven7 elevator machines by individual motors4 ,slightly later came another application of the conversion type4 ,this was the simple substitution of electrically driven pumps 7fig4 #ba7 for steam pumps in hydraulic installations4 ,it will be recalled that pumps were necessary in cases where water main pressure was insufficient to operate the elevator directly4 ,in both of these cases the operational demands on the motor were of course identical to those on the prime movers which they replaced2 no reversal of direction was necessary1 the speed was constant1 and the load was nearly constant4 ,furthermore1 the load could be applied to the motor gradually through automatic relief valves on the pump and in the mechanical machines by slippage as the belt was shifted from the loose to the fast pulleys4 ,the ultimate simplicity in control resulted from permitting the motor to run continuously1 drawing current only in proportion to its loading4 ,the direct-current motor of the #ahhj's was easily capable of such service1 and it was widely used in this way4 ,illustration3 ,figure #ae4--,rope-geared hydraulic freight elevator using a horizontal cylinder 7about #ahhc74 7,from a ,lane ,bodley illustrated catalog of hydraulic elevators1 ,cincinnati1 n4d47 ,illustration3 ,figure #af4--;,english direct plunger hydraulic elevator 7about #ahie74 7,from ,f4 ,dye1 ,popular ,engineering1 ,london1 #ahie1 p4 #bhj47 ,adaptation of the motor to the direct drive of an elevator machine was quite another matter1 the difficulties being largely those of control4 ,at this time the only practical means of starting a motor under load was by introducing resistance into the circuit and cutting it out in a series of steps as the speed picked up2 precisely the method used to start traction motors4 ,in the early attempts to couple the motor directly to the winding drum through worm gearing1 this notching up was transmitted to the car as a jerking motion1 disagreeable to passengers and hard on machinery4 ,furthermore1 the controller contacts had a short life because of the arcing which resulted from heavy starting currents4 ,in all1 such systems were unsatisfactory and generally unreliable1 and were held in disfavor by both elevator experts and owners4 ,illustration3 ,figure #ag4--,siemens' electric rack-climbing elevator of #ahhj4 7,from ,werner von ,siemens1 ,gesammelte ,abhandlungen und ,vortrge1 ,berlin1 #ahha1 pl4 #e47 ,there was1 moreover1 little inducement to overcome the problem of control and other minor problems because of a more serious difficulty which had persisted since the days of steam4 ,this was the matter of the drum and its attendant limitations4 ,the motor's action being rotatory1 the winding drum was the only practical way in which to apply its motive power to hoisting4 ,this single fact shut electricity almost completely out of any large-scale elevator business until after the turn of the century4 ,true1 there was a certain amount of development1 after about #ahhg1 of the electric worm-drive drum machine for slow-speed1 low-rise service 7fig4 #ai74 ,but the first installation of this type that was considered practically successful--in that it was in continuous use for a long period--was not made until #ahhi1g the year in which the ,eiffel ,tower was completed4 ,pertinent is the one nearly successful attempt which was made to approach the high-rise problem electrically4 ,in #ahhh1 ,charles ,r4 ,pratt1 an elevator engineer of ,montclair1 ,new ,jersey1 invented a machine based on the horizontal cylinder rope-geared hydraulic elevator1 in which the two sets of sheaves were drawn apart by a screw and traveling nut4 ,the screw was revolved directly by a ,sprague motor1 the system being known as the ,sprague-,pratt4 ,while a number of installations were made1 the machine was subject to several serious mechanical faults and passed out of use around #aijj4 ,generally1 electricity as a practical workable power for elevators seemed to hold little promise in #ahhh4h ,illustration3 ,figure #ah4--,motor and drive mechanism of ,siemens' elevator4 7,from ,alfred ,r4 ,urbanitzky1 ,electricity in the ,service of ,man1 ,london1 #ahhf1 p4 #fdf47 ,illustration3 ,morse1 ,williams ,co41 ,,builders ,,of ,,passenger ,,and ,,freight ,,elevators4 ,,electric ,,elevator4 ,write us for ,circulars and ,prices4 ,main ,office and ,works1 #aaje ,frankford ,avenue1 ,,philadelphia4 ,new ,york ,office1 #ajh ,liberty ,street4 ,new ,haven #hb ,church ,street4 ,pittsburg #dac ,fourth ,avenue4 ,boston ,office #ai ,pearl ,street4 ,baltimore ,builders' ,exchange4 ,scranton #dbe ,spruce ,street4 ,figure #ai4--,the electric elevator in its earliest commercial form 7#ahia71 with the motor connected directly to the load4 ,by this time1 incandescent lighting circuits in large cities were sufficiently extensive to make such installations practical4 ,however1 capacity and lift were severely limited by weaknesses of the control system and the necessity of using a drum4 7,from ,electrical ,world1 ,jan4 #b1 #ahig1 vol4 #bj1 p4 xcvii47 ,illustration3 ,,miller',s ,,patent ,,life ,,and ,,labor-,,saving ,,screw ,,hoisting ,,machine1 ,,for ,,the ,,use ,,of ,stores1 ,hotels1 ,warehouses1 ,factories1 ,sugar ,refineries1 ,packing ,houses1 ,mills1 ,docks1 ,mines1 c4 ,,manufactured ,,by ,,campbell1 ,,whittier ,,co41 ,,roxbury1 ,,mass4 ,sole ,agents for the ,new ,england ,states4 ,the above ,engraving illustrates a very superior ,hoisting ,machine1 designed for ,store and ,warehouse ,hoisting4 ,it is very simple in its construction1 compact1 durable1 and not liable to get out of order4 ,an examination of the ,engraving will convince any one who has any knowledge of ,machinery1 that the screw is the only safe principle on which to construct a ,hoisting ,machine or ,elevator4 ,figure #bj4--;,advertisement for the ,miller screw-hoisting machine1 about #ahfg 7see p4 #bc74 ,from flyer in the ,united ,states ,national ,museum4 ,illustration3 ,figure #ba4--,the first widespread use of electricity in the elevator field was to drive belt-type mechanical machines and the pumps of hydraulic systems 7see p4 #ad7 as shown here4 7,from ,electrical ,world1 ,jan4 #d1 #ahij1 vol4 #ae1 p4 #d47 ,the ,tower's ,elevators ,a great part of the ,eiffel ,tower's worth and its raison d'tre lay in the overwhelming visual power by which it was to symbolize to a world audience the scientific1 artistic1 and1 above all1 the technical achievements of the ,french ,republic4 ,another consideration1 in ,eiffel's opinion1 was its great potential value as a scientific observatory4 ,at its summit grand experiments and observations would be possible in such fields as meteorology and astronomy4 ,in this respect it was welcomed