,,american ,,society ,,of ,,civil ,,engineers ,instituted #aheb ,,transactions ,paper ,no4 #aaeg ,,the ,,new ,,york ,,tunnel ,,extension ,,of ,,the ,,pennsylvania ,,railroad4 ,,the ,,site ,,of ,,the ,,terminal ,,station4#a ,by ,,george ,c4 ,,clarke1 ,m4 ,am4 ,soc4 ,c4 ,e4 ,the purpose of this paper is to describe the preliminary work for and the preparation of that portion of the site for the ,terminal ,station in ,manhattan1 of the ,new ,york ,tunnel ,extension of the ,pennsylvania ,railroad1 which was constructed under the direction of the ,chief ,engineer of the ,east ,river ,division1 including the disposal of material excavated from all parts of the ,terminal construction and the tunnels on the ,east ,river ,division4 ,as outlined in the paper by ,brigadier-,general ,charles ,w4 ,raymond1 ,m4 ,am4 ,soc4 ,c4 ,e41 ,chairman of the ,board of ,engineers1 the track yard of the station1 ,plate ,,liii1 extends from the east line of ,tenth ,avenue eastward to points in #cb;d and #cc;d ,streets1 respectively1 #bib and #ejb ft4 east of the west line of ,seventh ,avenue4 ,the width of the available area at track level at ,tenth ,avenue is #bac ft41 continuing at this width to within #ahb ft4 of the west line of ,ninth ,avenue1 where1 by an offset toward the south1 it is increased to #cee ft4 ,this width is held to a point #e ft4 east of the east line of ,ninth ,avenue1 where1 by an offset toward the north1 it is increased to #eji ft41 which width continues to the west line of ,seventh ,avenue1 where it divides into two fan-shaped areas4 ,the north area has a width of about #agj ft4 and the south one1 #afj ft41 at the house line1 each area tapering gradually to the width of the standard three-track tunnel at the east ends1 noted above in #cc;d and #cb;d ,streets4 ,additional track room for four tail-tracks is gained by the construction of two double-track tunnels under ,ninth ,avenue at #cc;d ,street1 their center lines being parallel to the street and #de4e and #hd4e ft4 distant1 respectively1 from the north house line4 ,an additional width of #bd4e ft4 is occupied on the north from #bgg4e ft4 to #edc4e ft4 west of the west line of ,seventh ,avenue1 where the buildings on the north side of #cc;d ,street have been torn down and the enclosing wall set back in anticipation of a future outlet to #cdth ,street2 and on the south1 from #dei ft4 to #eig ft4 west of the west line of ,seventh ,avenue a rectangular offset of #abd ft4 encloses the area occupied by the ,service ,building4 ,the total area above outlined is the space occupied at track level1 and amounts to #bh acres1 of which the portion west of the east house line of ,ninth ,avenue and south of a line #ajg4c ft4 south of the south line of #cc;d ,street is a part of the ,north ,river ,division1 and was constructed under the direction of the engineers of that ,division2 the fan-shaped areas east of the west house line of ,seventh ,avenue were constructed under the direction of the ,chief ,engineer of ,electric ,traction and ,terminal ,station ,construction4 ,illustration3 ,plate ,,liii4 ,pennsylvania ,station1 ,new ,york ,city3 ,plan ,showing ,area at ,track ,level ,in ,june1 #aijc1 when the writer's connection with the work began1 the preliminary surveys had been completed and the location and extent of the ,terminal track area had been fixed1 in so far as the city blocks to be occupied were concerned4 ,this contemplated area1 however1 did not include the portion between ,ninth and ,tenth ,avenues1 that being added subsequently4 ,the elevation of the track level had also been fixed by the requirement in the agreement with the ,city that no part of the permanent structure should approach within #ai ft4 of the surface under any avenue or under any street except within the ,terminal area4 ,the nearest approach of the tracks to the surface is at a point #cbj ft4 east of ,eighth ,avenue1 where the top of the rail is #dj ft4 below the #cast ,street curb line4 ,,wash-,,borings4 ,the general plan of enclosing the area in retaining walls having been adopted1 wash-borings were taken1 for the purpose of determining the best location for the walls1 the depth of rock1 and the nature of the material overlying it4 ,these borings were made along both curb lines of ,seventh ,avenue1 the east curb line of ,ninth ,avenue1 the north curb line of #cc;d ,street1 and the south curb line of #cast ,street4 ,the borings1 as a rule1 were taken at intervals of approximately #ajj ft41 some deviation in these intervals being made in order to prevent injury to water1 gas1 and sewer connections1 and1 if the elevation of the surface of the rock1 as determined by one of these borings1 corresponded fairly well with the borings on either side of it1 no intermediate borings were taken4 ,when a discrepancy appeared1 a boring was taken midway between the two non-corresponding ones1 and if the information obtained from the intermediate boring failed to account for the discrepancy1 others were taken at the quarter points of the original #ajj-;ft4 interval4 ,the dotted lines on ,fig4 #a show the profiles of the surface of the rock underlying #cast and #cc;d ,streets1 on the line of the borings1 constructed from the elevations obtained by them2 the solid lines show the profiles of the actual surface of the rock as found when uncovered4 ,it will be noted that1 except in three cases1 ,borings #cac1 #cbh1 and #ccc1 the two profiles correspond very closely at the points where the borings were made1 but they differ widely between those points1 a variation of #e ft4 being common2 there is a variation of #ad ft4 between ,borings #cbd and #cbg1 and between ,nos4 #ccg and #cdj2 and of #ab ft4 between ,nos4 #ccc and #cce1 and between ,nos4 #cab and #cac1 while an extreme variation of #ag ft4 is shown between ,nos4 #cjc and #cje4 ,at each of the points where the variation is great the interval between borings is the full #ajj ft41 and it is quite apparent that1 if a definite idea is to be obtained of the elevation of the surface of the rock in ,manhattan1 borings must be taken at shorter intervals4 ,the necessary width of trench for the construction of the retaining walls was determined by the elevation of the rock1 as shown by the borings1 and only in the case of the dip between ,borings #cjc and #cje did the variation lead to any difficulty4 ,the trench at that point had to be widened after rock was reached4 ,this depression corresponded very closely in location to that of one arm of the creek shown on ,general ,viele's map of #ahfe1b the bed of that stream1 or one in approximately the same location1 being clearly marked across the excavation by smoothly-worn rock and well-rounded boulders4 ,the original stream1 however1 seemed to have turned in a westerly direction under #cast ,street to ,eighth ,avenue instead of crossing1 as shown on ,general ,viele's map4 ,illustration3 ,fig4 #a4 ,,profile ,,of ,,rock ,,surfaces ,,in ,,thirty-,,first ,,and ,,thirty-,,third ,,streets1 ,,between ,,seventh ,,and ,,ninth ,,avenues ,,sewers4 ,the arrangement of the sewers in the streets in the vicinity of the ,terminal ,site1 previous to the beginning of the construction1 and the drainage area tributary to those sewers1 is shown by ,fig4 #b4 ,the main sewer for this district was in ,eighth ,avenue1 and was a #f-;ft4 circular brick conduit within the ,terminal area4 ,the sewers leading to it from the west1 in #cast1 #cb;d1 and #cc;d ,streets1 were elliptical1 #c by #b ft41 and egg-shaped1 #d ft4 by #b ft4 #h in41 although in no case did they drain more than one block1 and they were on a heavy grade4 ,draining into ,eighth ,avenue from the east1 the one on #cast ,street was #d ft4 by #b ft4 #h in41 egg-shaped1 and drained a length of two blocks1 and those on #cb;d and #cc;d ,streets were circular1 #d ft4 in diameter1 and drained the territory for three blocks1 or as far east as ,fifth ,avenue4 ,there were no sewers in ,seventh ,avenue within the ,terminal area1 except small vitrified pipes1 each less than #bjj ft4 in length4 ,it was desirable that the size and number of the sewers in the streets and avenues surrounding the ,terminal should be reduced to a minimum1 on account of the difficulty of caring for them during construction and also to reduce the probability of sewage leaking into the underground portion of the work after its completion4 ,with this in view1 the plan was adopted of building an intercepting sewer down ,seventh ,avenue from north of #cc;d ,street to the #cjth ,street sewer1 which1 being a #d-;ft4 circular conduit1 was sufficiently large to carry all the sewage coming from east of ,seventh ,avenue and south of #cdth ,street4 ,it was decided to build this sewer of cast iron where it crossed the proposed construction work1 and also to replace with cast iron the brick sewers on #cast1 #cb;d1 and #cc;d ,streets from ,seventh ,avenue to a point east of the west end of the standard tunnel section1 and also the sewer on ,eighth ,avenue from the north side of #cc;d ,street to the south side of #cast ,street4 ,this arrangement permitted3 first1 the removal of the sewer in #cb;d ,street between ,seventh and ,eighth ,avenues1 which was necessary1 as that street was to be excavated2 second1 the reduction of the sewer in ,eighth ,avenue from a #f-;ft4 to a #e-;ft4 circular conduit2 and1 third1 assuming that the sewage and drainage from the ,terminal would be pumped directly to the sewers in the avenues1 the reduction of the sewers in #cast and #cc;d ,streets1 from ,seventh to ,ninth ,avenue1 to #ae-;in4 vitrified pipes1 except west of the ,service ,building in #cast ,street1 to accommodate which section1 a larger sewer was required4 ,the sewer in #cb;d ,street1 from ,ninth to ,eighth ,avenue1 of course1 could be dispensed with in any arrangement1 as all the area tributary to it was to be excavated4 ,illustration3 ,fig4 #b4 ,,plan ,,showing ,,layout ,,of ,,sewer ,,in ,,catchment ,,area ,,about ,,terminal ,,station ,,gas ,,and ,,water ,,mains4 ,a rearrangement of the gas pipes in the three streets crossing the ,terminal site was necessary4 ,these pipes were of two classes3 trunk mains and service mains4 ,fortunately1 there were but two trunk mains in the three streets1 one a #bj-;in4 in #cast ,street from east of ,seventh ,avenue to ,ninth ,avenue1 the other a #af-;in4 in #cb;d ,street from east of ,seventh ,avenue to ,eighth ,avenue4 ,the #bj-;in4 main was relaid from ,seventh ,avenue and #cast ,street down ,seventh ,avenue to #cjth ,street and through that street to ,ninth ,avenue4 ,the #af-;in4 main was relaid from ,seventh ,avenue and #cb;d ,street north to #cdth ,street and through that street to ,eighth ,avenue4 ,the service mains in #cb;d ,street were no longer required1 and were taken up and not replaced4 ,the houses on #cast and #cc;d ,streets were provided with service by two #f-;in4 wrought-iron mains back of the retaining walls in each street1 that location being chosen to avoid damage by gas drip to the water-proofing of the street bridges4 ,as the permanent structures under the avenues were not to approach the surface nearer than #ai ft41 only slight rearrangements1 sufficient to permit the new sewers and water lines to be laid1 were necessary4 ,there were no large water mains to be cared for1 in fact1 those in the streets were too small for ample fire protection1 being only #f in4 in diameter4 ,the main in #cb;d ,street was taken up and not replaced1 and those on #cast and #cc;d ,streets were replaced by #ab-;in4 pipes laid back of the retaining walls4 ,no changes were necessary in the mains in the avenues1 but1 before approving the rearrangement for the streets1 the ,department of ,water ,supply1 ,gas and ,electricity added a #dh-;in4 main in ,eighth ,avenue to be laid as a part of this construction1 the pipe being supplied by the ,city4 ,,location ,,and ,,design ,,of ,,retaining ,,walls4 ,the plans1 from the earliest stages1 contemplated founding the retaining wall on the surface of the rock1 where of suitable quality1 and afterward excavating the rock in front of the toe of the wall to sub-grade4 ,this plan was definitely adopted soon after the borings were completed1 on account of the great danger of blasting out large quantities of rock in timbered trenches close to buildings founded on soft material1 and also to avoid the additional cost and delay that would have been caused by carrying the walls to sub-grade4 ,the retaining walls in ,seventh ,avenue1 south of the viaduct1 and in ,ninth ,avenue1 north of the viaduct1 were not governed by the same conditions as in the streets4 ,the dip and quality of the rock at both points required that the walls be carried to sub-grade1 and they are1 in fact1 face walls2 the ,ninth ,avenue wall1 in particular1 having little thrust to sustain1 is very light4 ,the results aimed at in the design and location of the retaining walls in #cast and #cc;d ,streets were3 ,first4--,a perfectly stable wall under all conditions that might reasonably be expected2 ,second4--,as much room as possible at the elevation of the top of rail2 ,third4--,the least necessary interference with adjoining property during construction2 and1 ,fourth4--,the most economical wall that would fulfill the other conditions4 ,as stated in the paper by ,alfred ,noble1 ,past-,president1 ,am4 ,soc4 ,c4 ,e41 the third stipulation required the