,,steam ,,turbines ,a ,,book ,,of ,,instruction ,,for ,,the ,,adjustment ,,and ,,operation ,,of ,,the ,,principal ,,types ,,of ,,this ,,class ,,of ,,prime ,,movers ,,compiled ,,and ,,written ,,by ,,hubert ,e4 ,,collins ,,first ,,edition ,second ,impression ,mc,g,r,a,w-,,hill ,,book ,,company1 ,inc4 #bci ,,west #ci,,th ,,street1 ,,new ,,york #f ,,bouverie ,,street1 ,,london1 ,e4 ,c4 ,copyright1 #aiji1 by the ,hill ,publishing ,company ,all rights reserved ,,transcriber',s ,,notes ,the authors of this book used the spellings aline1 gage1 and hight for the conventional spellings align1 gauge1 and height4 ,as they are used consistently and do not affect the sense1 they have been left unchanged4 ,obvious typos and misspellings that did not affect the sense have been silently corrected4 ,the following substantive typographical errors have also been corrected3 being to bearing 7p4 #fh72 ,,fig4 #ej to ,,fig4 #ef 7p4 #ia71 and ,fig4 #b to ,fig4 #gc 7p4 #aei74 ,two other likely errors have been left as transcriber queries3 lead_/load on p4 #adb and beating_/heating on p4 #agg4 ,superscript numbers are indicated with carets3 ,b#a4 ,subscript numbers are indicated with curly braces3 ,p#a for ,p-sub-#a4 ,,introduction ,this issue of the ,power ,handbook attempts to give a compact manual for the engineer who feels the need of acquainting himself with steam turbines4 ,to accomplish this within the limits of space allowed1 it has been necessary to confine the work to the description of a few standard types1 prepared with the assistance of the builders4 ,following this the practical experience of successful engineers1 gathered from the columns of ,power1 is given4 ,it is hoped that the book will prove of value to all engineers handling turbines1 whether of the described types or not4 ,hubert ,e4 ,collins4 ,new ,york1 ,april1 #aiji4 ,,contents ,,chap4 ,,page ,i ,the ,curtis ,steam ,turbine in ,practice #a ,,ii ,setting the ,valves of the ,curtis ,turbine #ca ,,iii ,allis-,chalmers ,steam ,turbine #da ,,iv ,westinghouse-,parsons ,turbine #eh ,v ,proper ,method of ,testing a ,steam ,turbine #aab ,,vi ,testing a ,steam ,turbine #acg ,,vii ,auxiliaries for ,steam ,turbines #aed ,,viii ,trouble with ,steam ,turbine ,auxiliaries #agb ,i4 ,,the ,,curtis ,,steam ,,turbine ,,in ,,practice#a #a ,contributed to ,power by ,fred ,l4 ,johnson4 ,of the making of books there is no end4 ,this seems especially true of steam-turbine books1 but the book which really appeals to the operating engineer1 the man who may have a turbine unloaded1 set up1 put in operation1 and the builders' representative out of reach before the man who is to operate it fully realizes that he has a new type of prime mover on his hands1 with which he has little or no acquaintance1 has not been written4 ,there has been much published1 both descriptive and theoretical1 about the turbine1 but so far as the writer knows1 there is nothing in print that tells the man on the job about the details of the turbine in plain language1 and how to handle these details when they need handling4 ,the operating engineer does not care why the moving buckets are made of a certain curvature1 but he does care about the distance between the moving bucket and the stationary one1 and he wants to know how to measure that distance1 how to alter the clearance1 if necessary1 to prevent rubbing4 ,he doesn't care anything about the area of the step-bearing1 but he does want to know the way to get at the bearing to take it down and put it up again1 etc4 ,the lack of literature along this line is the writer's apology for what follows4 ,the ,curtis #aejj-kilowatt steam turbine will be taken first and treated from the ground up4 ,on entering a turbine plant on the ground floor1 the attention is at once attracted by a multiplicity of pumps1 accumulators and piping4 ,these are called auxiliaries and will be passed for the present to be taken up later1 for though of standard types their use is comparatively new in power-plant practice1 and the engineer will find that more interruptions of service will come from the auxiliaries than from the turbine itself4 ,builders' ,foundation ,plans ,incomplete ,it is impractical for the manufacturers to make complete foundation drawings1 as they are not familiar with the lay-out of pipes and the relative position of other apparatus in the station4 ,all that the manufacturers' drawing is intended to do is to show the customer where it will be necessary for him to locate his foundation bolts and opening for access to the step-bearing4 ,illustration3 ,,fig4 #a ,fig4 #a shows the builders' foundation drawing1 with the addition of several horizontal and radial tubes introduced to give passage for the various pipes which must go to the middle of the foundation4 ,entering through the sides of the masonry they do not block the passage1 which must be as free as possible when any work is to be done on the step-bearing1 or lower guide-bearing4 ,entering the passage in the foundation1 a large screw is seen passing up through a circular block of cast iron with a #c_/d-;inch pipe passing through it4 ,this is the step-supporting screw4 ,it supports the lower half of the step-bearing1 which in turn supports the entire revolving part of the machine4 ,it is used to hold the wheels at a proper hight in the casing1 and adjust the clearance between the moving and stationary buckets4 ,the large block which with its threaded bronze bushing forms the nut for the screw is called the cover-plate1 and is held to the base of the machine by eight #a-a_/b-;inch cap-screws4 ,on the upper side are two dowel-pins which enter the lower step and keep it from turning4 7,see ,figs4 #b and #c47 ,illustration3 ,,fig4 #b ,illustration3 ,,fig4 #c ,the step-blocks are very common-looking chunks of cast iron1 as will be seen by reference to ,fig4 #d4 ,the block with straight sides 7the lower one in the illustration7 has the two dowel holes to match the pins spoken of1 with a hole through the center threaded for #c_/d-;inch pipe4 ,the step-lubricant is forced up through this hole and out between the raised edges in a film1 floating the rotating parts of the machine on a frictionless disk of oil or water4 ,the upper step-block has two dowel-pins1 also a key which fits into a slot across the bottom end of the shaft4 ,illustration3 ,,fig4 #d ,the upper side of the top block is counterbored to fit the end of the shaft4 ,the counterbore centers the block4 ,the dowel-pins steer the key into the key-way across the end of the shaft1 and the key compels the block to turn with the shaft4 ,there is also a threaded hole in the under side of the top block4 ,this is for the introduction of a screw which is used to pull the top block off the end of the shaft4 ,if taken off at all it must be pulled1 for the dowel-pins1 key and counterbore are close fits4 ,two long bolts with threads the whole length are used if it becomes necessary to take down the step or other parts of the bottom of the machine4 ,two of the bolts holding the cover-plate in place are removed1 these long bolts put in their places and the nuts screwed up against the plate to hold it while the remaining bolts are removed4 ,how to ,lower ,step-,bearings to ,examine ,them ,now1 suppose it is intended to take down the step-bearings for examination4 ,the first thing to do is to provide some way of holding the shaft up in its place while we take its regular support from under it4 ,in some machines1 inside the base1 there is what is called a jacking ring4 ,it is simply a loose collar on the shaft1 which covers the holes into which four plugs are screwed4 ,these are taken out and in their places are put four hexagonal-headed screws provided for the purpose1 which are screwed up4 ,this brings the ring against a shoulder on the shaft and then the cover-plate and step may be taken down4 ,while all the machines have the same general appearance1 there are some differences in detail which may be interesting4 ,one difference is due to the sub-base which is used with the oil-lubricated step-bearings4 ,this style of machine has the jacking ring spoken of1 while others have neither sub-base nor jacking ring1 and when necessary to take down the step a different arrangement is used4 ,illustration3 ,,fig4 #e ,a piece of iron that looks like a big horseshoe 7,fig4 #e7 is used to hold the shaft up4 ,the flange that covers the entrance to the exhaust base is taken off and a man goes in with the horseshoe-shaped shim and an electric light4 ,other men take a long-handled wrench and turn up the step-screw until the man inside the base can push the horseshoe shim between the shoulder on the shaft and the guide-bearing casing4 ,the men on the wrench then back off and the horseshoe shim supports the weight of the machine4 ,when the shim is in place1 or the jacking ring set up1 whichever the case may be1 the cover-plate bolts may be taken out1 the nuts on the long screws holding the cover in place4 ,the #c_/d-;inch pipe which passes up through the step-screw is taken down and1 by means of the nuts on the long screws1 the cover-plate is lowered about #b inches4 ,then through the hole in the step-screw a #c_/d-;inch rod with threads on both ends is passed and screwed into the top step2 then the cover-plate is blocked so it cannot rise and1 with a nut on the lower end of the #c_/d-;inch rod1 the top step is pulled down as far as it will come4 ,the cover-plate is let down by means of the two nuts1 and the top step-block follows4 ,when it is lowered to a convenient hight it can be examined1 and the lower end of the shaft and guide-bearing will be exposed to view4 ,illustration3 ,,fig4 #f ,the lower guide-bearing 7,fig4 #f7 is simply a sleeve flanged at one end1 babbitted on the inside1 and slightly tapered on the outside where it fits into the base4 ,the flange is held securely in the base by eight #c_/d-;inch cap-screws4 ,between the cap-screw holes are eight holes tapped to #c_/d-;inch1 and when it is desired to take the bearing down the cap-screws are taken out of the base and screwed into the threaded holes and used as jacks to force the guide-bearing downward4 ,some provision should be made to prevent the bearing from coming down on the run1 for being a taper fit it has only to be moved about one-half inch to be free4 ,two bolts1 about #h inches long1 screwed into the holes that the cap-screws are taken from1 answer nicely1 as a drop that distance will not do any harm1 and the bearing can be lowered by hand1 although it weighs about #bjj pounds4 ,the lower end of the shaft is covered by a removable bushing which is easily inspected after the guide-bearing has been taken down4 ,if it is necessary to take off this bushing it is easily done by screwing four #e_/h-;inch bolts1 each about #b feet long1 into the tapped holes in the lower end of the bushing1 and then pulling it off with a jack4 7,see ,fig4 #g47 ,each pipe that enters the passage in the foundation should be connected by two unions1 one as close to the machine as possible and the other close to the foundation4 ,this allows the taking down of all piping in the passage completely and quickly without disturbing either threads or lengths4 ,illustration3 ,,fig4 #g ,studying the ,blueprints ,fig4 #h shows an elevation and part-sectional view of a #aejj-kilowatt ,curtis steam turbine4 ,if one should go into the exhaust base of one of these turbines1 all that could be seen would be the under side of the lower or fourth-stage wheel1 with a few threaded holes for the balancing plugs which are sometimes used4 ,the internal arrangement is clearly indicated by the illustration1 ,fig4 #h4 ,it will be noticed that each of the four wheels has an upper and a lower row of buckets and that there is a set of stationary buckets for each wheel between the two rows of moving buckets4 ,these stationary buckets are called intermediates1 and are counterparts of the moving buckets4 ,their sole office is to redirect the steam which has passed through the upper buckets into the lower ones at the proper angle4 ,illustration3 ,,fig4 #h4 ,,elevation ,,and ,,part-,,sectional ,,view ,,of ,a #aejj-,,kilowatt ,,curtis ,,turbine ,the wheels are kept the proper distance apart by the length of hub1 and all are held together by the large nut on the shaft above the upper wheel4 ,each wheel is in a separate chamber formed by the diaphragms which rest on ledges on the inside of the wheel-case1 their weight and steam pressure on the upper side holding them firmly in place and making a steam-tight joint where they rest4 ,at the center1 where the hubs pass through them1 there is provided a self-centering packing ring 7,fig4 #i71 which is free to move sidewise1 but is prevented from turning1 by suitable lugs4 ,this packing is a close running fit on the hubs of the wheel and is provided with grooves 7plainly shown in ,fig4 #i7 which break up and diminish the leakage of steam around each hub from one stage to the next lower4 ,each diaphragm1 with the exception of the top one1 carries the expanding nozzles for the wheel immediately below4 ,illustration3 ,,fig4 #i ,the expanding nozzles and moving buckets constantly increase in size and number from the top toward the bottom4 ,this is because the steam volume increases progressively from the admission to the exhaust and the entire expansion is carried out in the separate sets of nozzles1 very much as if it were one continuous nozzle2 but with this difference1 not all of the energy is taken out of the steam in any one set of nozzles4 ,the idea is to keep the velocity of the steam in each stage as nearly constant as possible4 ,the nozzles in the diaphragms and the intermediates do not1 except in the lowest stage1 take up the entire circumference1 but are proportioned to the progressive expansion of steam as it descends toward the condenser4 ,clearance ,while the machine is running it is imperative that there be no rubbing contact between the revolving and stationary parts1 and this is provided for by the clearance between the rows of moving buckets and the intermediates4 ,into each stage of the machine a #b-;inch pipe hole is drilled and tapped4 ,sometimes this opening is made directly opposite a row of moving buckets as in ,fig4 #aj1 and sometimes it is made opposite the intermediate4 ,when opposite a row of buckets1 it will allow one to see the amount of clearance between the buckets and the intermediates1 and between the buckets and the nozzles4 ,when drilled opposite the intermediates1 the clearance is shown top and bottom between the buckets and intermediates4 7,see ,fig4 #aa47 ,this clearance is not the same in all stages1 but is greatest in the fourth stage and least in the first4 ,the clearances in each stage are nearly as follows3 ,first stage1 #j4jfj to #j4jhj2 second stage1 #j4jhj to #j4ajj2 third stage1 #j4jhj to #j4ajj2 fourth stage1 #j4jhj to #j4bjj4 ,these clearances are measured by what are called clearance gages1 which are simply taper slips of steel about #a_/b-;inch wide accurately ground and graduated1 like a jeweler's ring gage1 by marks about #a_/b-;inch apart2 the difference in thickness of the gage is one-thousandth of an inch from one mark to the next4 ,illustration3 ,,fig4 #aj ,illustration3 ,,fig4 #aa ,to determine whether the clearance is right1 one of the #b-;inch plugs is taken out and some marking material1 such as red lead or anything that would be used on a surface plate or bearing to mark the high spots is rubbed on the taper gage1 and it is pushed into the gap between the buckets and intermediates as far as it will go1 and then pulled out1 the marking on the gage showing just how far in it went1 and the nearest mark giving in thousandths of an inch the clearance4 ,this is noted1 the marking spread again1 and the gage tried on the other side1 the difference on the gage showing whether the wheel is high or low4 ,whichever may be the case the hight is corrected by the step-bearing screw4 ,the wheels should be placed as nearly in the middle of the clearance space as possible4 ,by some operators the clearance is adjusted while running1 in the following manner3 ,with the machine running at full speed the step-bearing screw is turned until the wheels are felt or heard to rub lightly4 ,the screw is marked and then turned in the opposite direction until the wheel rubs again4 ,another mark is made on the screw and it is then turned back midway between the two marks4 ,either method is safe if practiced by a skilful engineer4 ,in measuring the clearance by the first method1 the gage should be used with care1 as it is possible by using too much pressure to swing the buckets and get readings which could be misleading4 ,to an inexperienced man the taper gages would seem preferable4 ,in the hands of a man who knows what he is doing and how to do it1 a tapered pine stick will give as satisfactory results as the most elaborate set of hardened and ground clearance gages4 ,referring back to ,fig4 #aa1 at ,a is shown one of the peep-holes opposite the intermediate in the third stage wheel for the inspection of clearance4 ,the taper clearance gage is inserted through this hole both above and below the intermediate1 and the distance which it enters registers the clearance on that side4 ,this sketch also shows plainly how the shrouding on the buckets and the intermediates extends beyond the sharp edges of the buckets1 protecting them from damage in case of slight rubbing4 ,in a very few cases wheels have been known to warp to such an extent from causes that were not discovered until too late1 that adjustment would not stop the rubbing4 ,in such cases the shrouding has been turned or faced off by a cutting-off tool used through the peep-hole4 ,carbon ,packing ,used ,where the shaft passes through the upper head of the wheel-case some provision must be made to prevent steam from the first stage escaping4 ,this is provided for by carbon packing 7,fig4 #ab71 which consists of blocks of carbon in sets in a packing case bolted to the top head of the wheel-case4 ,there are three sets of these blocks1 and each set is made of two rings of three segments each4 ,one ring of segments breaks joints with its mate in the case1 and each set is separated from the others by a flange in the case in which it is held4 ,in some cases the packing is kept from turning by means of a link1 one end of which is fastened to the case and the other to the packing holder4 ,sometimes light springs are used to hold the packing against the shaft and in some the pressure of steam in the case does this4 ,there is a pipe1 also shown in ,fig4 #ab1 leading from the main line to the packing case1 the pressure in the pipe being reduced4 ,the space between the two upper sets of rings is drained to the third stage by means of a three-way cock1 which keeps the balance between the atmosphere and packing-case pressure4 ,the carbon rings are fitted to the shaft with a slight clearance to start with1 and very soon get a smooth finish1 which is not only practically steam-tight but frictionless4 ,illustration3 ,,fig4 #ab ,the carbon ring shown in ,fig4 #ab is the older design4 ,the segments are held against the flat bearing surface of the case by spiral springs set in brass ferrules4 ,the circle is held together by a bronze strap screwed and drawn together at the ends by springs4 ,still other springs press the straps against the surface upon which the carbon bears1 cutting off leaks through joints and across horizontal surfaces of the carbon4 ,the whole ring is prevented from turning by a connecting-rod which engages a pin in the hole1 like those provided for the springs4 ,illustration3 ,,fig4 #ac ,illustration3 ,,fig4 #ad ,illustration3 ,,fig4 #ae ,illustration3 ,,fig4 #af ,the ,safety-stop ,there are several designs of safety-stop or speed-limit devices used with these turbines1 the simplest being of the ring type shown in ,fig4 #ac4 ,this consists of a flat ring placed around the shaft between the turbine and generator4 ,the ring-type emergencies are now all adjusted so that they normally run concentric with the shaft1 but weighted so that the center of gravity is slightly displaced from the center4 ,the centrifugal strain due to this is balanced by helical springs4 ,but when the speed increases the centrifugal force moves the ring into an eccentric position1 when it strikes a trigger and releases a weight which1 falling1 closes the throttle and shuts off the steam supply4 ,the basic principle upon which all these stops are designed is the same--the centrifugal force of a weight balanced by a spring at normal speed4 ,figs4 #ad1 #ae1 and #af show three other types4 ,the ,mechanical ,valve-,gear ,fig4 #ag shows plainly the operation of the mechanical valve-gear4 ,the valves are located in the steam chests1 which are bolted to the top of the casing directly over the first sets of expansion nozzles4 ,the chests1 two in number1 are on opposite sides of the machine4 ,the valve-stems extend upward through ordinary stuffing-boxes1 and are attached to the notched cross-heads by means of a threaded end which is prevented from screwing in or out by a compression nut on the lower end of the cross-head4 ,each cross-head is actuated by a pair of reciprocating pawls1 or dogs 7shown more plainly in the enlarged view1 ,fig4 #ah71 one of which opens the valve and the other closes it4 ,the several pairs of pawls are hung on a common shaft which receives a rocking motion from a crank driven from a worm and worm-wheel by the turbine shaft4 ,the cross-heads have notches milled in the side in which the pawls engage to open or close the valve1 this engagement being determined by what are called shield-plates1 ,a 7,fig4 #ah71 which are controlled by the governor4 ,these plates are set1 one a little ahead of the other1 to obtain successive opening or closing of the valves4 ,when more steam is required the shield plate allows the proper pawl to fall into its notch in the cross-head and lift the valve from its seat4 ,if less steam is wanted the shield-plate rises and allows the lower pawl to close the valve on the down stroke4 ,illustration3 ,,fig4 #ag ,illustration3 ,,fig4 #ah ,the valves1 as can easily be seen1 are very simple affairs1 the steam pressure in the steam chest holding the valve either open or shut until it is moved by the pawl on the rock-shaft4 ,the amount of travel on the rock-shaft is fixed by the design1 but the proportionate travel above and below the horizontal is controlled by the length of the connecting-rods from the crank to the rock-shaft4 ,there are besides the mechanical valve-gear the electric and hydraulic1 but these will be left for a future article4 ,the ,governor ,the speed of the machine is controlled by the automatic opening and closing of the admission valves under the control of a governor 7,fig4 #ai71 of the spring-weighted type attached directly to the top end of the turbine shaft4 ,the action of the governor depends on the balance of force exerted by the spring1 and the centrifugal effort of the rectangular-shaped weights at the lower end2 the moving weights acting through the knife-edge suspension tend to pull down the lever against the resistance of the heavy helical spring4 ,the governor is provided with an auxiliary spring on the outside of the governor dome for varying the speed while synchronizing4 ,the tension of the auxiliary spring is regulated by a small motor wired to the switchboard4 ,this spring should be used only to correct slight changes in speed4 ,any marked change should be corrected by the use of the large hexagonal nut in the upper plate of the governor frame4 ,this nut is screwed down to increase the speed1 and upward to decrease it4 ,illustration3 ,,fig4 #ai ,the ,stage ,valves ,fig4 #bj represents one of the several designs of stage valve1 sometimes called the overload valve1 the office of which is to prevent too high pressure in the first stage in case of a sudden overload1 and to transfer a part of the steam to a special set of expanding nozzles over the second-stage wheel4 ,this valve is balanced by a spring of adjustable tension1 and is1 or can be1 set to open and close within a very small predetermined range of first-stage pressure4 ,the valve is intended to open and close instantly1 and to supply or cut off steam from the second stage1 without affecting the speed regulation or economy of operation4 ,if any leaking occurs past the valve it is taken care of by a drip-pipe to the third stage4 ,illustration3 ,,fig4 #bj ,the steam which passes through the automatic stage valves and is admitted to the extra set of nozzles above the second-stage wheel acts upon this wheel just the same as the steam which passes through the regular second-stage nozzles2 i4e41 all the steam which goes through the machine tends to hasten its speed1 or1 more