as a tremendous improvement over the balloon and steam winch that had been featured in this service at the #ahgh ,paris exposition4 ,experiments were also to be conducted on the electrical illumination of cities from great heights4 ,the great strategic value of the ,tower as an observation post also was recognized4 ,but from the beginning1 sight was never lost of the structure's great value as an unprecedented public attraction1 and its systematic exploitation in this manner played a part in its planning1 second perhaps only to the basic design4 ,the conveyance of multitudes of visitors to the ,tower's first or main platform and a somewhat lesser number to the summit was a technical problem whose seriousness ,eiffel must certainly have been aware of at the project's onset4 ,while a few visitors could be expected to walk to the first or possibly second stage1 #cgg feet above the ground1 the main means of transport obviously had to be elevators4 ,indeed1 the two aspects of the ,tower with which the ,exposition commissioners were most deeply concerned were the adequate grounding of lightning and the provision of a reliable system of elevators1 which they insisted be unconditionally safe4 ,to study the elevator problem1 ,eiffel retained a man named ,backmann who was considered an expert on the subject4 ,apparently ,backmann originally was to design the complete system1 but he was to prove inadequate to the task4 ,as his few schemes are studied it becomes increasingly difficult to imagine by what qualifications he was regarded as either an elevator expert or designer by ,eiffel and the ,commission4 ,his proposals appear1 with one exception1 to have been decidedly retrogressive1 and1 further1 to incorporate the most undesirable features of those earlier systems he chose to borrow from4 ,nothing has been discovered regarding his work1 if any1 on elevators for the lower section of the ,tower4 ,realizing the difficulty of this aspect of the problem1 he may not have attempted its solution1 and confined his work to the upper half where the structure permitted a straight1 vertical run4 ,illustration3 ,figure #bb4--,various levels of the ,eiffel ,tower4 7,adapted from ,gustave ,eiffel1 ,la ,tour de ,trois ,cents ,mtres1 ,paris1 #aijj1 pl4 #a47 ,the ,backmann design for the upper elevators was based upon a principle which had been attractive to many inventors in the mid-#aith century period of elevator development--that of screwing the car up by means of a threaded element and a nut1 either of which might be rotated and the other remain stationary4 ,the analogy to a nut and bolt made the scheme an obvious one at that early time1 but its inherent complexity soon became equally evident and it never achieved practical success4 ,backmann projected two cylindrical cars that traveled in parallel shafts and balanced one another from opposite ends of common cables that passed over a sheave in the upperworks4 ,around the inside of each shaft extended a spiral track upon which ran rollers attached to revolving frames underneath the cars4 ,when the frames were made to revolve1 the rollers1 running around the track1 would raise or lower one car1 the other traveling in the opposite direction 7fig4 #bc74 ,illustration3 ,figure #bc4--;,backmann's proposed helicoidal elevator for the upper section of the ,eiffel ,tower4 ,the cars were to be self-powered by electric motors4 ,note similarity to the ,miller system 7fig4 #bj74 7,adapted from ,the ,engineer 7,london71 ,aug4 #c1 #ahhh1 vol4 #ff1 p4 #aja47 ,in the plan as first presented1 a ground-based steam engine drove the frames and rollers through an endless fly rope--traveling at high speed presumably to permit it to be of small diameter and still transmit a reasonable amount of power--which engaged pulleys on the cars4 ,the design was remarkably similar to that of the ,miller ,patent ,screw ,hoisting ,machine1 which had had a brief life in the ,united ,states around #ahfe4 ,the ,miller system 7see p4 #ai7 used a flat belt rather than a rope 7fig4 #bj74 ,this plan was quickly rejected1 probably because of anticipated difficulties with the rope transmission4#i ,backmann's second proposal1 actually approved by the ,commission1 incorporated the only--although highly significant--innovation evident in his designs4 ,for the rope transmission1 electric motors were substituted1 one in each car to drive the roller frame directly4 ,with this modification1 the plan does not seem quite as unreasonable1 and would probably have worked4 ,however1 it would certainly have lacked the necessary durability and would have been extremely expensive4 ,the ,commission discarded the whole scheme about the middle of #ahhh1 giving two reasons for its action3 7#a7 the novelty of the system and the attendant possibility of stoppages which might seriously interrupt the exploitation of the ,tower1 and 7#b7 fear that the rollers running around the tracks would cause excessive noise and vibration4 ,both reasons seem quite incredible when the ,backmann system is compared to one of those actually used--the ,roux1 described below--which obviously must have been subject to identical failings1 and on a far greater scale4 ,more likely there existed an unspoken distrust of electric propulsion4 ,that the ,backmann system should have been given serious consideration at all reflects the uncertainty surrounding the entire matter of providing elevator service of such unusual nature4 ,had the ,eiffel ,tower been erected only #ae years later1 the situation would have been simply one of selection4 ,as it was1 ,eiffel and the commissioners were governed not by what they wanted but largely by what was available4 ,,the ,,otis ,,system ,the curvature of the ,tower's legs imposed a problem unique in elevator design1 and it caused great annoyance to ,eiffel1 the fair's ,commission1 and all others concerned4 ,since a vertical shaftway anywhere within the open area beneath the first platform was esthetically unthinkable1 the elevators could be placed only in the inclined legs4 ,the problem of reaching the first platform was not serious4 ,the legs were wide enough and their curvature so slight in this lower portion as to permit them to contain a straight run of track1 and the service could have been designed along the lines of an ordinary inclined railway4 ,it was estimated that the great majority of visitors would go only to this level1 attracted by the several international restaurants1 bars and other features located there4 ,two elevators to operate only that far were contracted for with no difficulty--one to be placed in the east leg and one in the west4 ,to transport people to the second platform was an altogether different