relinquishing of a portion of the space under these streets granted by the ,city1 but it was finally decided not to approach the south house line of #cast ,street with the back of the walls nearer than #i ft41 while on #cc;d ,street the extreme position of the back was fixed at the north line1 as there were no buildings1 except those belonging to the ,railroad ,company1 on the house line at the low points in the rock4 ,the assumptions made in designing the wall were as follows3 ,first4--,weight of concrete1 #adj lb4 per cu4 ft4 ,second4--,weight of material from the surface of the ground to a depth of #ab ft4 7which was shown by tests made in bore-holes to be the elevation of the ground-water surface71 #ajj lb4 per cu4 ft42 and angle of repose1 #cj degrees4 ,the distance of #ab ft4 below the surface was the depth of the inverts of the sewers1 which undoubtedly drained the ground above them1 thus accounting for the standing of the ground-water in planes practically parallel with the surface4 ,third4--,weight of buildings back of wall neglected1 as that of the present type will about equal the cellars filled with material at #ajj lb4 per cu4 ft41 and if large buildings are erected in the future they will undoubtedly be carried to rock4 ,fourth4--,reaction from superstructure1 live and dead load1 #bj1jjj lb4 per lin4 ft4 of wall4 ,fifth4--,weight of materials below the #ab-;ft4 line1 #abd lb4 per cu4 ft41 ascertained as follows3 ,the material was considered as weighing #afe lb4 per cu4 ft4 in the solid1 and having #dj of voids filled with water at #fb4e lb4 per cu4 ft41 the resulting weight being 7#afe #fj_/ajj7 7#fb4e #dj_/ajj7 #abd lb4 per cu4 ft4 ,various angles of repose were used for this material in the investigation1 and it was finally decided that #cj was the greatest angle that could be expected1 whereas the worst condition that could be anticipated was that the sand and water would act separately and give a pressure as follows3 ,hydraulic pressure from liquid weighing #fb4e lb4 per cu4 ft4 plus pressure from sand with angle of repose at #cj and weight as follows3 ,weight of #a cu4 ft4 in air #afe #fj_/ajj #ii lb4 ,weight of water displaced by #a cu4 ft4 #fj_/ajj #fb4e lb4 #cg4e lb4 ,weight in water1 therefore #fa4e lb4 per cu4 ft4 ,these combined weights1 of course1 are equal to the weight of the combined material in the previous assumption4 ,sixth4--,the usual requirement that the resultant of both horizontal and vertical forces should1 at all points1 fall within the middle third of the wall1 or1 in other words1 that there should be no tension in the concrete4 ,illustration3 ,plate ,,liv4 ,diagram ,showing ,widths of ,base of ,retaining ,wall ,required for ,different ,batters and ,pressures1 ,pennsylvania ,station ,with these assumptions1 investigation was made of walls with various batters and differently designed backs4 ,this investigation developed the fact that the reaction from the superstructure was so great that1 for economy1 both in first cost and space occupied1 the batter must be sufficient to cause that reaction to fall within or very close to the middle third4 ,nothing could have been gained by having that reaction fall back of the front of the middle third1 as the wall was required to be stable against the full pressure before the superstructure was erected1 and in case it should ever be removed2 or1 to state the matter more clearly1 the reaction from the superstructure was so great in comparison to the weight of the wall1 that1 if it fell in front of the resultant of all the other forces1 the width of base required would be greatly increased to make the wall stable after the superstructure was erected2 whereas1 if the reaction from the superstructure fell back of the resultant of all the other forces1 the width of base could not be correspondingly decreased without danger of the wall being overturned before the superstructure was erected4 ,the least batter that would answer those conditions was found to be #b in4 per ft4 ,for convenience in designing1 and economy in constructing1 the steelwork1 the faces of the bridge seat and of the backwall were laid parallel to the center line of the ,terminal1 and in elevation on line parallel to the top of the curb and as near to it as the economical depth of steel would permit1 without bringing the finished construction above the plane fixed in the ordinance4 ,as there is a variation of #ac ft4 in the elevation of the top of the curb of #cast ,street above the top of rail and a variation of #ah ft4 in #cc;d ,street1 a uniform batter1 with the top parallel to the center line1 would produce a toe varying in distance from it and from the other constructions4 ,it was decided1 therefore1 for the sake of appearance1 to make the face of the wall 7or wall produced7 at the top of rail parallel to the center line1 and to vary the batter accordingly1 using the #b-;in4 batter previously mentioned as the minimum4 ,this gave a maximum batter of #c in4 per ft4 ,the variation is so gradual that it is unnoticeable1 and is not sufficient to introduce any complications in construction4 ,the wall was designed with a stepped back1 primarily to allow the water-proofing and brick protection to be held in position more readily4 ,the first step was put at #ac ft4 below the surface of the ground4 ,this gave a vertical back above that point for a #c-;in4 battered face1 and a slightly battered back for sections having a less batter in front4 ,below that point a step was added for each #e ft4 of depth to the elevation of the top of rail1 or to the foundation of the wall if above that elevation4 ,as the horizontal distance of the heel of the wall1 at its greatest width1 from its face at the top of rail would determine the effective room to be occupied by the wall1 it was determined to make the back vertical below the top of rail and gain the necessary increase in width below that point by making a heavy batter on the face4 ,the type of wall having been thus determined1 calculations were made of the width of base required for each -in4 batter from #b to #c in41 inclusive1 first for a depth of #ac ft4 below the top of the curb and then for each #e ft4 below that elevation1 to a depth corresponding to the distance between the top of the curb and the top of the rail at the point of greatest variation4 ,these widths of wall were determined for the two pressures previously decided on1 and curves were then plotted showing the thickness of wall required for each batter calculated and for each pressure4 ,they are shown on ,plate ,,liv4 ,the curves in broken lines represent the widths required for saturated material1 and the curves in dotted lines for hydraulic pressure4 ,mean curves were then drawn between each broken and its corresponding dotted curve4 ,these are shown in solid lines1 and represent the widths of wall which were used in the construction4 ,typical sections of the wall and pipes back of it are shown on ,fig4 #c4 ,the extreme positions of the back of the wall on the two streets having been determined1 as previously stated1 the width of base required at those points fixed the toe of the wall at the top of rail as #bed4e ft4 south of the center line of the ,terminal in #cast ,street1 and #beh4e ft4 north of the center line in #cc;d ,street4 ,illustration3 ,fig4 #c4 ,,typical ,,sections ,,of ,,retaining ,,wall ,,in ,,thirty-,,first ,,street ,,contracts4 ,the construction was done under the following contracts3 #a4--,the principal contract1 dated ,june #bast1 #aijd1 was with the ,new ,york ,contracting and ,trucking ,company1 later assigned by that company to the ,new ,york ,contracting ,company-,pennsylvania ,terminal1 for the performance of the following works3 7a74--,the excavation for and construction of a retaining wall in ,seventh ,avenue1 #cast ,street1 ,ninth ,avenue1 and #cc;d ,street4 7b74--,excavation over the area enclosed by the retaining wall4 7c74--,the building of sewers and the laying of water and gas pipes4 7d74--,the building of a timber trestle to support the surface of ,eighth ,avenue between the south side of #cast ,street and the north side of #cc;d ,street1 and also the surface of #cast and #cc;d ,streets between ,seventh and ,ninth ,avenues4 ,this refers to the trestles left in place on the completion of the work4 7e74--,the building of a trestle and bridging from a point near the west side of ,tenth ,avenue on the south side of #cb;d ,street1 westward to the outer end of ,pier ,no4 #fb1 at the foot of #cb;d ,street4 #b4--,the second contract1 dated ,february #ajth1 #aije1 was with the ,new ,york ,contracting ,company-,pennsylvania ,terminal1 for the excavation for and construction of retaining walls for the ,manhattan ,terminal ,power ,station1 and the excavation of the area thus enclosed4 #c4--,the third contract1 dated ,october #b;d1 #aijg1 was with the ,new ,york ,contracting ,company-,pennsylvania ,terminal1 for the construction of two twin tunnels under ,ninth ,avenue1 and other work incidental thereto4 ,sewers and gas mains laid outside the area covered by the foregoing contracts were constructed under the following agreements3 ,an agreement1 dated ,august #ith1 #aijd1 between the ,new ,york ,contracting ,company-,pennsylvania ,terminal1 and the ,new ,amsterdam ,gas ,company1 for a #bj-;in4 gas main from ,seventh ,avenue and #cast ,street to #cjth ,street1 and thence to ,ninth ,avenue1 the ,new ,amsterdam ,gas ,company being remunerated for the cost by the ,tunnel ,company4 ,a contract1 dated ,august #bdth1 #aijd1 with the ,new ,york ,contracting ,company-,pennsylvania ,terminal1 for the construction of sewers in ,seventh ,avenue and in #cb;d and #cc;d ,streets east of ,seventh ,avenue4 ,a contract1 dated ,november #bdth1 #aijh1 with the ,new ,york ,contracting ,company-,pennsylvania ,terminal1 for the construction of a #af-;in4 gas main from ,seventh ,avenue and #cb;d ,street to #cdth ,street1 and thence to ,eighth ,avenue4 ,all these contracts required that the excavated material be delivered on board scows to be furnished by the company at the pier at the foot of #cb;d ,street1 ,north ,river4 ,these scows were furnished and the material was disposed of from that point by ,henry ,steers1 ,incorporated1 under a contract1 dated ,august #ith1 #aijd1 which called for the transportation to and placing of all material so delivered in the ,pennsylvania ,railroad ,company's freight terminal at ,greenville1 ,n4,y4 ,the disposal of the excavated material was one of the principal features of the work1 and1 under the above contract1 material from those portions of the ,terminal site east of ,seventh ,avenue and west of ,ninth ,avenue1 and from all substructures work1 was disposed of1 as well as from the constructions herein described4 ,the problem differed from that presented by the usual foundation excavations in ,new ,york ,city in magnitude only1 and the methods were not unusual1 but were adaptations of the usual ones to exceptionally large work4 ,,piers ,,and ,,trestle ,,for ,,disposal4 ,the most rapid and economical handling of all excavated material to scows was made possible by the ,tunnel ,company procuring from the ,new ,york ,central and ,hudson ,river ,railroad ,company the pier at the foot of #cb;d ,street1 ,north ,river1 known in the earlier stages of the work as ,pier ,no4 #fb1 but subsequently changed to ,pier ,no4 #gb1 and thus referred to in this paper4 ,this pier was occupied by a freight-shed used by the ,new ,york ,central ,railroad ,company1 under a long-term lease from the ,city1 and that ,company had to make numerous changes in their tracks and adjoining piers before ,no4 #gb could be turned over2 the contract for the excavation1 therefore1 required the contractor to procure any piers needed previous to and in addition to it4 ,under this clause of the agreement1 the contractor procured one-half of the pier at #ceth ,street1 ,north ,river1 which was used for the disposal of all material excavated previous to ,may #bb;d1 #aije1 on which date ,pier ,no4 #gb was first put in service4 ,as the type of plant the contractor would elect to use could not be determined1 previous to the letting of the contract1 a general plan for ,pier ,no4 #gb and the trestle approach1 suitable for either trains or wagons1 was attached to the contract1 and the details were worked out afterward4 ,the method adopted was by train1 and a two-track approach to the pier was provided4 ,beginning on the east side of ,ninth ,avenue1 at the south line of #cb;d ,street1 at an elevation of #bj ft4 below the surface1 crossing under ,ninth ,avenue and to the center line of #cb;d ,street1 it rose on a #a4e grade in open cut to the surface of #cb;d ,street at a point #ejj ft4 west of ,tenth ,avenue1 from which point it rose above the surface of the street on a timber trestle to ,tenth ,avenue1 which was crossed overhead4 ,west of ,tenth ,avenue the line changed by a reverse curve to the south sidewalk of #cb;d ,street1 and continued on a timber trestle1 practically level1 to the ,new ,york ,central ,yard tracks near ,eleventh ,avenue4 ,these tracks and ,eleventh ,avenue were crossed overhead on a through-truss1 steel bridge1 and a column-and-girder construction on which the two tracks separated to a distance of #bi ft1 between center lines1 so as to bring them directly over the posts of special timber bents