accurately1 does work and maintains the speed of the machine4 ,,ii4 ,,setting ,,the ,,valves ,,of ,,the ,,curtis ,,turbine#b #b ,contributed to ,power by ,f4 ,l4 ,johnson4 ,under some conditions of service the stage valve in the ,curtis turbine will not do what it is designed to do4 ,it is usually attached to the machine in such manner that it will operate with1 or a little behind1 in the matter of time1 the sixth valve4 ,the machine is intended to carry full load with only the first bank of five valves in operation1 with proper steam pressure and vacuum4 ,if the steam pressure is under #aej pounds1 or the vacuum is less than #bh inches1 the sixth valve may operate at or near full load1 and also open the stage valve and allow steam to pass to the second-stage nozzles at a much higher rate of speed than the steam which has already done some work in the first-stage wheel4 ,the tendency is to accelerate unduly the speed of the machine4 ,this is corrected by the governor1 but the correction is usually carried too far and the machine slows down4 ,with the stage valve in operation1 at a critical point the regulation is uncertain and irregular1 and its use has to be abandoned4 ,the excess first-stage pressure will then be taken care of by the relief valve1 which is an ordinary spring safety valve 7not pop7 which allows the steam to blow into the atmosphere4 ,the mechanical valve-gear does not often get out of order1 but sometimes the unexpected happens4 ,the shop man may not have properly set up the nuts on the valve-stems2 or may have fitted the distance bushings between the shield plates too closely2 the superheat of the steam may distort the steam chest slightly and produce friction that will interfere with the regulation4 ,if any of the valve-stems should become loose in the cross-heads they may screw themselves either in or out4 ,if screwed out too far1 the valve-stem becomes too long and the pawl in descending will1 after the valve is seated1 continue downward until it has broken something4 ,if screwed in1 the cross-head will be too low for the upper pawl to engage and the valve will not be opened4 ,this second condition is not dangerous1 but should be corrected4 ,the valve-stems should be made the right length1 and all check-nuts set up firmly4 ,if for any purpose it becomes necessary to set the valves on a #aejj-kilowatt mechanical gear1 the operator should proceed in the following manner4 ,setting the ,valves of a #aejj-,kilowatt ,curtis ,turbine ,we will consider what is known as the mechanical valve-gear1 with two sets of valves1 one set of five valves being located on each side of the machine4 ,illustration3 ,,fig4 #ba ,in setting the valves we should first throw out all pawls to avoid breakage in case the rods are not already of proper length1 holding the pawls out by slipping the ends of the pawl springs over the points of the pawls1 as seen in ,fig4 #ba4 ,then turn the machine slowly by hand until the pawls on one set of valves are at their highest point of travel1 then with the valves wide open adjust the drive-rods1 i4e41 the rods extending from the crank to the rock-shaft1 so that there is #a_/cb of an inch clearance 7shown dotted in ,fig4 #ag1 ,chap4 ,i7 at the point of opening of the pawls when they are in4 7,see ,fig4 #bb47 ,then set up the check-nuts on the drive-rod4 ,turn the machine slowly1 until the pawls are at their lowest point of travel4 ,then1 with the valves closed1 adjust each valve-stem to give #a_/cb of an inch clearance at the point of closing of the pawls when they are in1 securely locking the check-nut as each valve is set4 ,repeat this operation on the other side of the machine and we are ready to adjust the governor-rods4 7,valves cannot be set on both sides of the machine at the same time1 as the pawls will not be in the same relative position1 due to the angularity of the drive-rods47 ,illustration3 ,,fig4 #bb ,next1 with the turbine running1 and the synchronizing spring in mid-position1 adjust the governor-rods so that the turbine will run at the normal speed of #ijj revolutions per minute when working on the fifth valve1 and carrying full load4 ,the governor-rods for the other side of the turbine 7controlling valves ,nos4 #f to #aj7 should be so adjusted that the speed change between the fifth and sixth valves will not be more than three or four revolutions per minute4 ,the valves of these turbines are all set during the shop test and the rods trammed with an #h-;inch tram4 ,governors are adjusted for a speed range of #b per cent4 between no load and full load 7#aejj kilowatt71 or #d per cent4 between the mean speeds of the first and tenth valves 7no load to full overload capacity74 ,the rods which connect the governor with the valve-gear have ordinary brass ends or heads and are adjusted by right-and-left threads and secured by lock-nuts4 ,they are free fits on the pins which pass through the heads1 and no friction is likely to occur which will interfere with the regulation1 but too close work on the shield-plate bushings1 or a slight warping of the steam chest1 will often produce friction which will seriously impair the regulation4 ,if it is noticed that the shield-plate shaft has any tendency to oscillate in unison with the rock-shaft which carries the pawls1 it is a sure indication that the shield-plates are not as free as they should be1 and should be attended to4 ,the governor-rod should be disconnected1 the pawls thrown out and the pawl strings hooked over the ends4 ,the plates should then be rocked up and down by hand and the friction at different points noted4 ,the horizontal rod at the back of the valve-gear may be loosened and the amount of end play of each individual shield-plate noticed and compared with the bushings on the horizontal rod at the back which binds the shield-plates together4 ,if the plates separately are found to be perfectly free they may be each one pushed hard over to the right or left and wedged2 then each bushing tried in the space between the tail-pieces of the plates4 ,it will probably be found that the bushings are not of the right length1 due to the alteration of the form of the steam chest by heat4 ,it will generally be found also that the bushings are too short1 and that the length can be corrected by very thin washers of sheet metal4 ,it has been found in some instances that the thin bands coming with sectional pipe covering were of the right thickness4 ,after the length of the bushings is corrected the shield-plates may be assembled1 made fast and tested by rocking them up and down1 searching for signs of sticking4 ,if none occurs1 the work has been correctly done1 and there will be no trouble from poor regulation due to friction of the shield-plates4 ,the ,baffler ,the water which goes to the step-bearing passes through a baffler1 the latest type of which is shown by ,fig4 #bc4 ,it is a device for restricting the flow of water or oil to the step- and guide-bearing4 ,the amount of water necessary to float the machine and lubricate the guide-bearing having been determined by calculation and experiment1 the plug is set at that point which will give the desired flow4 ,the plug is a square-threaded worm1 the length of which and the distance which it enters the barrel of the baffler determining the amount of flow4 ,the greater the number of turns which the water must pass through in the worm the less will flow against the step-pressure4 ,illustration3 ,,fig4 #bc ,the engineers who have settled upon the flow and the pressure decided that a flow of from #d-a_/b to #e-a_/b gallons per minute and a step-pressure of from #dbe to #dej pounds is correct4 ,these factors are so dependent upon each other and upon the conditions of the step-bearing itself that they are sometimes difficult to realize in every-day work2 nor is it necessary4 ,if the machine turns freely with a lower pressure than that prescribed by the engineers1 there is no reason for raising this pressure2 and there is only one way of doing it without reducing the area of the step-bearing1 and that is by obstructing the flow of water in the step-bearing itself4 ,a very common method used is that of grinding4 ,the machine is run at about one-third speed and the step-water shut off for #ae or #bj seconds4 ,this causes grooves and ridges on the faces of the step-bearing blocks1 due to their grinding on each other1 which obstruct the flow of water between the faces and thus raises the pressure4 ,it seems a brutal way of getting a scientific result1 if the result desired can be called scientific4 ,the grooving and cutting of the step-blocks will not do any harm1 and in fact they will aid in keeping the revolving parts of the machine turning about its mechanical center4 ,the operating engineer will be very slow to see the utility of the baffler1 and when he learns1 as he will sometime1 that the turbine will operate equally well with a plug out as with it in the baffler1 he will be inclined to remove the baffler4 ,it is true that with one machine operating on its own pump it is possible to run without the baffler1 and it is also possible that in some particular case two machines having identical step-bearing pressures might be so operated4 ,the baffler1 however1 serves a very important function1 as described more fully as follows3 ,it tends to steady the flow from the pump1 to maintain a constant oil film as the pressure varies with the load1 and when several machines are operating on the same step-bearing system it is the only means which fixes the flow to the different machines and prevents one machine from robbing the others4 ,therefore1 even if an engineer felt inclined to remove the baffler he would be most liable to regret taking such a step4 ,if the water supply should fail from any cause and the step-bearing blocks rub together1 no great amount of damage will result4 ,the machine will stop if operated long under these conditions1 for if steam pressure is maintained the machine will continue in operation until the buckets come into contact1 and if the step-blocks are not welded together the machine may be started as soon as the water is obtained4 ,if vibration occurs it will probably be due to the rough treatment of the step-blocks1 and may be cured by homeopathic repeat-doses of grinding1 say about #ae seconds each4 ,if the step-blocks are welded a new pair should be substituted and the damaged ones refaced4 ,some few experimental steps of spherical form1 called saucer steps1 have been installed with success 7see ,fig4 #bd74 ,they seem to aid the lower guide-bearing in keeping the machine rotating about the mechanical center and reduce the wear on the guide-bearing4 ,in some instances1 too1 cast-iron bushings have been substituted for bronze1 with marked success4 ,there seems to be much less wear between cast-iron and babbitt metal than between bronze and babbitt metal4 ,the matter is really worth a thorough investigation4 ,illustration3 ,,fig4 #bd ,,iii4 ,,allis-,,chalmers ,,company ,,steam ,,turbine ,in ,fig4 #be may be seen the interior construction of the steam turbine built by ,allis-,chalmers ,co41 of ,milwaukee1 ,wis41 which is1 in general1 the same as the well-known ,parsons type4 ,this is a plan view showing the rotor resting in position in the lower half of its casing4 ,illustration3 ,,fig4 #be ,fig4 #bf is a longitudinal cross-section cut of rotor and both lower and upper casing4 ,referring to ,fig4 #bf the steam comes in from the steam-pipe at ,c and passes through the main throttle or regulating valve ,d1 which is a balanced valve operated by the governor4 ,steam enters the cylinder through the passage ,e4 ,turning in the direction of the bearing ,a1 it passes through alternate stationary and revolving rows of blades1 finally emerging at ,f and going out by way of ,g to the condenser or to atmosphere4 ,h1 ,j1 and ,k represent three stages of blading4 ,l1 ,m1 and ,z are the balance pistons which counterbalance the thrust on the stages ,h1 ,j1 and ,k4 ,o and ,q are equalizing pipes1 and for the low-pressure balance piston similar provision is made by means of passages 7not shown7 through the body of the spindle4 ,illustration3 ,,fig4 #bf ,r indicates a small adjustable collar placed inside the housing of the main bearing ,b to hold the spindle in a position where there will be such a clearance between the rings of the balance pistons and those of the cylinder as to reduce the leakage of steam to a minimum and at the same time prevent actual contact under varying temperature4 ,at ,s and ,t are glands which provide a water seal against the inleakage of air and the outleakage of steam4 ,u represents the flexible coupling to the generator4 ,v is the overload or by-pass valve used for admitting steam to intermediate stage of the turbine4 ,w is the supplementary cylinder to contain the low-pressure balance piston4 ,x and ,y are reference letters used in text of this chapter to refer to equalizing of steam pressure on the low-pressure stage of the turbine4 ,the first point to study in this construction is the arrangement of dummies ,l1 ,m1 and ,z4 ,these dummy rings serve as baffles to prevent steam leakage past the pistons1 and their contact at high velocity means not only their own destruction1 but also damage to or the wrecking of surrounding parts4 ,a simple but effective method of eliminating this difficulty is found in the arrangement illustrated in this figure4 ,the two smaller balance pistons1 ,l and ,m1 are allowed to remain on the high-pressure end2 but the largest piston1 ,z1 is placed upon the low-pressure end of the rotor immediately behind the last ring of blades1 and working inside of the supplementary cylinder ,w4 ,being backed up by the body of the spindle1 there is ample stiffness to prevent warping4 ,this balance piston1 which may also be plainly seen in ,fig4 #be1 receives its steam pressure from the same point as the piston ,m1 but the steam pressure1 equalized with that on the third stage of the blading1 ,x1 is through holes in the webs of the blade-carrying rings4 ,entrance to these holes is through the small annular opening in the rotor1 visible in ,fig4 #be between the second and third barrels4 ,as1 in consequence of varying temperatures1 there is an appreciable difference in the endwise expansion of the spindle and cylinder1 the baffling rings in the low-pressure balance piston are so made as to allow for this difference4 ,the high-pressure end of the spindle being held by the collar bearing1 the difference in expansion manifests itself at the low-pressure end4 ,the labyrinth packing of the high-pressure and intermediate pistons has a small axial and large radial clearance1 whereas the labyrinth packing of the piston ,z has1 vice versa1 a small radial and large axial clearance4 ,elimination of causes of trouble with the low-pressure balance piston not only makes it possible to reduce the diameter of the cylinder1 and prevent distortion1 but enables the entire spindle to be run with sufficiently small clearance to obviate any excessive leakage of steam4 ,detail of ,blade ,construction ,in this construction the blades are cut from drawn stock1 so that at its root it is of angular dovetail shape1 while at its tip there is a projection4 ,to hold the roots of the blades firmly1 a foundation ring is provided1 as shown at ,a in ,fig4 #bg4 ,this foundation ring is first formed to a circle of the proper diameter1 and then slots are cut in it4 ,these slots are accurately spaced and inclined to give the right pitch and angle to the blades 7,fig4 #bh71 and are of dovetail shape to receive the roots of the blades4 ,the tips of the blades are substantially bound together and protected by means of a channel-shaped shroud ring1 illustrated in ,fig4 #ca and at ,b in ,fig4 #bg4 ,fig4 #ca shows the cylinder blading separate1 and ,fig4 #bg shows both with the shrouding4 ,in these1 holes are punched to receive the projections on the tips of the blades1 which are rivetted over pneumatically4 ,illustration3 ,,fig4 #bg ,the foundation rings themselves are of dovetail shape in cross-section1 and1 after receiving the roots of the blades1 are inserted in dovetailed grooves in the cylinder and rotor1 where they are firmly held in place by keypieces1 as may be seen at ,c in ,fig4 #bg4 ,each keypiece1 when driven in place1 is upset into an undercut groove1 indicated by ,d in ,fig4 #bg1 thereby positively locking the whole structure together4 ,each separate blade is firmly secured by the dovetail shape of the root1 which is held between the corresponding dovetailed slot in the foundation ring and the undercut side of the groove4 ,illustration3 ,,fig4 #bh ,fig4 #bi1 from a photograph of blading fitted in a turbine1 illustrates the construction1 besides showing the uniform spacing and angles of the blades4 ,illustration3 ,,fig4 #bi ,the obviously thin flanges of the shroud rings are purposely made in that way1 so that1 in case of accidental contact between revolving and stationary parts1 they will wear away enough to prevent the blades from being ripped out4 ,this protection1 however1 is such that to rip them out a whole half ring of blades must be sheared off at the roots4 ,the strength of the blading1 therefore1 depends not upon the strength of an individual blade1 but upon the combined shearing strength of an entire ring of blades4 ,illustration3 ,,fig4 #cj ,the blading is made up and inserted in half rings1 and ,fig4 #cj shows two rings of different sizes ready to be put in place4 ,fig4 #ca shows a number of rows of blading inserted in the cylinder of an ,allis-,chalmers steam turbine1 and ,fig4 #cb gives view of blading in the same turbine after nearly three years' running4 ,illustration3 ,,fig4 #ca ,illustration3 ,,fig4 #cb ,the ,governor ,next in importance to the difference in blading and balance piston construction1 is the governing mechanism used with these machines4 ,this follows the well-known ,hartung type1 which has been brought into prominence1 heretofore largely in connection with hydraulic turbines2 and the governor1 driven directly from the turbine shaft by means of cut gears working in an oil bath1 is required to operate the small1 balanced oil relay-valve only1 while the two steam valves1 main and by-pass 7or overload71 are controlled by an oil pressure of about #bj pounds per square inch1 acting upon a piston of suitable size4 ,in view of the fact that a turbine by-pass valve opens only when the unit is required to develop overload1 or the vacuum fails1 a good feature of this governing mechanism is that the valve referred to can be kept constantly in motion1 thereby preventing sticking in an emergency1 even though it be actually called into action only at long intervals4 ,another feature of importance is that the oil supply to the bearings1 as well as that to the governor1 can be interconnected so that the governor will automatically shut off the steam if the oil supply fails and endangers the bearings4 ,this mechanism is also so proportioned that1 while responding quickly to variations in load1 its sensitiveness is kept within such bounds as to secure the best results in the parallel operation of alternators4 ,the governor can be adjusted for speed while the turbine is in operation1 thereby facilitating the synchronizing of alternators and dividing the load as may be desired4 ,in order to provide for any possible accidental derangement of the main governing mechanism1 an entirely separate safety or over-speed governor is furnished4 ,this governor is driven directly by the turbine shaft without the intervention of gearing1 and is so arranged and adjusted that1 if the turbine should reach a predetermined speed above that for which the main governor is set1 the safety governor will come into action and trip a valve which entirely shuts off the steam supply1 bringing the turbine to a stop4 ,lubrication ,lubrication of the four bearings1 which are of the self-adjusting1 ball and socket pattern1 is effected by supplying an abundance of oil to the middle of each bearing and allowing it to flow out at the ends4 ,the oil is passed through a tubular cooler1 having water circulation1 and pumped back to the bearings4 ,fig4 #cc shows the entire arrangement graphically and much more clearly than can be explained in words4 ,the oil is circulated by a pump directly operated from the turbine1 except where the power-house is provided with a central oiling system4 ,particular stress is laid by the builders upon the fact that it is not necessary to supply the bearings with oil under pressure1 but only at a head sufficient to enable it to run to and through the bearings2 this head never exceeding a few feet4 ,with each turbine is installed a separate direct-acting steam pump for circulating oil for starting up4 ,this will be referred to again under the head of operating4 ,illustration3 ,,fig4 #cc ,generator ,the turbo-generator1 which constitutes the electrical end of this unit1 is totally enclosed to provide for noiseless operation1 and forced ventilation is secured by means of a small fan carried by the shaft on each end of the rotor4 ,the air is taken in at the ends of the generator1 passes through the fans and is discharged over the end connections of the armature coils into the bottom of the machine1 whence it passes through the ventilating ducts of the core to an opening at the top4 ,the field core is1 according to size1 built up either of steel disks1 each in one piece1 or of steel forgings1 so as to give high magnetic permeability and great strength4 ,the coils are placed in radial slots1 thereby avoiding side pressure on the slot insulation and the complex stresses resulting from centrifugal force1 which1 in these rotors1 acts normal to the flat surface of the strip windings4 ,operation ,as practically no adjustments are necessary when these units are in operation1 the greater part of the attention required by them is involved in starting up and shutting down1 which may be described in detail as follows3 ,to ,start ,up ,first1 the auxiliary oil pump is set going1 and this is speeded up until the oil pressure shows a hight sufficient to lift the inlet valve and oil is flowing steadily at the vents on all bearings4 ,the oil pressure then shows about #bj to #be pounds on the ,relay ,oil gage1 and #b to #d pounds on the ,bearing ,oil gage4 ,next the throttle is opened1 without admitting sufficient steam to the turbine to cause the spindle to turn1 and it is seen that the steam exhausts freely into the atmosphere1 also that the high-pressure end of the turbine expands freely in its guides4 ,water having been allowed to blow out through the steam-chest drains1 the drains are closed and steam is permitted to continue flowing through the turbine not less than a half an hour 7unless the turbine is warm to start with1 when this period may be reduced7 still without turning the spindle4 ,after this it is advisable to shut off steam and let the turbine stand ten minutes1 so as to warm thoroughly1 during which time the governor parts may be oiled and any air which may have accumulated in the oil cylinder above the inlet valve blown off4 ,then the throttle should be opened sufficiently to start the turbine spindle to revolving very slowly and the machine allowed to run in this way for five minutes4 ,successive operations may be mentioned briefly as admitting water to the oil cooler2 bringing the turbine up to speed1 at the same time slowing down the auxiliary oil pump and watching that the oil pressures are kept up by the rotary oil pump on the turbine2 turning the water on to the glands very gradually and1 before putting on vacuum1 making sure that there is just enough water to seal these glands properly2 and starting the vacuum gradually just before putting on the load4 ,these conditions having been complied with1 the operator next turns his attention to the generator1 putting on the field current1 synchronizing carefully and building up the load on the unit gradually4 ,the principal precautions to be observed are not to start without warming up properly1 to make sure that oil is flowing freely through the bearings1 that vacuum is not put on until the water glands seal1 and to avoid running on vacuum without load on the turbine4 ,in ,operation ,in operation all that is necessary is to watch the steam pressure at the ,throttle and ,inlet gages1 to see that neither this pressure nor the steam temperature varies much2 to keep the vacuum constant1 as well as pressures on the water glands and those indicated by the ,relay ,oil and ,bearing ,oil gages2 to take care that the temperatures of the oil flowing to and from the bearings does not exceed #ace degrees ,fahr4 7at which temperature the hand can comfortably grasp the copper oil-return pipes72 to see that oil flows freely at all vents on