problem4 ,since there was to be a single run from the ground1 it would have been necessary to form the elevator guides either with a constant curvature1 approximating that of the legs1 or with a series of straight chords connected by short segmental curves of small radius4 ,eiffel planned initially to use the first method1 but the second was adopted ultimately1 probably as being the simpler because only two straight lengths of run were found to be necessary4 ,bids were invited for two elevators on this basis--one each for the north and south legs4 ,here the unprecedented character of the matter became evident--there was not a firm in ,france willing to undertake the work4 ,the ,american ,elevator ,company1 the ,european branch of ,otis ,brothers ,company1 did submit a proposal through its ,paris office1 ,otis ,ascenseur ,cie41 but the ,commission was compelled to reject it because a clause in the fair's charter prohibited the use of any foreign material in the construction of the ,tower4 ,furthermore1 there was a strong prejudice against foreign contractors1 which1 because of the general background of disfavor surrounding the project during its early stages1 was an element worth serious consideration by the ,commission4 ,the bidding time was extended1 and many attempts were made to attract a native design but none was forthcoming4 ,as time grew short1 it became imperative to resolve the matter1 and the ,commission1 in desperation1 awarded the contract to ,otis in ,july #ahhg for the amount of #bb1ejj4aj ,a curious footnote to the affair appeared much later in the form of a published interview#aa with ,w4 ,frank ,hall1 ,otis' ,paris representative3 ,yes1 said ,mr4 ,hall1 this is the first elevator of its kind4 ,our people for thirty-eight years have been doing this work1 and have constructed thousands of elevators vertically1 and many on an incline1 but never one to strike a radius of #afj feet for a distance of over #ej feet4 ,it has required a great amount of preparatory study and we have worked on it for three years4 ,that was before you got the contract8 ,quite so1 but we knew that1 although the ,french authorities were very reluctant to give away this piece of work1 they would be bound to come to us1 and so we were preparing for them4 ,such supreme confidence must have rapidly evaporated as events progressed4 ,despite the invaluable advertising to be derived from an installation of such distinction1 the ,otises would probably have defaulted had they foreseen the difficulties which preceded completion of the work4 ,illustration3 ,figure #bd4--;,general arrangement of ,otis elevator system in ,eiffel ,tower4 7,from ,the ,engineer 7,london71 ,july #ai1 #ahhi1 vol4 #fh1 p4 #eh47 ,the proposed system 7fig4 #bd7 was based fundamentally upon ,otis' standard hydraulic elevator1 but it was recognizable only in basic operating principle 7fig4 #be74 ,tracks of regular rail section replaced the guides because of the incline1 and the double-decked cabin 7fig4 #bi7 ran on small flanged wheels4 ,this much of the apparatus was really not unlike that of an ordinary inclined railway4 ,motive power was provided by the customary hydraulic cylinder 7fig4 #bf71 set on an angle roughly equal to the incline of the lower section of run4 ,balancing the cabin's dead weight was a counterpoise carriage 7fig4 #bg7 loaded with pig iron that traveled on a second set of rails beneath the main track4 ,like the driving system1 the counterweight was rope-geared1 #c to #a1 so that its travel was about #abe feet to the cabin's #cgg feet4 ,illustration3 ,figure #be4--,schematic diagram of the rigging of the ,otis system4 7,adapted from ,gustave ,eiffel1 ,la ,tour de ,trois ,cents ,mtres1 ,paris1 #aijj1 p4 #abg47 ,everything about the system was on a scale far heavier than found in the normal elevator of the type4 ,the cylinder1 of #ch-;inch bore1 was #cf feet long4 ,rather than a simple nest of pulleys1 the piston rods pulled a large guided carriage or chariot bearing six movable sheaves 7fig4 #bh74 ,corresponding were five stationary sheaves1 the whole reeved to form an immense #ab-purchase tackle4 ,the car1 attached to the free ends of the cables1 was hauled up as the piston drew the two sheave assemblies apart4 ,in examining the system1 it is difficult to determine what single element in its design might have caused such a problem as to have been beyond the engineering ability of a ,french firm1 and to have caused such concern to a large1 well-established ,american organization of ,otis' wide elevator and inclined railway experience4 ,indeed1 when the ,french system--which served the first platform from the east and west legs--is examined1 it appears curious that a national technology capable of producing a machine at such a level of complexity should have been unable to deal easily with the entire matter4 ,this can be plausibly explained only on the basis of ,europe's previously mentioned lack of experience with rope-geared and other cable-hung elevator systems4 ,the difficulty attending ,otis' work1 usually true in the case of all innovations1 lay unquestionably in the multitudes of details--many of them1 of course1 invisible when only the successfully working end product is observed4 ,more than a matter of detail was the ,commission's demand for perfect safety1 which precipitated a situation typical of many confronting ,otis during the entire work4 ,otis had wished to coordinate the entire design process through ,mr4 ,hall1 with technical matters handled by mail4 ,nevertheless1 at ,eiffel's insistence1 and with some inconvenience1 in #ahhh the company dispatched the project's engineer1 ,thomas ,e4 ,brown1 ,jr41 to ,paris for a direct consultation4 ,mild conflict over minor details ensued1 but a gross difference of opinion arose ultimately between the ,american and ,french engineers over the safety of the system4 ,the disagreement threatened to halt the entire project4 ,in common with all elevators in which the car hangs by cables1 the prime consideration here was a means of arresting the cabin should the cables fail4 ,as originally presented to ,eiffel1 the plans indicated an elaborate modification of the standard ,otis safety device--itself a direct derivative of ,e4 ,g4 ,otis' original4 ,if any one of the six hoisting cables broke or stretched unduly1 or if their tension slackened for any reason1 powerful leaf springs were released causing brake shoes to grip the rails4 ,the essential feature of the design was the car's arrest by friction between its grippers and the rails so that the stopping action was gradual1 not sudden as in the elevator safety4 ,during proof trials of the safety1 made prior to the fair's opening by cutting away