which spanned the two house tracks of the ,new ,york ,central south-bound freight shed1 which the trestle here paralleled4 ,this position was held to a point #be ft4 west of the east house line of ,twelfth ,avenue1 where1 by a system of cross-overs and turn-outs1 access was had from either track to six tracks on the pier4 ,four of these were on upper decks1 two on the north and two on the south edge of the pier1 at an elevation of #da ft4 above mean high tide1 to carry earth and small rock to chutes from which it was dumped into barges4 ,the other two tracks proceeded by a #e4c grade down the center of the pier to the lower deck where1 at a distance of #edj ft4 from the bulkhead1 and beyond the upper deck construction1 they diverged into six1 two on the north and two on the south edge of the pier for standing tracks to serve derricks1 and two down the center for shifting purposes4 ,a siding to the north of the two running tracks just west of the bottom of the incline served a bank of eight electric telphers4 ,the arrangement of the pier is shown by ,fig4 #d4 ,the trestle east of the steel structure at ,eleventh ,avenue had simple four-post bents1 as shown by ,bent ,a1 on ,fig4 #e1 all posts being vertical1 to save room at the street level2 the outside posts and the caps and sills were of #ab by #ab-;in4 timber2 the intermediate posts were of #h by #ab-;in4 timber2 and single or double decks of #c by #h-;in4 bracing were used1 depending on the height of the bents4 ,these bents were framed on the ground in position and raised by hand4 ,west of ,tenth ,avenue1 the sills of the bents rested on four #ab by #ab-;in4 longitudinal timbers1 each spanning two bays and breaking joints1 for convenience in supporting the trestle while the tunnels were constructed in open cut beneath4 ,these bents were placed #ab ft4 on centers1 with one #h by #af-;in4 stringer under each rail1 and one #f by #af-;in4 jack-stringer supporting the overhang of the floor on either side4 ,the bents along the ,new ,york ,central freight shed had but two posts of #ab by #ad-;in4 yellow pine varying from #bf ft1 to #ca ft4 #i in4 from center to center2 they had double caps of #ab by #ad-;in4 yellow pine on edge1 no bottom sills or bracing1 and the vibration and wind pressure were taken care of by the top bracing and anchorage1 as shown by ,bent ,g1 on ,fig4 #f4 ,illustration3 ,fig4 #d4 ,,plant ,,for ,,disposal ,,of ,,excavated ,,materials ,,pier ,,no4 #gb ,n4,r4 ,the method of erection was as follows3 ,an excavation was made on the line of each post1 #d ft4 deep and from #d to #e ft4 square1 depending on whether it was for a single or reinforced post2 #f in4 of concrete was placed in the bottom1 and on this were laid1 at right angles to the center of the trench1 three #h by #ab-;in4 timbers varying in length with the excavation from #c to #d ft4 ,to these timbers was drifted one #ab by #ab-;in4 timber of the same length as those in the bottom row1 but at right angles to them4 ,elevations were then taken on top of the #ab by #ab-;in4 timber1 and the bent was framed complete and of correct height4 ,the framing was done south of the line of the trestle and west of the freight-house4 ,the framed bents were picked up by a small two-boom traveler carrying two double-drum1 electric1 hoisting engines1 and run forward into position4 ,a hole had previously been made in the metal gutter and canopy of the freight-house1 by an experienced roofer1 and in the freight platform underneath1 and1 as soon as the bent had been dropped into position1 it was firmly drifted to the foot-blocks1 previously described1 and the excavation made for them was filled with concrete well rammed about the blocks and rounded off #f in4 above the surface of the ground4 ,secure flashings1 in two sections1 were then made about the posts to cover the holes made in the gutter and roof1 the bottom sections being firmly soldered to the roof or gutter1 and the top sections1 which lapped over the bottom and cleared them #b in4 in all directions1 were firmly nailed to the posts and the joints leaded4 ,this arrangement allowed the bents to move slightly1 and at the same time made the roof and gutter water-tight4 ,these bents were placed #af ft4 on centers to correspond with the spacing of the doors of the freight shed4 ,under the cross-overs near ,eleventh ,avenue1 where the tracks had to be supported in different positions on the caps1 and could no longer be kept over the posts1 the caps were trussed and the posts were reinforced1 as shown on ,bents ,j1 ,h1 and ,k1 ,fig4 #e4 ,illustration3 ,fig4 #e4 ,,detail ,,of ,,bents ,,for ,,material ,,trestle ,the trusses for the through bridge over the tracks were erected on ,sunday1 ,april #afth4 ,the two trusses1 one #abb ft4 and the other #afe ft4 #h in4 from center to center of end posts1 had been assembled and riveted1 lying flat on cribwork a few feet above the ground1 south of the permanent position and between the ,new ,york ,central tracks and ,eleventh ,avenue4 ,on the date stated1 the contractor1 having been given permission to block the ,central's tracks from #e a4m4 to #i p4m41 erected a large steel gin pole just south of the correct position of the center of the north truss1 which was then dragged1 from the place where it had been assembled1 across the railroad tracks until the center of the bottom chord was vertically under its true position1 the truss still lying flat and about at right angles to the center line of the bridge4 ,chains were made fast to the top chord at the middle panel of the truss1 which was then turned up to a vertical plane1 raised to its permanent position1 and guyed4 ,the gin pole was then shifted and the operation repeated with the longer truss1 after which1 half of the floor beams and a part of the top laterals were bolted in position and the guys were removed1 the bridge being thus erected without the use of falsework of any kind4 ,during the lifting there was no sag in either truss that could be noticed by the eye4 ,fig4 #a1 ,plate ,,lv1 shows the bridge erected1 with the exception of the tight timber fence4 ,pier ,no4 #gb is directly over the ,north ,river ,tunnels4 ,when it was turned over by the ,new ,york ,central ,railroad ,company1 the contractor for the construction of those tunnels tore down the shed and removed the deck and such piles as were in the path of the tubes4 ,this left standing the four northernmost1 the four southernmost and two centers rows of piles for the entire length of the pier4 ,an additional row of piles was then driven on either side of the two center rows1 and battered so that at the elevation of the tunnels they would be close to the center rows and leave as much clear space as possible4 ,the pier1 therefore1 was constructed of three independent lines of four-post bents1 which1 however1 rested on sills which were continuous throughout the width of the pier1 as shown by ,figs4 #b and #c1 ,plate ,,lv4 ,illustration3 ,fig4 #f4 ,,detail ,,of ,,bents ,,for ,,material ,,trestle4 ,the bents for the upper floors of the pier were double-decked1 with #ab by #ab-;in4 posts1 sills1 intermediate and top caps1 and #c by #h-;in4 longitudinal and cross-bracing4 ,the bents for the incline were similar1 except that those below #af ft4 in height were of single-deck construction4 ,the spacing of the bents varied from #i ft4 #f in4 to #ab ft41 except the three outer bays1 which had a span of #bc ft41 all to agree with the position of the pile bents4 ,the double-deck construction extended for the full length of the original pier4 ,a single-deck extension1 of full width and #ahj ft4 in length1 was subsequently built for the accommodation of four derricks for handling building material and large rock4 ,the piles for this extension were driven in three sets of four rows each1 similar to those in the old portion of the pier1 except that the bents were driven with a uniform spacing of #ae ft4 between centers4 ,the three sets of bents were topped separately with #ab by #ab-;in4 caps and #ab by #ab-;in4 dock stringers2 they were braced with both cross and longitudinal low-water bracing1 and were tied together by a continuous #ab by #ab-;in4 timber over the dock stringers and #ab by #ab-;in4 packing pieces from stringer to stringer1 each of these ties being supported in the center of the span over the tunnels by two #b-;in4 hog rods1 ,section ,a-,a1 ,fig4 #d4 ,the south side of the upper deck of the pier carried three sets of nine hoppers1 each set covering #ij ft41 a little less than the full length between bulkheads of the largest deck scows1 with #gj ft4 clear between sets1 to allow for the length of a scow outside of the bulkhead and to permit the free movement of boats4 ,each hopper occupied the full space between two bents1 and1 as the caps were topped by strips of timber of triangular section1 with a width of #ab in4 on the base and a height of #f in41 protected by a #f by #f-;in4 steel angle1 each set of hoppers presented #ij lin4 ft4 of continuous dumping room4 ,the bottoms of the hoppers1 set at an angle of #de1 were formed by #ab by #ab-;in4 timbers laid longitudinally1 running continuously throughout each set1 and covered by #c-;in4 planking4 ,the partitions were formed with #d-;in4 planks securely spiked to uprights from the floor of the hoppers to the caps2 these partitions narrowed toward the front and bottom so as to fit inside the chutes4 ,each hopper was lined on the bottom and sides with -in4 steel plates1 and the bottoms were subsequently armored with #b by #a-;in4 square bars laid #c in4 on centers and bolted through the #ab by #ab-;in4 flooring of the hoppers4 ,the chutes1 extending from the bottom of the hoppers1 were #bj ft4 long and #g ft4 wide1 in the clear2 they were formed entirely of steel plates1 channels1 and angles1 and were supported from the upper deck of the pier by chains2 their lower ends were #ag ft4 above mean high tide and #ad ft4 #f in4 from the string piece of the pier4 ,the hoppers and chutes are shown by ,fig4 #a1 ,plate ,,lvi4 ,illustration3 ,plate ,,lv4 ,material ,trestle ,over ,n4,y4,c4 ,h4,r4,r4,r4 ,co4's ,tracks2 and ,construction of ,pier ,no4 #gb1 ,north ,river ,fig4 #a4--,material ,trestle ,over ,n4,y4,c4 ,h4,r4,r4,r4 ,co4's ,tracks4 ,fig4 #b4--,material ,trestle ,under ,construction on ,pier ,no4 #gb1 ,north ,river1 ,showing ,clear ,water ,over ,tunnel ,location4 ,fig4 #c4--,pier ,no4 #gb1 ,north ,river1 ,showing ,incline as ,reconstructed ,for ,locomotives4 ,a length of #aej ft4 of the north side of the pier was for the use of the contractor for the ,north ,river tunnels2 it was equipped with a set of nine chutes similar to those for the south side2 they were used but little1 and were finally removed to make room for a cableway for unloading sand and crushed stone4 ,at the foot of the incline there was a bank of eight telphers running on rails securely bolted to the tops of #bj-;in4 ,i-beams1 which were hung from stringers resting on the upper caps4 ,the beams were erected in pairs1 each pair being securely braced together and to the trestle posts to prevent swaying4 ,each telpher occupied the space between two bents1 about #aj ft41 so that the entire bank commanded a length of #hj ft41 which was approximately the length of a rock scow between bulkheads4 ,all supports for the telphers were provided as a part of the trestle1 but the machines themselves were a part of the contractor's plant4 ,four derricks were erected on the extension1 two on the north and two on the south edge of the pier1 supported on bents at a sufficient elevation above the floor to clear a locomotive4 ,after most of the earth had been excavated1 the out-bound set of hoppers on the south side of the pier was removed1 and two derricks were erected in their place and used for unloading sand1 crushed stone1 and other building material4 ,,plant4 ,as the use of the #ceth ,street pier for the disposal of material required that the mode of transportation should be by dump-wagons drawn by horses1 the plant in use by the contractor during that period necessarily differed in many respects from what it was later1 when ,pier ,no4 #gb was available4 ,therefore1 the nature of the plant during each period will be stated4 ,the plant for each period will be divided into five classes3 #a4--;,central ,plant3 7a7 ,power-,generating ,plant4 7b7 ,repair ,shops4 #b4--,retaining-,wall ,plant4 #c4--,pit-,excavating ,plant4 #d4--,transportation ,plant4 #e4--;,dock ,plant4 ,horse-and-,truck ,period3 ,july #aath1 #aijd1 to ,may #bb;d1 #aije4 #a4--;,central ,plant4 7a74--,power-,generating ,plant4--,the contractor's first central generating plant was established in a #ce by #he-;ft4 steel-framed building covered with corrugated iron1 the long side being parallel to ,ninth ,avenue and #ae ft4 from the east house line1 and the north end #dc ft4 south of the south house line of #cb;d ,street4 ,the foundations for the building and machinery were of concrete1 resting on bed-rock1 the floor being #bj ft4 below the level of the ,ninth ,avenue curb4 ,the south end of the building was the boiler-room and the north end the compressor-room1 the two being separated by a partition4 ,coal was delivered into a large bin1 between the boiler-house and ,ninth ,avenue1 its top being level with the street surface1 and its base level with the boiler-room floor4 ,at the