the bearings1 and that the governor parts are periodically oiled4 ,so far as the generator is concerned1 it is only essential to follow the practice common in all electric power plant operation1 which need not be reviewed here4 ,stopping the turbine is practically the reverse of starting1 the successive steps being as follows3 starting the auxiliary oil pump1 freeing it of water and allowing it to run slowly2 removing the load gradually2 breaking the vacuum when the load is almost zero1 shutting off the condenser injection and taking care that the steam exhausts freely into the atmosphere2 shutting off the gland water when the load and vacuum are off2 pulling the automatic stop to trip the valve and shut off steam and1 as the speed of the turbine decreases1 speeding up the auxiliary oil pump to maintain pressure on the bearings2 then1 when the turbine has stopped1 shutting down the auxiliary oil pump1 turning off the cooling water1 opening the steam chest drains and slightly oiling the oil inlet valve-stem4 ,during these operations the chief particulars to be heeded are3 not to shut off the steam before starting the auxiliary oil pump nor before the vacuum is broken1 and not to shut off the gland water with vacuum on the turbine4 ,the automatic stop should also remain unhooked until the turbine is about to be started up again4 ,general ,water used in the glands of the turbine must be free from scale-forming impurities and should be delivered at the turbine under a steady pressure of not less than #ae pounds4 ,the pressure in the glands will vary from #d to #aj pounds4 ,this water may be warm4 ,in the use of water for the cooling coils and of oil for the lubricating system1 nothing more is required than ordinary good sense dictates4 ,an absolutely pure mineral oil must be supplied1 of a non-foaming character1 and it should be kept free through filtering from any impurities4 ,the above refers particularly to ,allis-,chalmers turbines of the type ordinarily used for power service4 ,for turbines built to be run non-condensing1 the part relating to vacuum does not1 of course1 apply4 ,,iv4 ,,westinghouse-,,parsons ,,steam ,,turbine ,while the steam turbine is simple in design and construction and does not require constant tinkering and adjustment of valve gears or taking up of wear in the running parts1 it is like any other piece of fine machinery in that it should receive intelligent and careful attention from the operator by inspection of the working parts that are not at all times in plain view4 ,any piece of machinery1 no matter how simple and durable1 if neglected or abused will in time come to grief1 and the higher the class of the machine the more is this true4 ,any engineer who is capable of running and intelligently taking care of a reciprocating engine can run and take care of a turbine1 but if he is to be anything more than a starter and stopper1 it is necessary that he should know what is inside of the casing1 what must be done and avoided to prevent derangement1 and to keep the machine in continued and efficient operation4 ,in the steam turbine the steam instead of being expanded against a piston is made to expand against and to get up velocity in itself4 ,the jet of steam is then made to impinge against vanes or to react against the moving orifice from which it issues1 in either of which cases its velocity and energy are more or less completely abstracted and appropriated by the revolving member4 ,the ,parsons turbine utilizes a combination of these two methods4 ,illustration3 ,,fig4 #cd ,fig4 #cd is a sectional view of the standard ,westinghouse-,parsons single-flow turbine4 ,a photograph of the rotor ,r ,r ,r is reproduced in ,fig4 #ce1 while in ,fig4 #cf a section of the blading is shown upon a larger scale4 ,between the rows of the blading upon the rotor extend similar rows of stationary blades attached to the casing or stator4 ,the steam entering at ,a 7,fig4 #cd71 fills the circular space surrounding the rotor and passes first through a row of stationary blades1 #a 7,fig4 #cg71 expanding from the initial pressure ,p to the slightly lower pressure ,p#a1 and attaining by that expansion a velocity with which it is directed upon the moving blade #b4 ,in passing through this row of blades it is further expanded from pressure ,p#a to ,p#b and helps to push the moving blades along by the reaction of the force with which it issues therefrom4 ,impinging upon the second row of stationary blades #c1 the direction of flow is diverted so as to make it impinge at a favorable angle upon the second row of revolving blades #d1 and the action is continued until the steam is expanded to the pressure of the condenser or of the medium into which the turbine finally exhausts4 ,as the expansion proceeds1 the passages are made larger by increasing the length of the blades and the diameter of the drums upon which they are carried in order to accommodate the increasing volume4 ,illustration3 ,,fig4 #ce ,illustration3 ,,fig4 #cf ,illustration3 ,,fig4 #cg ,it is not necessary that the blades shall run close together1 and the axial clearance1 that is the space lengthwise of the turbine between the revolving and the stationary blades1 varies from #a_/h to #a_/b inch2 but in order that there may not be excessive leakage over the tops of the blades1 as shown1 very much exaggerated1 in ,fig4 #ch1 the radial clearance1 that is1 the clearance between the tops of the moving blades and the casing1 and between the ends of the stationary blades and the shell of the rotor1 must be kept down to the lowest practical amount1 and varies1 according to the size of the machine and length of blade1 from about #j4jbe to #j4abe of an inch4 ,illustration3 ,,fig4 #ch ,in the passage ,a 7,fig4 #cd7 exists the initial pressure2 in the passage ,b the pressure after the steam has passed the first section or diameter of the rotor2 in the passage ,c after it has passed the second section4 ,the pressure acting upon the exposed faces of the rows of vanes would crowd the rotor to the left4 ,they are therefore balanced by pistons or dummies ,p ,p ,p revolving with the shaft and exposing in the annular spaces ,b#a and ,c#a the same areas as those of the blade sections which they are designed to balance4 ,the same pressure is maintained in ,b#a as in ,b1 and in ,c#a as in ,c by connecting them with equalizing pipes ,e ,e4 ,the third equalizing pipe connects the back or right-hand side of the largest dummy with the exhaust passage so that the same pressure exists upon it as exists upon the exhaust end of the rotor4 ,these dummy pistons are shown at the near end of the rotor in ,fig4 #ce4 ,they are grooved so as to form a labyrinth packing1 the face of the casing against which they run being grooved and brass strips inserted1 as shown in ,fig4 #ci4 ,the dummy pistons prevent leakage from ,a1 ,b#a and ,c#a to the condenser1 and must1 of course1 run as closely as practicable to the rings in the casing1 the actual clearance being from about #j4jje to #j4jae of an inch1 again depending on the size of the machine4 ,illustration3 ,,fig4 #ci ,the axial adjustment is controlled by the device shown at ,t in ,fig4 #cd and on a larger scale in ,fig4 #dj4 ,the thrust bearing consists of two parts1 ,t#a ,t#b4 ,each consists of a cast-iron body in which are placed brass collars4 ,these collars fit into grooves ,c1 turned in the shaft as shown4 ,the halves of the block are brought into position by means of screws ,s#a ,s#b acting on levers ,l#a ,l#b and mounted in the bearing pedestal and cover4 ,the screws are provided with graduated heads which permit the respective halves of the thrust bearing to be set within one one-thousandth of an inch4 ,illustration3 ,,fig4 #dj ,the upper screw ,s#b is set so that when the rotor exerts a light pressure against it through the thrust block and lever the grooves in the balance pistons are just unable to come in contact with the dummy strips in the cylinder4 ,the lower screw ,s#a is then adjusted to permit about #j4jjh to #j4jaj of an inch freedom for the collar between the grooves of the thrust bearing4 ,these bearings are carefully adjusted before the machine leaves the shop1 and to prevent either accidental or unauthorized changes of their adjustment the adjusting screw heads are locked by the method shown in ,fig4 #dj4 ,the screw cannot be revolved without sliding back the latch ,l#c4 ,to do this the pin ,p#d must be withdrawn1 for which purpose the bearing cover must be removed4 ,in general this adjustment should not be changed except when there has been some wear of the collars in the thrust bearing2 nevertheless1 it is a wise precaution to go over the adjustment at intervals4 ,the method of doing this is as follows3 ,the machine should have been in operation for some time so as to be well and evenly heated and should be run at a reduced speed1 say #aj per cent4 of the normal1 during the actual operation of making the adjustment4 ,adjust the upper screw which1 if tightened1 would push the spindle away from the thrust bearing toward the exhaust4 ,find a position for this so that when the other screw is tightened the balance pistons can just be heard to touch1 and so the least change of position inward of the upper screw will cause the contact to cease4 ,to hear if the balance pistons are touching1 a short piece of hardwood should be placed against the cylinder casing near the balance piston4 ,if the ear is applied to the other end of the piece of wood the contact of the balance pistons can be very easily detected4 ,the lower screw should then be loosened and the upper screw advanced from five to fifteen one-thousandths1 according to the machine1 at which position the latter may be considered to be set4 ,the lower screw should then be advanced until the under half of the thrust bearing pushes the rotor against the other half of the thrust bearing1 and from this position it should be pushed back ten or more one-thousandths1 to give freedom for the rotor between the thrusts1 and locked4 ,a certain amount of care should be exercised in setting the dummies1 to avoid straining the parts and thus obtain a false setting4 ,the object in view is to have the grooves of the balance pistons running as close as possible to the collars in the cylinder1 but without danger of their coming in actual contact1 and to allow as little freedom as possible in the thrust bearing itself1 but enough to be sure that it will not heat4 ,the turbine rotor itself has scarcely any end thrust1 so that all the thrust bearing has to do is to maintain the above-prescribed adjustment4 ,the blades are so gaged that at all loads the rotor has a very light but positive thrust toward the running face of the dummy strips1 thus maintaining the proper clearance at the dummies as determined by the setting of the proper screw adjustment4 ,main ,bearings ,the bearings which support the rotor are shown at ,f ,f in ,fig4 #cd and in detail in ,fig4 #da4 ,the bearing proper consists of a brass tube ,b with proper oil grooves4 ,it has a dowel arm ,l which fits into a corresponding recess in the bearing cover and which prevents the bearing from turning4 ,on this tube are three concentric tubes1 ,c ,d ,e1 each fitting over the other with some clearance so that the shaft is free to move slightly in any direction4 ,these tubes are held in place by the nut ,f1 and this nut1 in turn1 is held by the small set-screw ,g4 ,the bearing with the surrounding tubes is placed inside of the cast-iron shell ,a1 which rests in the bearing pedestal on the block and liner ,h4 ,the packing ring ,m prevents the leakage of oil past the bearing4 ,oil enters the chamber at one end of the bearing at the top and passes through the oil grooves1 lubricating the journal1 and then out into the reservoir under the bearing4 ,the oil also fills the clearance between the tubes and forms a cushion1 which dampens any tendency to vibration4 ,illustration3 ,,fig4 #da ,the bearings1 being supported by the blocks or pads ,h1 are self-alining4 ,under these pads are liners #e1 #aj1 #bj1 and #ej thousandths in thickness4 ,by means of these liners the rotor may be set in its proper running position relative to the stator4 ,this operation is quite simple4 ,remove the liners from under one bearing pad and place them under the opposite pad until a blade touch is obtained by turning the rotor over by hand4 ,after a touch has been obtained on the top1 bottom1 and both sides1 the total radial blade clearance will be known to equal the thickness of the liners transferred4 ,the position of the rotor is then so adjusted that the radial blade clearance is equalized when the turbine is at operating temperature4 ,on turbines running at #ahjj revolutions per minute or under1 a split babbitted bearing is used1 as shown in ,figs4 #db;a and #db;b4 ,these bearings are self-alining and have the same liner adjustment as the concentric-sleeve bearings just described4 ,oil is supplied through a hole ,d in the lower liner pad1 and is carried to the oil groove ,f through the tubes ,e ,e4 ,the oil flows from the middle of this bearing to both ends instead of from one end to the other1 as in the other type4 ,illustration3 ,,fig4 #db;,a ,illustration3 ,,fig4 #db;,b ,packing ,glands ,where the shaft passes through the casing at either end it issues from a chamber in which there exists a vacuum4 ,it is necessary to pack the shaft at these points1 therefore1 against the atmospheric pressure1 and this is done by means of a water-gland packing ,w ,w 7,fig4 #cd74 ,upon the shaft in ,fig4 #ce1 just in front of the dummy pistons1 will be seen a runner of this packing gland1 which runner is shown upon a larger scale and from a different direction in ,fig4 #dc4 ,to get into the casing the air would have to enter the guard at ,a 7,fig4 #dd71 pass over the projecting rings ,b1 the function of which is to throw off any water which may be creeping along the shaft by centrifugal force into the surrounding space ,c1 whence it escapes by the drip pipe ,d1 hence over the five rings of the labyrinth packing ,e and thence over the top of the revolving blade wheel1 it being apparent from ,fig4 #dc that there is no way for the air to pass by without going up over the top of the blades2 but water is admitted to the centrally grooved space through the pipe shown1 and is revolved with the wheel at such velocity that the pressure due to centrifugal force exceeds that of the atmosphere1 so that it is impossible for the air to force the water aside and leak in over the tips of the blades1 while the action of the runner in throwing the water out would relieve the pressure at the shafts and avoid the tendency of the water to leak outward through the labyrinth packing either into the vacuum or the atmosphere4 ,illustration3 ,,fig4 #dc ,illustration3 ,,fig4 #dd ,the water should come to the glands under a head of about #aj feet1 or a pressure of about #e pounds1 and be connected in such a way that this pressure may be uninterruptedly maintained4 ,its temperature must be lower than the temperature due to the vacuum within the turbine1 or it will evaporate readily and find its way into the turbine in the form of steam4 ,illustration3 ,,fig4 #de ,in any case a small amount of the steaming water will pass by the gland collars into the turbine1 so that if the condensed steam is to be returned to the boilers the water used in the glands must be of such character that it may be safely used for feed water4 ,but whether the water so used is to be returned to the boilers or not it should never contain an excessive amount of lime or solid matter1 as a certain amount of evaporation is continually going on in the glands which will result in the deposit of scale and require frequent taking apart for cleaning4 ,illustration3 ,,fig4 #df ,when there is an ample supply of good1 clean water the glands may be packed as in ,fig4 #de1 the standpipe supplying the necessary head and the supply valve being opened sufficiently to maintain a small stream at the overflow4 ,when water is expensive and the overflow must be avoided1 a small float may be used as in ,fig4 #df1 the ordinary tank used by plumbers for closets1 etc41 serving the purpose admirably4 ,when the same water that is supplied to the glands is used for the oil-cooling coils1 which will be described in detail later1 the coils may be attached to either of the above arrangements as shown in ,fig4 #dg4 ,illustration3 ,,fig4 #dg ,when the only available supply of pure water is that for the boiler feed1 and the condensed steam is pumped directly back to the boiler1 as shown in ,fig4 #dh1 the delivery from the condensed-water pumps may be carried to an elevation #aj feet above the axis of the glands1 where a tank should be provided of sufficient capacity that the water may have time to cool considerably before being used4 ,in most of these cases1 if so desired1 the oil-cooling water may come from the circulating pumps of the condenser1 provided there is sufficient pressure to produce circulation1 as is also shown in ,fig4 #dh4 ,illustration3 ,,fig4 #dh ,when the turbine is required to exhaust against a back pressure of one or two pounds a slightly different arrangement of piping must be made4 ,the water in this case must be allowed to circulate through the glands in order to keep the temperature below #bab degrees ,fahrenheit4 ,if this is not done the water in the glands will absorb heat from the main castings of the machine and will evaporate4 ,this evaporation will make the glands appear as though they were leaking badly4 ,in reality it is nothing more than the water in the glands boiling1 but it is nevertheless equally objectionable4 ,this may be overcome by the arrangement shown in ,fig4 #di1 where two connections and valves are furnished at ,m and ,n1 which drain away to any suitable tank or sewer4 ,these valves are open just enough to keep sufficient circulation so that there is no evaporation going on1 which is evidenced by steam coming out as though the glands were leaking4 ,these circulating valves may be used with any of the arrangements above described4 ,illustration3 ,,fig4 #di ,the ,governor ,on the right-hand end of the main shaft in ,fig4 #cd there will be seen a worm gear driving the governor4 ,this is shown on a larger scale at ,a 7,fig4 #ej74 ,at the left of the worm gear is a bevel gear driving the spindle ,d of the governor1 and at the right an eccentric which gives a vibratory motion to the lever ,f4 ,the crank ,c upon the end of the shaft operates the oil pump4 ,the speed of the turbine is controlled by admitting the steam in puffs of greater or less duration according to the load4 ,the lever ,f1 having its fulcrum in the collar surrounding the shaft1 operates with each vibration of the eccentric the pilot valve4 ,the valve is explained in detail later4 ,illustration3 ,,fig4 #ej ,this form of governor has been superseded by an improved type1 but so many have been made that it will be well to describe its construction and adjustment4 ,the two balls ,w ,w 7,fig4 #ej7 are mounted on the ends of bell cranks ,n1 which rest on knife edges4 ,the other end of the bell cranks carry rollers upon which rest a plate ,p1 which serves as a support for the governor spring ,s4 ,they are also attached by links to a yoke and sleeve ,e which acts as a fulcrum for the lever ,f4 ,the governor is regulated by means of the spring ,s resting on the plate ,p and compressed by a large nut ,g on the upper end of the governor spindle1 which nut turns on a threaded quill ,j1 held in place by the nut ,h on the end of the governor spindle and is held tight by the lock-nut ,k4 ,to change the compression of the spring and thereby the speed of the turbine the lock-nut must first be loosened and the hand-nut raised to lower the speed or lowered to raise the speed as the case may be4 ,this operation may be accomplished while the machine is either running or at rest4 ,the plate ,p rests upon ball bearings so that by simply bringing pressure to bear upon the hand-wheel1 which is a part of the quill ,j1 the spring and lock-nut may be held at rest and adjusted while the rest of the turbine remains unaffected4 ,another lever is mounted upon the yoke ,e on the pin shown at ,i1 the other end of which is fastened to the piston of a dash-pot so as to dampen the governor against vibration4 ,under the yoke ,e will be noticed a small trigger ,m which is used to hold the governor in the full-load position when the turbine is at rest4 ,the throwing out of the weights elevates the sleeve ,e1 carrying with it the collar ,c1 which is spanned by the lever ,f upon the shaft ,h4 ,the later turbines are provided with an improved form of governor operating on the same principle1 but embodying several important features4 ,first1 the spindle sleeve is integral with the governor yoke1 and the whole rotates about a vertical stationary spindle1 so that two motions are encountered--a rotary motion and an up and down motion1 according to the position taken by the governor4 ,this spiral motion almost entirely eliminates the effect of friction of rest1 and thereby enhances the sensitiveness of the governor4 ,second1 the governor weights move outward on a parallel motion opposed directly by spring thrust1 thus relieving the fulcrum entirely of spring thrust4 ,third1 the lay shaft driving the governor oil pump and reciprocator is located underneath the main turbine shaft1 so that the rotor may be readily removed without in the least disturbing the governor adjustment4 ,the ,valve-,gear ,the valve-gear is shown in section in ,fig4 #ea1 the main admission being shown at ,v#a at the right1 and the secondary ,v#b at the left of the steam inlet4 ,the pilot valve ,f receives a constant reciprocating motion from the eccentric upon the layshaft of the turbine through the lever ,f 7,fig4 #ej74 ,these reciprocations run from #aej to #ahj per minute4 ,the space beneath the piston ,c is in communication with the large steam chest1 where exists the initial pressure through the port ,a2 the admission of steam to the piston ,c being controlled by a needle valve ,b4 ,the pilot valve connects the port ,e1 leading from the space beneath the piston to an exhaust port ,i4 ,illustration3 ,,fig4 #ea ,when the pilot valve is closed1 the pressures can accumulate beneath the piston ,c and raise the main admission valve from its seat4 ,when the pilot valve opens1 the pressure beneath the piston is relieved and it is seated by the helical spring above4 ,if the fulcrum ,e 7,fig4 #ej7 of the lever ,f were fixed the admission would be of an equal and fixed duration4 ,but if the governor raises the fulcrum ,e1 the pilot valve ,f 7,fig4 #ea7 will be lowered1 changing the relations of the openings with the working edges of the ports4 ,the seating of the main admission valve is cushioned by the dashpot1 the piston of which is shown in section at ,g 7,fig4 #ea74 ,the valve may be opened by hand by means of the lever ,k1 to see if it is perfectly free4 ,the secondary valve is somewhat different in its action4 ,steam is admitted to both sides of its actuating piston through the needle valves ,m ,m1 and the chamber from which this steam is taken is connected with the under side of the main admission valve1 so that no steam can reach the actuating piston of the secondary valve until it has passed through the primary valve4 ,when the pilot valve is closed1 the pressures equalize above and below the piston ,n and the valve remains upon its seat4 ,when the load upon the turbine exceeds its rated capacity1 the pilot valve moves upward so as to connect the space above the piston with the exhaust ,l1 relieving the pressure upon the upper side and allowing the greater pressure below to force the valve open1 which admits steam to the secondary stage of the turbine4 ,it would do no good to admit more steam to the first stage1 for at the rated capacity that stage is taking all the steam for which the blade area will afford a passage4 ,the port connecting the upper side of the piston ,n with the exhaust may be permanently closed by means of the hand valve ,q1 to be found on the side of the secondary pilot valve chest1 thus cutting the secondary valve entirely out of action4 ,no dashpot is necessary on this valve1 the compression of the steam in the chamber ,w by the fall of the piston being sufficient to avoid shock4 ,the timing of the secondary valve is adjusted by raising or lowering the pilot valve by means of the adjustment provided4 ,it should open soon enough so that there will not be an appreciable drop in speed before the valve comes into play4 ,the economy of the machine will be impaired if the valve is allowed to open too soon4 ,safety ,stop ,governor ,this device is mounted on the governor end of the turbine shaft1 as shown in ,figs4 #eb