a set of temporary hoisting cables1 the cabin would fall about #aj feet before being halted4 ,illustration3 ,figure #bf4--,section through the ,otis power cylinder4 7,adapted from ,gustave ,eiffel1 ,la ,tour de ,trois ,cents ,mtres1 ,paris1 #aijj1 pl4 #bb47 ,illustration3 ,figure #bg4--;,details of the counterweight carriage in the ,otis system4 7,from ,gustave ,eiffel1 ,la ,tour de ,trois ,cents ,mtres1 ,paris1 #aijj1 pl4 #bbd47 ,although highly efficient and of unquestionable security1 this safety device was considered an insufficient safeguard by ,eiffel1 who1 speaking in the name of the ,commission1 demanded the application of a device known as the rack and pinion safety that was used to some extent on ,european cog railways4 ,the commissioners not only considered this system more reliable but felt that one of its features was a necessity3 a device that permitted the car to be lowered by hand1 even after failure of all the hoisting cables4 ,the serious shortcomings of the rack and pinion were its great noisiness and the limitation it imposed on hoisting speed4 ,both disadvantages were due to the constant engagement of a pinion on the car with a continuous rack set between the rails4 ,the meeting ended in an impasse1 with ,brown unwilling to approve the objectionable apparatus and able only to return to ,new ,york and lay the matter before his company4 ,while ,eiffel's attitude in the matter may appear highly unreasonable1 it must be said that during a subsequent meeting between ,brown and ,koechlin1 the ,french engineer implied that a mutual antagonism had arisen between the ,tower's creator and the ,commission4 ,thus1 since his own judgment must have had little influence with the commissioners at that time1 ,eiffel was compelled to specify what he well knew were excessive safety provisions4 ,this decision placed ,otis ,brothers in a decidedly uncomfortable position1 at the mercy of the ,commission4 ,w4 ,e4 ,hale1 promoter of the water balance elevator--who by then had a strong voice in ,otis' affairs--expressed the seriousness of the matter in a letter to the company's president1 ,charles ,r4 ,otis1 following receipt of ,brown's report on the ,paris conference4 ,referring to the controversial cogwheel1 ,hale wrote 444 if this must be arranged so that the car is effected sic in its operation by constant contact with the rack and pinion 444 so as to communicate the noise and jar1 and unpleasant motion which such an arrangement always produces1 ,i should favor giving up the whole matter rather than allying ourselves with any such abortion4444 we would be the laughing stock of the world1 for putting up such a contrivance4 ,this difficult situation apparently was the product of a somewhat general contract phrased in terms of service to be provided rather than of specific equipment to be used4 ,this is not unusual1 but it did leave open to later dispute such ambiguous clauses as adequate safety devices are to be provided4 ,although faced with the loss not only of all previously expended design work but also of an advertisement of international consequence1 the company apparently concurred with ,hale and so advised ,paris4 ,unfortunately1 there are no ,otis records to reveal the subsequent transactions1 but we may assume that ,otis' threat of withdrawal prevailed1 coupled as it was with ,eiffel's confidence in the ,american equipment4 ,the system went into operation as originally designed1 free of the odious rack and pinion4 ,that1 unfortunately1 was not the final disagreement4 ,before the fair's opening in ,may #ahhi1 the relationship was strained so drastically that a mutually satisfactory conclusion to the project must indeed have seemed hopeless4 ,the numerous minor structural modifications of the ,tower legs found necessary as construction progressed had necessitated certain equivalent alteration to the ,otis design insofar as its dependency upon the framework was affected4 ,consequently1 work on the machinery was set back by some months4 ,eiffel was informed that although everything was guaranteed to be in full operation by opening day on ,may #a1 the contractual deadline of ,january #a could not possibly be met4 ,eiffel1 now unquestionably acting on his own volition1 responded by cable1 refusing all payment4 ,charles ,otis' reply1 a classic of indignation1 disclosed to ,eiffel the jeopardy in which his impetuosity had placed the success of the entire project3 ,after all else we have borne and suffered and achieved in your behalf1 we regard this as a trifle too much2 and we do not hesitate to declare1 in the strongest terms possible to the ,english language1 that we will not put up with it 444 and1 if there is to be ,war1 under the existing circumstances1 propose that at least part of it shall be fought on ,american ground4 ,if ,mr4 ,eiffel shall1 on the contrary1 treat us as we believe we are entitled to be treated1 under the circumstances1 and his confidence in our integrity to serve him well shall be restored in season to admit of the completion of this work at the time wanted1 well and good2 but it must be done at once 444 otherwise we shall ship no more work from this side1 and ,mr4 ,eiffel must charge to himself the consequences of his own acts4 ,this message apparently had the desired effect and the matter was somehow resolved1 as the machinery was in full operation when the ,exposition opened4 ,the installation must have had immense promotional value for ,otis ,brothers1 particularly in its contrast to the somewhat anomalous ,french system4 ,this contrast evidently was visible to the technically unsophisticated as well as to visiting engineers4 ,several newspapers reported that the ,otis elevators were one of the best ,american exhibits at the fair4 ,in spite of their large over-all scale and the complication of the basic pattern imposed by the unique situation1 the ,otis elevators performed well and justified the original judgment and confidence which had prompted ,eiffel to fight for their installation4 ,aside from the obvious advantage of simplicity when compared to the ,french machines1 their operation was relatively quiet1 and fast4 ,the double car1 traveling at #djj feet per minute1 carried #dj persons1 all seated because of the change of inclination4 ,the main valve or distributor that controlled the flow of water to and from the driving cylinder was operated from the car by cables4 ,the hydraulic head necessary to produce pressure within the cylinder was obtained from a large open reservoir on the second platform4 ,after being exhausted from the cylinder1 the water was pumped back up by two ,girard pumps 7fig4 #ca7 in the engine room at the base of the ,tower's south leg4 ,,the ,,system ,,of ,,roux1 ,,combaluzier ,,and ,,lepape ,there can be little doubt that the ,french elevators placed in the east and west piers to carry visitors to the first stage of the ,tower had the important secondary function of saving face4 ,that an engineer of ,eiffel's mechanical perception would have permitted their use1 unless compelled to do so by the ,exposition ,commission1 is unthinkable4 ,whatever the attitudes of the commissioners may have been1 it must be said--recalling the ,backmann system--that they did not fear innovation4 ,the machinery installed by the firm of ,roux1 ,combaluzier and ,lepape was novel in every respect1 but it was a product of misguided ingenuity and set no precedent4 ,the system1 never duplicated1 was conceived1 born1 lived a brief and not overly creditable life1 and died1 entirely within the ,tower4 ,basis of the ,french system was an endless chain of short1 rigid1 articulated links 7fig4 #ce71 to one point of which the car was attached4 ,as the chain moved1 the car was raised or lowered4 ,recalling the ,european distrust of suspended elevators1 it is interesting to note that the car was pushed up by the links below1 not drawn by those above1 thus the active links were in compression4 ,to prevent buckling of the column1 the chain was enclosed in a conduit 7fig4 #cf74 ,excessive friction was prevented by a pair of small rollers at each of the knuckle joints between the links4 ,the system was1 in fact1 a duplicate one1 with a chain on either side of the car4 ,at the bottom of the run the chains passed around huge sprocket wheels1 #ab4hj feet in diameter1 with pockets on their peripheries to engage the joints4 ,smaller wheels at the top guided the chains4 ,if by some motive force the wheel 7fig4 #cc7 were turned counterclockwise1 the lower half of the chain would be driven upward1 carrying the car with it4 ,slots on the inside faces of the lower guide trunks permitted passage of the connection between the car and chain4 ,lead weights on certain links of the chains' upper or return sections counterbalanced most of the car's dead weight4 ,illustration3 ,figure #bh4--,plan and section of the ,otis system's movable pulley assembly1 or chariot4 ,piston rods are at left4 7,adapted from ,the ,engineer 7,london71 ,july #ai1 #ahhi1 vol4 #fh1 p4 #eh47 ,two horizontal cylinders rotated the driving sprockets through a mechanism whose effect was similar to the rope-gearing of the standard hydraulic elevator1 but which might be described as chain gearing4 ,the cylinders were of the pushing rather than the pulling type used in the ,otis system2 that is1 the pressure was introduced behind the plungers1 driving them out4 ,to the ends of the plungers were fixed smooth-faced sheaves1 over which were looped heavy quadruple-link pitch chains1 one end of each being solidly attached to the machine base4 ,the free ends ran under the cylinder and made another half-wrap around small sprockets keyed to the main drive shaft4 ,as the plungers were forced outward1 the free ends of the chain moved in the opposite direction1 at twice the velocity and linear displacement of the plungers4 ,the drive sprockets were thereby revolved1 driving up the car4 ,descent was made simply by permitting the cylinders to exhaust1 the car dropping of its own weight4 ,the over-all gear or ratio of the system was the multiplication due to the double purchase of the plunger sheaves times the ratio of the chain and drive sprocket diameters3 #b7ab4hj_/a4ig7 or about #ac3a4 ,to drive the car #bah feet to the first platform of the ,tower the plungers traveled only about #af4e feet4 ,to penetrate the inventive rationale behind this strange machine is not difficult4 ,aware of the fundamental dictum of absolute safety before all else1 the ,roux engineers turned logically to the safest known elevator type--the direct plunger4 ,this type of elevator1 being well suited to low rises1 formed the main body of ,european practice at the time1 and in this fact lay the further attraction of a system firmly based on tradition4 ,since the piers between the ground and first platform could accommodate a straight1 although inclined run1 the solution might obviously have been to use an inclined1 direct plunger4 ,the only difficulty would have been that of drilling a #bbj-;foot1 inclined well for the cylinder4 ,while a difficult problem1 it would not have been insurmountable4 ,what then was the reason for using a design vastly more complex8 ,the only reasonable answer that presents itself is that the designers1 working in a period before the ,otis bid had been accepted1 were attempting to evolve an apparatus capable of the complete service to the second platform4 ,the use of a rigid direct plunger thus precluded1 it became necessary to transpose the basic idea in order to adapt it to the curvature of the ,tower leg1 and at the same time retain its inherent quality of safety4 ,continuing the conceptual sequence1 the idea of a plunger made in some manner flexible apparently suggested itself1 becoming the heart of the ,roux machines4 ,illustration3 ,figure #bi4--,section through cabin of the ,otis elevator4 ,note the pivoted floor-sections4 ,as the car traveled1 these floor-sections were leveled by the operator to compensate for the change of inclination2 however1 they were soon removed because they interfered with the loading and unloading of passengers4 7,from ,la ,nature1 ,may #d1 #ahhi1 vol4 #ag1 p4 #cfj47 ,here then was a design exhibiting strange contrast4 ,it was on the one hand completely novel1 devised expressly for this trying service2 yet on the other hand it was derived from and fundamentally based on a thoroughly traditional system4 ,if nothing else1 it was safe beyond question4 ,in ,eiffel's own words1 the ,roux lifts not only were safe1 but appeared safe2 a most desirable feature in lifts traveling to such heights and carrying the general public4#ab ,the system's shortcomings could hardly be more evident4 ,friction resulting from the more than #cbj joints in the flexible pistons1 each carrying two rollers1 plus that from the pitch chains must have been immense4 ,the noise created by such multiplicity of parts can only be imagined4 ,capacity was equivalent to that of the ,otis system4 ,about #ajj people could be carried in the double-deck cabin1 some standing4 ,the speed1 however1 was only #bjj feet per minute1 understandably low4 ,if it had been the initial intention of the designers to operate their cars to the second platform1 they must shortly have become aware of the impracticability of this plan1 caused by an inherent characteristic of the apparatus4 ,as long as the compressive force acted along the longitudinal axis of the links1 