end of the horse-and-truck period the plant consisted of3 ,two ,rand1 straight-line compressors1 #bd by #cj in41 having a capacity of #a1djj cu4 ft4 of free air per min4 when operating at #hf rev4 per min4 and compressing to #hj lb4 above atmospheric pressure4 ,one #aj by #f by #aj-;in41 ,worthington1 steam1 plunger pump4 ,three horizontal boilers of the locomotive type1 each of #abe h4p4 7b74--,repair ,shops4--,the repair shops1 which included blacksmith1 machine and carpenter shops1 were located on the first floor of a #dj by #gj-;ft4 two-story frame structure1 which was in the pit on the north side of #cast ,street1 #dh ft4 east of ,ninth ,avenue4 ,the second floor was on the street level1 and was used as a storehouse for hand-tools and small plant4 ,the blacksmith shop contained3 ,four forges with hand blowers1 four anvils1 and hand-tools4 ,the machine shop contained3 ,one drill press1 one shaper 7#ad-;in4 stroke71 one #ah-;in4 swing lathe1 and one #f-;in4 bed lathe4 ,the carpenter shop contained3 ,one circular saw1 one wood lathe1 and hand-tools4 ,the plant in both machine and carpenter shops was operated by one #g-;h4p4 ,general ,electric motor1 the current for which was obtained from the ,edison ,electric ,heat1 ,light1 and ,power ,company4 ,illustration3 ,plate ,,lvi4 ,material ,trestle ,showing ,first ,chutes in ,operation2 and ,views of ,east and ,west ,pits at ,terminal ,site ,fig4 #a4--,material ,trestle1 ,showing ,first ,chutes in ,operation4 ,fig4 #b4--;,east ,pit1 ,steam ,shovel ,loading ,excavated ,material on ,car4 ,fig4 #c4--,west ,pit1 ,showing ,condition on ,june #bhth1 #aije4 #b4--,retaining-,wall ,plant4 ,three cableways1 with #ce-;ft4 towers of #ab by #ab-;in4 yellow pine timber capable of spanning #cej ft41 and operated by #g by #aj-;in4 double-drum ,lambert hoisting engines mounted with #be-;h4p4 ,lambert upright boilers4 ,five stiff-leg derricks1 with masts from #ce to #ej ft4 long and booms from #de to #fj ft4 long1 operated by #g by #aj-;in4 ,lambert double-drum and swinging gear engines1 mounted with #be-;h4p4 upright ,lambert boilers4 ,six ,cameron pumps1 varying in size from #g by #f by #ac in4 to #aj by #h by #af in4 ,the first dimension referring to the diameter of the steam cylinder1 the second to that of the water1 and the third to the stroke4 ,five ,rand sheeting drivers4 ,two ,ransome -cu4 yd4 concrete mixers1 mounted on frame1 with kerosene driving engine4 ,drills drawn from pit plant as required4 #c4--,pit-,excavating ,plant4 ,one guy derrick1 #ej-;ft4 mast and #de-;ft4 boom1 operated by a ,lambert two-drum and swing-gear hoisting engine1 with ,lambert #be-;h4p4 upright boiler4 ,three stiff-leg derricks1 similar to those used on the retaining wall work4 ,three ,bucyrus1 #gj-ton steam shovels with #c-;cu4 yd4 dippers4 ,one traveling derrick1 built with an ,a-frame of #ab by #ab-;in4 timbers1 #ae-;ft4 mast1 and #be-;ft4 boom2 the traveler carried an engine and boiler similar to those used on the stiff-leg derricks1 and was used on the ,seventh and ,eighth ,avenue sewers1 as well as in the pit4 ,ten ,rand-,ingersoll rock drills1 ,nos4 #a1 #c1 and #d4 ,one ,reliance stone crusher 7nominal capacity #ag tons of crushed stone per hour7 belt-driven by #ej-;h4p4 engine4 #d4--,transportation ,plant4 ,during the whole of the first period the transportation plant consisted of two-horse trucks and snatch teams as needed4 ,the number varied greatly from #be at the beginning and end of the period to an average of #ace from ,august #ast to ,december #ast1 #aijd1 about #aj of the total number of teams being used as snatch teams4 #e4--;,dock ,plant4 ,the only machinery used on the dock during the horse-and-truck period was one stiff-leg derrick similar in size and operation to those described under the head of retaining-wall plant4 ,the plant described above does not represent that which was used during the whole of the horse-and-truck period1 but what had accumulated at the end of it4 ,the power-generating plant might almost have been omitted from this period1 as the first compressor did not begin running until ,february1 #aije4 ,previous to that time1 the power for drilling1 pumping1 driving1 sheeting1 etc41 was steam furnished by the boilers which subsequently drove the compressors1 these being brought on the ground and fired as occasion required4 ,train-,disposal ,period1 ,beginning ,may #bb;d1 #aije4 ,at the beginning of this period there had been excavated #bdb1hjj cu4 yd4 of earth and #bb1hjj cu4 yd4 of rock1 of the total excavation of #hjc1ejj cu4 yd4 of earth and #hjd1jjj cu4 yd4 of rock included in the principal contract1 leaving to be excavated under that contract #efj1jjj cu4 yd4 of earth and #gha1bjj cu4 yd4 of rock1 and an additional contract had been let to the ,new ,york ,contracting ,company for the terminal power station1 which increased the earth by #af1ejj and the rock by #ae1ejj cu4 yd4 ,during the year following1 contracts for the east and west portions and the sub-structures were let1 which brought the total to be excavated1 after the beginning of the train-disposal period1 up to #fha1jjj cu4 yd4 of earth and #a1did1jjj cu4 yd4 of rock4 ,the central plant1 transportation plant1 and dock plant were used indiscriminately on all these contracts1 and1 as no separation can be made which will hold good for any appreciable length of time1 the plant in those classes will be stated in total4 ,the retaining-wall and pit plant here given include that used on the principal contract and terminal power station only4 ,the power-generating plant given under the horse-and-truck period was doubled at the beginning of the train-disposal period1 but it was still insufficient for the work then under contract1 and the additional contracts necessitated a greater increase4 ,the location had also to be changed to permit the excavation of the rock under ,ninth ,avenue4 ,the old stone church fronting on #cdth ,street1 between ,seventh and ,eighth ,avenues1 a building #fh ft4 wide and #ib ft4 long1 made a roomy and very acceptable compressor-house4 ,the wooden floors and galleries were removed1 and good concrete foundations were put in1 on which to set the plant2 the walls1 which were cracked in several places1 were trussed apart and prevented from moving outward by cables passed about the pilasters between the windows4 ,the boilers were erected south of the church1 an ash-pit being first built1 the full width of it1 with the floor on a level with the basement4 ,the rear wall of the church formed the north wall of the ash-pit1 and the south wall and the ends were built of concrete4 ,the boilers were set with the fire-doors toward the rear wall of the building1 and #g ft4 distant from it1 and above this fire-room and the boilers there was erected a coal-bin of #ejj tons capacity4 ,the rear wall of the compressor-house formed the north wall of the bin1 the section of which was an isosceles right-angled triangle4 ,coal was delivered by dumping wagons into a large vault constructed under the sidewalk on #cdth ,street1 and was taken from there to the bin by a belt conveyor4 ,the plant for the second period was as follows3 #a4--;,central ,plant4 7a74--,power-,generating ,plant4--,the plant in the engine-room consisted of3 ,three ,rand straight-line compressors from the original power plant at ,ninth ,avenue and #cb;d ,street4 ,one ,ingersoll straight-line compressor from the old power-house4 ,one ,rand duplex ,corliss1 #dj by #dh-;in4 air-compressor1 with both air and steam cylinders cross-compounded1 and a capacity of #e1fjj cu4 ft4 of free air per min4 compressed to #hj lb4 at #gj rev4 per min4 ,three ,rand duplex1 #cj by #cj-;in41 compressors1 connected with #ebe-;h4p41 #f1fjj-volt1 ,general ,electric motors1 with a capacity of #c1jjj cu4 ft4 of free air per min4 compressed to #hj lb4 at #abe rev4 per min4 ,two #aj by #f by #aj-;in4 ,worthington steam plunger pumps4 ,one #g-;h4p4 ,general ,electric motor for driving the ,robbins belt coal conveyor4 ,one forced-draft fan 7built by the ,buffalo ,forge and ,blower ,company71 driven by an #h by #aj-;in4 ,buffalo engine4 ,in the boiler-room there were three #ejj-;h4p4 ,sterling water-tube boilers4 7b74--,repair ,shops4--,the repair shops remained in their old location until sufficient room had been excavated to sub-grade in the lot east of ,eighth ,avenue1 and then they were moved to the old ,ninth ,avenue power-house which had been erected at that point4 ,the contents of the blacksmith shop remained the same as for the first period4 ,the equipment of the machine shop was increased by one #ah-ton trip-hammer operated by air and one bolt-cutting machine1 size #a in4 to #a in4 ,the carpenter shop remained the same except that the electric motor was replaced by a #be-;h4p4 single-cylinder air motor2 there was added to the repair shop a drill shop containing3 ,four forges with compressed air blowers1 four anvils1 two ,ajax #bj-;ft4 drill sharpeners1 and one oil blower forge4 #b4--,retaining-,wall ,plant4 ,the retaining-wall plant was identical with that described for the first period1 with the addition of two ,ransome #a-;cu4 yd41 concrete mixers1 with vertical engines mounted on the same frame1 using compressed air4 #c4--,pit-,excavating ,plant4 ,the pit-excavating plant included that listed for the first period and1 in addition1 the following3 ,one ,vulcan1 #cj-ton1 steam shovel1 with #a-;cu4 yd4 dipper and a vertical boiler4 ,one ,ohio1 #cj-ton1 steam shovel1 with #a-;cu4 yd4 dipper and a vertical boiler4 ,four guy derricks 7#ej to #hj-;ft4 masts and #de to #fj-;ft4 booms71 operated by ,lambert #g by #aj-;in4 engines1 with two drums and swinging gear1 mounted with #be-;h4p4 vertical boilers1 but driven by compressed air4 ,seventy ,ingersoll-,rand rock drills1 ,nos4 #a1 #c1 and #d4 ,two ,rand quarry bars1 cutting #aj ft4 in length at one set-up1 and mounted with ,no4 #d drill using a ,z-bit4 #d4--,transportation ,plant4 ,twenty-one ,h4 ,k4 ,porter locomotives1 #aj by #af-;in41 and #cf-;in4 gauge4 ,three ,davenport locomotives1 #i by #af-;in41 and #cf-;in4 gauge4 ,one hundred and forty ,western dump-cars1 each of #d cu4 yd4 capacity4 ,one hundred and sixty-five flat cars1 with iron skips1 each of #d cu4 yd4 capacity4 #e4--;,dock ,plant4 ,four stiff-leg derricks on extension1 having #ce-;ft4 masts and #dj-;ft4 booms1 and each operated by a #fj-;h4p4 ,lambert1 three-drum1 electric1 hoisting engine4 ,one stiff-leg derrick1 on the south side of the pier on the upper deck1 with a #bh-;ft4 mast operated by a three-drum ,lambert engine and a #be-;h4p4 vertical boiler4 ,one stiff-leg derrick1 on the north side of the dock on the upper deck1 used exclusively for bringing in brick1 electric conduit1 pipe1 and other building material1 operated when first erected by a three-drum1 steam-driven1 ,lambert1 hoisting engine4 ,this engine was later changed to the derrick on the south side of the dock1 and a motor-driven ,lambert engine from that derrick was substituted4 ,eight electric telphers4 ,ninth ,avenue ,twin-,tunnels ,plant4 ,one stiff-leg derrick1 previously used in retaining-wall work4 ,one ,smith concrete mixer1 #a cu4 yd4 capacity1 driven by attached air engine4 ,two cableways taken from the retaining-wall plant and used for mucking out the tunnels after the center pier had been built2 driven by air supplied to the original engine4 ,one ,robbins belt conveyor1 driven by a #cj-;h4p4 engine run by air4 ,three #a-;cu4 yd4 ,hopple dump-cars4 ,,construction4 ,ground was broken for work under the principal contract on ,july #ith1 #aijd1 on which date the contractor began cutting asphalt for ,trench ,no4 #a in #cast ,street1 and also began making a roadway from ,ninth ,avenue into the pit just south of #cb;d ,street4 ,excavation for ,retaining ,walls4--,two essentially different methods were used in excavating for and building the retaining walls2 one1 construction in trench1 the other1 construction on bench4 ,in general1 the trench method was used wherever the rock on which the wall was to be founded was #ab ft4 or more below the surface of the street2 or1 what is perhaps a more exact statement1 as it includes the determining factor1 where the buildings adjoining the wall location were not founded on rock4 ,in the trench method the base of the wall was staked out on the surface of the ground1 the required width being determined by the elevation of the rock1 as shown by the borings4 ,the contractor then added as much width as he desired for sheeting and working space1 and excavated to a depth of about #e ft4 before setting any timber4 ,in some cases the depth of #e ft4 was excavated before the cableway or derrick for the excavation was erected1 the wagons being driven directly into the excavation and loaded by hand1 but1 usually1 the cableway was first erected1 and buckets were used from the start4 ,after the first #e ft4 had been excavated1 two sets of rangers and struts were set1 the first in the bottom of the excavation and the second at the level of the street surface1 supported by posts resting on the bottom rangers4 ,the sheeting was then set1 and all voids back of it were filled with clean earth and well tamped4 ,the toe of the sheeting was kept level with the bottom of the excavation until the ground-water was reached1 after which it was kept from #c to #e ft4 ahead of the digging4 ,the