and #ec4 ,when the speed reaches a predetermined limit1 the plunger ,a1 having its center of gravity slightly displaced from the center of rotation of the shaft1 is thrown radially outward and strikes the lever ,b4 ,it will easily be understood that when the plunger starts outward1 the resistance of spring ,c is rapidly overcome1 since the centrifugal force increases as the square of the radius1 or in this case the eccentricity of the center of gravity relative to the center of rotation4 ,hence1 the lever is struck a sharp blow4 ,this releases the trip ,e on the outside of the governor casing1 and so opens the steam valve ,f1 which releases steam from beneath the actuating piston of a quick-closing throttle valve1 located in the steam line4 ,thus1 within a period of usually less than one second1 the steam is entirely shut off from the turbine when the speed has exceeded #g or #h per cent of the normal4 ,illustration3 ,,fig4 #eb ,illustration3 ,,fig4 #ec ,the ,oiling ,system ,mounted on the end of the bedplate is the oil pump1 operated from the main shaft of the turbine as previously stated4 ,this may be of the plunger type shown in ,fig4 #ed1 or upon the latest turbine1 the rotary type shown in ,fig4 #ee4 ,around the bedplate are located the oil-cooling coils1 the oil strainer1 the oil reservoir and the oil pipings to the bearing4 ,illustration3 ,,fig4 #ed ,the oil reservoir1 cooler1 and piping are all outside the machine and easily accessible for cleaning4 ,usually a corrugated-steel floor plate covers all this apparatus1 so that it will not be unsightly and accumulate dirt1 particularly when the turbine is installed1 so that all this apparatus is below the floor level2 i4e41 when the top of the bedplate comes flush with the floor line4 ,in cases where the turbine is set higher1 a casing is usually built around this material so that it can be easily removed1 and forms a platform alongside the machine4 ,illustration3 ,,fig4 #ee ,the oil cooler1 shown in ,fig4 #ef1 is of the counter-current type1 the water entering at ,a and leaving at ,b1 oil entering at ,c 7opening not shown7 and leaving at ,d4 ,the coils are of seamless drawn copper1 and attached to the cover by coupling the nut4 ,the water manifold ,f is divided into compartments by transverse ribs1 each compartment connecting the inlet of each coil with the outlet of the preceding coil1 thus placing all coils in series4 ,these coils are removable in one piece with the coverplate without disturbing the rest of the oil piping4 ,illustration3 ,,fig4 #ef ,blading ,illustration3 ,,fig4 #eg ,the blades are drawn from a rod consisting of a steel core coated with copper so intimately connected with the other metal that when the bar is drawn to the section required for the blading1 the exterior coating drawn with the rest of the bar forms a covering of uniform thickness as shown in ,fig4 #eg4 ,the bar after being drawn through the correct section is cut into suitable lengths punched as at ,a 7,fig4 #eh71 near the top of the blade1 and has a groove shown at ,b 7,fig4 #ei71 near the root1 stamped in its concave face1 while the blade is being cut to length and punched4 ,the blades are then set into grooves cut into the rotor drum or the concave surface of the casing1 and spacing or packing pieces ,c 7,fig4 #ei7 placed between them4 ,these spacing pieces are of soft iron and of the form which is desired that the passage between the blades shall take4 ,the groove made upon the inner face of the blade is sufficiently near to the root to be covered by this spacing piece4 ,when the groove has been filled the soft-iron pieces are calked or spread so as to hold the blades firmly in place4 ,a wire of comma section1 as shown at ,a 7,fig4 #ei71 is then strung through the punches near the outer ends of the blades and upset or turned over as shown at the right in ,fig4 #eh4 ,this upsetting is done by a tool which shears the tail of the comma at the proper width between the blades4 ,the bent-down portion on either side of the blade holds it rigidly in position and the portion retained within the width of the blade would retain the blade in its radial position should it become loosened or broken off at the root4 ,this comma lashing1 as it is called1 takes up a small proportion only of the blade length or projection and makes a job which is surprisingly stiff and rigid1 and yet which yields in case of serious disturbance rather than to maintain a contact which would result in its own fusing or the destruction of some more important member4 ,illustration3 ,,fig4 #eh ,illustration3 ,,fig4 #ei ,starting ,up the ,turbine ,when starting up the turbine for the first time1 or after any extended period of idleness1 special care must be taken to see that everything is in good condition and that all parts of the machine are clean and free from injury4 ,the oil piping should be thoroughly inspected and cleaned out if there is any accumulation of dirt4 ,the oil reservoirs must be very carefully wiped out and minutely examined for the presence of any grit4 7,avoid using cotton waste for this1 as a considerable quantity of lint is almost sure to be left behind and this will clog up the oil passages in the bearings and strainer47 ,the pilot valves should be removed from the barrel and wiped off1 and the barrels themselves cleaned out by pushing a soft cloth through them with a piece of wood4 ,in no case should any metal be used4 ,if the turbine has been in a place where there was dirt or where there has been much dust blowing around1 the bearings should be removed from the spindle and taken apart and thoroughly cleaned4 ,with care this can be done without removing the spindle from the cylinder1 by taking off the bearing covers and very carefully lifting the weight of the spindle off the bearings1 then sliding back the bearings4 ,it is best to lift the spindle by means of jacks and a rope sling1 as1 if a crane is used1 there is great danger of lifting the spindle too high and thereby straining it or injuring the blades4 ,after all the parts have been carefully gone over and cleaned1 the oil for the bearing lubrication should be put into the reservoirs by pouring it into the governor gear case ,g 7,fig4 #cd74 ,enough oil should be put in so that when the governor1 gear case1 and all the bearing-supply pipes are full1 the supply to the oil pump is well covered4 ,special care should be taken so that no grit gets into the oil when pouring it into the machine4 ,considerable trouble may be saved in this respect by pouring the oil through cloth4 ,a very careful inspection of the steam piping is necessary before the turbine is run4 ,if possible it should be blown out by steam from the boilers before it is finally connected to the turbine4 ,considerable annoyance may result by neglecting this precaution1 from particles of scale1 red lead1 gasket1 etc41 out of the steam pipe1 closing up the passages of the guide blades4 ,when starting up1 always begin to revolve the spindle without vacuum being on the turbine4 ,after the spindle is turning slowly1 bring the vacuum up4 ,the reason for this is1 that when the turbine is standing still1 the glands do not pack and air in considerable quantity will rush through the glands and down through the exhaust pipe4 ,this sometimes has the effect of unequal cooling4 ,in case the turbine is used in conjunction with its own separate condenser1 the circulating pump may be started up1 then the turbine revolved1 and afterward the air pump put in operation2 then1 last1 put the turbine up to speed4 ,in cases1 however1 where the turbine exhausts into the same condenser with other machinery and the condenser is therefore already in operation1 the valve between the turbine and the condenser system should be kept closed until after the turbine is revolved1 the turbine in the meantime exhausting through the relief valve to atmosphere4 ,care must always be taken to see that the turbine is properly warmed up before being caused to revolve1 but in cases where high superheat is employed always revolve the turbine just as soon as it is moderately hot1 and before it has time to become exposed to superheat4 ,in the case of highly superheated steam1 it is not undesirable to provide a connection in the steam line by means of which the turbine may be started up with saturated steam and the superheat gradually applied after the shaft has been permitted to revolve4 ,for warming up1 it is usual practice to set the governor on the trigger 7see ,fig4 #ej7 and open the throttle valve to allow the entrance of a small amount of steam4 ,it is always well to let the turbine operate at a reduced speed for a time1 until there is assurance that the condenser and auxiliaries are in proper working order1 that the oil pump is working properly1 and that there is no sticking in the governor or the valve gear4 ,after the turbine is up to speed and on the governor1 it is well to count the speed by counting the strokes of the pump rod1 as it is possible that the adjustment of the governor may have become changed while the machine has been idle4 ,it is well at this time1 while there is no load on the turbine1 to be sure that the governor controls the machine with the throttle wide open4 ,it might be that the main poppet valve has sustained some injury not evident on inspection1 or was leaking badly4 ,should there be some such defect1 steps should be taken to regrind the valve to its seat at the first opportunity4 ,on the larger machines an auxiliary oil pump is always furnished4 ,this should be used before starting up1 so as to establish the oil circulation before the turbine is revolved4 ,after the turbine has reached speed1 and the main oil pump is found to be working properly1 it should be possible to take this pump out of service1 and start it again only when the turbine is about to be shut down4 ,if possible1 the load should be thrown on gradually to obviate a sudden1 heavy demand upon the boiler1 with its sometimes attendant priming and rush of water into the steam pipe1 which is very apt to take place if the load is thrown on too suddenly4 ,a slug of water will have the effect of slowing down the turbine to a considerable extent1 causing some annoyance4 ,there is not likely to be the danger of the damage that is almost sure to occur in the reciprocating engine1 but at the same time it is well to avoid this as much as possible4 ,a slug of water is obviously more dangerous when superheated steam is being employed1 owing to the extreme temperature changes possible4 ,running ,while the turbine is running1 it should have a certain amount of careful attention4 ,this1 of course1 does not mean that the engineer must stand over it every minute of the day1 but he must frequently inspect such parts as the lubricators1 the oiling system1 the water supply to the glands and the oil-cooling coil1 the pilot valve1 etc4 ,he must see that the oil is up in the reservoir and showing in the gage glass provided for that purpose1 and that the oil is flowing freely through the bearings1 by opening the pet cocks in the top of the bearing covers4 ,an ample supply of oil should always be in the machine to keep the suction in the tank covered4 ,care must be taken that the pump does not draw too much air4 ,this can usually be discovered by the bubbling up of the air in the governor case1 when more oil should be added4 ,it is well to note from time to time the temperature of the bearings1 but no alarm need be occasioned because they feel warm to the touch2 in fact1 a bearing is all right as long as the hand can be borne upon it even momentarily4 ,the oil coming from the bearings should be preferably about #abj degrees ,fahrenheit and never exceed #afj degrees4 ,it should generally be seen that the oil-cooling coil is effective in keeping the oil cool4 ,sometimes the cooling water deposits mud on the cooling surface1 as well as the oil depositing a vaseline-like substance1 which interferes with the cooling effect4 ,the bearing may become unduly heated because of this1 when the coil should be taken out at the first opportunity and cleaned on the outside and blown out by steam on the inside1 if this latter is possible4 ,if this does not reduce the temperature1 either the oil has been in use too long without being filtered1 or the quality of the oil is not good4 ,should a bearing give trouble1 the first symptom will be burning oil which will smoke and give off dense white fumes which can be very readily seen and smelled4 ,however1 trouble with the bearings is one of the most unlikely things to be encountered1 and1 if it occurs1 it is due to some radical cause1 such as the bearings being pinched by their caps1 or grit and foreign matter being allowed to get into the oil4 ,if a bearing gets hot1 be assured that there is some very radical cause for it which should be immediately discovered and removed4 ,never1 under any circumstances1 imagine that you can nurse a bearing1 that has heated1 into good behavior4 ,turbine bearings are either all right or all wrong4 ,there are no halfway measures4 ,the oil strainer should also be occasionally taken apart and thoroughly cleaned1 which operation may be performed1 if necessary1 while the turbine is in operation4 ,the screens should be cleaned by being removed from their case and thoroughly blown out with steam4 ,in the case of a new machine1 this may have to be done every two or three hours4 ,in course of time1 this need only be repeated perhaps once a week4 ,the amount of dirt found will be an indication of the frequency with which this cleaning is necessary4 ,the proper water pressure1 about five pounds per square inch1 must be maintained at the glands4 ,any failure of this will mean that there is some big leak in the piping1 or that the water is not flowing properly4 ,the pilot valve must be working freely1 causing but little kick on the governor1 and should be lubricated from time to time with good oil4 ,should it become necessary1 while operating1 to shut down the condenser and change over to non-condensing operation1 particular care should be observed that the change is not made too suddenly to non-condensing1 as all the low-pressure sections of the turbine must be raised to a much higher temperature4 ,while this may not cause an accident1 it is well to avoid the stresses which necessarily result from the sudden change of temperature4 ,the same reasons1 of course1 do not hold good in changing from non-condensing to condensing4 ,shutting ,down ,when shutting down the turbine the load may be taken off before closing the throttle2 or1 as in the case of a generator operating on an independent load1 the throttle may be closed first1 allowing the load to act as a brake1 bringing the turbine to rest quickly4 ,in most cases1 however1 the former method will have to be used1 as the turbine generally will have been operating in parallel with one or more other generators4 ,when this is the case1 partially close the throttle just before the load is to be thrown off1 and if the turbine is to run without load for some time1 shut off the steam almost entirely in order to prevent any chance of the turbine running away4 ,there is no danger of this unless the main valve has been damaged by the water when wet steam has been used1 or held open by some foreign substance1 when1 in either case1 there may be sufficient leakage to run the turbine above speed1 while running light4 ,at the same time1 danger is well guarded against by the automatic stop valve1 but it is always well to avoid a possible danger4 ,as soon as the throttle is shut1 stop the condenser1 or1 in the case where one condenser is used for two or more turbines1 close the valve between the turbine and the condenser4 ,also open the drains from the steam strainer1 etc4 ,this will considerably reduce the time the turbine requires to come to rest4 ,still more time may be saved by leaving the field current on the generator4 ,care should be taken1 when the vacuum falls and the turbine slows down1 to see that the water is shut off from the glands for fear it may leak out to such an extent as to let the water into the bearings and impair the lubricating qualities of the oil4 ,inspection ,at regular intervals thorough inspection should be made of all parts of the turbine4 ,as often as it appears necessary from the temperature of the oil1 depending on the quality of the oil and the use of the turbine1 remove the oil-cooling coil and clean it both on the inside and outside as previously directed2 also clean out the chamber in which it is kept4 ,put in a fresh supply of oil4 ,this need not necessarily be new1 but may be oil that has been in use before but has been filtered4 ,we recommend that an oil filter be kept for this purpose4 ,entirely new oil need only be put into the turbine when the old oil shows marked deterioration4 ,with a first-class oil this will probably be a very infrequent necessity1 as some new oil has to be put in from time to time to make up the losses from leakage and waste4 ,clean out the oil strainer1 blowing steam through the wire gauze to remove any accumulation of dirt4 ,every six months to a year take off the bearing covers1 remove the bearings1 and take them apart and clean out thoroughly4 ,even the best oil will deposit more or less solid matter upon hot surfaces in time1 which will tend to prevent the free circulation of the oil through the bearings and effectively stop the cushioning effect on the bearings4 ,take apart the main and secondary valves and clean thoroughly1 seeing that all parts are in good working order4 ,clean and inspect the governor and the valve-gear1 wiping out any accumulation of oil and dirt that may appear4 ,be sure to clean out the drains from the glands so that any water that may pass out of them will run off freely and will not get into the bearings4 ,at the end of the first three months1 and after that about once a year1 take off the cylinder cover and remove the spindle4 ,when the turbine is first started up1 there is very apt to be considerable foreign matter come over in the steam1 such as balls of red lead or small pieces of gasket too small to be stopped by the strainer4 ,these get into the guide blades in the cylinder and quite effectively stop them up4 ,therefore1 the blades should be gone over very carefully1 and any such additional accumulation removed4 ,examine the glands and equilibrium ports for any dirt or broken parts4 ,particularly examine the glands for any deposit of scale4 ,all the scale should be chipped off the gland parts1 as1 besides preventing the glands from properly packing1 this accumulation will cause mechanical contact and perhaps cause vibration of the machine due to lack of freedom of the parts4 ,the amount of scale found after the first few inspections will be an indication of how frequently the cleaning should be done4 ,as is discussed later1 any water that is unsuitable for boiler feed should not be used in the glands4 ,in reassembling the spindle and cover1 very great care must be taken that no blades are damaged and that nothing gets into the blades4 ,nearly all the damage that has been done to blades has resulted from carelessness in this respect2 in fact1 it is impossible to be too careful4 ,particular care is also to be taken in assembling all the parts and in handling them1 as slight injury may cause serious trouble4 ,in no case should a damaged part be put back until the injury has been repaired4 ,if for any reason damaged blades cannot be repaired at the time1 they can be easily removed and the turbine run again without them until it is convenient to put in new ones2 in fact1 machines have been run at full load with only three-quarters of the total number of blades4 ,in such an event remove the corresponding stationary blades as well as the moving blades1 so as not to disturb the balance of the end thrust4 ,conditions ,conducive to ,successful ,operation ,in the operation of the turbine and the conditions of the steam1 both live and exhaust play a very important part4 ,it has been found by expensive experimenting that moisture in the steam has a very decided effect on the economy of operation2 or considerably more so than in the case of the reciprocating engine4 ,in the latter engine1 #b per cent4 of moisture will mean very close to #b per cent4 increase in the amount of water supplied to the engine for a given power4 ,on the other hand1 in the turbine #b per cent4 moisture will cause an addition of more nearly #d per cent4 ,it is therefore readily seen that the drier the entering steam1 the better will be the appearance of the coal bill4 ,by judicious use of first-class separators in connection with a suitable draining system1 such as the ,holly system which returns the moisture separated from the steam1 back to the boilers1 a high degree of quality may be obtained at the turbine with practically no extra expense during operation4 ,frequent attention should be given the separators and traps to insure their proper operation4 ,the quality of the steam may be determined from time to time by the use of a throttling calorimeter4 ,dry steam1 to a great extent1 depends upon the good and judicious design of steam piping4 ,superheated steam is of great value where it can be produced economically1 as even a slight degree insures the benefits to be derived from the use of dry steam4 ,the higher superheats have been found to increase the economy to a considerable extent4 ,when superheat of a high degree 7#ajj degrees ,fahrenheit or above7 is used special care must be exercised to prevent a sudden rise of the superheat of any amount4 ,the greatest source of trouble in this respect is when a sudden demand is made for a large increase in the amount of steam used by the engine1 as when the turbine is started up and the superheater has been in operation for some time before1 the full load is suddenly thrown on4 ,it will be readily seen that with the turbine running light and the superheater operating1 there is a very small amount of steam passing through2 in fact1 practically none1 and this may become very highly heated in the superheater1 but loses nearly all its superheat in passing slowly to the turbine2 then1 when a sudden demand is made1 this very high temperature steam is drawn into the turbine4 ,this may usually be guarded against where a separately fired superheater is used1 by keeping the fire low until the load comes on1 or1 in the case where the superheater is part of the boiler1 by either not starting up the superheater until after load comes on1 or else keeping the superheat down by mixing saturated steam with that which has been superheated4 ,after the plant has been started up there is little danger from this source1 but such precautions should be taken as seem best in the particular cases4 ,taking up the exhaust end of the turbine1 we have a much more striking departure from the conditions familiar in the reciprocating engine4 ,due to the limits imposed upon the volume of the cylinder of the engine1 any increase in the vacuum over #bc or #bd inches1 in the case1 for instance1 of a compound-condensing engine1 has very little1 if any1 effect on the economy of the engine4 ,with the turbine1 on the other hand1 any increase of vacuum1 even up to the highest limits1 increases the economy to a very considerable extent and1 moreover1 the higher the vacuum the greater will be the increase in the economy for a given addition to the vacuum4 ,thus1 raising the vacuum from #bg to #bh inches has a greater effect than from #bc to #bd inches4 ,for this reason the engineer will readily perceive the great desirability of maintaining the vacuum at the highest possible point consistent with the satisfactory and economical operation of the condenser4 ,the exhaust pipe should always be carried downward to the condenser when possible1 to keep the water from backing up from the condenser into the turbine4 ,if the condenser must be located above the turbine1 then the pipe should be carried first downward and then upward in the ,u form1 in the manner of the familiar entrainer1 which will be found effectively to prevent water getting back when the turbine is operating4 ,condensers ,as has been previously pointed out1 the successful and satisfactory operation of the turbine depends very largely on the condenser4 ,with the reciprocating engine1 if the condenser will give #be inches vacuum1 it is considered fairly good1 and it is allowed to run along by itself until the vacuum drops to somewhere below #bj inches1 when it is completely gone over1 and in many cases practically rebuilt and the vacuum brought back to the original #be inches4 ,it has been seen that this sort of practice will never do in the case of the turbine condenser and1 unless the vacuum can be regularly maintained at #bg or #bh