there was no lateral resultant and the only load on the small rollers was that due to the dead weight of the link itself4 ,however1 if a curve had been introduced in the guide channels to increase the incline of the upper run1 as done by ,otis1 the force on those links traversing the bend would have been eccentric--assuming the car to be in the upper section1 above the bend4 ,the difference between the two sections 7based upon the ,otis system7 was #ghi' minus #edce'1 or #bccd'1 the tangent of which equals #j4dcf4 ,forty-three percent of the unbalanced weight of the car and load would then have borne upon the1 say1 #ab sets of rollers on the curve4 ,the immense frictional load thus added to the entire system would certainly have made it dismally inefficient1 if not actually unworkable4 ,in spite of ,eiffel's public remarks regarding the safety of the ,roux machinery1 in private he did not trouble to conceal his doubts4 ,otis' representative1 ,hall1 discussing this toward the end of ,brown's previously mentioned report1 probably presented a fairly accurate picture of the situation4 ,his comments were based on conversations with ,eiffel and ,koechlin3 ,mr4 ,gibson1 ,mr4 ,hanning who were other ,otis employees and myself came to the unanimous conclusion that ,mr4 ,eiffel had been forced to order those other machines1 from outside parties1 against his own judgment3 and that he was very much in doubt as to their being a practical success--and was1 therefore1 all the more anxious to put in our machines 7which he did have faith in7 444 and if the others ate up coal in proportions greatly in excess of ours1 he would have it to say 444 ,gentlemen1 these are my choice of elevators1 those are yours c4 ,there was a published interview 444 in which ,eiffel stated 444 that he was to meet some ,american gentlemen the following day1 who were to provide him with elevators--grand elevators1 ,i think he said4444 ,illustration3 ,figure #cj4--,upperworks and passenger platforms of the ,otis system at second level4 7,from ,la ,nature1 ,aug4 #aj1 #ahhi1 vol4 #ag1 p4 #afi47 ,the ,roux and the ,otis systems both drew their water supply from the same tanks2 also1 each system used similar distributing valves 7fig4 #cb7 operated from the cars4 ,although no reports have been found of actual controlled tests comparing the efficiencies of the ,otis and ,roux systems1 a general quantitative comparison may be made from the balance figures given for each 7p4 #dj71 where it is seen that #b1ffe pounds of excess tractive effort were allowed to overcome the friction of the ,otis machinery against #ac1hef pounds for the ,roux4 ,,the ,,edoux ,,system ,the section of the ,tower presenting the least difficulty to elevator installation was that above the juncture of the four legs--from the second platform to the third1 or observation1 enclosure4 ,there was no question that ,french equipment could perform this service4 ,the run being perfectly straight and vertical1 the only unusual demand upon contemporary elevator technology was the length of rise--#ebe feet4 ,the system ultimately selected 7fig4 #cg7 appealed to the ,commission largely because of a similar one that had been installed in one tower of the famous ,trocadero#ac and which had been operating successfully for #aj years4 ,it was the direct plunger system of ,leon ,edoux1 and was1 for the time1 far more rationally contrived than ,backmann's helicoidal system4 ,edoux1 an old schoolmate of ,eiffel's1 had built thousands of elevators in ,france and was possibly the country's most successful inventor and manufacturer in the field4 ,it is likely that he did not attempt to obtain the contract for the elevator equipment in the ,tower legs1 as his experience was based almost entirely on plunger systems1 a type1 as we have seen1 not readily adaptable to that situation4 ,what is puzzling was the failure of the ,commission's members to recognize sooner ,edoux's obvious ability to provide equipment for the upper run4 ,it may have been due to their inexplicable confidence in ,backmann4 ,illustration3 ,figure #ca4--,the ,french ,girard pumps that supplied the ,otis and ,roux systems4 7,from ,la ,nature1 ,oct4 #e1 #ahhi1 vol4 #ag1 p4 #bib47 ,the direct plunger elevator was the only type in which ,european practice was in advance of ,american practice at this time4 ,not until the beginning of the #bjth century1 when hydraulic systems were forced into competition with electrical systems1 was the direct plunger elevator improved in ,america to the extent of being practically capable of high rises and speeds4 ,another reason for its early disfavor in the ,united ,states was the necessity for drilling an expensive plunger well equal in length to the rise4#ad ,as mentioned1 the most serious problem confronting ,edoux was the extremely high rise of #ebe feet4 ,the ,trocadero elevator1 then the highest plunger machine in the world1 traveled only about #bcj feet4 ,a secondary difficulty was the esthetic undesirability of permitting a plunger cylinder to project downward a distance equal to such a rise1 which would have carried it directly into the center of the open area beneath the first platform 7fig4 #f74 ,both problems were met by an ingenious modification of the basic system4 ,the run was divided into two equal sections1 each of #bfb feet1 and two cars were used4 ,one operated from the bottom of the run at the second platform level to an intermediate platform half-way up1 while the other operated from this point to the observation platform near the top of the ,tower4 ,the two sections were of course parallel1 but offset4 ,a central guide1 on the ,tower's center-line1 running the entire #ebe feet served both cars1 with shorter guides on either side--one for the upper and one for the lower run4 ,thus1 each car traveled only half the total distance4 ,the two cars were connected1 as in the ,backmann system1 by steel cables running over sheaves at the top1 balancing each other and eliminating the need for counterweights4 ,two driving rams were used4 ,by being placed beneath the upper car1 their cylinders extended downward only the #bfb feet to the second platform and so did not project beyond the confines of the system itself4#ae ,in making the upward or downward trip1 the passengers had to change from one car to the other at the intermediate platform1 where the two met and parted 7fig4 #ci74 ,this transfer was the only undesirable feature of what was1 on the whole1 a thoroughly efficient and well designed work of elevator engineering4 ,illustration3 ,figure #cb4--,the ,otis distributor1 with valves shown in motionless1 neutral position4 ,since the main valve at all times was subjected to the full operating