sheeting used was #c-;in41 in variable widths2 it was always tongued and grooved on the side of the trench next to the buildings and in the deeper excavations on both sides of the trench1 and was driven by wooden mauls above the ground-water level1 but steam sheeting-drivers were used below that elevation4 ,struts1 rangers1 and posts were generally #ab by #ab-;in4 ,some exceedingly bad material was encountered in the deeper excavations1 beds of quicksand being passed through1 varying in thickness from #a to #ah ft41 the latter1 in #cast ,street between ,seventh and ,eighth ,avenues1 in the deepest excavation made4 ,after encountering the fine sand in that trench1 no headway was made until a tight wooden cylinder was sunk through the sand by excavating the material inside of it and heavily weighting the shell with pig iron4 ,when this cylinder had reached the gravel1 which lay below the sand1 it was used as a sump1 and the water level was kept below the bottom of the excavation1 which permitted good progress4 ,sand continued to flow under the sheeting to such an extent1 however1 that the front walls of four adjoining buildings were badly cracked and had to be taken down and rebuilt4 ,all the stoops along this trench settled1 and had to be repaired4 ,the bench method of excavating for the retaining wall was very simple1 and was used only where the rock lay near the surface and the adjoining buildings were founded on it1 the overlying material being in such case dry1 and consequently firm1 little or no shoring was required4 ,the method was to extend the pit excavation to a width of #b or #c ft4 beyond the proposed back of the retaining wall1 and to carry that width down to the depth required for its base1 below which the excavation was narrowed to #a ft4 inside of the face of the wall and continued either before it was built or subsequently4 ,retaining-,wall ,construction4--,the concrete walls were built in sections #ej ft4 in length1 except where that spacing would bring an expansion joint under a girder pocket or just on line with a tier of struts1 in which cases the section was shortened as required4 ,trenches were never allowed to remain open at the full depth1 the concreting being started as soon after the necessary length of rock had been uncovered as the forms and preliminary work for a section could be prepared4 ,each section was a monolith1 except in a few cases where very heavy rains made it impossible to hold the laborers4 ,the various operations in building the concrete wall are shown on ,fig4 #g4 ,guide-planks1 a a1 ,section ,a-,a1 were securely spiked to alternate tiers of struts for the length of the section1 the face of each guide-plank being set on line with the intended face of the concrete wall1 and #b-;in4 tongued-and-grooved spruce plank were laid along the guide-plank to the height of the bottom strut and securely braced from the front sheeting4 ,a #d-;in4 brick wall was built simultaneously on line with the back of the wall to the height of the first step4 ,where the bottom strut was below that elevation1 the brickwork was left low at that immediate point and built up when the strut was removed4 ,the brick wall was then water-proofed on the side toward the concrete1 and loose laps of the water-proofing were allowed to hang over the brickwork and at least #h in4 down the back4 ,a #f-;in4 vitrified pipe drain was then laid along the surface of the rock just outside of the brick wall1 the joints in the pipe being caulked with oakum saturated in cement1 and pointed with cement mortar above a line #a in4 below the horizontal diameter1 the remainder of each joint being left open4 ,cross-drains were laid from tees in the back drain to the face of the wall at all low points in the rock and at least for every #be ft4 of wall length1 the joints of these discharge pipes being caulked and cemented throughout4 ,the surface of the rock was then washed and scraped clean1 and was covered with about #a in4 of mortar1 after which the section was ready for concrete4 ,the building of monolithic sections in trenches required that the thrust from one set of struts be taken by the concrete before the set above could be removed1 and necessarily caused slow progress1 the rate at which concrete was deposited being just sufficient to prevent one layer from setting before the next layer above could be placed4 ,the concrete used was mixed in the proportions of #a part of cement to #c parts of sand and #f parts of stone1 in #b-;bag batches1 in -yd4 and #a-yd4 ,ransome portable mixers mounted with air-driven engines on the same frame4 ,these mixers were placed at the surface1 and were charged with barrows1 the correct quantities of sand and stone for each batch being measured in rectangular boxes previous to loading the barrows4 ,the concrete was discharged from the mixer into a hopper which divided into two chutes1 only one of which was used at a time1 the concrete being shoveled from the bottom of the chutes to its final position4 ,facing mortar1 #b in4 thick1 was deposited simultaneously with the concrete1 and was kept separate from it by a steel diaphragm until both were in place1 when the diaphragm was removed and the two were spaded together4 ,the bottoms of the guide-planks were cut off just above the concrete as it progressed1 and1 as soon as the wall had reached a strut at one end of the section1 that strut was removed1 the form was built up to the next strut1 at front and back1 and braced to the sheeting1 so that1 by the time the entire length of the section had been carried up to the level of the first line of struts1 forms were ready at one end for the succeeding layers4 ,the layers of concrete never exceeded #h in4 in height1 and at times there were slight delays in the concreting while the carpenters made ready the next lift of forms1 but such delays were rarely long enough to permit the concrete to take its initial set4 ,illustration3 ,fig4 #g4 ,,sketch ,,showing ,,forms ,,for1 ,,and ,,method ,,of1 ,,concreting ,,retaining ,,walls ,,in ,,trench4 ,after a section of concrete had firmly set1 both back and front forms were removed1 and the thrust from the sides of the trench was transferred directly to the finished wall4 ,the face of the wall was rubbed with a cement brick to remove the marks of the plank1 and was then coated with a wash of thin cement grout4 ,the water-proofing and brick armor were then continued up the back of the wall1 the spaces between the lines of braces being first water-proofed and bricked1 and the braces transferred to the finished surface1 after which the omitted panels were completed4 ,the water-proofing consisted of three layers of ,hydrex felt1 of a brand known as ,pennsylvania ,special1 and four layers of coal-tar pitch4 ,the pitch contained not less than #be of carbon1 softened at #fj ,fahr41 and melted at a point between #if and #ajf ,fahr4 ,the melting point was determined by placing #a gramme of pitch on a lead disk over a hole1 #e_/af-;in4 in diameter1 and immersed in water which was heated at the rate of #a per min42 the temperature of the water at the time the pitch ran through the hole was considered as the melting point4 ,in order to prevent the water-proofing from being torn at the joint between sections when they contract from changes in temperature1 a vertical strip of felt1 #f in4 wide1 was pitched over each joint1 lapping #c in4 on each concrete section4 ,the back of this strip was not pitched1 but was covered with pulverized soapstone1 so that the water-proofing sheet was free from the wall for a distance of #c in4 on either side of each joint4 ,concreting was continued during the severest weather1 one section being placed when the thermometer was #e above zero4 ,when the thermometer was below the freezing point both sand and stone were heated by wood fires in large pipes under the supply piles2 the temperature of the mix was taken frequently1 and was kept above #dj degrees4 ,numerous tests made while the work was in progress showed that1 while the temperature fell slightly soon after the concrete was deposited1 it was always from #b to #e higher at the end of #b hours4 ,the face and back of the concrete were prevented from freezing by a liberal packing of salt hay just outside the forms4 ,a vertical hog trough1 #bd in4 wide and #i in4 deep1 was placed in one end of each section1 for its full height below the bridge seat1 into which the next section keyed1 and1 when the temperature at the time of concreting was below #ej ,fahr41 a compression joint was formed by placing a strip of heavy deadening felt1 #b ft4 wide1 on the end of the completed section next to the face and covering the remainder of the end with two ply of the felt and pitch water-proofing2 the one ply of deadening felt near the face was about the same thickness as the two ply of water-proofing1 and was used to prevent the pitch from being squeezed out of the joint to the face of the wall4 ,the excavation for the retaining walls in #cast and #cc;d ,streets were in all cases made of sufficient width to receive the sewers1 which were laid as soon as the back-fill1 carefully rammed and puddled1 had reached the proper elevations2 the back-filling was then completed1 and the gas and water mains were afterward laid in separate trenches4 ,illustration3 ,fig4 #h4 ,,sketch ,,showing ,,forms ,,and ,,bracing ,,for ,,ninth ,,avenue ,,wall ,the sections of concrete built in trench varied in height from #ac to #ei ft4 from the base to the top of the back wall4 ,with the exception of the ,seventh ,avenue wall1 #ej ft4 in height1 and the ,ninth ,avenue wall1 #fb ft4 in height1 none of those sections constructed by the bench method was more than #ad ft4 ,the forms and bracing for these walls were substantially the same1 except that the low walls were built in lengths of approximately #ej ft41 while the forms for the ,seventh and ,ninth ,avenue walls were only #bj ft4 long4 ,the forms and bracing for the ,ninth ,avenue walls are shown on ,fig4 #h4 ,these forms were built in one piece and moved ahead from section to section1 and they were firmly braced from the bottom with raker braces to a point #cf ft4 above the base1 the upper part being held in place by -in4 bolts passed through the forms and anchored by cables to bolts grouted into the rock behind4 ,after the forms had been set and braced1 an #h-;in4 brick wall was laid up the face of the rock1 containing a vertical line of three-cell hollow tile block every #e ft4 of length1 and laid to conform as nearly as possible to the face of the rock1 all voids being filled with broken stone4 ,water-proofing1 similar to that described for the walls in the trench1 was then applied to the brick and tile wall for the full height1 and firmly braced to the front forms1 the braces being removed as the concrete reached them4 ,the concrete was mixed at the street level and deposited through chutes1 as described previously4 ,tables #a1 #b1 and #c show the quantity of cement used in each section of retaining wall1 and give figures by which the quantities of other materials may be determined4 ,pit ,excavation4--,the pit excavation during the horse-and-truck period was largely preparatory work done to get the excavation in good shape for handling spoil trains after ,pier ,no4 #gb and the trestle approach were finished4 ,this required an open cut from ,ninth to ,seventh ,avenues at a sufficient depth below the sewers and other substructures in the avenues to clear a locomotive1 and wide enough for both running and loading tracks1 also the building of the cast-iron sewer in ,eighth ,avenue across the entire excavation1 with enough of the temporary bridging to support it4 ,the building of the trestle in ,eighth ,avenue was essentially a part of the pit excavation1 as the progress of one depended greatly on that of the other4 ,excavation was commenced on ,july #abth1 #aijd1 for the crossing under ,ninth ,avenue1 and in the pit east of ,ninth ,avenue along #cb;d ,street4 ,the line chosen for the opening cut was down the center of the pit1 as it was not safe to excavate near the bounding streets until after the completion of the enclosing retaining wall4 ,the excavation was started by hand1 but three #gj-ton ,bucyrus steam shovels were put to work as soon as they could be delivered1 the first on ,july #beth and the third on ,september #abth4 ,the excavated material was loaded by the shovels on end-dump wagons1 each having a capacity of #b cu4 yd41 and was conveyed in them to the dumping board at #ceth ,street4 ,the average number of teams was #ace1 #aj being snatch teams to pull the wagons out of the pit and to assist them up the runway at the dumping board4 ,the teams averaged only seven trips per day of #aj hours1 considerable delay being caused by the trains of the ,new ,york ,central ,railroad at ,eleventh ,avenue4 ,the number of teams was not sufficient1 therefore1 to keep the three shovels busy when they were all in good digging1 but the dumping board was taxed to accommodate that number1 and little would have been gained by increasing it4 ,the digging was very good during this period1 practically no rock being encountered1 and the building foundations were too light to present any obstacle to such powerful shovels4 ,the capacity of their dippers was #c cu4 yd41 so that one dipperful meant one truck loaded and running