inches1 the condenser is not doing as well as it ought to do1 or it is not of the proper type1 unless perhaps the temperature and the quantity of cooling water available render a higher vacuum unattainable4 ,on account of the great purity of the condensed steam from the turbine and its peculiar availability for boiler feed 7there being no oil of any kind mixed with it to injure the boilers71 the surface condenser is very desirable in connection with the turbine4 ,it further recommends itself by reason of the high vacuum obtainable4 ,where a condenser system capable of the highest vacuum is installed1 the need of utilizing it to its utmost capacity can hardly be emphasized too strongly4 ,a high vacuum will1 of course1 mean special care and attention1 and continual vigilance for air leaks in the exhaust piping1 which will1 however1 be fully paid for by the great increase in economy4 ,it must not be inferred that a high vacuum is essential to successful operation of this type of turbine1 for excellent performance both in the matter of steam consumption and operation is obtained with inferior vacuum4 ,the choice of a condenser1 however1 is a matter of special engineering1 and is hardly within the province of this article4 ,oils ,there are several oils on the market that are suitable for the purpose of the turbine oiling system1 but great care must be exercised in their selection4 ,in the first place1 the oil must be pure mineral1 unadulterated with either animal or vegetable oils1 and must have been washed free from acid4 ,certain brands of oil require the use of sulphuric acid in their manufacture and are very apt to contain varying degrees of free acid in the finished product4 ,a sample from one lot may have almost no acid1 while that from another lot may contain a dangerous amount4 ,mineral oils that have been adulterated1 when heated up1 will partially decompose1 forming acid4 ,these oils may be very good lubricants when first put into use1 but after awhile they lose all their good qualities and become very harmful to the machine by eating the journals in which they are used4 ,these oils must be very carefully avoided in the turbine1 as the cheapness of their first cost will in no way pay for the damage they may do4 ,a very good and simple way to test for such adulterations is to take up a quantity of the oil in a test tube with a solution of borax and water4 ,if there is any animal or vegetable adulterant present it will appear as a white milk-like emulsion which will separate out when allowed to stand4 ,the pure mineral oil will appear at the top as a clear liquid and the excess of the borax solution at the bottom1 the emulsion being in between4 ,a number of oils also contains a considerable amount of paraffin which is deposited in the oil-cooling coil1 preventing the oil from being cooled properly1 and in the pipes and bearings1 choking the oil passages and preventing the proper circulation of the oil and cushioning effect in the bearing tubes4 ,this is not entirely a prohibitive drawback1 the chief objection being that it necessitates quite frequently cleaning the cooling coil1 and the oil piping and bearings4 ,some high-class mineral oils of high viscosity are inclined to emulsify with water1 which emulsion appears as a jelly-like substance4 ,it might be added that high-grade oils having a high viscosity might not be the most suitable for turbine use4 ,since the consumption of oil in a turbine is so very small1 being practically due only to leakage or spilling1 the price paid for it should therefore be of secondary importance1 the prime consideration being its suitability for the purpose4 ,in some cases a central gravity system will be employed1 instead of the oil system furnished with the turbine1 which1 of course1 will be a special consideration4 ,for large installations a central gravity oiling system has much to recommend it1 but as it performs such an important function in the power plant1 and its failure would be the cause of so much damage1 every detail in connection with it should be most carefully thought out1 and designed with a view that under no combination of circumstances would it be possible for the system to become inoperative4 ,one of the great advantages of such a system is that it can be designed to contain very large quantities of oil in the settling tanks2 thus the oil will have quite a long rest between the times of its being used in the turbine1 which seems to be very helpful in extending the life of the oil4 ,where the oil can have a long rest for settling1 an inferior grade of oil may be used1 providing1 however1 that it is absolutely free of acid4 ,v4 ,,proper ,,method ,,of ,,testing ,a ,,steam ,,turbine#c #c ,contributed to ,power by ,thomas ,franklin4 ,the condensing arrangements of a turbine are perhaps mainly instrumental in determining the method of test4 ,the condensed steam alone1 issuing from a turbine having1 for example1 a barometric or jet condenser1 cannot be directly measured or weighed1 unless by meter1 and these at present are not sufficiently accurate to warrant their use for test purposes1 if anything more than approximate results are desired4 ,the steam consumed can1 in such a case1 only be arrived at by measuring the amount of condensing water 7which ultimately mingles with the condensed steam71 and subtracting this quantity from the condenser's total outflow4 ,consequently1 in the case of turbines equipped with barometric or jet condensers1 it is often thought sufficient to rely upon the measurement taken of the boiler feed1 and the boiler's initial and final contents4 ,turbines equipped with surface-condensing plants offer better facilities for accurate steam-consumption calculations than those plants in which the condensed exhaust steam and the circulating water come into actual contact1 it being necessary with this type simply to pump the condensed steam into a weighing or measuring tank4 ,in the case of a single-flow turbine of the ,parsons type1 the covers should be taken off and every row of blades carefully examined for deposits1 mechanical irregularities1 deflection from the true radial and vertical positions1 etc4 ,the blade clearances also should be gaged all around the circumference1 to insure this clearance being an average working minimum4 ,on no account should a test be proceeded with when any doubt exists as to the clearance dimensions4 ,illustration3 ,,fig4 #fj ,the dummy rings of a turbine1 namely1 those rings which prevent excessive leakage past the balancing pistons at the high-pressure end1 should have especial attention before a test4 ,a diagrammatic sketch of a turbine cylinder and spindle is shown in ,fig4 #fj1 for the benefit of those unfamiliar with the subject4 ,in this ,a is the cylinder or casing1 ,b the spindle or rotor1 and ,c the blades4 ,the balancing pistons1 ,d1 ,e1 and ,f1 the pressure upon which counterbalances the axial thrust upon the three-bladed stages1 are grooved1 the brass dummy rings ,g ,g in the cylinder being alined within a few thousandths of an inch of the grooved walls1 as indicated4 ,after these rings have been turned 7the turning being done after the rings have been calked in the cylinder71 it is necessary to insure that each ring is perfectly bedded to its respective grooved wall so that when running the several small clearances between the groove walls and rings are equal4 ,a capital method of thus bedding the dummy rings is to grind them down with a flour of emery or carborundum1 while the turbine spindle is slowly revolving under steam4 ,under these conditions the operation is performed under a high temperature1 and any slight permanent warp the rings may take is thus accounted for4 ,the turbine thrust-block1 which maintains the spindle in correct position relatively to the spindle1 may also be ground with advantage in a similar manner4 ,the dummy rings are shown on a large scale in ,fig4 #fa1 and their preliminary inspection may be made in the following manner3 ,the spindle has been set and the dummy rings ,c are consequently within a few thousandths of an inch of the walls d of the spindle dummy grooves ,d4 ,the clearances allowed can be gaged by a feeler placed between a ring and the groove wall4 ,before a test the spindle should be turned slowly around1 the feelers being kept in position4 ,by this means any mechanical flaws or irregularities in the groove walls may be detected4 ,illustration3 ,,fig4 #fa ,it has sometimes been found that the groove walls1 under the combined action of superheated steam and friction1 in cases where actual running contact has occurred1 have worn very considerably1 the wear taking the form of a rapid crumbling away4 ,it is possible1 however1 that such deterioration may be due solely to the quality of the steel from which the spindle is forged4 ,good low-percentage carbon-annealed steel ought to withstand considerable friction2 at all events the wear under any conditions should be uniform4 ,if the surfaces of both rings and grooves be found in bad condition1 they should be re-ground1 if not sufficiently worn to warrant skimming up with a tool4 ,as the question of dummy leakage is of very considerable importance during a test1 it may not be inadvisable to describe the manner of setting the spindle and cylinder relatively to one another to insure minimum leakage1 and the methods of noting their conduct during a prolonged run4 ,in ,fig4 #fb1 showing the spindle1 ,b is the thrust 7made in halves71 the rings ,o of which fit into the grooved thrust-rings ,c in the spindle4 ,two lugs ,d are cast on each half of the thrust-block4 ,the inside faces of these lugs are machined1 and in them fit the ball ends of the levers ,e1 the latter being fulcrumed at ,f in the thrust-bearing cover4 ,the screws ,g1 working in bushes1 also fit into the thrust-bearing cover1 and are capable of pushing against the ends of the levers ,e and thus adjusting the separate halves of the block in opposite directions4 ,illustration3 ,,fig4 #fb ,the top half of the turbine cylinder having been lifted off1 the spindle is set relatively to the bottom half by means of the lower thrust-block screw ,g4 ,this screw is then locked in position and the top half of the cover then lowered into place4 ,with this method great care must necessarily be exercised when lowering the top cover2 otherwise the brass dummy rings may be damaged4 ,a safer method is to set the dummy rings in the center of the grooves of the spindle1 and then to lower the cover1 with less possibility of contact4 ,there being usually plenty of side clearance between the blades of a turbine1 it may be deemed quite safe to lock the thrust-block in its position1 by screwing the screws ,g up lightly1 and then to turn on steam and begin running slowly4 ,next1 the spindle may be very carefully and gradually worked in the required direction1 namely1 in that direction which will tend to bring the dummy rings and groove walls into contact1 until actual but very light contact takes place4 ,the slightest noise made by the rubbing parts inside the turbine can be detected by placing one end of a metal rod onto the casing in vicinity of the dummy pistons1 and letting the other end press hard against the ear4 ,contact between the dummy rings and spindle being thus demonstrated1 the spindle must be moved back by the screws1 but only by the slightest amount possible4 ,the merest fraction of a turn is enough to break the contact1 which is all that is required4 ,in performing this operation it is important1 during the axial movements of the spindle1 to adjust the halves of the thrust-block so that there can exist no possible play which would leave the spindle free to move axially and probably vibrate badly4 ,after ascertaining the condition of the dummy rings1 attention might next be turned to the thrust-block1 which must not on any account be tightened up too much4 ,it is sufficient to say that the actual requirements are such as will enable a very thin film of oil to circulate between each wall of the spindle thrust-grooves and the brass thrust-blocks ring4 ,in other words1 there should be no actual pressure1 irrespective of that exerted by the spindle when running1 upon the thrust-block rings1 due to the separate halves having been nipped too tightly4 ,the results upon a test of considerable friction between the spindle and thrust-rings are obvious4 ,the considerations outlined regarding balancing pistons and dummy rings can be dispensed with in connection with impulse turbines of the ,de ,laval and ,rateau types1 and also with double-flow turbines of a type which does not possess any dummies4 ,the same general considerations respecting blade conditions and thrust-blocks are applicable1 especially to the latter type4 ,with pure so-called impulse turbines1 where the blade clearances are comparatively large1 the preliminary blade inspection should be devoted to the mechanical condition of the blade edges and passages4 ,as the steam velocities of these types are usually higher1 the importance of minimizing the skin friction and eliminating the possibility of eddies is great4 ,although steam leakage through the valves of a turbine may not materially affect its steam consumption1 unless it be the leakage through the overload valve during a run on normal full load1 a thorough examination of all valves is advocated for many reasons4 ,in a turbine the main steam-inlet valve is usually operated automatically from the governor2 and whether it be of the pulsating type1 admitting the steam in blasts1 or of the non-pulsating throttling type1 it is equally essential to obtain the least possible friction between all moving and stationary parts4 ,similar remarks apply to the main governor1 and any sensitive transmitting mechanism connecting it with any of the turbine valves4 ,if a safety or runaway governor is possessed by the machine to be tested1 this should invariably be tried under the requisite conditions before proceeding farther4 ,the object of this governor being automatically to shut off all steam from the turbine1 should the latter through any cause rise above the normal speed1 it is often set to operate at about #ab to #ae per cent4 above the normal4 ,thus1 a turbine revolving at about #cjjj revolutions per minute would be closed down at1 say1 #cejj1 which would be within the limit of safe speed4 ,importance of ,oiling ,system and ,water ,service ,the oil question1 being important1 should be solved in the early stages previously1 if possible1 to any official or unofficial consumption tests4 ,whether the oil be supplied to the turbine bearings by a self-contained system having the oil stored in the turbine bedplate or by gravity from a separate oil source1 does not affect the question in its present aspect4 ,the necessary points to investigate are four in number1 and may be headed as follows3 7a7 ,examination of pipes and partitions for oil leakage4 7b7 ,determination of volume of oil flowing through each bearing per unit of time4 7c7 ,examination for signs of water in oil4 7d7 ,determination of temperature rise between inlet and outlet of oil bearings4 ,the turbine supplied with oil by the gravity or any other separate system holds an advantage over the ordinary self-contained machine1 inasmuch as the oil pipes conveying oil into and from the bearings can be easily approached and1 if necessary1 repaired4 ,on the other hand1 the machine possessing its own oil tank1 cooling chamber and pump is somewhat at a disadvantage in this respect1 as a part of the system is necessarily hidden from view1 and1 further1 it is not easily accessible4 ,the leakage taking place in any system1 if there be any1 must1 however1 be detected and stopped4 ,fig4 #fc is given to illustrate a danger peculiar to the self-contained oil system1 in which the oil and oil-cooling chambers are situated adjacently in the turbine bedplate4 ,one end of the bedplate only is shown2 ,b is a cast-iron partition dividing the oil chamber ,c from the oil-cooling chamber ,d4 ,castings of this kind have sometimes a tendency to sponginess and the trouble consequent upon this weakness would take the form of leakage between the two chambers4 ,of course this is only a special case1 and the conditions named are hardly likely to exist in every similarly designed plant4 ,the capacity of oil1 and especially of hot oil1 to percolate through the most minute pores is well known4 ,consequently1 in advocating extreme caution when dealing with oil leakage1 no apology is needed4 ,illustration3 ,,fig4 #fc ,it may be stated without fear of contradiction that the oil in a self-contained system1 namely1 a system in which the oil1 stored in a reservoir near or underneath the turbine1 passes only through that one turbine's bearings1 and immediately back to the storage compartment1 deteriorates more rapidly than when circulating around an entire system1 such as the gravity or other analogous system4 ,in the latter1 the oil tanks are usually placed a considerable distance from the turbine or turbines1 with the oil-cooling arrangements in fairly close proximity4 ,the total length of the oil circuit is thus considerably increased1 incidentally increasing the relative cooling capacity of the whole plant1 and thereby reducing the loss of oil by vaporization4 ,the amount of oil passing through the bearings can be ascertained accurately by measurement4 ,with a system such as the gravity it is only necessary to run the turbine up to speed1 turn on the oil1 and then1 over a period1 calculate the volume of oil used by measuring the fall of level in the storage tank and multiplying by its known cross-sectional area4 ,in those cases where the return oil1 after passing through the bearings1 is delivered back into the same tank from which it is extracted1 it is of course necessary1 during the period of test1 to divert this return into a separate temporary receptacle4 ,where the system possesses two tanks1 one delivery and one return 7a superior arrangement71 this additional work is unnecessary4 ,the same method can be applied to individual turbines pumping their own oil from a tank in the bedplate2 the return oil1 as previously described1 being temporarily prevented from running back to the supply4 ,the causes of excessive oil consumption by bearings are many4 ,there is an economical mean velocity at which the oil must flow along the revolving spindle2 also an economical mean pressure1 the latter diminishing from the center of the bearing toward the ends4 ,the aim of the economist must therefore be in the direction of adjusting these quantities correctly in relation to a minimum supply of oil per bearing2 and the principal factors capable of variation to attain certain requirements are the several bearing clearances measured as annular orifices1 and the bearing diameters4 ,it is not always an easy matter to detect the presence of water in an oil system1 and this difficulty is increased in large circuits1 as the water1 when the oil is not flowing1 generally filters to the lowest members and pipes of the system1 where it cannot usually be seen4 ,a considerable quantity of water in any system1 however1 indicates its presence by small globular deposits on bearings and spindles1 and in the worst cases the water can clearly be seen in a small sample tapped from the oil mains4 ,there is only one effective method of ridding the oil of this water1 and this is by allowing the whole mass of oil in the system to remain quiescent for a few days1 after which the water1 which falls to the lowest parts1 can be drained off4 ,a simple method of clearing out the system is to pump all the oil the whole circuit contains through the filters1 and thence to a tank from which all water can be taken off4 ,one of the ordinary supply tanks used in the gravity system will serve this purpose1 should a temporary tank not be at hand4 ,if necessary1 the headers and auxiliary pipes of the system can be cleaned out before circulating the oil again1 but as this is rather a large undertaking1 it need only be resorted to in serious cases4 ,illustration3 ,,fig4 #fd ,it is seldom possible to discover the correct and permanent temperature rise of the circulating oil in a turbine within the limited time usually alloted for a test4 ,after a continuous run of one hundred hours it is possible that the temperature at the bearing outlets may be lower than it was after the machine had run for1 say1 only twenty hours4 ,as a matter of fact an oil-temperature curve plotted from periodical readings taken over a continuous run of considerable length usually reaches a maximum early1 afterward falling to a temperature about which the fluctuations are only slight during the remainder of the run4 ,fig4 #fd illustrates an oil-temperature curve plotted from readings taken over a period of twenty-four hours4 ,in this case the oil system was of the gravity description1 the capacity of the turbine being about #fjjj kilowatts4 ,the bearings were of the ordinary white-metal spherical type4 ,over extended runs of hundreds and even thousands of hours1 the above deductions may be scarcely applicable4 ,running without break for so long1 a small turbine circulating its own lubricant would possibly require a renewal of the oil before the run was completed1 in the main owing to excessive temperature rise and consequent deterioration of the quality of the oil4 ,under these conditions the probabilities are that several temperature fluctuations might occur before the final maximum1 and more or less constant1 temperature was reached4 ,in this connection1 however1 the results obtained are to a very large extent determined by the general mechanical design and construction of the oiling system and turbine4 ,a reference to ,fig4 #fc again reveals at once a weakness in that design1 namely1 the unnecessarily close proximity in which the oil and water tanks are placed4 ,illustration3 ,,fig4 #fe ,a design of thermometer cup suitable for oil thermometers is given in ,fig4 #fe in which ,a is an end view of the turbine bedplate1 ,b is a turbine bearing and ,c and ,d are the inlet and outlet pipes1 respectively4 ,the thermometer fittings1 which are placed as near the bearing as is practicable1 are made in the form of an angular tee fitting1 the oil pipes being screwed into its ends4 ,the construction of the oil cup and tee piece is shown in the detail at the left where ,a is the steel tee piece1 into which is screwed the brass thermometer cup ,b4 ,the hollow bottom portion of this cup is less than #a_/af of an inch in thickness4 ,the top portion of the bored hole is enlarged as shown1 and into this1 around the thermometer1 is placed a non-conducting material4 ,the cup itself is generally filled with a thin oil of good conductance4 ,allied to the oil system of a turbine plant is the water service1 of comparatively little importance in connection with single self-contained units of small capacity1 where the entire service simply consists of a few coils and pipes1 but of the first consideration in large installations having numerous separate units supplied by oil and water from an exterior source4 ,the largest turbine units are often supplied with water for cooling the bearings and other parts liable to attain high temperature4 ,although the water used for cooling the bearings indirectly supplements the action taking place in the separate oil coolers1 it is of necessity a separate auxiliary service in itself1 and the complexity of the system is thus added to4 ,a carefully constructed water service1 however1 is hardly likely to give trouble of a mechanical nature4 ,the more serious deficiencies usually arise from conditions inherent to the design1 and as such must be approached4 ,special ,turbine ,features to be ,inquired into ,before leaving the prime mover itself1 and proceeding to the auxiliary plant inspection1 it may be well to instance a few special features relating to the general conduct of a turbine1 which it is the duty of a tester to inquire into4 ,there are certain specified qualifications which a machine must hold when running under its commercial conditions1 among these being lack of vibration of both turbine and machinery driven1 be it generator or fan1 the satisfactory running of auxiliary turbine parts directly driven from the turbine spindle1 minimum friction between the driving mediums1 such as worm-wheels1 pumps1 fans1 etc41 slight irregularities of construction1 often resulting in heated parts and excessive friction and wear1 and must therefore be detected and righted before the final test4 ,furthermore1 those features of design--and they are not infrequent in many machines of recent development--which1 in practice1 do not fulfil theoretical expectations1 must be re-designed upon lines of practical consistency4 ,the experienced