pressure1 it was necessary to drive this valve with a servo piston4 ,the control cable operated only the servo piston's valve4 7,adapted from ,gustave ,eiffel1 ,la ,tour de ,trois ,cents ,mtres1 ,paris1 #aijj1 p4 #acj47 ,illustration3 ,figure #cc4--;,general arrangement of the ,roux ,combaluzier and ,lepape elevator4 ,illustration3 ,figure #cd4--,roux1 ,combaluzier and ,lepape machinery and cabin at the ,tower's base4 7,from ,la ,nature1 ,aug4 #aj1 #ahhi1 vol4 #ag1 p4 #afh47 ,in operation1 water was admitted to the two cylinders from a tank on the third platform4 ,the resultant hydraulic head was sufficient to force out the rams and raise the upper car4 ,as the rams and car rose1 the rising water level in the cylinders caused a progressive reduction of the available head4 ,this negative effect was further heightened by the fact that1 as the rams moved upward1 less and less of their length was buoyed by the water within the cylinders1 increasing their effective weight4 ,these two factors were1 however1 exactly compensated for by the lengthening of the cables on the other side of the pulleys as the lower car descended4 ,perfect balance of the system's dead load for any position of the cabins was1 therefore1 a quality inherent in its design4 ,however1 there were two extreme conditions of live loading which required consideration3 the lower car full and the upper empty1 or vice versa4 ,to permit the upper car to descend under the first condition1 the plungers were made sufficiently heavy1 by the addition of cast iron at their lower ends1 to overbalance the weight of a capacity load in the lower car4 ,the second condition demanded simply that the system be powerful enough to lift the unbalanced weight of the plungers plus the weight of passengers in the upper car4 ,as in the other systems1 safety was a matter of prime importance4 ,in this case1 the element of risk lay in the possibility of the suspended car falling4 ,the upper car1 resting on the rams1 was virtually free of such danger4 ,here again the influence of ,backmann was felt--a brake of his design was applied 7fig4 #ch74 ,it was1 true to form1 a throwback1 similar safety devices having proven unsuccessful much earlier4 ,attached to the lower car were two helically threaded vertical rollers1 working within the hollow guides4 ,corresponding helical ribs in the guides rotated the rollers as the car moved4 ,if the car speed exceeded a set limit1 the increased resistance offered by the apparatus drove the rollers up into friction cups1 slowing or stopping the car4 ,illustration3 ,figure #ce4--;,detail of links in the ,roux system4 7,from ,gustave ,eiffel1 ,la ,tour de ,trois ,cents ,mtres1 ,paris1 #aijj1 p4 #aef47 ,illustration3 ,figure #cf4--,section of guide trunks in the ,roux system4 7,from ,gustave ,eiffel1 ,la ,tour de ,trois ,cents ,mtres1 ,paris1 #aijj1 p4 #aef47 ,the device was considered ineffectual by ,edoux and ,eiffel1 who were aware that the ultimate safety of the system resulted from the use of supporting cables far heavier than necessary4 ,there were four such cables1 with a total sectional area of #ae4e square inches4 ,the total maximum load to which the cables might be subjected was about #dg1jjj pounds1 producing a stress of about #c1jjj pounds per square inch compared to a breaking stress of #adj1jjj pounds per square inch--a safety factor of #df6af ,illustration3 ,figure #cg4--,schematic diagram of the ,edoux system4 7,adapted from ,gustave ,eiffel1 ,la ,tour de ,trois ,cents ,mtres1 ,paris1 #aijj1 p4 #age47 ,illustration3 ,figure #ch4--,vertical section through lower 7suspended7 ,edoux car1 showing ,backmann helicoidal safety brake4 7,adapted from ,gustave ,eiffel1 ,la ,tour ,eiffel en #aijj1 ,paris1 #aijb1 p4 #ab47 ,a curiosity in connection with the ,edoux system was the use of ,worthington 7,american7 pumps 7fig4 #dj7 to carry the water exhausted from the cylinders back to the supply tanks4 ,no record has been found that might explain why this particular exception was made to the foreign materials stipulation4 ,this exception is even more strange in view of ,otis' futile request for the same pumps and the fact that any number of native machines must have been available4 ,it is possible that ,edoux's personal influence was sufficient to overcome the authority of the regulation4 ,illustration3 ,figure #ci4--,passengers changing cars on ,edoux elevator at intermediate platform4 7,from ,la ,nature1 ,may #d1 #ahhi1 vol4 #ag1 p4 #cfa47 ,illustration3 ,figure #dj4--,worthington tandem compound steam pumps1 at base of the ,tower's south pier1 supplied water for the ,edoux system4 ,the tank was at #hif feet1 but suction was taken from the top of the cylinders at #fdc feet2 therefore1 the pumps worked against a head of only about #bej feet4 7,from ,la ,nature1 ,oct4 #e1 #ahhi1 vol4 #ag1 p4 #bic47 ,illustration3 ,figure #da4--,recent view of lower car of the ,edoux system1 showing slotted cylindrical guides that enclose the cables4 ,epilogue ,in #aijj1 after the customary #aa-year period1 ,paris again prepared for an international exposition1 about #e years too early to take advantage of the great progress made by the electric elevator4 ,when the ,roux machines1 the weakest element in the ,eiffel ,tower system1 were replaced at this time1 it was by other hydraulics4 ,built by the well known ,french engineering organization of ,fives-,lilles1 the new machines were the ultimate in power1 control1 and general excellence of operation4 ,as in the ,otis system1 the cars ran all the way to the second platform4 ,the ,fives-,lilles equipment reflected the advance of ,european elevator engineering in this short time4 ,the machines were rope-geared and incorporated the elegant feature of self-leveling cabins which compensated for the varying track inclination4 ,for the #aijj fair1 the ,otis elevator in the south pier was also removed and a wide stairway to the first platform built in its place4 ,in #aiab1 #be years after ,backmann's startling proposal to use electricity for his system1 the remaining ,otis elevator was replaced by a small electric one4 ,this innovation was reluctantly introduced solely for the purpose of accommodating visitors in the winter when the hydraulic systems were shut down due to freezing weather4 ,the electric elevator had a short life1 being removed in #aibb when the number of winter visitors increased far beyond its capacity4 ,however1 the two hydraulic systems were modified to operate in freezing temperatures--presumably by the simple expedient of adding an antifreezing chemical to the water--and operation was placed on a year-round basis4 ,today the two ,fives-,lilles hydraulic systems remain in full use2 and visitors