over4 ,the output from ,august to ,november1 inclusive1 averaged #dj1jjj cu4 yd4 per month2 one shift only was worked per day1 and although the quantity was not large for three such powerful shovels1 it was large to truck through the streets1 and required that one team pass a given point every #ah sec4 ,at the end of ,november the opening up of the pit had been accomplished1 considerable rock had been stripped near ,ninth ,avenue1 and the streets had become so icy that the cost of transportation was practically doubled2 work in the pit1 therefore1 was much curtailed1 and amounted to continuous work for one shovel from that time until the end of the period1 ,may #bb;d1 #aije1 when ,pier ,no4 #gb was put in service and transportation by train began4 ,figs4 #b and #c1 ,plate ,,lvi1 show the condition of the pit east and west of ,eighth ,avenue1 respectively1 on that date4 ,illustration3 ,fig4 #i4 ,,sketch ,,showing ,,typical ,,bent ,,of ,,trestle ,,supporting ,,eighth ,,avenue ,the work of excavating for and building the temporary street bridge1 a typical bent and bracing for which are shown on ,fig4 #i1 and the cast-iron sewer and water mains in ,eighth ,avenue1 was commenced on ,september #c;d1 #aijd4 ,the trestle was a double-decked structure of yellow pine1 with #aj by #aj-;in4 posts and sills1 #aj by #ad-;in4 intermediate and top caps1 and #b by #aj-;in4 longitudinal and cross-braces4 ,the trestle was further stiffened longitudinally by four lines of #h by #aj-;in4 struts1 butted between the intermediate caps1 and held in position by #b by #h-;in4 splice-plates resting on top of them4 ,the intermediate caps were at an elevation of #ae ft4 below the surface of the street1 and above that line the longitudinal bracing was continuous1 while below it the bents were braced in pairs1 the bracing being omitted from every second bay4 ,below the intermediate cap the bents were uniform for the entire width of the trestle1 but the top cap was not continuous1 being #e ft4 below the surface under the trolley tracks1 and only #ah in41 the depth of stringers and planking1 beyond4 ,the stringers under the trolley tracks were #h by #af-;in4 yellow pine1 spaced three to a track1 and those for the driveway were #f by #ad-;in41 spaced #a ft4 #f in4 on centers1 the planking being #d-;in4 yellow pine4 ,the first step in the construction was to excavate a trench #ae ft4 wide on the west side of the street1 the east side of the trench being #d ft4 west of the westernmost trolley rail4 ,while this work was in progress1 all vehicular traffic was turned to that part of the avenue east of the westerly trolley rail4 ,the trench was sheeted and timbered1 and carried to a depth sufficient to receive the intermediate cap4 ,that portion of the bent from the bottom of the intermediate cap to the bottom of the top cap was then erected for the width of the trench1 after which the #fj-;in4 cast-iron sewer and the #dh-;in4 water main were laid in position and caulked4 ,the top cap1 stringers1 and planking were then laid1 for the full width of the trestle west of the trolley tracks4 ,this work was finished and the sewage turned into the new sewer in ,april1 #aije4 ,as the planking was laid west of the trolley tracks1 traffic was turned to that side of the street1 and the material east of the tracks was excavated to its natural slope4 ,trenches were then dug under the tracks on the line of the bents1 and the caps were set in position on blocking4 ,the material between these trenches was then removed1 the tracks being supported meanwhile by blocking at least every #f ft41 and the stringers and planking were shoved into place4 ,excavation was next made between the caps to a depth of about #e ft4 below them1 needle-beams being placed under the caps1 one or two at a time1 and supported on posts erected in these excavations2 the material on line of the bents was excavated to the depth of the intermediate caps1 which were then set1 together with the posts and bracing for the upper deck of the structure4 ,this operation was repeated for the lower deck1 about #aj ft4 being gained for each change of posts1 and three shifts1 therefore1 were required4 ,at the beginning of the train-transportation period1 ,may #bb;d1 #aije1 two shifts of #aj hours each were inaugurated1 and the earth was handled at the rate of from #he1jjj to #ij1jjj cu4 yd4 per month2 but1 by the end of ,august1 when a little more than #fj of the total earth had been disposed of1 the rock began to interfere very greatly with the progress4 ,the strike of the rock was almost directly north and south1 and its surface formed broken ridges running in that direction1 with deep valleys between4 ,the dip was almost vertical near ,ninth ,avenue1 and about #gj toward the west near ,seventh ,avenue4 ,this condition made it necessary to turn the shovels parallel to the ridges in order to strip the rock for drilling2 and1 as the ridges were very broken1 the shovels continued to bump into them on all occasions1 making it necessary to move back and start other cuts or stand and wait for the rock to be drilled and blasted4 ,one small ,vulcan steam shovel1 with vertical boiler and -cu4 yd4 dipper1 had been brought on the work to be used in stripping rock1 and was moved from place to place so much more easily than the large ones that an ,ohio shovel of the same general type was purchased in ,october1 and thereafter the stripping was done largely by the two small shovels and by hand1 the large shovels being used almost exclusively in handling rock4 ,the drilling necessary to remove the rock was very large in amount and also per yard excavated4 ,in order not to damage the retaining walls and the rock underlying them1 holes spaced at #e-;in4 centers were drilled #a ft4 away from the face of the walls and on the same batter4 ,these breaking holes alone amounted to a total of #baj1jjj lin4 ft41 or #a ft4 of hole for each #c cu4 yd4 of rock excavated2 and the regulations of the ,bureau of ,combustibles1 which prevented springing1 caused the blasting holes to be placed very close together and required a total of about #dbj1jjj lin4 ft41 making #fcj1jjj ft4 ,if to this is added the block holes1 for some of the rock broke very large1 it will show at least #a ft4 of drill hole for each cubic yard of rock excavated1 about ten times the average on general railroad work4 ,transcriber's ,note3 ,the three numbered ,tables were originally printed at full width1 with columns 7#a7-7ac7 displayed in a single row4 ,,table #a;a4--,record of ,retaining-,wall ,sections1 ,terminal ,station4 ,west ,thirty-first ,street from ,seventh ,avenue to ,ninth ,avenue4 7#a7 ,section ,no4 7#b7 ,stations4 7#c7 ,contents of section1 in cubic yards4 7#d7 ,barrels of cement used for facing4 7#e7 ,cubic yards of facing mortar equivalent4 7#f7 ,barrels of cement used for bed mortar4 7#g7 ,cubic yards of bed mortar equivalent4 7#h7 ,cubic yards of embedded stone4 7#a7 7#b7 7#c7 7#d7 7#e7 7#f7 7#g7 7#h7 #a #afe #je4h #afe #ff4j #fag4dh #ag4ej #e4ie 444 444 444 #b #afe #ff4j #afe #ie4d #bcc4if #aj4be #c4di 444 444 444 #c #afe #ie4d #aff #da4b #cee4bj #bd4ej #h4cd 444 444 444 #d #aga #jc4d #aga #ec4d #cji4bi #fg4ej #bc4jj 444 444 444 #e #agg #dd4j #agg #id4j #aji4fb #cj4be #aj4cj 444 444 444 #f #aga #ec4d #aga #hc4j #bdf4ce #bg4ge #i4dd 444 444 444 #g #aff #da4b #aff #gi4j #fdd4ab #gg4ej #bf4cg 444 444 444 #h #aga #hc4j #agb #ab4j #cid4dc #fc4ge #ba4fi 444 444 444 #i #aff #gi4j #afg #bj4e #igd4eh #ajc4ge #ce4cj #b4ej #j4he #g4if #aj #agj #af4f #agj #eh4f #gfg4cd #ib4ej #ca4dh #b4ge #j4id 444 #aa #agj #eh4f #aga #jc4d #eii4ag #gg4jj #bf4bj #aj4be #c4di 444 #ab #afg #bj4e #afg #dc4i #ece4bh #ej4ej #ag4ah #b4jj #j4fh #d4jj #ac #age #ah4e #age #fa4h #eec4jd #fb4jj #ba4aj #e4be #a4gi 444 #ad #agg #jb4i #agg #dd4j #cje4ab #di4be #af4gf #d4ej #a4ec 444 #ae #age #fa4h #agf #ia4g #dbi4hh #ej4jj #ag4ja #a4ej #j4ea 444 #af #agf #fb4e #agg #jb4i #fge4fd #gg4ej #bf4cg #f4be #b4ac 444 #ag #agd #jd4e #agd #bi4f #afb4ih #bi4jj #i4hg #c4ej #a4ai 444 #ah #age #ia4g #agf #ba4e #fih4hh #df4be #ae4gb #d4ej #a4ec #ae4hf #ai #agf #ba4e #agf #fb4e #a1aff4gi #ha4ej #bg4gc #d4jj #a4cf #cd4if #bj #afg #dc4i #afg #ib4f #ige4ec #ie4ge #cb4eh #c4be #a4aa #cf4ii #ba #agb #ab4j #agb #de4b #bga4dh #ca4ge #aj4hj #b4ej #j4he #h4fe #bb #afh #da4c #afh #gb4f #caf4cj #dd4jj #ad4ig #e4be #a4gi #g4ah #bc #agc #fc4f #agd #jd4e #ebi4cc #ed4ge #ah4fc #d4ge #a4fb #a4be #bd #afg #ib4f #afh #da4c #a1jaj4fd #ff4jj #bb4df #e4ej #a4hg #aj4af #be #agc #ba4b #agc #fc4f #fge4ba #gg4ge #bf4df #b4ej #j4he #ab4jj #bf #afd #gb4e #afe #je4h #deh4bb #dj4jj #ac4fa #e4ej #a4hg #bb4cg #bg #agb #ha4i #agc #ba4b #dji4dc #ce4jj #aa4ia #i4ge #c4ca #d4fd #bh #afd #bg4f #afd #gb4e #feh4df #gb4jj #bd4ej #a4ej #j4ea #af4dj #bi #agb #de4b #agb #ha4i #cde4hi #cj4be #aj4bi #e4jj #a4gj #a4fb #ca #agd #gh4j #age #ah4e #ejg4ej #ce4ge #ab4ag #c4jj #a4jb #ag4ji #cb #agd #bi4f #agd #gh4j #cif4ii #dc4ge #ad4hi #a4ge #j4fj #f4ej #dc #agg #id4j #agh #dd4a #aid4jg #cj4jj #aj4ba #b4jj #j4fh #h4ce ,pier #afh #gb4f #afh #ha4a #ajf4eb 444 444 444 444 444 #gf #agh #dd4a #agh #id4a #acf4cb #ab4ge #d4cd #d4ge #a4fb 444 #gi #agh #id4a #agi #dd4a #aah4jg #i4jj #c4jf #h4ej #a4ai 444 #hb #agi #dd4a #agi #ic4g #abf4ab #f4ej #b4ba #b4ej #j4he 444 #hd #agi #ic4g #ahj #dd4b #abf4gg #f4ge #b4cj #b4be #j4gg 444 #hf #ahj #dd4b #ahj #ic4f #afb4dh #h4jj #b4gb #b4ge #j4id 444 #ij #ahj #ic4f #aha #ag4i #ib4eb #d4jj #a4cf #a4jj #j4cd 444 ,,table #a;b4--,record of ,retaining-,wall ,sections1 ,terminal ,station4 ,west ,thirty-first ,street from ,seventh ,avenue to ,ninth ,avenue4 7#a7 ,section ,no4 7#b7 ,stations4 7#i7 ,cubic yards of concrete in section 7net74 7#aj7 ,barrels of cement used in concrete4 7#aa7 ,barrels of cement per cubic yard of concrete4 7#ab7 ,concrete started4 7#ac7 ,concrete finished4 7#a7 7#b7 7#i7 7#aj7 7#aa7 7#ab7 7#ac7 #a #afe #je4h #afe #ff4j #faa4ec #gca4ej #a4bj #aa_/d_/jd #aa_/bj_/jd #b #afe #ff4j #afe #ie4d #bcj4dg #bgg4be #a4bj #aa_/ba_/jd #aa_/bg_/jd #c #afe #ie4d #aff #da4b #cdf4hf #cih4be #a4ae #aa_/bf_/jd #ab_/c_/jd #d #aga #jc4d #aga #ec4d #bhf4bi #cfj4ej #a4bf #ab_/b_/jd #ab_/aj_/jd #e #agg #dd4j #agg #id4j #ii4cb #abj4ge #a4bb #ab_/bh_/jd #ab_/cj_/jd #f #aga #ec4d #aga #hc4j #bcf4ia #bib4ej #a4bc #a_/b_/je #a_/aa_/je #g #aff #da4b #aff #gi4j #fag4ge #gcg4jj #a4ai #a_/ac_/je #b_/d_/je #h #aga #hc4j #agb #ab4j #cgb4gd #dbj4ge #a4ac #a_/ad_/je #a_/bh_/je #i #aff #gi4j #afg #bj4e #icj4dg #a1jff4be #a4ad #b_/ah_/je #c_/ac_/je #aj #agj #af4f #agj #eh4f #gcd4ib #heb4ej #a4af #a_/ca_/je #b_/be_/je #aa #agj #eh4f #aga #jc4d #efi4dh #fhi4ge #a4ba #c_/aa_/je #c_/bc_/je #ab #afg #bj4e #afg #dc4i #eac4db #faa4ge #a4ai #c_/i_/je #c_/bf_/je #ac #age #ah4e #age #fa4h #ecj4ae #fcj4ej #a4ai #c_/ae_/je #c_/bi_/je #ad #agg #jb4i #agg #dd4j #bhf4hc #cdj4be #a4ai #c_/bf_/je #c_/ca_/je #ae #age #fa4h #agf #ia4g #dab4cf #dgb4ej #a4ae #c_/bh_/je #d_/ad_/je #af #agf #fb4e #agg #jb4i #fdg4ad #ghh4jj #a4bb #d_/a_/je #d_/ag_/je #ag #agd #jd4e #agd #bi4f #aea4ib #ahb4ej #a4bj #e_/c_/je #e_/f_/je #ah #age #ia4g #agf #ba4e #ffe4gg #hja4jj #a4bj #e_/i_/je #e_/ai_/je #ai #agf #ba4e #agf #fb4e #a1ajb4gd #a1ced4ej #a4bc #e_/ae_/je #e_/bh_/je #bj #afg #dc4i #afg #ib4f #ijd4he #a1jab4ge #a4ab #e_/be_/je #f_/c_/je #ba #agb #ab4j #agb #de4b #bea4ah #caa4ej #a4bd #e_/bi_/je #f_/c_/je #bb #afh #da4c #afh #gb4f #bib4cf #cch4ge #a4af #f_/e_/je #f_/aj_/je #bc #agc #fc4f #agd #jd4e #ejg4hc #ehg4be #a4af #f_/e_/je #f_/ac_/je #bd #afg #ib4f #afh #da4c #igf4ae #a1jch4ge #a4jg #f_/h_/je #f_/ba_/je #be #agc #ba4b #agc #fc4f #fce4ij #ggf4be #a4bb #f_/af_/je #f_/bd_/je #bf #afd #gb4e #afe #je4h #dbj4cg #ecb4jj #a4bf #f_/bc_/je #f_/bh_/je #bg #agb #ha4i #agc #ba4b #chi4eg #dej4jj #a4af #f_/bg_/je #g_/g_/je #bh #afd #bg4f #afd #gb4e #fag4je #gbf4be #a4ah #f_/bi_/je #g_/g_/je #bi #agb #de4b #agb #ha4i #ccb4bh #chd4jj #a4af #g_/aa_/je #g_/ai_/je #ca #agd #gh4j #age #ah4e #dgg4bb #efg4ej #a4ai #g_/bi_/je #h_/f_/je #cb #agd #bi4f #agd #gh4j #cge4jj #dcd4be #a4af #h_/e_/je #h_/ab_/je #dc #agg #id4j #agh #dd4a #agd4hc #bai4ge #a4bf #aa_/i_/je #aa_/ab_/je ,pier #afh #gb4f #afh #ha4a #ajf4eb #add4jj #a4ce #ab_/f_/jf #ab_/h_/jf #gf #agh #dd4a #agh #id4a #acj4cf #adb4ej #a4ji #g_/h_/jg #g_/aj_/jg #gi #agh #id4a #agi #dd4a #aac4hb #abi4ej #a4ad #g_/ae_/jg #g_/af_/jg #hb #agi #dd4a #agi #ic4g #abc4jf #aca4ge #a4jg #g_/bb_/jg #g_/bc_/jg #hd #agi #ic4g #ahj #dd4b #abc4gj #acc4ej #a4jh #g_/bf_/jg #g_/bg_/jg #hf #ahj #dd4b #ahj #ic4f #aeh4hb #afg4jj #a4je #g_/cj_/jg #g_/ca_/jg #ij #ahj #ic4f #aha #ag4i #ij4hb #aae4jj #a4bg #h_/ah_/jh #h_/ah_/jh ,,note4--,the number of cubic yards of crushed stone used in any section can be found by multiplying the figure for that section in ,column #aj by #j4gggh4 ,the number of cubic yards of sand used in any section can be found by multiplying3 the sum of the figures for that section in ,columns #d1 #f1 and #aj by #j4chhi4 ,,remarks4--,section ,no4 #d4 ,amount of sand cut down on a part of this section on account of dust in stone4 ,section ,no4 #h4 ,o',rourke stone used on this section1 large and full of dust4 ,section ,no4 #i4 ,stone crushed on the work used on this section1 large and full of dust4 ,section ,no4 #ba4 #a3c3e mix was used in part of this section on account of stone being large4 ,section ,no4 #bd4 ,different sized stone was shipped on barge and mixed on the board for this