tester's opinion is often at this point invaluable4 ,to illustrate the foregoing1 ,figs4 #ff1 #fg1 and #fh are given1 representing1 respectively1 three distinct phases in the evolution of a turbine part1 namely1 the coupling4 ,briefly1 an ordinary coupling connecting a driving and a driven shaft becomes obstinate when the two separate spindles which it connects are not truly alined4 ,the desire of turbine manufacturers has consequently been to design a flexible coupling1 capable of accommodating a certain want of alinement between the two spindles without in any way affecting the smooth running of the whole unit4 ,illustration3 ,,fig4 #ff ,illustration3 ,,fig4 #fg ,in ,fig4 #ff ,a is the turbine spindle end and ,b the generator spindle end1 which it is required to drive4 ,it will be seen from the cross-sectional end view that both spindle ends are squared1 the coupling ,c1 with a square hole running through it1 fitting accurately over both spindle ends as shown4 ,obviously the fit between the coupling and spindle in this case must be close1 otherwise considerable wear would take place2 and equally obvious is the fact than any want of alinement between the two spindles ,a and ,b will be accompanied by a severe strain upon the coupling1 and incidentally by many other troubles of operation of which this inability of the coupling to accommodate itself to a little want of alinement is the inherent cause4 ,looking at the coupling illustrated in ,fig4 #fg1 it will be seen that something here is much better adapted to dealing with troubles of alinement4 ,the turbine and generator spindles ,a and ,b1 respectively1 are coned at the ends1 and upon these tapered portions are shrunk circular heads ,c and ,d having teeth upon their outer circumferences4 ,made in halves1 and fitting over the heads1 is a sleeve-piece1 with teeth cut into its inner bored face4 ,the teeth of the heads and sleeve are proportioned correctly to withstand1 without strain1 the greatest pressure liable to be thrown upon them4 ,there is practically no play between the teeth1 but there exists a small annular clearance between the periphery of the heads and the inside bore of the sleeve1 which allows a slight lack of alinement to exist between the two spindles1 without any strain whatever being felt by the coupling sleeve ,e4 ,the nuts ,f and ,g prevent any lateral movement of the coupling heads ,c and ,d4 ,for all practical requirements this type of coupling is satisfactory1 as the clearances allowed between sliding sleeve and coupling heads can always be made sufficient to accommodate a considerable want of alinement1 far beyond anything which is likely to occur in actual practice4 ,perhaps the only feature against it is its lack of simplicity of construction and corresponding costliness4 ,illustration3 ,,fig4 #fh ,the type illustrated in ,fig4 #fh is a distinct advance upon either of the two previous examples1 because1 theoretically at least1 it is capable of successfully accommodating almost any amount of spindle movement4 ,the turbine and generator spindle ends1 ,a and ,b1 have toothed heads ,c and ,d shrunk upon them1 the heads being secured by the nuts ,e and ,f4 ,the teeth in this case are cut in the enlarged ends as shown4 ,a sleeve ,g1 made in halves1 fits over the heads1 and the teeth cut in each half engage with those of their respective heads4 ,all the teeth and teeth faces are cut radially1 and a little side play is allowed4 ,the ,condenser ,to some extent1 as previously remarked1 the condenser and condensing arrangements are instrumental in determining the lines upon which a test ought to be carried out4 ,in general1 the local features of a plant restrict the tester more or less in the application of his general methods4 ,a thorough inspection1 including some preliminary tests if necessary1 is as essential to the good conduct of the condensing plant as to the turbine above it4 ,it may be interesting to outline the usual course this inspection takes1 and to draw attention to a few of the special features of different plants4 ,for this purpose a type of vertical condenser is depicted in ,fig4 #fi4 ,its general principle will be gathered from the following description3 ,exhaust steam from the turbine flows down the pipe ,t and enters the condenser at the top as shown1 where it at once comes into contact with the water tubes in ,w4 ,these tubes fill an annular area1 the central un-tubed portion below the baffle cap ,b forming the vapor chamber4 ,the condensed steam falls upon the bottom tube-plate ,p and is carried away by the pipe ,s leading to the water pump ,h4 ,the ,y pipe ,e terminating above the level of the water in the condenser enters the dry-air pump section pipe ,a4 ,cold circulating water enters the condenser at the bottom1 through the pipe ,i1 and entering the water chamber ,x proceeds upward through the tubes into the top-water chamber ,y1 and from there out of the condenser through the exit pipe4 ,it will be observed that the vapor extracted through the plate ,p passes on its journey out of the condenser through the cooling chamber ,d surrounded by the cold circulating water4 ,this1 of course1 is a very advantageous feature4 ,at ,r is the condenser relief1 at ,u the relief valve for the water chambers4 ,illustration3 ,,fig4 #fi ,a new condenser1 especially if it embody new and untried features1 generally requires a little time and patience ere the best results can be obtained from it4 ,perhaps the quickest and most satisfactory method of getting at the weak points of this portion of a plant is to test the various elements individually before applying a strict load test4 ,thus1 in dealing with a condenser similar to that illustrated in ,fig4 #fi1 the careful tester would probably make1 in addition to a thorough mechanical examination1 three or four individual vacuum and water tests4 ,a brief description of these will be given4 ,the water test1 the purpose of which is to discover any leakage from the tubes1 tube-plates1 water pipes1 etc41 into portions of the steam or air chambers1 should be made first4 ,water ,tests of ,condenser ,the condenser is first thoroughly dried out1 particular care being given to the outside of the tubes and the bottom tube-plate ,p4 ,water is then circulated through the tubes and chambers for an hour or two1 after which the pumps are stopped1 all water is allowed to drain out and a careful examination is made inside4 ,any water leaking from the tubes above the bottom baffle-plate will ultimately be deposited upon that plate4 ,it is essential to stop this leakage if there be any1 otherwise the condensed steam measured during the consumption test will be increased to the extent of the leakage4 ,a slight leakage in a large condenser will obviously not affect the results to any serious extent4 ,the safest course to adopt when a leak is discovered and it is found inopportune to effect immediate repair is to measure the actual volume of leakage over a specified period1 and the quantity then being known it can be subtracted from the volume of the condensed steam at the end of the consumption test4 ,it is equally essential that no leakage shall occur between the bottom tube-plate ,p and the tube ends4 ,the soundness of the tube joints1 and the joint at the periphery of the tube-plate can be tested by well covering the plate with water1 the water chamber ,w and cooling chamber having been previously emptied1 and observing the under side of the plate4 ,it must be admitted that the practice of measuring the extent of a water leak over a period1 and afterward with this knowledge adjusting the obtained quantities1 is not always satisfactory4 ,on no account should any test be made with considerable water leakage inside the condenser4 ,the above method1 however1 is perhaps the most reliable to be followed1 if during its conduct the conditions of temperature in the condenser are made as near to the normal test temperature as possible4 ,there are many condensers using salt water in their tubes1 and in these cases it would seem natural to turn to some analytical method of detecting the amount of saline and foreign matter leaking into the condensed steam4 ,unless1 however1 only approximate results are required1 such methods are not advocated4 ,there are many reasons why they cannot be relied upon for accurate results1 among these being the variation in the percentage of saline matter in the sea-water1 the varying temperature of the condenser tubes through which the water flows1 and the uncertainty of such analysis1 especially where the percentage leakage of pure saline matter is comparatively small4 ,the ,vacuum ,test ,having convinced himself of the satisfactory conduct of the condenser under the foregoing simple preparatory water tests1 the tester may safely pass to considerations of vacuum4 ,there exists a good old-fashioned method of discovering the points of leakage in a vacuum chamber1 namely1 that of applying the flame of a candle to all seams and other vulnerable spots1 which in the location of big leaks is extremely valuable4 ,assuming that the turbine joints and glands have been found capable of preventing any inleak of air1 with only a small absolute pressure of steam or air inside it1 and1 further1 an extremely important condition1 with the turbine casing at high and low temperatures1 separately1 a vacuum test can be conducted on the condenser alone4 ,this test consists of three operations4 ,in the first place a high vacuum is obtained by means of the air pump1 upon the attainment of which communication with everything else is closed1 and results noted4 ,the second operation consists in repeating the above with the water circulating through the condenser tubes1 the results in this case also being carefully tabulated4 ,before conducting the third test1 the condensers must be thoroughly warmed throughout1 by running the turbine for a short time if necessary1 and after closing communication with everything1 allowing the vacuum to slowly fall4 ,a careful consideration and comparison of the foregoing tests will reveal the capabilities of the condenser in the aspect in which it is being considered1 and will suggest where necessary the desirable steps to be taken4 ,,vi4 ,,testing ,a ,,steam ,,turbine#d #d ,contributed to ,power by ,thomas ,franklin4 ,special ,auxiliary ,plant for ,consumption ,test ,there are one or two points of importance in the conduct of a test on a turbine and these will be briefly touched upon4 ,fig4 #gj illustrates the general arrangement of the special auxiliary plant necessary for carrying through a consumption test1 when the turbine exhaust passes through a surface condenser4 ,the condensed steam1 after leaving the condenser1 passes along the pipe ,a to the pump1 and is then forced along the pipe ,b 7leading under ordinary circumstances to the hot-well71 through the main water valve ,c directly to the measuring tanks4 ,to enter these the water has to pass through the valves ,d and ,e1 while the valves ,f and ,g are for quickly emptying the tanks when necessary1 being of a larger bore than the inlet valves4 ,the inlet pipes ,h ,i are placed directly above the outlet valves1 and thus1 when required1 before any measurements are taken1 the water can flow directly through the outlet valves1 the pipes terminating only a short distance above them1 away to an auxiliary tank or directly to the hot-well4 ,levers ,k and ,l fulcrumed at ,j and ,j are connected to the valve spindles by auxiliary levers4 ,the valve arrangement is such that by pulling down the lever ,k the inlet valve ,d is opened and the inlet valve ,e is closed4 ,again1 by pulling down the lever ,l the outlet valve ,f is closed1 while the outlet valve ,g is also simultaneously closed4 ,illustration3 ,,fig4 #gj ,during a consumption test the valves are operated in the following manner3 ,the lever ,k is pulled down1 which opens the inlet valve to the first tank and closes that to the second4 ,the bottom lever ,l1 however1 is lifted1 which for the time being opens the outlet valve ,f1 and incidentally opens the valve ,g2 the latter valve can2 however1 for the moment be neglected4 ,when the turbine is started1 and the condensed steam begins to accumulate in the condenser1 the water is pumped along the pipes and1 both the inlet and outlet valves on the first tank being open1 passes through1 without any being deposited in the tank1 to the drain4 ,this may be continued until all conditions are right for a consumption test and1 the time being carefully noted1 lever ,l is quickly pulled down and the valves ,f and ,g closed4 ,the first tank now gradually fills1 and after a definite period1 say fifteen minutes1 the lever ,k is pushed up1 thus diverting the flow into the second tank4 ,while the latter is filling1 the water in the first tank is measured1 and the tank emptied by a large sluice valve1 not shown4 ,the operation of alternately filling1 measuring1 and emptying the two measuring tanks is thus carried on until the predetermined time of duration of test has expired1 when the total water as measured in the tanks1 and representing the amount of steam condensed during that time1 is easily found by adding together the quantities given at each individual measurement4 ,all that are necessary to insure successful results from a plant similar to this are care and accuracy in its operation and construction4 ,undoubtedly in most cases it is preferable to weigh the condensed steam instead of measuring the volume passed1 and from that to calculate the weight4 ,if dependence is being placed upon the volumetric method1 it is advisable to lengthen the duration of the test considerably1 and if possible to measure the feed-water evaporated at the same time4 ,such a course1 however1 would necessitate little change1 and none of a radical nature1 from the arrangement described4 ,where1 however1 the measuring method is adopted1 the all-important feature1 requiring on the tester's part careful personal investigation1 is the graduation of the tanks4 ,it facilitates this operation very considerably when the receptacles are graduated upon a weight scale4 ,that is to say1 whether or not a vertical scale showing the actual hight of water be placed inside the tank1 it is advisable to have a separate scale indicating at once to the attendant the actual contents1 by weight1 of the tank at any time4 ,it is the tester's duty to himself to check the graduation of this latter scale by weighing the water with which he performs the operation of checking4 ,apart from the foregoing1 there is little to be said about the measuring apparatus4 ,as has been stated1 accuracy of result depends in this connection1 as in all others1 upon careful supervision and sound and accurate construction1 and this the tester can only positively insure by exhaustive inspection in the one case and careful deliberation in the conduct of the other4 ,it will be readily understood that the procedure--and this implies some limitations--of a test is to an extent controlled by the conditions1 or particular environment of the moment4 ,this is strictly true1 and as a consequence it is often impossible1 in a maker's works1 for example1 to obtain every condition1 coinciding with those specified1 which are to be had on the site of final operation only4 ,for this reason it would appear best to reserve the final and crucial test of a machine1 which test usually in the operating sense restricts a prime mover in certain directions with regard to its auxiliary plant1 etc41 until the machine has been finally erected on its site4 ,obviously1 unless a machine had become more or less standardized1 a preliminary consumption test would be necessary1 but once this primary qualification respecting consumption had been satisfactorily settled1 there appears to be no reason why exhaustive tests in other directions should not all be carried out upon the site1 where the conditions for them are so much more favorable4 ,when the steam consumption of a steam turbine is so much higher than the guaranteed quantity1 it usually takes little less than a reconstruction to put things right4 ,the minor qualifications of a machine1 however1 which can be examined into and tested with greater ease1 and usually at considerably less expense1 upon the site1 and consequently under specified conditions1 may be advantageously left over until that site is reached1 where it is obvious that any shortcomings and general deficiency in performance will be more quickly detected and diagnosed4 ,test ,loads from the ,tester's ,view-point ,before proceeding to describe the points of actual interest in the consumption test1 a few considerations respecting test loads will be dealt with from the tester's point of view4 ,here again we often find ourselves restricted1 to an extent1 by the surrounding conditions4 ,the very first considerations1 when undertaking to carry out a consumption test1 should be devoted to obtaining the steadiest possible lead ,transcriber3 load84 ,it may be1 and is in many cases1 that circumstances are such as to allow a steady electrical load to be obtained at almost any time4 ,on the other hand an electrical load of any description is sometimes not procurable at all1 without the installation of a special plant for the purpose4 ,in such cases a mechanical friction load1 as1 for example1 that obtained by the water brake1 is sometimes available1 or can easily be procured4 ,whereas1 however1 this type of load may be satisfactory for small machines1 it is usually quite impossible for use with large units1 of1 say1 #ejjj kilowatts and upward4 ,it is seldom1 however1 that turbines are made in large sizes for directly driving anything but electrical plants1 although there is every possibility of direct mechanical driving between large steam turbines and plants of various descriptions1 shortly coming into vogue1 so that usually there exist some facilities for obtaining an electrical load at both the maker's works and upon the site of operation4 ,one consideration of importance is worth inquiring into1 and this has relation to the largest turbo-generators supplied for power-station and like purposes4 ,obviously1 the testing of1 say1 a #gjjj-kilowatt alternator by any standard electrical-testing method must entail considerable expense1 if such a test is to be carried out in the maker's works4 ,nor would this expense be materially decreased by transferring the operations to the power-station1 and there erecting the necessary electrical plant for obtaining a water load1 or any other installation of sufficient capacity to carry the required load according to the rated full capacity of the machine4 ,assuming1 then1 that there exist no permanent facilities at either end1 namely the maker's works and the power station1 for adequately procuring a steady electrical-testing load of sufficient capacity1 there still remains1 in this instance1 an alternative source of power which is usually sufficiently elastic to serve all purposes1 and this is of course the total variable load procurable from the station bus-bars4 ,it is conceivable that one out of a number of machines running in parallel might carry a perfectly steady load1 the latter being a fraction of a total varying quantity1 leaving the remaining machines to receive and deal with all fluctuations which might occur4 ,even in the event of there being only two machines1 it is possible to maintain the load on one of them comparatively steady1 though the percentage variation in load on either side of the normal would in the latter case be greater than in the previous one4 ,this is accomplished by governor regulation after the machines have been paralleled4 ,for example1 assuming three turbo-alternators of similar make and capacity to be running in parallel1 each machine carrying exactly one-third of the total distributed load1 it is fair to regard the governor condition1 allowing for slight mechanical disparities of construction1 of all three machines as being similar2 and even in the case of three machines of different capacity and construction1 the governor conditions when the machines are paralleled are more or less relatively and permanently fixed in relation to one another4 ,in other words1 while the variation in load on each machine is the same1 the relative variation in the governor condition must be constant4 ,by a previously mentioned system of governor regulation1 however1 it is possible1 considering again for a moment the case of three machines in parallel1 by decreasing the sensitiveness of one governor only1 to accommodate nearly all the total variation in load by means of the two remaining machines1 the unresponsiveness of the one governor to change in speed maintaining the load on that machine fairly constant4 ,by this method1 at any rate1 the variation in load on any one machine can be minimized down to1 say1 #c per cent1 either side of the normal full load4 ,there is another and more positive method by which a perfectly steady load can be maintained upon one machine of several running in parallel4 ,this may be carried out as follows3 ,suppose1 in a station having a total capacity of #bj1jjj kilowatts1 there are three machines1 two of #fjjj kilowatts each1 and one of #hjjj kilowatts1 and it is desired to carry out a steady full-load test upon one of the #fjjj kilowatts units4 ,assuming that the test is to be of six hours' duration1 and that the conditions of load fluctuations upon the station are well known1 the first step to take is to select a period for the test during which the total load upon all machines is not likely to fall below1 say1 #hjjj kilowatts4 ,the tension upon the governor spring of the turbine to be tested must then be adjusted so that the machine on each peak load is taxed to its utmost normal capacity2 and even when the station load falls to its minimum1 the load from the particular machine shall not be released sufficiently to allow it to fall below #fjjj kilowatts4 ,under these conditions1 then1 it may be assumed that although the load on the test machine will vary1 it cannot fall below #fjjj kilowatts4 ,therefore1 all that remains to be done to insure a perfectly steady load equal to the normal full load of the machine1 or #fjjj kilowatts1 is to fix the main throttle or governing valve in such a position that the steam passing through at constant pressure is just capable of sustaining full speed under the load required4 ,when this method is adopted1 it is desirable to fix a simple hight-adjusting and locking mechanism to the governing-valve spindle4 ,the load as read on the indicating wattmeter can then be very accurately varied until correct1 and farther varied1 if necessary1 should any change occur in the general conditions which might either directly or indirectly bring about a change of load4 ,preparing the ,turbine for ,testing ,all preliminary labors connected with a test being satisfactorily disposed of1 it only remains to place the turbines under the required conditions1 and to then proceed with the test4 ,for the benefit of those inexperienced in the operation of large turbines1 we will assume that such a machine is about to be started for the purpose outlined4 ,it is always advisable to make a strict practice of getting all the auxiliary plant under way before starting up the turbine4 ,in handling a turbine plant the several operations might be carried through in the following order3 7#a7 ,circulating oil through all bearings and oil chambers4#e 7#b7 ,starting of condenser circulating-water pumps1 and continuous circulation of circulating water through the tubes of condenser4 7#c7 ,starting of pump delivering condensed steam from the condenser hot-well to weighing tanks4 7#d7 ,starting of air pump1 vacuum being raised as high as possible within condenser4 7#e7 ,sealing of turbine glands1 whether of liquid or steam type1 no adjustment of the quantity of sealing fluid being necessary1 however1 at this point4 7#f7 ,adjustment of valves on and leading to the water-weighing tanks4 7#g7 ,opening of main exhaust valve or valves between turbine and condenser4 7#h7 ,starting up of turbine and slowly running to speed4 7#i7 ,application of load1 and adjustment of gland-sealing steam4 #e ,in a self-contained system1 where the oil pump is usually driven from the turbine spindle1 this would of course be impossible4 ,in the gravity and allied systems1 however1 it should always be the first operation performed4 ,the tests for oil consumption1 described previously1 having been carried out1 it is assumed that suitable means have been adopted to restrict the total oil flow through the bearings to a minimum quantity4 ,the running to speed of large turbo-alternators requires considerable care1 and should always be done slowly2 that is to say the rate of acceleration should