reach the ,tower's summit by ,edoux's elevator 7fig4 #da71 which is all that remains of the original installation4 ,,balance ,,of ,,the ,,three ,,elevator ,,systems ,the ,otis ,system ,negative effect ,weight of cabin3 #bc1ijj lb4 sin #ghi' 7incline of upper run7 #bc1cij lb4 ,live load3 #dj persons #aej lb4 #f1jjj sin #ghi' #e1hgb ------ -- #bi1bfb lb4 ,positive effect ,counterweight3 #ee1jjj sin #edce' 7incline of lower run7 ---------------------------------------- -- #c 7rope gear ratio7 #ad1idj lb4 ,weight of piston and chariot3 #cc1jfj sin #edce' ------------------ #ab 7ratio7 #b1bde ,power3 #aef p4s4i4 #a1acd sq4 in4 7piston area7 ---------------------------------------- #ab 7ratio7 #ad1gdb #ca1ibg lb4 ,excess to overcome friction #b1ffe lb4 ,the ,roux1 ,combaluzier and ,lepape ,system ,negative effect ,weight of cabin3 #ad1ajj sin #edce' #aa1ejj lb4 ,live load3 #ajj persons #aej lb4 #ae1jjj sin #edce' #ab1bbj ------ -- #bc1gbj lb4 ,positive effect ,counterweight3 #f1fjj sin #edce' #e1chj ,power3 #aef p4s4i4 #b 7pistons7 #a1cda4e sq4 in4 7piston area7 ---------------------------------------- -- #ac 7ratio7 #cb1aif #cg1egf lb4 ------ ---------- ,excess to overcome friction #ac1hef lb4 ,the ,edoux ,system ,negative effect ,unbalanced weight of plungers 7necessary to raise full lower car and weight of cables on lower side7 #db1ccj lb4 ,live load3 #fj persons #aej lb4 #i1jjj ------ -- #ea1ccj lb4 ,positive effect ,power3 #bbg4e p4s4i4 #b 7plungers7 #abd sq4 in4 7plunger area7 #ef1dbj lb4 ---------- ,excess to overcome friction #e1jij lb4 ,footnotes3 #a ,translated from ,jean ,a4 ,keim1 ,la ,tour ,eiffel1 ,paris1 #aiej4 #b ,the foundation footings exerted a pressure on the earth of about #bjj pounds per square foot1 roughly one-sixth that of the ,washington ,monument1 then the highest structure in the world4 #c ,a type of elevator known as the teagle was in use in some multistory ,english factories by about #ahce4 ,from its description1 this elevator appears to have been primarily for the use of passengers1 but it unquestionably carried freight as well4 ,the machine shown in figure #g had1 with the exception of a car safety1 all the features of later systems driven from line shafting--counterweight1 control from the car1 and reversal by straight and crossed belts4 #d ,the ,otis safety1 of which a modified form is still used1 consisted essentially of a leaf wagon spring1 on the car frame1 kept strained by the tension of the hoisting cables4 ,if these gave way1 the spring1 released1 drove dogs into continuous racks on the vertical guides1 holding the car or platform in place4 #e ,a notable exception was the elevator in the ,washington ,monument4 ,installed in #ahhj for raising materials during the structure's final period of erection and afterwards converted to passenger service1 it was for many years the highest-rise elevator in the world 7about #ejj feet71 and was certainly among the slowest1 having a speed of #ej feet per minute4 #f ,today1 although not limited by the machinery1 speeds are set at a maximum of about #a1djj feet per minute4 ,if higher speeds were used1 an impractically long express run would be necessary for starting and stopping in order to prevent an acceleration so rapid as to be uncomfortable to passengers and a strain on the equipment4 #g ,two machines1 by ,otis1 in the ,demarest ,building1 ,fifth ,avenue and #cc;d ,street1 ,new ,york4 ,they were in use for over #cj years4 #h ,although the eventually successful application of electric power to the elevator did not occur until #aijd1 and therefore goes beyond the chronological scope of this discussion1 it was of such importance insofar as current practice is concerned as to be worthy of brief mention4 ,in that year the first gearless traction machine was installed by ,otis in a ,chicago theatre4 ,as the name implies1 the cables were not wrapped on a drum but passed1 from the car1 over a grooved sheave directly on the motor shaft1 the other ends being attached to the counterweights4 ,the result was a system of beautiful simplicity1 capable of any rise and speed with no proportionate increase in the number or size of its parts1 and free from any possibility of car or weights being drawn into the machinery4 ,this system is still the only one used for rises of over #ajj feet or so4 ,by the time of its introduction1 motor controls had been improved to the point of complete practicability4 #i ,mechanical transmission of power by wire rope was a well developed practice at this time1 involving in many instances high powers and distances up to a mile4 ,to attempt this system in the ,eiffel ,tower1 crowded with structural work1 machinery and people1 was another matter4 #aj ,according to ,otis ,elevator ,company1 the final price1 because of extras1 was #cj1jjj4 #aa ,in ,pall ,mall ,gazette1 as quoted in ,the ,engineering and ,building ,record and the ,sanitary ,engineer1 ,may #be1 #ahhi1 vol4 #ai1 p4 #cde4 #ab ,from speech at annual summer meeting of ,institution of ,mechanical ,engineers1 ,paris1 #ahhi4 ,quoted in ,engineering1 ,july #e1 #ahhi1 vol4 #dh1 p4 #ah4 #ac ,located near the ,tower1 built for the ,paris fair of #ahgh4 #ad ,improved oil-well drilling techniques were influential in the intense but short burst of popularity enjoyed by direct plunger systems in the ,united ,states between #ahii and #aiaj4 ,in ,new ,york1 many such systems of #bjj-;foot rise1 and one of #chj feet1 were installed4 #ae ,an obvious question arises here3 ,what prevents a plunger #bjj or #cjj feet long and no more than #af inches in diameter from buckling under its compressive loading8 ,the answer is simply that most of this length is not in compression but in tension4 ,the ,edoux rams1 when fully extended1 virtually hung from the upper car1 sustained by the weight of #ejj feet of cable on the other side of the sheaves4 ,as the upper car descended this effect diminished1 but as the rams moved back into the cylinders their unsupported length was correspondingly reduced4 #af ,m4 ,a4 ,ansaloni1 ,the ,lifts in the ,eiffel ,tower1 quoted in ,engineering1 ,july #e1 #ahhi1 vol4 #dh1 p4 #bc4 ,the strength of steel when drawn into wire is increased tremendously4 ,breaking stresses of #adj1jjj p4s4i4 were not particularly high at the time4 ,special cables with breaking stresses of up to #cgj1jjj p4s4i4 were available4 ,transcriber's ,notes3 ,passages in italics are indicated by underscore4 ,the original was printed in two columns per page4 ,illustrations have been moved to the nearest paragraph break4 ,the following misprints have been corrected3 ,trevethick's corrected to ,trevithick's 7page #e7 then corrected to than 7page #ad7 smiliar corrected to similar 7page #ca7