section4 ,section ,no4 #be4 #a3c3e mix used in a small part of this section on account of stone being large4 ,sections ,nos4 #gf1 #hb1 #hd1 and #hf4 ,stone contained large amount of dust4 ,,table #b;a4--,record of ,retaining-wall ,sections1 ,terminal ,station4 ,west ,thirty-third ,street from ,seventh ,avenue to ,ninth ,avenue4 7#a7 ,section ,no4 7#b7 ,stations4 7#c7 ,contents of section1 in cubic yards4 7#d7 ,barrels of cement used for facing4 7#e7 ,cubic yards of facing mortar equivalent4 7#f7 ,barrels of cement used for bed mortar4 7#g7 ,cubic yards of bed mortar equivalent4 7#h7 ,cubic yards of embedded stone4 7#a7 7#b7 7#c7 7#d7 7#e7 7#f7 7#g7 7#h7 #cj #agj #gc4b #aga #af4a #cfd4gb #db4ej #ad4df #d4jj #a4cf 444 #cc #agh #dh4g #agh #hd4a #ahj4dj #bi4ej #aj4jd #c4ej #a4ai 444 #cd ,r #b #ge4e #agj #jc4e #bad4ab #ch4jj #ab4ic #a4jj #j4cd #a4ej #ce #aga #af4a #aga #db4e #cha4ef #dj4be #ac4gj #a4jj #j4cd #ad4cg #cf #agj #jc4f #agj #be4j #aej4af #bj4ej #f4ih 444 444 #f4be #cg #aga #db4e #aga #ia4c #hfi4dj #ei4ej #bj4be #d4ej #a4ec #dd4if #ch #aga #ia4c #agb #ai4b #bcc4di #bb4ge #g4gd #b4ge #j4id #ad4de #ci #agi #bg4b #agi #fd4b #bee4ci #cb4jj #aj4hi #c4jj #a4jb #i4je #dj #agj #be4j #agj #gc4b #ejj4gc #dd4be #ae4jf #a4jj #j4cd #bi4fd #da #afi #ej4h ,r #b #ge4e #bae4ic #bh4be #i4fa #b4jj #j4fh 444 #db #agh #hd4a #agi #bg4b #agg4fb #bc4jj #g4hc #a4ej #j4ea #g4jf #dd #ahj #je4e #ahj #dd4b #icf4ae #eh4ge #ai4ii #aj4ej #c4dg #gc4hd #de #ahj #dd4b #ahj #gd4i #a1acc4ei #fj4jj #bj4db #e4jj #a4gj #fj4ga #df #agi #fd4b #ahj #je4e #dgg4ad #ce4jj #aa4ia #c4ge #a4bh #bd4eh #dg #afi #jj4a #afi #ej4h #acf4ai #ad4be #d4he #c4ej #a4ai #b4jj #dh #agh #bd4a #agh #dh4g #aib4gh #ba4be #g4bc #b4jj #j4fh 444 #di #agg #ha4a #agh #bd4a #bda4ea #be4be #h4ei #b4ej #j4he #a4cc #ej #afh #jc4f #afh #de4f #dje4fa #be4ej #h4fh #d4jj #a4cf #cf4aj #ea #agg #ch4d #agg #ha4a #ajj4ed #ab4ge #d4cd #c4jj #a4jb #j4gh #eb #afh #de4f #afh #hj4a #aha4if #ai4jj #f4dg #a4jj #j4cd #i4jc #ec #afh #hj4a #afi #jj4a #da4cb #c4ej #a4ai 444 444 444 #ee #agf #ij4j #agg #ch4d #ib4da #aa4be #c4hc #b4ej #j4he #c4fh #ef #afg #fb4a #afh #jc4f #chc4fg #cc4ge #aa4dh #c4be #a4aa #cf4fb #ei #age #fg4c #age #ih4i #age4fa #ae4ej #e4bg #b4ej #j4he #i4cg #fj #agf #di4j #agf #ij4j #fi4ig #h4be #b4ha #c4jj #a4jb #a4eh #fa #age #ih4i #agf #di4j #ajd4ef #h4jj #b4gb #c4ej #a4ai #c4gb #fd #age #cj4c #age #fg4c #adj4ae #ad4ge #e4jb #b4ge #j4id 444 #fe #agd #he4d #age #cj4c #hj4ff #i4jj #c4jf #b4ej #j4he 444 #ff #agd #dg4i #agd #he4d #fh4hi #e4ej #a4hg #c4be #a4aa 444 #fg #agd #ba4a #agd #dg4i #fj4ad #c4jj #a4jb #b4jj #j4fh #j4ib #fh #afg #ab4c #afg #fb4a #cgi4id #bc4ej #h4jj #e4jj #a4gj #ai4cd #fi #agc #he4f #agd #ba4a #gg4dc #f4ej #b4ba #c4jj #a4jb 444 #gj #aff #ge4f #afg #ab4c #djh4ha #cc4ge #aa4dh #c4ge #a4bh 444 #ga #agc #df4e #agc #he4f #he4ib #h4be #b4ha #a4ge #j4fj 444 #gd #agb #ai4b #agb #gc4j #ddi4bh #bb4ge #g4gd #f4be #b4ac 444 #ge #agb #gc4j #agc #bd4j #ejb4bj #bg4be #i4bg #g4jj #b4ch 444 #gg #afd #gg4j #afe #bg4a #ada4ch #i4jj #c4jf #g4be #b4dg 444 #gh #afh #hc4d #afi #ah4c #fc4ce #c4jj #a4jb #a4ej #j4ea 444 #hj #afe #bg4a #afe #gf4f #ajh4hf #aa4ge #d4jj #c4jj #a4jb 444 #ha #afh #de4f #afh #hc4d #baj4ig #ac4jj #d4db #f4be #b4ac 444 #hc #afe #gf4f #aff #bj4e #ajh4jf #h4jj #b4gb #c4ge #a4bh 444 #he #aff #bj4e #aff #fd4f #ajg4eb #i4jj #c4jf #b4be #j4gf 444 #hg #aff #fd4f #aff #ge4f #bc4dd #a4jj #j4cd #b4be #j4db 444 #hh #afd #bf4c #afd #gg4j #cag4gb #bd4jj #h4ag #b4be #j4gf 444 #hi #agc #bj4h #agc #df4e #ic4ea #e4fj #a4gj #a4ej #j4ea 444 #ia #ahj #gd4i #ahj #ib4g #ada4dj #ag4ej #e4if 444 444 444 #ib #ahj #ib4g #aha #bh4h #aah4ic #ai4jj #f4df 444 444 444 ,,table #b;b4--,record of ,retaining-wall ,sections1 ,terminal ,station4 ,west ,thirty-third ,street from ,seventh ,avenue to ,ninth ,avenue4 7#a7 ,section ,no4 7#b7 ,stations4 7#i7 ,cubic yards of concrete in section 7net74 7#aj7 ,barrels of cement used in concrete4 7#aa7 ,barrels of cement per cubic yard of concrete4 7#ab7 ,concrete started4 7#ac7 ,concrete finished4 7#a7 7#b7 7#i7 7#aj7 7#aa7 7#ab7 7#ac7 #cj #agj #gc4b #aga #af4a #cdh4ij #cia4jj #a4ab #g_/bj_/je #g_/bf_/je #cc #agh #dh4g #agh #hd4a #afi4ag #ahh4jj #a4aa #h_/g_/je #h_/aa_/je #cd ,r #b #ge4e #agj #jc4e #aii4ce #bag4be #a4ji #h_/ad_/je #h_/ai_/je #ce #aga #af4a #aga #db4e #cec4ae #djj4be #a4ac #h_/af_/je #h_/bb_/je #cf #agj #jc4f #agj #be4j #acf4ic #acc4ge #j4ih #h_/ai_/je #h_/bb_/je #cg #aga #db4e #aga #ia4c #hjb4ff #iji4jj #a4ac #h_/bb_/je #i_/f_/je #ch #aga #ia4c #agb #ai4b #baj4cf #bch4ej #a4ac #h_/bd_/je #h_/bg_/je #ci #agi #bg4b #agi #fd4b #bcd4dc #bgj4be #a4ae #h_/bi_/je #i_/b_/je #dj #agj #be4j #agj #gc4b #dee4fi #ebe4ge #a4ae #i_/aa_/je #i_/ae_/je #da #afi #ej4h ,r #b #ge4e #bje4fd #bcf4ej #a4ae #aj_/c_/je #aj_/f_/je #db #agh #hd4a #agi #bg4b #afb4bb #aid4ge #a4bj #aj_/i_/je #aj_/aa_/je #dd #ahj #je4e #ahj #dd4b #hch4he #ihg4jj #a4ah #aa_/ag_/je #aa_/bg_/je #de #ahj #dd4b #ahj #gd4i #a1jej4hf #a1bjf4jj #a4ae #ab_/ac_/je #ab_/bc_/je #df #agi #fd4b #ahj #je4e #dci4cg #ece4jj #a4bb #a_/ae_/jf #a_/ai_/jf #dg #afi #jj4a #afi #ej4h #abh4ae #aej4ej #a4ag #d_/d_/jf #d_/f_/jf #dh #agh #bd4a #agh #dh4g #ahd4hg #bbf4jj #a4bb #d_/bd_/jf #d_/cj_/jf #di #agg #ha4a #agh #bd4a #bcj4gd #bgd4jj #a4ai #e_/ba_/jf #e_/bd_/jf #ej #afh #jc4f #afh #de4f #cei4dg #djf4jj #a4ac #f_/ac_/jf #f_/ah_/jf #ea #agg #ch4d #agg #ha4a #id4dj #aab4jj #a4ai #f_/bj_/jf #f_/ba_/jf #eb #afh #de4f #afh #hj4a #aff4ab #aij4jj #a4ad #f_/be_/jf #f_/bh_/jf #ec #afh #hj4a #afi #jj4a #dj4ac #dd4ej #a4aa #f_/bi_/jf #f_/bi_/jf #ee #agf #ij4j #agg #ch4d #hd4je #ih4be #a4ag #h_/ag_/jf #h_/ah_/jf #ef #afg #fb4a #afh #jc4f #ccd4df #chc4ej #a4ad #h_/bh_/jf #i_/a_/jf #ei #age #fg4c #age #ih4i #afj4ab #ahf4jj #a4af #aj_/ae_/jf #aj_/af_/jf #fj #agf #di4j #agf #ij4j #fd4ef #ge4jj #a4af #aj_/ag_/jf #aj_/ah_/jf #fa #age #ih4i #agf #di4j #if4ic #ajh4jj #a4aa #aj_/ai_/jf #aj_/bj_/jf #fd #age #cj4c #age #fg4c #acd4ai #afa4ej #a4bj #aa_/ba_/jf #aa_/bb_/jf #fe #agd #he4d #age #cj4c #gf4ge #ib4ge #a4ba #ab_/ad_/jf #ab_/ae_/jf #ff #agd #dg4i #agd #he4d #fe4ia #hc4ej #a4bg #ab_/ah_/jf #ab_/ah_/jf #fg #agd #ba4a #agd #dg4i #eg4eb #fg4ej #a4ag #ab_/ba_/jf #ab_/ba_/jf #fh #afg #ab4c #afg #fb4a #cej4ij #dab4ej #a4ag #a_/b_/jg #a_/f_/jg #fi #agc #he4f #agd #ba4a #gd4bj #ia4jj #a4bc #a_/bi_/jg #a_/cj_/jg #gj #aff #ge4f #afg #ab4c #cif4je #dfh4ej #a4ah #d_/b_/jg #d_/aj_/jg #ga #agc #df4e #agc #he4f #hb4ea #ie4ge #a4af #d_/ag_/jg #d_/ai_/jg #gd #agb #ai4b #agb #gc4j #dci4da #ejf4jj #a4ae #f_/bj_/jg #f_/bd_/jg #ge #agb #gc4j #agc #bd4j #dij4ee #egi4jj #a4ah #g_/h_/jg #h_/be_/jg #gg #afd #gg4j #afe #bg4a #ace4he #afa4ej #a4ai #g_/ac_/jg #g_/ae_/jg #gh #afh #hc4d #afi #ah4c #fa4hb #gc4jj #a4ah #g_/ac_/jg #g_/ad_/jg #hj #afe #bg4a #afe #gf4f #ajc4hd #acc4ej #a4bh #g_/ah_/jg #g_/ai_/jg #ha #afh #de4f #afh #hc4d #bjd4db #bee4ge #a4be #g_/bj_/jg #g_/bc_/jg #hc #afe #gf4f #aff #bj4e #ajd4jf #abh4ej #a4bc #g_/be_/jg #g_/bg_/jg #he #aff #bj4e #aff #fd4f #ajc4gj #add4ej #a4ci #g_/bi_/jg #g_/cj_/jg #hg #aff #fd4f #aff #ge4f #bb4fh #cj4jj #a4cb #g_/ca_/jg #g_/ca_/jg #hh #afd #bf4c #afd #gg4j #cjh4gi #cgj4jj #a4bj #h_/h_/jg #h_/aa_/jg #hi #agc #bj4h #agc #df4e #ia4cj #aba4ge #a4cc #i_/g_/jg #i_/h_/jg #ia #ahj #gd4i #ahj #ib4g #ace4dd #bjc4ej #a4ej #aa_/ah_/jg #aa_/bj_/j #ib #ahj #ib4g #aha #bh4h #aab4dg #aij4jj #a4fi #ab_/a_/jh #ab_/b_/jh ,,note4--,the number of cubic yards of crushed stone used in any section can be found by multiplying the figure for that section in ,column #aj by #j4gggh4 ,the number of cubic yards of sand used in any section can be found by multiplying the sum of the figures for that section in ,columns #d1 #f1 and #aj by #j4chhi4 ,,remarks4--,section ,no4 #dg4 ,part of this section was removed on account of damage done by blasting and was replaced by ,section ,no4 #gh4 ,section ,no4 #eb4 ,all of this section was removed on account of damage done by blasting and was replaced by ,section ,no4 #ha4 ,section ,no4 #ec4 ,all of this section was removed on account of damage done by blasting and was replaced by ,sections ,nos4 #gh and #ha4 ,,table #c;a4--,record of ,retaining ,wall ,sections4 7#a7 ,section ,no4 7#b7 ,stations4 7#c7 ,contents of section1 in cubic yards4 7#d7 ,barrels of cement used for facing4 7#e7 ,cubic yards of facing mortar equivalent4 7#f7 ,barrels of cement used for bed mortar4 7#g7 ,cubic yards of bed mortar equivalent4 7#h7 ,cubic yards of embedded stone4 ,power-,house4 7#a7 7#b7 7#c7 7#d7 7#e7 7#f7 7#g7 7#h7 ,a ,l #b #ge4c ,l #c #be4c #dfc4bh #eh4be #ai4hb #e4ej #a4hg #aa4ej ,b ,l #c #be4c ,l #c #gd4i #aad4gh #bc4jj #g4hc #a4ge #j4fj #a4ej ,c #afi #cj4h #afi #gd4h #agi4ai #cd4be #aa4ff #a4jj #j4cd #c4fj ,d #afi #gd4h #agj #bh4h #aad4ch #bg4be #i4bg #j4be #j4ji #j4jg ,e #afh #hc4f #afi #cj4h #aja4bj #bb4jj #g4di #a4ej #j4ea #j4fe ,f ,l #b #gh4b ,l #c #ai4f #ceh4hj #ci4ej #ac4dd #j4ge #j4bf #i4ej ,g ,l #c #ai4f ,l #c #ef4i #bcg4cc #bc4jj #g4hc #a4jj #j4cd #j4gd ,h ,l #c #ef4i #afh #hc4e #be4ee #f4be #b4ac #j4ge #j4bf 444 ,seventh ,avenue4 #ed #afd #bg4f ,l #b #cb4j #gfd4dh #fi4ge #bc4gd #c4jj #a4jb 444 #eg ,l #b #aj4c ,l #b #cb4j #ecc4jf #cd4jj #aa4eg #b4be #j4gg 444 #eh ,l #a #hg4a ,l #b #aj4c #edd4ed #cb4be #aj4ig #b4jj #j4fh #i4hj #fb ,l #a #hg4a ,l #a #fd4d #ege4fg #cj4jj #aj4ba #c4jj #a4jb #f4bj #fc ,l #a #db4d ,l #a #fd4d #fjg4ja #cj4ej #aj4ch #b4ej #j4he #c4gi #gb ,l #a #db4d ,l #a #ai4f #fca4ig #cj4jj #aj4ba #a4ge #j4fj #a4ah #gc ,l #a #ai4f ,l #j #ig4j #egc4cc #be4be #h4ei #j4be #j4jh #b4dh ,,table #c;b4--,record of ,retaining ,wall ,sections4 7#a7 ,section ,no4 7#b7 ,stations4 7#i7 ,cubic yards of concrete in section 7net74 7#aj7 ,barrels of cement used in concrete4 7#aa7 ,barrels of cement per cubic yard of concrete4 7#ab7 ,concrete started4 7#ac7 ,concrete finished4 ,power-,house4 7#a7 7#b7 7#i7 7#aj7 7#aa7 7#ab7 7#ac7 ,a ,l #b #ge4c ,l #c #be4c #dcj4ji #dhb4ge #a4ab #e_/ah_/je #e_/be_/je ,b ,l #c #be4c ,l #c #gd4i #ajd4he #abe4ej #a4bj #f_/ad_/je #f_/af_/je ,c #afi #cj4h #afi #gd4h #afc4ei #ahc4jj #a4ab #g_/aj_/je #g_/ac_/je ,d #afi #gd4h #agj #bh4h #ajd4ie #aai4be #a4ad #g_/ad_/je #g_/ai_/je ,e #afh #hc4f #afi #cj4h #ib4ee #ajg4be #a4af #g_/bf_/je #g_/bh_/je ,f ,l #b #gh4b ,l #c #ai4f #cce4fj #cig4ge #a4ah #i_/ai_/je #i_/bd_/je ,g ,l #c #ai4f ,l #c #ef4i #bbh4db #bgh4jj #a4bb #i_/bf_/je #i_/bi_/je ,h ,l #c #ef4i #afh #hc4e #bc4af #bh4jj #a4ba #i_/bi_/je #i_/bi_/je ,seventh ,avenue4 #ed #afd #bg4f ,l #b #cb4j #gci4gb #ijg4ej #a4bc #h_/f_/jf #h_/ae_/jf #eg ,l #b #aj4c ,l #b #cb4j #ebj4gb #faj4ge #a4ag #i_/aj_/jf #i_/ae_/jf #eh ,l #a #hg4a ,l #b #aj4c #ebc4ji #ehh4be #a4ab #i_/bd_/jf #i_/bh_/jf #fb ,l #a #hg4a ,l #a #fd4d #ech4bd #fci4ej #a4ai #aj_/bd_/jf #aj_/bi_/jf #fc ,l #a #db4d ,l #a #fd4d #eha4ii #fgh4ej #a4ag #aa_/e_/jf #aa_/aa_/jf #gb ,l #a #db4d ,l #a #ai4f #fai4ih #gai4ej #a4af #d_/be_/jg #d_/cj_/jg #gc ,l #a #ai4f ,l #j #ig4j #efb4ah #fhe4ge #a4bb #e_/ac_/jg #e_/ah_/jg ,,note4--,the number of cubic yards of crushed stone used in any section can be found by multiplying the figure for that section in ,column #aj by #j4gggh4 ,the number of cubic yards of sand used in any section can be found by multiplying the sum of the figures for that section in ,columns #d1 #f1 and #aj by #j4chhi4 ,channeling with a #aj-;ft quarry bar1 carrying a ,no4 #d ,ingersoll-,rand drill with ,z-bits1 was attempted in place of the close drilling below the walls1 but1 as the rock stood so nearly vertical and was full of soft seams1 very little could be accomplished1 the average cut per day of #aj hours1 counting the time of moving and setting up1 was only #d sq4 ft41 and1 after a thorough trial1 the bars were abandoned4 ,disposal4--,the excavated material was hauled from the shovels to the pier in #aj-;car trains4 ,the cars were of three classes3 #d-yd4 ,western dump-cars1 flat cars without skips1 and flats carrying specially designed steel skips having a capacity of #d cu4 yd4 each4 ,as far as practicable1 earth1 and rock containing #a cu4 yd4 or less1 was loaded on dumpers1 medium-sized rock on the skips1 and large rock on the bare flats4 ,as a steam shovel must pick up what is nearest to it first1 however1 this classification could not always be adhered to1 and many large rocks were loaded into dumpers4 ,cars of this class which contained no material too large to dump were run at once to the hoppers1 and were dumped and returned to the pit2 others1 together with the flat and skip cars1 were run down the incline to the derricks and telphers1 where the flats and skips were entirely unloaded1 and the large rocks ware removed from the dumpers1 after which they were run to the hoppers and emptied4 ,the total quantity of excavated material handled at this pier from ,may #bb;d1 #aije1 to ,december #cast1 #aijh1 amounted to #fgc1hjj cu4 yd4 of earth and #a1dhh1jjj cu4 yd4 of rock1 place measurement1 equal to #c1bjc1djj cu4 yd41 scow measurement2 in addition to which #age1jjj cu4 yd4 of crushed stone and sand and #f1jjj car loads of miscellaneous building material were transferred from scows and lighters to small cars for delivery to the ,terminal work4 ,all the earth and #egj1jjj cu4 yd4 of the rock1 place measurement1 were handled through the chutes1 and the remainder of the rock1 #iah1jjj cu4 yd41 and all the incoming material by the derricks and telphers4 ,in capacity to handle material1 one telpher was about equal to one derrick4 ,a train1 