be slow4 ,it is well known that the vibration of a heavy unit is accompanied by a synchronous or non-synchronous vibration of the foundation upon which it rests4 ,the nearest approach to perfect synchronism between unit and foundation is obtained by a gradual rise in speed4 ,a machine run up to speed too quickly might1 after passing the critical speed1 settle down with little visible vibration1 but at a later time1 even hours after1 suddenly begin vibrating violently from no apparent cause4 ,the chances of this occurring are minimized by slow and careful running to speed4 ,whether the machine being tested is one of a number running in parallel1 or a single unit running on a steady water load1 the latter should in all cases be thrown on gradually until full load is reached4 ,a preliminary run of two or three hours--whenever possible--should then be made1 during which ample opportunity is afforded for regulating the conditions in accordance with test requirements4 ,the tester will do well during the last hour of this trial run to station his recorders at their several posts and1 for a short time at least1 to have a complete set of readings taken at the correct test intervals4 ,this more particularly applies to the electrical water1 superheat and vacuum readings4 ,in the case of a turbo-alternator the steadiness obtainable in the electrical load may determine the frequency of readings taken1 both electrical and otherwise4 ,on a perfectly steady water-tank load1 for example1 it may be sufficiently adequate to read all wattmeters1 voltmeters1 and ammeters from standard instruments at from one- to two-minute intervals4 ,readings at half-minute intervals1 however1 should be taken with a varying load1 even when the variation is only slight4 ,the water-measurement readings may of course be taken at any suitable intervals1 the time being to an extent determined by the size of the measuring tanks or the capacity of the weighing machine or machines4 ,when designing the measuring apparatus1 the object should be to minimize1 within economical and practical range1 the total number of weighings or measurements necessary4 ,consequently1 no strict time of interval between individual weighings or measurements can be given in this case4 ,it may be said1 however1 that it is not desirable to take these at anything less than five-minute intervals4 ,under ordinary circumstances a three- to five-minute interval is sufficient in the case of all steam-pressure1 vacuum--including mercurial columns and barometer--superheat and temperature readings4 ,gland and ,hot-,well ,regulation ,there are two highly important features requiring more or less constant attention throughout a test1 namely the gland and hot-well regulation4 ,for the present purpose we may assume that the glands are supplied with either steam or water for sealing them4 ,all steam supplied to the turbine obviously goes to swell the hot-well contents1 and to thus increase the total steam consumption4 ,the ordinary steam gland is in reality a pressure gland4 ,at both ends of the turbine casing is an annular chamber1 surrounding the turbine spindle at the point where it projects through the casing4 ,a number of brass rings on either side of this chamber encircle the spindle1 with only a very fine running clearance between the latter and themselves4 ,steam enters the gland chamber at a slight pressure1 and1 when a vacuum exists inside the turbine casing1 tends to flow inward4 ,the pressure1 however1 inside the gland is increased until it exceeds that of the atmosphere outside1 and by maintaining it at this pressure it is obvious that no air can possibly enter the turbine through the glands1 to destroy the vacuum4 ,the above principle must be borne in mind during a test upon a turbine having steam-fed glands4 ,perhaps the best course to follow--in view of the economy of gland steam consumption necessary--is as follows3 ,during the preliminary non-test run1 full steam is turned into both glands while the vacuum is being raised1 and maintained until full load has been on the turbine for some little time4 ,the vacuum will by this time have probably reached its maximum1 and perhaps fallen to a point slightly lower1 at which hight it may be expected to remain1 other conditions also remaining constant4 ,the gland steam must now be gradually turned off until the amount of steam vapor issuing from the glands is almost imperceptible4 ,this should not lower the vacuum in the slightest degree4 ,by gradual degrees the gland steam can be still farther cut down1 until no steam vapor at all can be discerned issuing from the gland boxes4 ,this reduction should be continued until a point is reached at which the vacuum is affected1 when it must be stopped and the amount of steam flowing to the gland again increased very slightly1 just enough to bring the vacuum again to its original hight4 ,the steam now passing into the glands is the minimum required under the conditions1 and should be maintained as nearly constant as possible throughout the test4 ,practically all steam entering the glands is drawn into the turbine1 and thence to the condenser1 and under the circumstances it may be assumed the increase in steam consumption arising from this source is also a minimum4 ,there is one mechanical feature which has an important bearing upon the foregoing question1 and which it is one of the tester's duties to investigate4 ,this is illustrated in ,fig4 #ga1 which shows a turbine spindle projecting through the casing4 ,the gland box is let into the casing as shown4 ,brass rings ,a calked into the gland box encircle the shaft on either side of the annular steam space ,s4 ,as the clearance between the turbine spindle and the rings ,a is in a measure instrumental in determining the amount of steam required to maintain a required pressure inside the chamber1 it is obvious that this clearance should be minimum4 ,an unnecessarily large clearance means a proportionally large increase in gland steam consumption and vice versa4 ,illustration3 ,,fig4 #ga ,when the turbine glands are sealed with water1 all water leakage which takes place into the turbine1 and ultimately to the condenser hot-well1 must be measured and subtracted from the hot-well contents at the end of a test4 ,the foregoing remarks would not apply to those cases in which the gland supply is drawn from and returned to the hot-well1 or a pipe leading from the hot-well4 ,then no correction would be necessary1 as all water used for gland purposes might be assumed as being taken from the measuring tanks and returned again in time for same or next weighing or measurement4 ,general ,considerations ,there are a few principal elementary points which it is necessary always to keep in mind during the conduct of a test4 ,among these are the effects of variation in vacuum1 superheat1 initial steam pressure1 and1 as already indicated1 in load4 ,there exist many rules for determining the corrections necessitated by this variation4 ,for example1 it is often assumed that #i degrees ,fahrenheit1 excess or otherwise1 above or below that specified1 represents an increase or reduction in efficiency of about #a per cent4 ,it is probable that the percentage increase or decrease in steam consumption1 in the case of superheat1 can be more reliably calculated than in other cases1 as1 for example1 vacuum2 but the increase cannot be said to be due solely to the variation in superheat4 ,in other words1 the individuality of the particular turbine being tested always contributes something1 however small this something may be1 to the results obtained4 ,these remarks are particularly applicable where vacuum is concerned4 ,here again rules exist1 one of these being that every additional inch of vacuum increases the economy of the turbine by something slightly under half a pound of steam per kilowatt-hour4 ,but a moment's consideration convinces one of the utter unreliability of such rules for general application4 ,it is1 for instance1 well known that many machines1 when under test1 have demonstrated that the total increase in the water rate is very far from constant4 ,a machine tested1 for example1 gave approximately the following results1 the object of the test being to discover the total increase in the water rate per inch decrease in vacuum3 ,from #bg inches to #bf inches1 #d4e per cent4 ,from #bf4b inches to #bd4e inches1 #b4e per cent4 ,this illustrates to what an extent the ratio of increase can vary1 and it must be borne in mind that it is very probable that the variation is different in different types and sizes of machines4 ,there can exist1 therefore1 no empirical rules of a reliable nature upon which the tester can base his deductions4 ,the only way calculated to give satisfaction is to conduct a series of preliminary tests upon the turbine undergoing observation1 and from these to deduce all information of the nature required1 which can be permanently recorded in a set of curves for reference during the final official tests4 ,in conclusion1 it must be admitted that many published tests outlining the performances of certain makes of turbine are unreliable4 ,to determine honestly the capabilities of any machine in the direction of steam economy is an operation requiring time1 and unbiased and accurate supervision4 ,by means of such assets as floating quantities1 short tests during exceptionally favorable conditions1 and disregard of the vital necessity of running a test under the proper specified conditions1 it is comparatively easy to obtain results apparently highly satisfactory1 but which under other conditions might be just the reverse4 ,these considerations are1 however1 unworthy of the tester proper4 ,,vii4 ,,auxiliaries ,,for ,,steam ,,turbines#f #f ,contributed to ,power by ,thomas ,franklin4 ,the ,jet ,condenser ,the jet condenser illustrated in ,fig4 #gb is singularly well adapted for the turbine installation4 ,as the type has not been so widely adopted as the more common forms of jet condenser and the surface types1 it may prove of interest to describe briefly its general construction and a few of its special features in relation to tests4 ,illustration3 ,,fig4 #gb ,referring to the figure1 ,c is the main condenser body4 ,exhaust steam enters at the left-hand side through the pipe ,e1 condensing water issuing through the pipe ,d at the opposite side4 ,passing through the short conical pipe ,p1 the condensing water enters the cylindrical chamber ,w and falls directly upon the spraying cone ,s4 ,the hight of this spraying cone is determined by the tension upon the spring ,t1 below the piston ,r1 the latter being connected to the cone by a spindle ,l4 ,an increase of the water pressure inside the chamber ,w will thus compress the spring1 and the spraying cone being consequently lowered increases the aperture between it and the sloping lower wall of the chamber ,w1 allowing a greater volume of water to be sprayed4 ,the piston ,r incidentally prevents water entering the top vapor chamber ,v4 ,from the foregoing it can be seen that this condenser is of the contra-flow type1 the entering steam coming immediately into contact with the sprayed water4 ,the perforated diaphragm plate ,f allows the vapor to rise into the chamber ,v1 from which it is drawn through the pipe ,a to the air pump4 ,a relief valve ,u prevents an excessive accumulation of pressure in the vapor chamber1 this valve being obviously of delicate construction1 capable of opening upon a very slight increase of the internal pressure over that of the atmosphere4 ,condensed steam and circulating water are together carried down the pipe ,b to the well ,z1 from which a portion may be carried off as feed water1 and the remainder cooled and passed through the condenser again4 ,under any circumstances1 whether the air pump is working or not1 a certain percentage of the vapor in the condenser is always carried down the pipe ,b1 and this action alone creates a partial vacuum1 thus rendering the work of the air pump easier4 ,as a matter of fact1 a fairly high vacuum can be maintained with the air pump closed down1 and only the indirect pumping action of the falling water operating to rarify the contents of the condenser body4 ,it is customary to place the condenser forty or more feet above the circulating-water pump1 the latter usually being a few feet below the turbine4 ,features ,demanding ,attention ,when operating a condenser of this type1 the most important features requiring preliminary inspection and regulation while running are3 7a7 ,circulating-water regulation4 7b7 ,freedom of all mechanical parts of spraying mechanism4 7c7 ,relief-valve regulation4 7d7 ,water-cooling arrangements4 ,the tester will1 however1 devote his attention to a practical survey of the condenser and its auxiliaries1 before running operations commence4 ,a preliminary vacuum test ought to be conducted upon the condenser body1 and the exhaust piping between the condenser and turbine4 ,to accomplish this the circulating-water pipe ,d can be filled with water to the condenser level4 ,the relief valve should also be water-sealed4 ,any existing leakage can thus be located and stopped4 ,having made the condenser as tight as possible within practical limits1 vacuum might be again raised and1 with the same parts sealed1 allowed to fall slowly for1 say1 ten minutes4 ,a similar test over an equal period may then be conducted with the relief valve not water-sealed4 ,a comparison of the times taken for an equal fall of vacuum in inches1 under the different conditions1 during the above two tests1 will reveal the extent of the leakage taking place through the relief valve4 ,it seems superfluous to add that the fall of vacuum in both the foregoing tests must not be accelerated in any way1 but must be a result simply of the slight inevitable leakage which is to be found in every system4 ,on a comparatively steady load1 and with consequently only small fluctuation in the volume of steam to be condensed1 the conditions are most favorable for regulating the amount of circulating water necessary4 ,naturally1 an excess of water above the required minimum will not affect the pressure conditions inside the condenser4 ,it does1 however1 increase the quantity of water to be handled from the hot-well1 and incidentally lowers the temperature there1 which1 whether the feed-water pass through economizers or otherwise1 is not advisable from an economical standpoint4 ,thus there is an economical minimum of circulating water to be aimed at1 and1 as previously stated1 it can best be arrived at by running the turbine under normal load and adjusting the flow of the circulating water by regulating the main valve and the tension upon the spring ,t4 ,under abnormal conditions1 the breakdown of an air pump1 or the sudden springing of a bad leak1 for instance1 the amount of circulating water can be increased by a farther opening of the main valve if necessary1 and a relaxation of the spring tension by hand2 or1 the spring tension might be automatically changed immediately upon the vacuum falling4 ,the absolute freedom of all moving parts of the spraying mechanism should be one of the tester's first assurances4 ,to facilitate this1 it is customary to construct the parts1 with the exception of the springs1 of brass or some other non-corrosive metal4 ,the spraying cone must be thoroughly clean in every channel1 to insure a well-distributed stream of water4 ,nor is it less important that careful attention be given to the setting and operation of the relief valve1 as will be seen later4 ,the obvious object of such a valve is to prevent the internal condenser pressure ever being maintained much higher than the atmospheric pressure4 ,a number of carefully designed rubber flap valves1 or one large one1 have been found to act successfully for this purpose1 although a balanced valve of more substantial construction would appear to be more desirable4 ,importance of ,relief ,valves ,the question of relief valves in turbine installations is an important one1 and it seems desirable at this point to draw attention to another necessary relief valve and its function1 namely the turbine atmospheric valve4 ,as generally understood1 this is placed between the turbine and condenser1 and1 should the pressure in the latter1 owing to any cause1 rise above that of the atmosphere1 it opens automatically and allows the exhaust steam to flow through it into the atmosphere1 or into another condenser4 ,a general diagrammatic arrangement of a steam turbine1 condenser1 and exhaust piping is shown in ,fig4 #gc4 ,connected to the exhaust pipe ,b1 near to the condenser1 is the automatic atmospheric valve ,d1 from which leads the exhaust piping ,e to the atmosphere4 ,the turbine relief valve is shown at ,f1 and the condenser relief valve at ,g4 ,the main exhaust valve between turbine and condenser is seen at ,h4 ,we have here three separate relief valves3 one1 ,f1 to prevent excessive pressure in the turbine3 the second1 ,d1 an atmospheric valve opening a path to the air1 and1 in addition to preventing excessive pressure accumulating1 also helping to keep the temperature of the condenser body and tubes low2 the third1 the condenser relief valve ,g1 which in itself ought to be capable of exhausting all steam from the turbine1 should occasion demand it4 ,illustration3 ,,fig4 #gc ,assuming a plant of this description to be operating favorably1 the conditions would of necessity be as follows3 ,the valves ,f1 ,d1 and ,g1 all closed2 the valve ,h open4 ,suppose that1 owing to sudden loss of circulating water1 the vacuum fell to zero4 ,the condenser would at once fill with steam1 a slight pressure would be set up1 and whichever of the three valves happened to be set to blow off at the lowest pressure would do so4 ,now it is desirable that the first valve to open under such circumstances should be the atmospheric valve ,d4 ,this being so1 the condenser would remain full of steam at atmospheric pressure until the attendant had had time to close the main hand-or motor-operated exhaust valve ,h1 which he would naturally do before attempting to regain the circulation of the condensing water4 ,again1 assume the installation to be running under the initial conditions1 with the atmospheric valve ,d and all remaining valves except ,h closed4 ,suppose the vacuum again fell to zero from a similar cause1 and1 further1 suppose the atmospheric valve ,d failed to operate automatically4 ,the only valves now capable of passing the exhaust steam are the turbine and condenser relief valves ,f and ,g4 ,inasmuch as the pressures at exhaust in the turbine proper1 on varying load1 vary over a considerably greater range than the small fairly constant absolute pressures inside the condenser1 it is obviously necessary to allow for this factor in the respective setting of these two relief valves4 ,in other words1 the obvious deduction is to set the turbine relief valve to blow off at a higher pressure than the condenser relief valve1 even when considering the question with respect to condensing conditions only4 ,in this second hypothetical case1 then1 with a closed and disabled atmospheric valve1 the exhaust must take place through the condenser1 until the turbine can be shut down1 or the circulating water regained without the former course being found necessary4 ,there is one other remote case which may be assumed1 namely1 the simultaneous refusal of both atmospheric and condenser relief valves to open1 upon the vacuum inside the condenser being entirely lost4 ,the exhaust would then be blown through the turbine relief valve ,f1 until the plant could be closed down4 ,although the conditions just cited are highly improbable in actual practice1 it can at once be seen that to insure the safety of the condenser1 absolutely1 the turbine relief valve must be set to open at a comparatively low pressure1 say #dj pounds by gage1 or thereabouts4 ,to set it much lower than this would create a possibility of its leaking when the turbine was making a non-condensing run1 and when the pressure at the turbine exhaust end is often above that of the atmosphere4 ,from every point of view1 therefore1 it is advisable to make a minute examination of all relief valves in a system1 and before a test to insure that these valves are all set to open at their correct relative pressures4 ,it must be admitted that the practice of placing a large relief valve upon a condenser in addition to the atmospheric exhausting valve is by no means common4 ,the latter valve1 where surface condensing is adopted1 is often thought sufficient1 working in conjunction with a quickly operated main exhaust valve4 ,similarly1 with a barometric condenser as that illustrated in ,fig4 #gb1 the atmospheric exhaust valve ,d 7seen in ,fig4 #gc7 is sometimes dispensed with4 ,this course is1 however1 objectionable1 for upon a loss of vacuum in the turbine1 all exhaust steam must pass through the condenser body1 or the entire plant be closed down until the vacuum is regained4 ,the simple construction of the barometric condenser1 however1 is in such an event much to its advantage1 and the passage of the hot steam right through it is not likely to seriously warp or strain any of its parts1 as might probably happen in the case of a surface condenser4 ,the question of the advisability of thus adding to a plant can only be fairly decided when all conditions1 operating and otherwise1 are fully known4 ,for example1 if we assume a large turbine to be operating on a greatly varying load1 and exhausting into a condenser1 as that in ,fig4 #gb1 and1 further1 having an adequate stand-by to back it up1 one's obvious recommendation would be to equip the installation with both a condenser relief valve and an atmospheric valve1 in addition1 of course1 to the main exhaust valve1 which is always placed between the atmospheric valve and condenser4 ,there are still other considerations1 such as water supply1 condition of circulating water1 style of pump1 etc41 which must all necessarily have an obvious bearing upon the settlement of this question2 so that generalization is somewhat out of place1 the final design in all cases depending solely upon general principles and local conditions4 ,other ,necessary ,features of a ,test ,in connection with the condenser1 of any type1 and its auxiliaries1 there remain a few necessary examinations and operations to be conducted1 if it is desired to obtain the very best results during the test4 ,it will be sufficient to just outline them1 the method of procedure being well known1 and the requirement of any strict routine being unnecessary4 ,these include3 7#a7 ,a thorough examination of the air-pump1 and1 if possible1 an equally careful examination of diagrams taken from it when running on full load4 ,also careful examination of the piping1 and of any other connections between the air pump and condenser1 or other auxiliaries4 ,it will be well in this examination to note the general lay of the air pipes1 length1 hight to which they rise above condenser and air pump1 facilities for drainage1 etc41 as this information may prove valuable in determining the course necessary to rectify deficiencies which may later be found to exist4 7#b7 ,in a surface condenser1 inspection of the pumps delivering condensed steam to the measuring tanks or hot-well2 inspection of piping between the condenser and the pump1 and also between the pump and measuring tanks4 ,if these pumps are of the centrifugal type it is essential to insure1 for the purposes of a steam-consumption test1 as much regularity of delivery as possible4 7#c7 ,in the case of a consumption test upon a turbine exhausting into a barometric condenser1 and where the steam consumed is being measured by the evaporation in the boiler over the test period1 time must be devoted to the feed-pipes between the feed-water measuring meter or tank and the boilers4 ,under conditions similar to those operating in a plant such as that shown in ,fig4 #gb1 the necessary boiler feed might be drawn from the hot-well1 the remainder of the hot-well contents probably being pumped through water coolers1 or towers1 for circulating through the condenser4 ,with the very best system1 it is possible for a slight quantity of oil to leak into the exhaust steam1 and thence to the hot-well4 ,in its passage1 say along wooden conduits1 to the measuring tank or meter1 this water would probably pass through a number of filters4 ,the efficiency of these must be thoroughly insured4 ,it is unusual1 in those cases where a simple turbine steam-consumption test is being carried out1 and not an efficiency test of a complete plant1 to pass the measured feed-water through economizers4 ,should the latter course1 owing to special conditions1 become necessary1 a careful examination of