therefore1 could be emptied or a boat loaded under the bank of eight telphers in one-fourth the time required by the derricks1 of which only two could work on one boat4 ,the telphers1 therefore1 were of great advantage where track room and scow berths were limited4 ,as noted in the list of contracts under which the work was executed1 the scows at both the #ceth ,street dumping board and ,pier ,no4 #gb were furnished1 towed1 and the material finally disposed of1 by ,henry ,steers1 ,incorporated4 ,during the same period1 this contractor disposed of the material excavated from both the ,cross-town ,tunnels1 constructed by the ,united ,engineering and ,contracting ,company1 and the tunnels under the ,east ,river1 constructed by ,s4 ,pearson and ,son1 ,incorporated4 ,as stated in other papers of this series relating to the construction of those tunnels1 the material excavated by the ,united ,engineering and ,contracting ,company was delivered to barges at #ceth ,street and ,east ,river and that by ,s4 ,pearson and ,son1 ,incorporated1 at two points1 one in ,long ,island ,city and the other at #cc;d ,street and ,east ,river1 ,manhattan4 ,the total number of cubic yards of material disposed of amounted to3 ,place measurement4 ,total barge ,earth4 ,rock4 measurement4 #ceth ,street and ,north ,river #bdb1hjj #bb1hjj #bha1ejj ,pier ,no4 #gb1 ,north ,river #fgc1hjj #a1dhh1jjj #c1bjc1djj ,from ,cross-town ,tunnels #egj1djj ,from ,under-river ,tunnels #djb1ejj ----------- ,total #d1deg1hjj ,the material was delivered as follows3 ,to the freight terminal of the ,pennsylvania ,railroad ,company at ,greenville1 ,n4,j4 #c1ded1hjj ,to the ,meadows ,division of the ,tunnel ,line between ,harrison1 ,n4,j41 and the ,north ,river ,portals #gaa1ijj ,to other points selected by the contractors #bia1ajj --------- ,total #d1deg1hjj ,the handling of this large quantity of material required the loading of from #aj to #bj scows per day 7and for more than two years the average was #ad71 and1 as the average time spent in one round trip was #c #a_/c days1 a fleet of more than #ej scows was required to keep all points supplied and allow for a few to be out of service undergoing repairs4 ,all loaded scows were towed from the docks1 with the ebb tide1 to a stake boat anchored in the bay about one mile off shore at ,greenville2 and were taken from there to the different unloading points1 as required1 by smaller tugs which also returned the empty scows to the stake4 ,the unloading plants were similar at the different points1 although that at ,greenville was much larger than the others4 ,it included five land dredges and eight traveling derricks of two types1 one floating and the other mounted on wheels and traveling on a track of #af-;ft4 gauge4 ,the derricks handled the large rock1 which was loaded at ,pier ,no4 #gb by derricks and telphers4 ,they were of the ordinary ,a-frame type1 and were designed to handle #bj tons4 ,they were operated by #i by #aj-;in4 ,lidgerwood double-drum and swinging-gear engines4 ,the large rock was deposited by the derricks either in the channels along which they worked or in the fill along shore1 without the use of cars4 ,the land dredges were equipped with a #fj-;ft4 boom and a #b-yd4 ,hayward bucket operated by a #ad by #ah-;in4 double-drum ,lidgerwood dredging engine4 ,they loaded into #i-yd41 standard-gauge1 side-dump cars1 built by the contractor1 and unloaded the scows to within about #a ft4 of the deck1 a ,hayward bucket being unsuitable for closer work without greatly damaging the scows4 ,the material remaining was loaded by hand into skips which were handled to the cars by small derricks1 one of which was located at the rear of each dredge4 ,the cars were taken to the dump and returned by #be-ton1 standard-gauge1 engines which had previously done service on the ,manhattan ,elevated ,railroad1 but were spotted for loading by the engine on the dredge4 ,in order to keep a record of the fleet of scows1 which would show the available supply at a glance1 a board1 #aj by #ae in41 and covered with a heavy sheet of ruled paper1 was arranged as shown by ,fig4 #aj4 ,it was divided into #ab vertical columns1 the first of which was headed ,scows1 and contained the name or number of each scow in service4 ,the next four columns denoted loading points1 and were headed ,pier ,no4 #gb1 ,thirty-third ,street1 ,east ,river1 ,thirty-fifth ,street1 ,east ,river1 and ,long ,island ,city1 respectively2 the sixth column was headed ,greenville1 the seventh ,hackensack1 the eighth ,passaic1 and the ninth ,governors ,island1 being unloading points1 the tenth and eleventh1 ,stake ,boat and ,dry ,dock1 respectively1 while the twelfth was for ,extra pins1 not in use4 ,to indicate the condition of the scows1 small pins with colored heads were used2 white indicated empty2 blue1 working2 black1 loaded2 red1 being repaired2 and a pearl-colored pin1 missing4 ,thus a white-headed pin opposite the number #f in the column headed ,pier ,no4 #gb indicated that scow ,no4 #f was lying at that pier waiting to be placed in position for loading1 whereas a black-headed pin at the same point meant that the scow had received its load and was ready to be towed4 ,,board ,,recording ,,location ,,and ,,condition ,,of ,,scows ,transcriber's ,note3 ,this chart was originally presented as an illustration1 ,figure #aj4 ,it is shown here rotated from horizontal to vertical for readability4 ,as in the original1 only a partial board is shown2 the number of ,scows was at least #h4 ---------------------------------------- -----------------------_/ ,scows4 ,h4,s4 ,h4,s4 ,h4,s4 ,h4,s4 ,h4,s4 ,h4,s4 _/ ,no4 #a ,no4 #b ,no4 #c ,no4 #d ,no4 #e ,no4 #f _/ ---------------------------------------- -----------------------_/ ,loading ,points _/ ---------------------------------------- ----------------------_/ ,pier ,no4 #gb _/ ---------------------------------------- --------------------_/ ,thirty-third _/ ,street ,east ,r4 _/ ---------------------------------------- --------------------_/ ,thirty-fifth _/ ,street ,east ,r4 _/ ---------------------------------------- --------------------_/ ,long ,island ,city _/ ---------------------------------------- ----------------------_/ ,unloading ,points _/ ---------------------------------------- ----------------------_/ ,greenville4 _/ ---------------------------------------- --------------------_/ ,hackensack4 _/ ---------------------------------------- --------------------_/ ,passaic4 _/ ---------------------------------------- --------------------_/ ,governors ,island4 _/ ---------------------------------------- ----------------------_/ ,stake ,boat4 _/ ---------------------------------------- -----------------------_/ ,dry ,dock4 _/ ---------------------------------------- -----------------------_/ _/ ,extra ,pins4 ,empty4 ,white ,pins not in use placed here4 _/ _/ ---------------------------------------- ----------------------------_/ ,the scows were all taken from the general service about the harbor2 some of them were practically new1 while others had seen much service4 ,they were of two general types1 truss-framed or bulkhead-framed2 all were flat-bottomed1 with a rake of about #de at bow and stern4 ,the truss-framed scows were built with a cross-truss every #aj to #ae ft41 on which rested1 fore and aft1 two classes of beams1 main and intermediate4 ,the main beams were built of timbers ranging from #aj by #aj in4 to #ad by #ad in41 were scarfed at the joints1 and trussed with the bottom logs4 ,the intermediate beams were of timbers varying from #f by #f in4 to #aj by #ab in41 had butt joints1 and were dapped at the cross-trusses to give a convex surface to the deck1 which was built of #c-;in4 and #d-;in4 plank1 from #h to #ab in4 in width1 running athwartship4 ,the sides of the scows of this class were spiked and bolted to trusses similar to those running under the main beams4 ,the bulkheaded boats had both sides and two longitudinal bulkheads placed so as to divide the scow into three sections of equal width1 built of #h by #h-;in4 or #aj by #aj-;in4 timbers1 laid one upon the other1 and bolted through from top to bottom4 ,the beams on these boats ran athwartship1 rested on sides and bulkheads1 and ranged from #f by #aj-;in4 to #aj by #ab-;in41 spaced #b ft4 apart1 and dressed to give a convex surface to the deck1 which was usually #c in41 in some cases #d in41 in thickness1 and made up of narrow plank from #d to #f in4 in width4 ,illustration3 ,fig4 #aa4 ,,diagram ,,of ,,deck ,,showing ,,bays ,these boats had all been designed for lighter work than they were here required to perform1 and a large amount of breakage occurred from the start4 ,in order that the contractors for the excavation should be unhampered as to method of loading1 the contracts provided that they should pay for all damage done to the scows in loading1 other than ordinary and usual wear and tear1 all other damage being at the expense of the contractor for the disposal4 ,a rigid system of inspection was necessary to determine and record properly the damage for which each contractor was responsible2 and1 as much of the breakage could not be noticed from the exterior1 a thorough examination of the interior of each scow was made before and after every loading4 ,in order to keep proper records1 the bays of each scow1 formed by the cross-trusses1 were numbered1 beginning aft with number #a and going forward to the bow1 and the longitudinal bays formed by the main beams were lettered1 beginning with ,a on the port side4 ,a beam broken in #a-;,a1 therefore1 would be an intermediate beam in the stern port corner bay1 and a beam broken in #aj-;,a-,b would be a main beam at the bow end on the port side4 ,the underside of each plank was marked with a number beginning with #a at the stern and increasing by unity to the bow4 ,fig4 #aa is a diagram of a scow in accordance with this system4 ,in addition to recording the date1 location1 extent1 and party responsible for each damage1 in a book kept for that purpose1 the injured member was marked with paint1 the color of which indicated the party responsible4 ,the repairs were made by the contractor for the disposal of material1 and the cost was assessed according to the marking in the boat4 ,the careful inspection of the damage done to scows and the cost of their repairs enables a fairly accurate statement to be made of the amount at different points1 and it is here given on the basis of cost of repairs per cubic yard1 barge measurement1 of material handled4 ,cost1 in cents per cubic yard4 ,repairs of damage done in loading material from the terminal site #b4jj ,repairs of damage done in loading material from cross-town tunnels #a4cb ,repairs of damage done in loading material from under-river tunnels #a4gg ,repairs of damage done in transporting and unloading material from all points #a4ha ,the above figures do not include the expense due to scows which were overturned or sunk while in the service1 which amounted to #j4d cent per cubic yard1 additional4 ,ninth ,avenue ,tunnels4--,the two double-track tunnels under ,ninth ,avenue1 constructed to obtain #ajj ft4 of additional tail room on each of four tracks1 required an excavation #gf ft4 wide1 ,fig4 #ab4 ,the rock1 although fair1 was not firm enough for so great a span1 and1 to obviate the necessity of timbering1 the center wall was built before excavating for the full width4 ,the dip of the rock at this point is almost #ij1 and to prevent blowing away the entire face in excavating for the tunnel1 the pit excavation was not carried west to the final face below the springing line1 a #aj-;ft4 bench being left at that elevation4 ,a top heading #i ft4 high and #aj ft4 wide was started above that bench and1 after penetrating about #aj ft41 was widened to #bj ft4 ,a cross-heading was driven in each direction at the west end of the first heading2 the bench was then shot down1 and the first #aj ft4 of the longitudinal heading was widened sufficiently to receive the center wall1 ,fig4 #ab4 ,after the middle wall had been concreted1 any voids between its top and the rock were grouted through pipes left for that purpose2 the wall was then protected by curtains of heavy round timber securely wired together1 and the remainder of the excavation was made by widening the cross-headings toward the face4 ,the muck was carried out by two cableways1 one on each side of the completed middle wall1 each of which was supported by a tower outside of the tunnel and a large hook-bolt grouted into the rock at the inner end of the tunnel4 ,forms were built for each tunnel complete1 and the concrete was delivered by a belt conveyor1 running over the top of the lagging1 and moved out as the tunnel was keyed4 ,illustration3 ,fig4 #ab4 ,,terminal ,,station ,,sketch ,,showing ,,two ,,track ,,tunnels ,,at ,,ninth ,,avenue ,,and ,,thirty-,,third ,,street ,,footnotes #a3 ,presented at the meeting of ,may #dth1 #aiaj4 #b3 ,reproduced as ,plate ,,ix in the paper by ,mr4 ,noble4 ,text reference for footnote #b3 one arm of the creek shown on ,general ,viele's map of #ahfe ,the article is ,,asce #aaeb1 ,the ,east ,river ,division1 available from ,project ,gutenberg as e-text #ahjfe 99 99 99 99 99 99 99 99 99 99 99 99 99 99 ,errata3 ,table #b;a #hg #aff #fd4f #aff #ge4f #bc4dd #a4jj #j4cd #b4be #j4db 444 #b4be is unclear2 only 4#be is fully legible