all economizer pipes would be necessary4 7#d7 ,the very careful examination of all thermometer pockets1 steam- and temperature-gage holes1 etc41 as to cleanliness1 non-accumulation of scale1 etc4 ,special ,auxiliaries ,necessary ,having outlined the points of interest and importance in connection with the more permanent features of a plant1 we arrive at the preparation and fitting of those special auxiliaries necessary to carry on the test4 ,illustration3 ,,fig4 #gd ,it is customary1 when carrying out a first test1 upon both prime mover and auxiliaries1 to place every important stage in the expansion in communication with a gage1 so that the various pressures may be recorded and later compared with the figures of actual requirement4 ,to do this1 in the case of the turbine1 it is necessary to bore holes in the cover leading to the various expansion chambers1 and into each of these holes to screw a short length of steam pipe1 having preferably a loop in its length1 to the other end of which the gage is attached4 ,fig4 #gd illustrates1 diagrammatically1 a complete turbine installation1 and shows the various points along the course taken by the steam at which it is desirable to place pressure gages4 ,the figure does not show the high-pressure steam pipe1 nor any of the turbine valves4 ,with regard to these1 it will be desirable to place a steam gage in the pipe1 immediately before the main stop-valve1 and another immediately after it4 ,any fall of pressure between the two sides of the valve can thus be detected4 ,to illustrate this clearly1 ,fig4 #ge is given1 showing the valves of a turbine1 and the position of the gages connected to them4 ,the two gages ,e and ,f on either side of the main stop-valve ,a are also shown4 ,the steam after passing through the valve1 which1 in the case of small turbines1 is hand-operated1 goes in turn through the automatic stop-valve ,b1 the function of which is to automatically shut steam off should the turbine attain a predetermined speed above the normal1 the steam strainer ,c1 and finally through the governing valve ,d into the turbine4 ,as shown1 gages ,g and ,h are also fitted on either side of the strainer1 and these1 in conjunction with gages ,e and ,f1 will enable any fall in pressure between the first two valves and the governing valve to be found4 ,up to the governing-valve inlet no throttling of the steam ought to take place under normal conditions1 i4e41 with all valves open1 and consequently any fall in pressure between the steam inlet and this point must be the result of internal wire-drawing4 ,by placing the gages as shown1 the extent to which this wire-drawing affects the pressures obtainable can be discovered4 ,illustration3 ,,fig4 #ge ,on varying and even on normal and steady full load1 the steam is more or less reduced in pressure after passing through the governing valve ,d2 a gage ,i must consequently be placed between the valve1 preferably on the valve itself1 and the turbine4 ,returning to ,fig4 #gd1 the gages shown are ,a1 ,b1 ,c1 ,d1 and ,e1 connected to the first1 second1 third1 fourth1 and fifth expansions2 also ,f in the turbine and exhaust space1 where there are no blades1 ,g in the exhaust pipe immediately before the main exhaust valve ,e 7see ,fig4 #gc71 and ,h connected to the condenser4 ,on condensing full load it is probable that ,a1 ,b1 and ,c will all register pressures above the atmosphere1 while gages ,d1 ,e1 ,f1 and ,g will register pressures below the atmosphere1 being for this purpose vacuum gages4 ,on the other hand1 with a varying load1 and consequently varying initial pressures1 one or two of the gages may register pressure at one moment and vacuum at another4 ,it will therefore be necessary to place at these points compound gages capable of registering both pressure and vacuum4 ,with the pressures in the various stages constantly varying1 however1 a gage is not by any means the most reliable instrument for recording such variations4 ,the constant swinging of the finger not only renders accurate reading at any particular moment both difficult and1 to an extent1 unreliable1 but1 in addition1 the accompanying sudden changes of condition1 both of temperature and pressure1 occurring inside the gage tube1 in a comparatively short time permanently warp this part1 and thus altogether destroy the accuracy of the gage4 ,it is well known that even with the best steel-tube gages1 registering comparatively steady pressures1 this warping of the tube inevitably takes place4 ,the quicker deterioration of such gage tubes1 when the gage is registering quickly changing pressures1 can therefore readily be conceived1 and for this reason alone it is desirable to have all gages1 whatever the conditions under which they work1 carefully tested and adjusted at short intervals4 ,if it is desired to obtain reliable registration of the several pressures in the different expansions of a turbine running on a varying load1 it would therefore seem advisable to obtain these by some type of external spring gage 7an ordinary indicator has been found to serve well for this purpose7 which the sudden internal variations in pressure and temperature cannot deleteriously affect4 ,in view of the great importance he must attach to his gage readings1 the tester would do well to test and calibrate and adjust where necessary all the gages he intends using during a test4 ,this he can do with a standard gage-testing outfit4 ,by this means only can he have full confidence in the accuracy of his results4 ,in like manner it is his duty personally to supervise the connecting and arrangement of the gages1 and the preliminary testing for leakage which can be carried out simultaneously with the vacuum test made upon the turbine casing4 ,where ,thermometers are ,required ,equally important with the foregoing is the necessity of calibrating and testing of all thermometers used during a test4 ,where possible it is advisable to place new thermometers which have been previously tested at all points of high temperature4 ,briefly running them over1 the points at which it is necessary to place thermometers in the entire system of the steam and condensing plant are as follows3 7#a7 ,a thermometer in the steam pipe on the boiler1 where the pipe leaves the superheater4 7#b7 ,in the steam pipe immediately in front of the main stop-valve1 near point ,e in ,fig4 #ge4 7#c7 ,in the main governing valve body 7see ,i1 ,fig4 #ge7 on the inlet side4 7#d7 ,in the main governing valve body on the turbine side1 which will register temperatures of steam after it has passed through the valve4 7#e7 ,in the steam-turbine high-pressure chamber1 giving the temperature of the steam before it has passed through any blades4 7#f7 ,in the exhaust chamber1 giving the temperature of steam on leaving the last row of blades4 7#g7 ,in the exhaust pipe near the condenser4 7#h7 ,in the condenser body4 7#i7 ,in the circulating-water inlet pipe close to the condenser4 7#aj7 ,in the circulating-water outlet pipe close to the condenser4 7#aa7 ,in the air-pump suction pipe close to the condenser4 7#ab7 ,in the air-pump suction pipe close to the air pump4 ,it is not advisable to place at those vital points1 the readings at which directly or indirectly affect the consumption1 two thermometers1 say one ordinary chemical thermometer and one thermometer of the gage type1 thus eliminating the possibility of any doubt which might exist were only one thermometer placed there4 ,there is no apparent reason why one should attempt to take a series of temperature readings during a consumption test on varying load4 ,the temperatures registered under a steady load test can be obtained with great reliability1 but on a varying load1 with constantly changing temperatures at all points1 this is impossible4 ,this is1 of course1 owing to the natural sluggishness of the temperature-recording instruments1 of whatever class they belong to1 in responding to changes of condition4 ,as a matter of fact1 the possibility of obtaining correctly the entire conditions in a system running under greatly varying loads is very doubtful indeed1 and consequently great reliance cannot be placed upon figures obtained under such conditions4 ,a few simple calculations will reveal to the tester his special requirements in the direction of measuring tanks1 piping1 etc41 for his steam consumption test4 ,thus1 assuming the turbine to be tested to be of #cjjj kilowatt capacity normal load1 with a guaranteed steam consumption of1 say1 #ad4e pounds per kilowatt-hour1 he calculates the total water rate per hour1 which in this case would be #dc1ejj pounds1 and designs his weighing or measuring tanks to cope with that amount1 allowing1 of course1 a marginal tank volume for overload requirements4 ,,viii4 ,,troubles ,,with ,,steam ,,turbine ,,auxiliaries#g #g ,contributed to ,power by ,walter ,b4 ,gump4 ,the case about to be described concerns a steam plant in which there were seven cross-compound condensing ,corliss engines1 and two ,curtis steam turbines4 ,the latter were each of #aejj-kilowatt capacity1 and were connected to surface condensers1 dry-vacuum pumps1 centrifugal1 hot-well and circulating pumps1 respectively4 ,in the illustration 7,fig4 #gf71 the original lay-out of piping is shown in full lines4 ,being originally a reciprocating plant it was difficult to make the allotted space for the turbines suitable for their proper installation4 ,the trouble which followed was a perfectly natural result of the failure to meet the requirements of a turbine plant1 and the description herein given is but one example of a great many where the executive head of a concern insists upon controlling the situation without regard to engineering advice or common sense4 ,illustration3 ,,fig4 #gf4 ,,turbine ,,auxiliaries ,,and ,,piping ,circulating ,pump ,fails to ,meet ,guarantee ,observing the plan view1 it will be seen that the condensers for both turbines receive their supply of cooling water from the same supply pipe2 that is1 the pipes1 both suction and discharge1 leading to ,no4 #a condenser are simply branches from ,no4 #b1 which was installed first without consideration for a second unit4 ,when ,no4 #a was installed there was a row of columns from the basement floor to the main floor extending in a plane which came directly in front of the condenser4 ,the column ,p shown in the plan was so located as to prevent a direct connection between the centrifugal circulating pump and the condenser inlet4 ,the centrifugal pump was direct-connected to a vertical high-speed engine1 and the coupling is shown at ,e in the elevation4 ,every possible plan was contemplated to accommodate the engine and pump without removing any of the columns1 and the arrangement shown was finally adopted1 leaving the column ,p in its former place by employing an ,s-connection from the pump to the condenser4 ,it should be stated that the pump was purchased under a guarantee to deliver #fjjj gallons per minute under a head of #ej feet1 with an impeller velocity of #bhe revolutions per minute4 ,the vertical engine to which the pump was connected proved to be utterly unfit for running at a speed beyond #bbe to #bcj revolutions per minute1 and in addition the ,s-bend would obviously reduce the capacity1 even at the proper speed of the impeller4 ,besides these factors there was another feature even more serious4 ,it was found that when ,no4 #b unit was operating ,no4 #a could not get as great a quantity of circulating water as when ,no4 #b was shut down4 ,this was because ,no4 #b was drawing most of the water1 and ,no4 #a received only that which ,no4 #b could not pull from the suction pipe ,a4 ,this will be clear from the fact that the suction and discharge pipes for ,no4 #a were only #af inches1 while those of ,no4 #b were #bj inches and #af inches1 respectively4 ,the condenser for ,no4 #b had #ajjj square feet less cooling surface than ,no4 #a1 which had #fjjj square feet and was supplied with cooling water by means of two centrifugal pumps of smaller capacity than for ,no4 #a and arranged in parallel4 ,these were each driven by an electric motor1 and were termed ,the ,siamese ,twins1 due to the way in which they were connected4 ,the load factor of the plant ranged from #j4bb to #j4cj1 the load being almost entirely lighting1 so that for the winter season the load factor reached the latter figure4 ,the day load was1 therefore1 light and not sufficient to give one turbine more than from one-fourth to one-third its rated capacity4 ,under these conditions ,no4 #a unit was able to operate much more satisfactorily than when fully loaded1 because of the fact that the cooling water was more effective4 ,this was1 of course1 all used by ,no4 #a unit when ,no4 #b was not operating4 ,at best1 however1 it was found that the vacuum could not be made to exceed #bd inches1 and during the peak1 with the two turbines running1 the vacuum would often drop to #ab inches4 ,a vacuum of #af inches or #ah inches on the peak was considered good4 ,an ,investigation ,severe criticism rained heavily upon the engineer in charge1 and complaints were made in reference to the high oil consumption4 ,an investigation on the company's part followed1 and the firm which furnished the centrifugal pump and engine was next in order to receive complaints4 ,repeated efforts were made to increase the speed of the vertical engine to #bhe revolutions per minute1 but such a speed proved detrimental to the engine1 and a lower speed of about #bbe revolutions per minute had to be adopted4 ,a thorough test on the pump to ascertain its delivery at various speeds was the next move1 and a notched weir1 such as is shown in the elevation1 was employed4 ,the test was made on ,no4 #b cooling tower1 not shown in the sketch1 and showed that barely #cjjj gallons per minute were being delivered to the cooling tower4 ,while the firm furnishing the pump was willing to concede that the pump might not be doing all it should1 attention was called to the fact that there might be some other conditions in connection with the system which were responsible for the losses4 ,notable among these was the hydraulic friction1 and when this feature of the case was presented1 the company did not seem at all anxious to investigate the matter further2 obviously on account of facing a possible necessity for new piping or other apparatus which might cost something4 ,approximately #cd feet was the static head of water to be pumped over ,no4 #b cooling tower4 ,pressure gages were connected to the suction1 discharge1 and condenser inlet1 as shown at ,g1 ,g' and ,g'' respectively4 ,when ,no4 #a unit was operating alone the gage ,g showed practically zero1 indicating no vacuum in the suction pipe4 ,observing the same gage when ,no4 #b unit was running1 a vacuum as high as #b pounds was indicated1 showing that ,no4 #b was drawing more than its share of cooling water from the main ,a and hence the circulating pump for ,no4 #a was fighting for all it received4 ,gage ,g' indicated a pressure of #ba pounds1 while ,g'' indicated #ah4e pounds1 showing a difference of #b4e pounds pressure lost in the ,s-bend4 ,this is equivalent to a loss of head of nearly #f feet1 #j4dc pound per foot head being the constant employed4 ,the total head against which the pump worked was therefore ,g' ,g #ba #b1 or #bc ---- #ec #j4dc feet approximately4 ,since the static head was #cd feet1 the head lost in friction was evidently #ec-cd #ai feet1 or #aijj ---- #cf #ec per cent41 approximately4 ,supply of ,cooling ,water ,limited ,in addition to this the supply of cooling water was limited1 the vacuum being extremely low at just the time when efficient operation should be had4 ,the natural result occurred1 which was this3 ,as the load on the turbine increased1 the amount of steam issuing into the condenser increased1 beating ,transcriber3 heating8 the circulating water to a temperature which the cooling tower 7not in the best condition7 was unable to decrease to any great extent4 ,the vacuum gradually dropped off1 which indicated that the condenser was being filled with vapor1 and in a short time the small centrifugal tail-pump lost its prime1 becoming vapor bound1 and the vacuum further decreased4 ,the steam which had condensed would not go into the tail-pump because of the tendency of the dry-pump to maintain a vacuum4 ,when a certain point was reached the dry-vacuum pump started to draw water in its cylinder1 and the unit had to be shut down immediately4 ,vapor-bound ,pumps ,as the circulating water gradually rose in temperature the circulating pump also became vapor bound1 so that the unit would be tied up for the rest of the night1 as this pump could not be made to draw hot water4 ,the reason for this condition may be explained in the following way4 ,when the circulating pump was operating and there was a suction of #b pounds indicated at ,g1 the water was not flowing to the pump of its own accord1 but was being pulled through by force4 ,this water would flow through the pump until a point was reached when the water became hot enough to be converted into vapor1 this occurring at a point where the pressure was sufficiently reduced to cause the water to boil4 ,naturally this point was in the suction pipe and vapor was thus maintained behind the pump as long as it was operating4 ,in this case the pump was merely maintaining a partial vacuum1 but not drawing water4 ,after the vacuum was once lost1 by reason of the facts given1 it could not be regained1 as the circulating water1 piping and condenser required a considerable period of time in which to cool4 ,before any radical changes were made it was decided that a man should crawl in the suction pipe ,a1 and remove such sand1 dirt1 or any other obstacles as were believed to cause the friction4 ,after this had been done and considerable sand had been removed1 tests were resumed with practically the same results as before4 ,the investigation was continued and the dry-vacuum pumps were overhauled1 as they had been damaged by water in the cylinders1 and furthermore needed re-boring4 ,in short1 the auxiliaries were restored to the best condition that could be brought about by the individual improvement of each piece of apparatus4 ,as this was not the seat of the trouble1 however1 the remedy failed to effect a cure4 ,it was demonstrated that the steam consumption of the turbines was greatly increased due to priming of the boilers1 as well as condensation in the turbine casing2 hence1 the ills above mentioned were aggravated4 ,changes in ,piping ,after a great deal of argument from the chief engineer1 and the firm which furnished the pump1 both making a strong plea for a change in the piping1 the company accepted the inevitable1 and the dotted portion shows the present layout4 ,the elbow ,m was removed1 and a tee put in its place to which the piping ,d was connected4 ,the circulating pump was removed to the position shown1 and a direct connection substituted for the ,s-bend4 ,the discharge pipe ,c was carried from ,no4 #a unit separately1 as shown in the elevation1 and terminated at ,no4 #a cooling tower instead of ,no4 #b1 which shortened the distance about #fj feet1 the total length of pipe 7one way7 from ,no4 #a unit being originally #bej feet4 ,in this way the condensing equipment was made practically separate for each turbine1 as it should have been in the first place4 ,with the new piping a vacuum of #bd inches on the peak could be reached4 ,while this is far from an efficient value1 yet it is better than the former figure4 ,the failure to reach a vacuum of #bh inches or better is due primarily to a lack of cooling water1 but an improvement in this regard could be made by reconstructing the cooling towers1 which at present do not offer the proper amount of cooling surface4 ,the screens used were heavy galvanized wire of about #c_/af-;inch mesh1 which became coated in a short time1 and must be thoroughly cleaned to permit the water to drop through them4 ,the supply of cooling water was taken from a #cj-;inch pipe line several miles long and fed from a spring4 ,the amount of water varied considerably and was at times quite insufficient for the load on the plant4 ,instead of meeting this condition with the best apparatus possible1 a chain of difficulties were added to it1 with the results given4 ,,index ,acceleration1 rate of1 #adg ,adjustment1 axial1 #fe making1 #ff ,air-pump1 examining1 #afc ,allis-,chalmers ,co4 steam turbine1 #da ,auxiliaries1 #b1 #aed special1 #afe ,auxiliary plant for consumption test1 #acg spring on governor dome1 #bh ,axial adjustment1 #fe ,baffler1 #cf functions1 #ci ,bearings1 main1 #fi ,blades1 construction details1 #dd inspecting1 #ajd ,blading1 ,allis-,chalmers turbine1 #dh ,westinghouse-,parsons turbine1 #ei1 #ib ,blueprints1 studying1 #aa ,buckets1 moving1 #ad stationary1 #ad ,bushings1 #cf ,carbon packing1 #ai ring1 #bj ,central gravity oiling system1 #aaa ,circulating pump fails to meet guarantee1 #agb ,clearance1 #ae1 #aej adjusting1 #ah between moving and stationary buckets1 #d gages1 #ag measuring1 #ah radial1 #fc ,comma lashing1 #ie ,condensers1 #ajh1 #aca jet1 #aed ,conditions for successful operation1 #aje ,cooling water supply limited1 #agg ,coupling1 #abg ,cover-plate1 #d -plate1 lowering1 #i ,curtis turbine1 #aa turbine in practice1 #a setting valves1 #ca1 #cb ,de ,laval turbines1 #aah ,draining system1 #aje ,dummy leakage1 #aae pistons1 #fc1 #fe rings1 #dc1 #aac1 #aad ,equalizing pipes1 #fd ,exhaust end of turbine1 #ajg pipe1 #ajg ,expanding nozzles1 #ad ,feed-pipes1 #afd ,flow1 rate1 #ch ,foundation drawings1 #b rings1 #dd1 #df ,fourth-stage wheel1 #ad ,franklin1 ,thomas1 #aab1 #acg1 #aed ,gages1 calibrating and adjusting1 #afi clearance1 #ag for test work1 #afe ,generator1 #ec ,glands1 examination for scale1 #ajd packing1 #ga1 #gg regulation1 #adh ,governor1 ,allis-,chalmers turbine1 #dh ,curtis turbine1 #bg1 #ca improved1 ,westinghouse-,parsons turbine1 #hc -rods1 adjusting1 #ce safety-stop1 #hf ,westinghouse-,parsons turbine1 #hj ,grinding1 #ch ,guide-bearing1 lower1 #i ,gump1 ,walter ,b41 #agb ,holly draining system1 #ajf ,horseshoe shim1 #h ,hot-well regulation1 #adh ,inspection1 #ajc ,intermediate1 #ad ,jacking ring1 #h ,jet condenser1 #aed ,johnson1 ,fred ,l41 #a1 #ca ,leakage1 #aah ,load variation1 #add ,lower guide-bearing1 #i ,lubrication1 #ea ,measuring tanks1 #aga ,mechanical valve-gear1 #cb ,nozzles1 expanding1 #ad ,oil1 #eg1 #ajc1 #aji amount passing through bearings1 #abb consumption1 high1 #age detecting water in1 #abb pressure1 #abb -temperature curve1 #abc ,oil1 testing1 #aaj velocity of flow1 #abb ,oiling1 #hg system1 importance1 #aai ,operation1 ,allis-,chalmers turbine1 #ed1 #ee successful1 #aje ,operations in handling turbine plant1 #adf ,overload valve1 #bh ,packing1 carbon1 #ai glands1 #ga ring1 self-centering1 #ad ,parsons type of turbine1 #da ,passage in foundation1 #b ,peep-holes1 #ae1 #ah ,piping1 #aga changing1 #agi inspection1 #afd ,pressure1 #fc gages1 #aff in glands1 #eg ,pump1 circulating1 fails to meet guarantee1 #agb inspection1 #afd ,radial clearance1 #fc ,rateau turbines1 #aah ,relief valves1 #ca valves1 importance1 #aei ,ring1 carbon1 #bj ,rotor1 ,westinghouse-,parsons turbine1 #ei ,running1 #ii ,safety-stop1 #bb -stop governor1 #hf ,saucer steps1 #ci ,screw1 step-bearing1 #ah step-supporting1 #d ,separators1 #aje ,setting spindle and cylinder for minimum leakage1 #aae valves in ,curtis turbine1 #ca1 #cb ,shaft1 holding up while removing support1 #h ,shield-plate1 #bf1 #cf ,shim1 horseshoe1 #h ,shroud rings1 #dd1 #df ,shrouding on buckets and intermediates1 #ah ,shutting down1 #aja ,special turbine features1 #abg ,spindle1 lifting1 #if removing1 #ajd ,spraying mechanism1 #aeh ,stage valves1 #bh1 #ca ,starting up1 #ed1 #ie ,step-bearing1 lowering to examine1 #h -bearing screw1 #ah -blocks1 #d -lubricant1 #d -pressure1 #ch -supporting screw1 #d -water1 flow1 #ch ,stopping turbine1 #ef ,sub-base1 #h ,superheated steam1 #aje ,test loads1 #ada necessary features1 #afc ,testing oil1 #aaj preparing turbine for1 #ade steam turbine1 #aab1 #acg1 #aeb ,thermometer1 calibrating and testing1 #afi oil1 #abe ,thrust-block1 #aah ,top block1 #d ,troubles with steam turbine auxiliaries1 #agb ,turbine features1 special1 #abg ,vacuum1 #aeb raising1 #ajg test1 #ace ,valve-gear1 #hc -gear1 mechanical1 #bb1 #cb operation during consumption test1 #ach overload1 #bh relief1 #ca importance1 #aei setting in ,curtis turbine1 #ca1 #cb stage1 #bh1ca ,vapor bound pumps1 #agh ,water1 cooling1 limited1 #agg in oil1 detecting1 #abb -measurement readings1 #adh pressure1 #aja service1 #abf importance1 #aai tests of condenser1 #acc used in glands1 #eg1 #gf ,westinghouse-,parsons steam turbine1 #eh ,wheels1 #ad lower or fourth-stage1 #ad position1 #ah